Prior art keywords
die
leakage
positioning
rubber block
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021416316.6U
Other languages
Chinese (zh)
Inventor
张喜林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhusen Architectural Design Co Ltd
Original Assignee
Jiangsu Zhusen Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhusen Architectural Design Co Ltd filed Critical Jiangsu Zhusen Architectural Design Co Ltd
Priority to CN202021416316.6U priority Critical patent/CN213533087U/en
Application granted granted Critical
Publication of CN213533087U publication Critical patent/CN213533087U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model discloses a prefabricated composite floor slab die with slurry leakage prevention and quick assembly, which comprises a bottom plate and four side dies arranged on the bottom plate, wherein the four side dies surround to form a die cavity, and the side dies are fixed on the bottom plate through a fixed magnetic box; the side die is sequentially provided with a plurality of positioning round holes which penetrate through the side die and are used for extending the reinforcing steel bars along the length direction of the side die, and the side die is divided into a lower die and an upper die by a plane where the axes of the plurality of positioning round holes are located; the end part of the lower die is connected with the end part of the upper die in a manner of splicing the positioning block with the positioning groove; the four side forms are provided with abutting ends, and connecting bolts are fixedly arranged on the end faces of the abutting ends; after the abutting end of one side die abuts against the inner side face of the other side die which is perpendicular to the side die, the two side dies are fixedly connected with each other in a mode that the two side dies penetrate through the positioning round holes through the connecting bolts and then are connected with the nuts. The utility model discloses simple structure, the limit is touched between the equipment swift, and the location round hole that the periphery touched can make things convenient for placing and the accurate positioning of reinforcing bar.

