CN213509259U - Building construction is with roof drainage device who has anti-blocking mechanism - Google Patents

Building construction is with roof drainage device who has anti-blocking mechanism Download PDF

Info

Publication number
CN213509259U
CN213509259U CN202021876714.6U CN202021876714U CN213509259U CN 213509259 U CN213509259 U CN 213509259U CN 202021876714 U CN202021876714 U CN 202021876714U CN 213509259 U CN213509259 U CN 213509259U
Authority
CN
China
Prior art keywords
wall
filter
drain pipe
tank
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021876714.6U
Other languages
Chinese (zh)
Inventor
蒲金梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Feipeng Construction Engineering Co ltd
Original Assignee
Hunan Feipeng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Feipeng Construction Engineering Co ltd filed Critical Hunan Feipeng Construction Engineering Co ltd
Priority to CN202021876714.6U priority Critical patent/CN213509259U/en
Application granted granted Critical
Publication of CN213509259U publication Critical patent/CN213509259U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a roof drainage device technical field specifically is a building construction is with roof drainage device who has anti-blocking mechanism, including wall and drain pipe, the edge of wall is inserted and is equipped with the drain pipe, the inside fixed mounting of drain pipe has the connecting rod, the right side of connecting rod is seted up slottedly, and the inside in groove is inserted and is equipped with the pivot, the outer wall of pivot has cup jointed the flabellum, the right side of drain pipe is provided with the filter-tank, and the outer wall of filter-tank has seted up and has filtered the through-hole. The utility model discloses a be provided with flabellum and filter-tank, the filter-tank can protect the great impurity of external volume, avoids impurity to enter into the inside condition that forms the jam of drain pipe, and simultaneously at the in-process of drainage, rivers drive the flabellum and rotate, can make the flabellum drive the filter-tank and rotate, cleans through the filtration through-hole on the brush to the filter-tank afterwards, avoids impurity to cause the filtration through-hole jam condition, and the drainage effect that further makes the drain pipe is better.