Description

Leak protection thick liquid and equipment swift prefabricated coincide floor mould
Technical Field
The utility model relates to a prefabricated coincide floor mould, more specifically say, relate to a leak protection thick liquid and equipment swift prefabricated coincide floor mould.
Background
With the development of the times, the life rhythm of people is continuously accelerated, and the requirements on the environment and the life quality are higher and higher, so that the development of the assembly type industry is promoted. As a novel design and construction plate in the building industry, the fabricated building has the advantages of short construction period, energy conservation, environmental protection, capability of meeting individual requirements, good heat insulation performance and the like compared with the traditional cast-in-place mode. When using prefabricated floor among the current internal assembly type structure, prefabricated superimposed sheet is adopted to the overwhelming majority of prefabricated floor, and prefabricated superimposed sheet four sides are provided with overhanging reinforcing bar to form reliable the connection between the prefabricated superimposed sheet and between prefabricated superimposed sheet and the wall roof beam. In the production process of the prefabricated composite slab, most of the prefabricated composite slab is processed and manufactured by adopting angle steel while being touched, and in order to meet the requirement that four sides of the prefabricated composite slab have the overhanging reinforcing steel bars, mounting holes are required to be formed in preset positions while being touched according to design requirements, and the overhanging reinforcing steel bars can stretch out through the mounting holes. The thick liquid phenomenon that leaks can appear in concrete placement vibrating process after the opening is touched on the limit, easily causes prefabricated superimposed sheet to go out the bar position concrete collapse coarse aggregate and leaks outward, and in addition, current limit is touched and is connected the equipment between inconvenient.
Disclosure of Invention
1. Technical problem to be solved by the utility model
An object of the utility model is to overcome foretell not enough, provide a leak protection thick liquid and assemble swift prefabricated coincide floor mould, adopt the technical scheme of the utility model, simple structure, the limit is touched between the equipment swift, and the location round hole that the periphery touched can make things convenient for placing and the accurate positioning of reinforcing bar, can solve the leak protection thick liquid problem effectively through setting up the leak protection thick liquid block rubber in addition.
2. Technical scheme
In order to achieve the above purpose, the utility model provides a technical scheme does:
in order to achieve the above purpose, the utility model provides a technical scheme does:
the utility model discloses a leak protection thick liquid and assemble swift prefabricated coincide floor mould, including the bottom plate and four side forms of setting on the bottom plate, four side forms enclose and constitute the die cavity, the side form is fixed on the bottom plate through fixed magnetism box; a plurality of positioning round holes penetrating through the side forms and used for extending out of the reinforcing steel bars are sequentially arranged on the side forms along the length direction of the side forms; the side die is divided into a lower die and an upper die by the plane where the axes of the positioning round holes are located; the end part of the lower die is connected with the end part of the upper die in a manner of splicing the positioning block with the positioning groove; lower mould and last mould between be provided with leak protection thick liquid rubber piece, this leak protection thick liquid rubber piece is gone up and has set gradually a plurality of leak protection thick liquid round holes that run through leak protection thick liquid rubber piece and be used for wrapping up the reinforcing bar along its length direction, a plurality of leak protection thick liquid round holes are the one-to-one setting with above-mentioned a plurality of location round holes.
Furthermore, the plane where the axes of the circular holes for preventing leakage of the slurry are located is divided into an upper rubber block and a lower rubber block; the inserting part of the upper rubber block is inserted into the slot formed on the lower surface of the upper die, and the inserting part of the lower rubber block is inserted into the slot formed on the upper surface of the lower die.
Furthermore, the four side forms are provided with abutting ends, after the abutting ends of one side form abut against the inner side face of the other side form which is perpendicular to the side form, the two side forms are fixedly connected with each other in a mode that the two side forms penetrate through the positioning round holes through the connecting bolts and then are connected with the nuts.
Furthermore, the positioning block is arranged on the lower surface of the end part of the upper die, and the positioning groove is arranged on the upper surface of the end part of the lower die.
3. Advantageous effects
Adopt the technical scheme provided by the utility model, compare with existing well-known technique, have following beneficial effect:
(1) the utility model discloses a leak protection thick liquid and assemble swift prefabricated coincide floor mould, connect through the mode of locating piece and constant head tank grafting between the tip of its lower mould and the tip of last mould, go up mould and lower mould compound die swiftly;
(2) the utility model discloses a leak protection thick liquid and assemble swift prefabricated coincide floor mould, its four side forms all have one to lean on the end, four sides touch two liang of end to end vertical connection, make things convenient for the regulation of size, and after the support end of a side form leaned on the medial surface of another side form that sets up mutually perpendicular with it, the mode of being connected with the nut after passing the location round hole through connecting bolt between two side forms links firmly, the equipment is swift between the side form;
(3) the utility model discloses a leak protection thick liquid and equipment swift prefabricated coincide floor mould, be provided with leak protection thick liquid rubber piece between its lower mould and the last mould, leak protection thick liquid rubber piece is gone up and has set gradually a plurality of leak protection thick liquid round holes that run through leak protection thick liquid rubber piece and be used for wrapping up the reinforcing bar along its length direction, leak protection thick liquid rubber piece is divided into rubber piece and lower rubber piece by the plane at a plurality of leak protection thick liquid round hole axis places, the grafting portion of going up the rubber piece inserts the slot that is formed on last mould lower surface, the grafting portion of lower rubber piece inserts the slot that is formed on the lower mould upper surface, moreover, the steam generator is simple in structure, high durability and convenient connection, can solve the leak protection thick liquid problem.