Description

Building construction is with roof drainage device who has anti-blocking mechanism
Technical Field
The utility model relates to a roof drainage device technical field specifically is a building construction is with roof drainage device who has anti-blocking mechanism.
Background
In building engineering, often can meet rainy day, the rainwater of rainy day can leave over on the roof, installs the drain pipe at the outer wall of roof usually for discharge the water of roof, avoid the water to pile up and cause the condition of seepage.
However, after the existing roof drainage device is used for a long time, sundries on the roof flow along with rainwater and are accumulated at the drainage port, so that the blockage situation is caused, the drainage effect is influenced, and the use is inconvenient, so that the roof drainage device with the anti-blocking mechanism for building construction is urgently needed to solve the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building construction is with roof drainage device who has anti-blocking mechanism to debris on the roof that proposes in solving above-mentioned background art can flow along with the rainwater, piles up in drain outlet department afterwards, and then cause the condition of jam, influence its drainage effect, use comparatively inconvenient problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building construction is with roof drainage device with prevent stifled mechanism, includes wall and drain pipe, the edge of wall is inserted and is equipped with the drain pipe, the inside fixed mounting of drain pipe has the connecting rod, slottedly is seted up on the right side of connecting rod, and the inside in groove is inserted and is equipped with the pivot, the outer wall of pivot has cup jointed the flabellum, the right side of drain pipe is provided with the filter-tank, and the outer wall of filter-tank has seted up and has filtered the through-hole, the one end intermediate position department that the drain pipe was kept away from to the filter-tank has seted up the hole, and the inside of hole is inserted and is equipped with the bull stick, the top fixed mounting of wall has place the seat, place the top of seat and seted up the hole, place the seat cup joint at the outer wall of bull stick.
Preferably, the wall surface is provided with a rotary groove at one end close to the filter groove, the filter groove is provided with a hole at one end close to the drain pipe, an insert block is inserted into the inner wall of the hole, and the rotary groove is annular.
Preferably, one end of the drain pipe close to the filter tank is fixedly provided with a brush, and the brush is attached to the inner wall of the filter tank.
Preferably, one end of the inner wall of the connecting rod, which is close to the filter tank, is fixedly provided with a supporting rod, a hole is formed in the middle position of the supporting rod, and the supporting rod is sleeved on the outer wall of the rotating shaft.
Preferably, a groove is formed in one side, close to the filter tank, of the rotating shaft, the inner shape of the groove is triangular, the outer wall of the inserting rod is triangular, the inserting rod is matched with the groove in the rotating shaft, and the inserting rod is inserted in the rotating shaft.
Preferably, the outer wall of the insert block is sleeved with a pressure spring, and one end of the insert block, which is close to the rotary groove, is obliquely arranged.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the device is provided with flabellum and filter-tank, and the filter-tank can protect the great impurity of external volume, avoids impurity to enter into the inside formation condition of blockking up of drain pipe, and simultaneously at the in-process of drainage, rivers drive the flabellum and rotate, can make the flabellum drive the filter-tank and rotate, cleans through the filtration through-hole on the filter-tank through the brush afterwards, avoids impurity to cause the filtration through-hole condition of blockking up, and the drainage effect that further makes the drain pipe is better.
2. The device is provided with abaculus and rotary trough, can make the filter-tank better at pivoted in-process stability, and then has made things convenient for the effect of cleaning of brush, and the inside that the abaculus breaks away from the rotary trough simultaneously can drive the filter-tank and break away from, and then conveniently clears up the impurity of filter-tank inside to avoided the filter-tank to cause the condition of jam, and then made the result of use of filter-tank better.
Drawings
Fig. 1 is a schematic front view of a cross-sectional structure of the present invention;
fig. 2 is a schematic top view of the cross-sectional structure of the present invention;
FIG. 3 is a schematic sectional view of the side view structure of the drain pipe of the present invention;
fig. 4 is a partially enlarged schematic view of a in fig. 1 according to the present invention.
In the figure: 1. a wall surface; 2. a drain pipe; 3. a connecting rod; 4. a rotating shaft; 5. a fan blade; 6. a support bar; 7. a filter tank; 8. a filtration through hole; 9. inserting a rod; 10. a rotating rod; 11. a placing seat; 12. a brush; 13. rotating the groove; 14. an insert block; 15. a pressure spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment:
a roof drainage device with an anti-blocking mechanism for building construction comprises a wall surface 1 and a drainage pipe 2, wherein the drainage pipe 2 is inserted at the corner of the wall surface 1, a connecting rod 3 is fixedly installed inside the drainage pipe 2, a groove is formed in the right side of the connecting rod 3, a rotating shaft 4 is inserted inside the groove, a fan blade 5 is sleeved on the outer wall of the rotating shaft 4, a filter groove 7 is arranged on the right side of the drainage pipe 2, a filter through hole 8 is formed in the outer wall of the filter groove 7, a hole is formed in the middle position of one end of the filter groove 7, which is far away from the drainage pipe 2, a rotating rod 10 is inserted inside the hole, a placing seat 11 is fixedly installed at the top end of the wall surface 1, a hole is formed in the top end of the placing seat 11, the placing seat 11 is sleeved on the outer wall of the rotating rod 10, an inserting rod 9 is fixedly installed at the middle position of one end, which is close to the, enter into filter tank 7's inside afterwards, at last in the inside that enters into drain pipe 2, filter tank 7 can filter the great impurity of external volume, the inside of avoiding the great impurity of volume to enter into drain pipe 2 causes the condition of drain pipe 2 jam, simultaneously at the in-process of drainage, rivers impact flabellum 5, make flabellum 5 rotate, flabellum 5 drives pivot 4 and rotates, can make pivot 4 drive filter tank 7 rotate, avoid external impurity to form and pile up the condition that causes filter tank 7 to block up, and then make drain pipe 2's drainage effect better.
Further, the outer wall of wall 1 is close to the one end of filter-tank 7 and has been seted up rotary tank 13, filter-tank 7 has been close to the one end outer wall of drain pipe 2 and has been seted up the hole, and the inner wall of hole is inserted and is equipped with abaculus 14, the shape of rotary tank 13 is the annular, can make the rotational stability of filter-tank 7 better, abaculus 14 can break away from the inside of rotary tank 13 simultaneously, and then conveniently dismantle filter-tank 7, can clear up the inside impurity of filter-tank 7, make the filter effect of filtering through-hole 8 better.
Further, the one end fixed mounting that drain pipe 2 is close to filter-tank 7 has brush 12, and brush 12 laminates with the inner wall of filter-tank 7 each other, and filter-tank 7 contacts with brush 12 at the pivoted in-process, and then makes brush 12 clean filtering through-hole 8 on the filter-tank 7, avoids impurity to pile up the condition, convenient to use that form the jam in filtering through-hole 8's inside.
Further, the one end fixed mounting that the inner wall of connecting rod 3 is close to filter-tank 7 has bracing piece 6, and the hole has been seted up to bracing piece 6's intermediate position department, and bracing piece 6 cup joints at the outer wall of pivot 4, can make pivot 4 better at pivoted in-process stability, avoids pivot 4 to receive the condition that water impact takes place to incline, and then makes the pivoted stability of flabellum 5 better.
Further, one side of pivot 4 that is close to filter-tank 7 is seted up slottedly, and the inside shape in groove is triangle-shaped, the outer wall shape of inserted bar 9 is triangle-shaped, inserted bar 9 and the inside groove looks adaptation of pivot 4, inserted bar 9 inserts the inside of establishing at pivot 4, filter-tank 7 is when the installation, it imbeds the inslot portion of pivot 4 to drive inserted bar 9, and then make pivot 4 drive inserted bar 9 at the pivoted in-process and rotate, thereby make filter-tank 7 rotate, inserted bar 9 can break away from the inside of pivot 4 simultaneously, made things convenient for filter-tank 7 to dismantle, it is more convenient to make filter-tank 7 clear up.
Further, the outer wall of abaculus 14 has cup jointed pressure spring 15, and the one end that abaculus 14 is close to the rotary trough 13 sets up for the slope, imbeds filter tank 7 to the outer wall of drain pipe 2, and drain pipe 2's outer wall extrudees abaculus 14 to make abaculus 14 begin to shrink along the inclined plane, resume through pressure spring 15 afterwards, make the inside that the abaculus 14 was embedded into rotary trough 13 fixed, make the more convenient of filter tank 7 installation.
The working principle is as follows: during the use, external rainwater flows to drain pipe 2's position department makes, impurity that contains in the rainwater is blockked by filtration through-hole 8, enter into the inside of rose box 7 afterwards, at last in the inside that enters into drain pipe 2, rose box 7 can filter the great impurity of external volume, avoid the great impurity of volume to enter into the inside that drain pipe 2 causes the condition of drain pipe 2 jam, simultaneously at the in-process of drainage, rivers strike flabellum 5, make flabellum 5 rotate, flabellum 5 drives pivot 4 and rotates, can make pivot 4 drive rose box 7 rotate, avoid external impurity to form and pile up the condition that causes 7 blockings of rose box, and then make drain pipe 2's drainage effect better.
Stimulate the abaculus 14 afterwards, and then make the abaculus 14 break away from the inside of rotary tank 13, can make the filter tank 7 break away from drain pipe 2's outer wall, inserted bar 9 breaks away from the inside of pivot 4 simultaneously, and then make the filter tank 7 break away from, can conveniently clear up the impurity in the filter tank 7 inside, make the result of use of filter tank 7 better, filter tank 7 after will clearing up the completion is embedded into the outer wall of drain pipe 2 afterwards, the outer wall of drain pipe 2 extrudees abaculus 14, thereby make the abaculus 14 begin to shrink along the inclined plane, recover through compression spring 15 afterwards, make the inside that the abaculus 14 was embedded into rotary tank 13 fixed, it is more convenient to make the installation of filter tank 7, above this scheme's whole theory of operation.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a building construction is with roof drainage device who has anti-blocking mechanism, includes wall (1) and drain pipe (2), its characterized in that: the wall is characterized in that a drain pipe (2) is inserted at the corner of the wall surface (1), a connecting rod (3) is fixedly installed inside the drain pipe (2), a groove is formed in the right side of the connecting rod (3), a rotating shaft (4) is inserted inside the groove, fan blades (5) are sleeved on the outer wall of the rotating shaft (4), a filter tank (7) is arranged on the right side of the drain pipe (2), a filter through hole (8) is formed in the outer wall of the filter tank (7), a hole is formed in the middle position of one end, away from the drain pipe (2), of the filter tank (7), a rotating rod (10) is inserted inside the hole, a placing seat (11) is fixedly installed at the top end of the wall surface (1), a hole is formed in the top end of the placing seat (11), the placing seat (11) is sleeved on the outer wall of the rotating rod (10), an inserting rod (9) is fixedly installed at the middle position, close to, the inserted bar (9) is connected with the rotating shaft (4).
2. The roof drainage device with an anti-blocking mechanism for building construction according to claim 1, wherein: the wall is characterized in that a rotary groove (13) is formed in one end, close to the filter tank (7), of the outer wall of the wall face (1), a hole is formed in the outer wall, close to the drain pipe (2), of one end of the filter tank (7), an insert block (14) is inserted into the inner wall of the hole, and the rotary groove (13) is annular.
3. The roof drainage device with an anti-blocking mechanism for building construction according to claim 1, wherein: one end of the drain pipe (2) close to the filter tank (7) is fixedly provided with a brush (12), and the brush (12) is attached to the inner wall of the filter tank (7).
4. The roof drainage device with an anti-blocking mechanism for building construction according to claim 1, wherein: the inner wall of connecting rod (3) is close to the one end fixed mounting of filter-tank (7) has bracing piece (6), the hole has been seted up to the intermediate position department of bracing piece (6), and bracing piece (6) cup joint the outer wall in pivot (4).
5. The roof drainage device with an anti-blocking mechanism for building construction according to claim 1, wherein: one side of the rotating shaft (4) close to the filter tank (7) is provided with a groove, the inner shape of the groove is triangular, the outer wall of the inserted bar (9) is triangular, the inserted bar (9) is matched with the groove in the rotating shaft (4), and the inserted bar (9) is inserted in the rotating shaft (4).
6. The roof drainage device with an anti-blocking mechanism for building construction according to claim 2, wherein: the outer wall of the embedded block (14) is sleeved with a pressure spring (15), and one end, close to the rotary groove (13), of the embedded block (14) is obliquely arranged.
CN202021876714.6U 2020-09-01 2020-09-01 Building construction is with roof drainage device who has anti-blocking mechanism Active CN213509259U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021876714.6U CN213509259U (en) 2020-09-01 2020-09-01 Building construction is with roof drainage device who has anti-blocking mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021876714.6U CN213509259U (en) 2020-09-01 2020-09-01 Building construction is with roof drainage device who has anti-blocking mechanism