Drawings
Fig. 1 is a schematic structural view of a slurry-leakage-proof fast-assembling prefabricated composite floor slab mold of the present invention;
FIG. 2 is a partially disassembled view of the slurry leakage preventing and quick assembling prefabricated composite floor slab mold of the present invention;
fig. 3 is a partial exploded view of a side form for supporting bottom reinforcing steel bars in a prefabricated composite floor slab mold which is leak-proof and fast to assemble;
fig. 4 is the utility model discloses a leak protection thick liquid and assemble the swift local resolution of the side forms that are used for supporting the top reinforcing bar in the prefabricated coincide floor slab mould.
The reference numerals in the schematic drawings illustrate: 1. a base plate; 2. side forms; 2-1, a lower die; 2-2, an upper die; 2-3, positioning a round hole; 2-4, inserting slots; 3. fixing the magnetic box; 4. reinforcing steel bars; 5-1, leak protection of circular holes; 5-2, mounting a rubber block; 5-3, lower rubber block; 6-1, positioning blocks; 6-2, positioning grooves; 7. a connecting bolt; 8. and a nut.
Detailed Description
For a further understanding of the present invention, reference will be made to the following detailed description taken in conjunction with the accompanying drawings and examples.
Examples
With reference to fig. 1 and fig. 2, the prefabricated composite floor slab mold with slurry leakage prevention and fast assembly in the embodiment includes a bottom plate 1 and four side forms 2 arranged on the bottom plate 1, the four side forms 2 enclose to form a mold cavity, and the side forms 2 are fixed on the bottom plate 1 through a fixed magnetic box 3; a plurality of positioning round holes 2-3 which penetrate through the side die 2 and are used for extending the reinforcing steel bars 4 are sequentially arranged on the side die 2 along the length direction of the side die; because the bottom steel bars and the top steel bars in the prefabricated composite floor slab are positioned at different levels, the axes of the positioning round holes 2-3 on the two side forms 2 for supporting the bottom steel bars in the four side forms 2 and the axes of the positioning round holes 2-3 on the two side forms 2 for supporting the top steel bars in the four side forms 2 are arranged in a vertically staggered manner; the side die 2 is divided into a lower die 2-1 and an upper die 2-2 by a plane where the axes of the plurality of positioning round holes 2-3 are located; the end part of the lower die 2-1 is connected with the end part of the upper die 2-2 in a manner of splicing the positioning block 6-1 with the positioning groove 6-2, in the embodiment, the positioning block 6-1 is arranged on the lower surface of the end part of the upper die 2-2, and the positioning groove 6-2 is arranged on the upper surface of the end part of the lower die 2-1;
continuing and referring to fig. 3 and 4, after the four side forms 2 are provided with an abutting end, the abutting end of one side form 2 abuts against the inner side surface of the other side form 2 which is perpendicular to the abutting end, the two side forms 2 are fixedly connected in a mode that the connecting bolt 7 penetrates through the positioning round hole 2-3 and then is connected with the nut 8, the structure is simple, and the four side forms 2 are assembled quickly; specifically, because the positioning round holes 2-3 for supporting the bottom steel bars and the positioning round holes 2-3 for supporting the top steel bars are arranged in a vertically staggered manner, the connecting bolts 7 are arranged at different positions on the side dies with different supporting functions, the connecting bolts 7 are fixedly arranged at the end parts of the upper dies 2-2 of the side dies for supporting the bottom steel bars, and the connecting bolts 7 are fixedly arranged at the end parts of the lower dies 2-1 of the side dies for supporting the top steel bars;
a leakage-proof rubber block is arranged between the lower die 2-1 and the upper die 2-2, a plurality of leakage-proof circular holes 5-1 which penetrate through the leakage-proof rubber block and are used for wrapping the reinforcing steel bars 4 are sequentially arranged on the leakage-proof rubber block along the length direction of the leakage-proof rubber block, and the plurality of leakage-proof circular holes 5-1 are arranged in one-to-one correspondence with the plurality of positioning circular holes 2-3; the plane where the axes of the circular holes 5-1 for preventing leakage of the slurry are positioned is divided into an upper rubber block 5-2 and a lower rubber block 5-3; the inserting part of the upper rubber block 5-2 is inserted into the slot 2-4 formed on the lower surface of the upper die 2-2, and the inserting part of the lower rubber block 5-3 is inserted into the slot 2-4 formed on the upper surface of the lower die 2-1.
The specific assembling process is as follows:
the first step is as follows: adjusting the positions of four side dies according to the size of the prefabricated laminated floor, inserting a connecting bolt 7 on the abutting end of the side die into a positioning round hole 2-3 on the other side die perpendicular to the abutting end of the side die after the adjustment is finished, and then connecting the side die with a nut, wherein the nut is not screwed at the moment;
the second step is that: the upper die 2-2 provided with the upper rubber block 5-2 is taken off, and the lower die 2-1 provided with the lower rubber block 5-3 is fixed on the bottom plate 1 through the fixed magnetic box 3;
the third step: according to the requirement of reinforcing steel bar arrangement, firstly arranging reinforcing steel bars at the bottom in the prefabricated composite floor slab, then arranging reinforcing steel bars at the top, and adjusting the extension lengths of the reinforcing steel bars;
the fourth step: the upper die 2-2 taken away in advance is connected with the lower die 2-1 again in a mode that the positioning block 6-1 is inserted into the positioning groove 6-2;
the fifth step: the nuts 8 provided on the connecting bolts 7 are sequentially tightened, and concrete pouring, curing and form removal are prepared.
The utility model discloses a leak protection thick liquid and equipment swift prefabricated coincide floor mould, simple structure, the limit is touched between the equipment swift, and the locating round hole that the periphery touched can make things convenient for placing and the accurate positioning of reinforcing bar, can solve effectively through setting up the leak protection thick liquid block rubber in addition and leak the thick liquid problem.
The present invention and its embodiments have been described above schematically, and the description is not limited thereto, and what is shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. Therefore, if the person skilled in the art receives the teaching of the present invention, without departing from the inventive spirit of the present invention, the person skilled in the art should also design the similar structural modes and embodiments without creativity to the technical solution, and all shall fall within the protection scope of the present invention.

Claims (4)

1. A prefabricated composite floor slab die capable of preventing slurry leakage and being assembled quickly comprises a bottom plate (1) and four side dies (2) arranged on the bottom plate (1), wherein the four side dies (2) surround to form a die cavity, and the side dies (2) are fixed on the bottom plate (1) through a fixed magnetic box (3); side forms (2) on have set gradually a plurality of locating round holes (2-3) that run through side forms (2) and be used for reinforcing bar (4) to stretch out along its length direction, its characterized in that: the side die (2) is divided into a lower die (2-1) and an upper die (2-2) by a plane where the axes of the positioning round holes (2-3) are located; the end part of the lower die (2-1) is connected with the end part of the upper die (2-2) in an inserting manner through the positioning block (6-1) and the positioning groove (6-2); and a leakage-proof rubber block is arranged between the lower die (2-1) and the upper die (2-2), a plurality of leakage-proof circular holes (5-1) which penetrate through the leakage-proof rubber block and are used for wrapping the reinforcing steel bars (4) are sequentially arranged on the leakage-proof rubber block along the length direction of the leakage-proof rubber block, and the plurality of leakage-proof circular holes (5-1) and the plurality of positioning circular holes (2-3) are arranged in a one-to-one correspondence manner.
2. The prefabricated composite floor slab mold capable of preventing slurry leakage and being assembled quickly according to claim 1, wherein: the plane where the axes of the circular holes (5-1) for preventing leakage of the slurry are located is divided into an upper rubber block (5-2) and a lower rubber block (5-3); the inserting part of the upper rubber block (5-2) is inserted into the slot (2-4) formed on the lower surface of the upper die (2-2), and the inserting part of the lower rubber block (5-3) is inserted into the slot (2-4) formed on the upper surface of the lower die (2-1).
3. The prefabricated composite floor slab mold capable of preventing slurry leakage and being assembled quickly according to claim 1, wherein: four side forms (2) all have one and lean on the end, the end that leans on of one side form (2) supports on the medial surface of another side form (2) that sets up with it mutually perpendicular after, link firmly with the mode that nut (8) are connected after passing location round hole (2-3) through connecting bolt (7) between two side forms (2).
4. The prefabricated composite floor slab mold capable of preventing slurry leakage and being assembled quickly according to claim 1, wherein: the positioning block (6-1) is arranged on the lower surface of the end part of the upper die (2-2), and the positioning groove (6-2) is arranged on the upper surface of the end part of the lower die (2-1).
CN202021416316.6U 2021-03-18 2021-03-18 Leak protection thick liquid and equipment swift prefabricated coincide floor mould Expired - Fee Related CN213533087U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021416316.6U CN213533087U (en) 2021-03-18 2021-03-18 Leak protection thick liquid and equipment swift prefabricated coincide floor mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021416316.6U CN213533087U (en) 2021-03-18 2021-03-18 Leak protection thick liquid and equipment swift prefabricated coincide floor mould

Publications (1)

Publication Number Publication Date
CN213533087U true CN213533087U (en) 2021-06-25

Family

ID=76486870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021416316.6U Expired - Fee Related CN213533087U (en) 2021-03-18 2021-03-18 Leak protection thick liquid and equipment swift prefabricated coincide floor mould

Country Status (1)

Country Link
CN (1) CN213533087U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114800804A (en) * 2022-04-24 2022-07-29 湖南交安建设集团有限公司 Bridge prefabricated plate mould
CN114800772A (en) * 2022-04-14 2022-07-29 三一筑工科技股份有限公司 Side formwork device and preparation method of external thermal insulation protection system of external wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114800772A (en) * 2022-04-14 2022-07-29 三一筑工科技股份有限公司 Side formwork device and preparation method of external thermal insulation protection system of external wall
CN114800772B (en) * 2022-04-14 2023-11-24 三一筑工科技股份有限公司 Side mold device and preparation method of external wall external heat preservation and protection system
CN114800804A (en) * 2022-04-24 2022-07-29 湖南交安建设集团有限公司 Bridge prefabricated plate mould

Similar Documents

Publication Publication Date Title
CN213533087U (en) Leak protection thick liquid and equipment swift prefabricated coincide floor mould
CN103612323B (en) A kind of concrete member mould and application thereof
CN111546468B (en) Combined adjustable laminated plate die
CN203566830U (en) Concrete member mould
CN210013342U (en) Connecting device for green fabricated building light steel wall and foundation
CN211030588U (en) Assembled steel pedestal
CN202148687U (en) Building template forming structure and fastening piece
CN219825960U (en) Lightweight concrete wallboard and structural wall, post drawknot structure
CN219445454U (en) Reinforcement plate for concrete slab production
CN220848731U (en) Angle adjustment supporting device for assembled building stair construction
CN111571774B (en) Precast concrete with filling heat preservation wallboard assembling die
CN219910180U (en) Counter type landscape PC component for architectural decoration
CN219466475U (en) Equipment for producing multi-specification T/L type corner post and edge member capable of preventing seam from cracking
CN219691139U (en) Simple building block mortar joint control device
CN220882769U (en) Impervious mould of concrete
CN217027508U (en) Positioning device for embedded part of fair-faced concrete stand
CN220150865U (en) Rib beam forming member for cast-in-situ concrete
CN220978806U (en) Cylinder pouring molding guard plate structure
CN219672118U (en) Integral template device of beam column node
CN219732501U (en) Main body structure of assembled building
CN216968162U (en) Universal side die
CN113172736B (en) Preparation method of concrete moon door and special mold
CN211566280U (en) High-pressure brick die
CN219826119U (en) Steel-plastic combined template for concrete decorative column
CN212926474U (en) Prefabricated rising post and rising beam combined frame structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210625