Publications (1)

Publication Number Publication Date
CN213509259U true CN213509259U (en) 2021-06-22

Family

ID=76443191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021876714.6U Active CN213509259U (en) 2020-09-01 2020-09-01 Building construction is with roof drainage device who has anti-blocking mechanism

Country Status (1)

Country Link
CN (1) CN213509259U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114525895A (en) * 2022-02-24 2022-05-24 山东长箭建设集团有限公司 Waterproof construction at building outer wall top

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114525895A (en) * 2022-02-24 2022-05-24 山东长箭建设集团有限公司 Waterproof construction at building outer wall top
CN114525895B (en) * 2022-02-24 2024-03-19 山东长箭建设集团有限公司 Waterproof construction at building outer wall top

Similar Documents

Publication Publication Date Title
CN211006999U (en) Filter equipment for municipal administration water supply and drainage
CN213509259U (en) Building construction is with roof drainage device who has anti-blocking mechanism
CN211006954U (en) Road drainage ditch with anti-blocking function
CN213709779U (en) Anti-blocking drainage pipe head
CN211596985U (en) Prevent blockking up drain pipe
CN218843551U (en) Prevent blockking up roofing siphon rainwater fill
CN214459610U (en) Road and bridge drainage ditch with good drainage effect
CN212656479U (en) Architectural design roof eaves mouth waterproof construction
CN213390457U (en) Anti-blocking floor drain
CN212294990U (en) Drainage device of dirty mixed flow pipe pipeline of rain
CN214461897U (en) Anti-blocking device for building design roof outlet
CN112627440A (en) Waterproof construction at building outer wall top
CN220318357U (en) Bridge drain pipe anti-blocking device
CN216787357U (en) Anti-blocking structure for rain sewage pipeline
CN216275967U (en) Prevent blockking up outdoor fire hydrant
CN216006610U (en) Anti-blocking drainage pipeline for building bridge
CN214033991U (en) Sinking type green land overflow well
CN218437419U (en) Sponge urban road storage drainage structure
CN215027056U (en) Anti-blocking vacuum pipeline
CN214246356U (en) Anti-blocking device for building design roof outlet
CN216108856U (en) Ecological garden road drainage device
CN206408600U (en) Pumping station triangle automatically adjusts sewage blocking device
CN214402050U (en) Construction rainfall drainage structures
CN217896692U (en) Road drainage structure convenient to clearance impurity
CN219808456U (en) Anti-blocking structure for drainage construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant