CN213459193U - Full-water-blocking parallel bundling overhead cable - Google Patents

Full-water-blocking parallel bundling overhead cable Download PDF

Info

Publication number
CN213459193U
CN213459193U CN202022174494.9U CN202022174494U CN213459193U CN 213459193 U CN213459193 U CN 213459193U CN 202022174494 U CN202022174494 U CN 202022174494U CN 213459193 U CN213459193 U CN 213459193U
Authority
CN
China
Prior art keywords
clamping block
shell
block
clamping
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022174494.9U
Other languages
Chinese (zh)
Inventor
宋伟
刘林
孙建夺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningjin Dinghui Cable Co ltd
Original Assignee
Ningjin Dinghui Cable Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningjin Dinghui Cable Co ltd filed Critical Ningjin Dinghui Cable Co ltd
Priority to CN202022174494.9U priority Critical patent/CN213459193U/en
Application granted granted Critical
Publication of CN213459193U publication Critical patent/CN213459193U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/14Extreme weather resilient electric power supply systems, e.g. strengthening power lines or underground power cables

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model relates to the technical field of bunched cables, in particular to a full water-blocking parallel bunched overhead cable which facilitates the straightening of bunched cables and comprises a shell, wherein the front end and the rear end of the shell are provided with through holes A, the inside of the shell is provided with a connecting rod, the front end of the connecting rod is provided with a hand wheel, the rear end of the shell is provided with a hook, the front part of the connecting rod is provided with a fixed block A, the rear part of the connecting rod is provided with a fixed block B, the circumferential surface of the fixed block A is provided with a plurality of fixture blocks B, the right part of the front end in the shell is provided with a fixture block C, the bottom end of the fixture block C is provided with a fixed plate, the right part of the inside of the shell is provided with a clamping block, the clamping block comprises a clamping block A and a clamping block B, the bottom end of the clamping block A is provided with four placing, the cluster overhead cable can be straightened by rotating the hand wheel.

Description

Full-water-blocking parallel bundling overhead cable
Technical Field
The utility model relates to a cable technical field tied in a bundle specifically is a parallelly tied in a bundle aerial [ insulated ] cable blocks water entirely.
Background
As is well known, with the increase of power construction and maintenance work, parallel bunched cables are more and more widely applied, and when the existing parallel bunched cables are tightened on a rod, wire tighteners in the existing market are used by single electric wires, so that a plurality of wires of the bunched cables cannot be clamped and straightened.
If two tighteners are used for clamping two lines on the edge respectively at the same time, and then two tighteners are used for tightening on the wire clamping device, the method easily increases the workload in the construction work, reduces the working effect and has poor use effect.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a make things convenient for parallel bundling aerial [ insulated ] cable that blocks water entirely of bundling cable flare-out.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a full-water-blocking parallel bundling aerial cable comprises a shell, wherein through holes A are formed in the front end and the rear end of the shell, the two through holes A penetrate through the left end and the right end of the shell to the inside of the shell respectively, a connecting rod is arranged inside the shell and is installed inside the two through holes A, a hand wheel is arranged at the front end of the connecting rod, a handle is arranged at the front end of the hand wheel, a hook is arranged at the right end of the shell, a fixing block A is arranged at the front portion of the connecting rod, a clamping groove is formed in the front end of the fixing block A and penetrates through the front end to the rear end of the fixing block A, a clamping block A is arranged at the front portion of the connecting rod and is matched with the clamping groove, a fixing block B is arranged at the rear portion of the connecting rod, the fixing block B is cylindrical in shape, a plurality of clamping, the bottom end of the clamping block C is provided with a fixing plate, the fixing plate is installed inside the shell through welding, a positioning column is arranged between the clamping block C and the fixing plate, a spring is installed in the positioning column, the clamping block C is matched with a plurality of clamping blocks B, the middle part of the connecting rod is provided with a steel wire, the steel wire is connected with a hook, the right part inside the shell is provided with a clamping block, the clamping block comprises a clamping block A and a clamping block B, the clamping block A is positioned at the top part of the clamping block B, the front part and the rear part of the clamping block A are respectively provided with a through hole B, the two through holes B penetrate through the top end of the clamping block A to the bottom end of the clamping block A, the front end and the rear end of the clamping block B are respectively provided with threaded holes, the two threaded holes B are respectively matched with the two through holes B, the two through holes B are respectively connected with each other through bolts, the bottom end of the clamping block A is, the top of clamp splice B is provided with four standing grooves B to four standing grooves B all run through to the left end of clamp splice B in clamp splice B's right-hand member, and clamp splice A's bottom pastes tightly each other with clamp splice B's top.
Further, a spacing groove is arranged between each placing groove A and each placing groove B and between the adjacent placing groove A and each placing groove B.
Further, the bottom of the inside of casing is provided with logical groove to lead to the bottom of groove in the bottom of casing and run through to the bottom of casing.
Furthermore, the surface of the handle is provided with a plurality of anti-skid lines.
Furthermore, the top edge angle of the right end of the shell is set to be a circular arc.
Furthermore, the grip is made of rubber.
(III) advantageous effects
Compared with the prior art, the utility model provides a parallelly connected bundling aerial [ insulated ] cable blocks water entirely possesses following beneficial effect:
this parallelly bound aerial [ insulated ] cable blocks water entirely, front end through the connecting rod is provided with the hand wheel, and the front end of hand wheel is provided with the handle, make the binding clasp can carry out the flare-out to the aerial [ insulated ] cable tied in a bundle through the mode of rotating the hand wheel, bottom through clamp splice A is provided with four standing groove A, and the top of clamp splice B is provided with four standing groove B, make the aerial [ insulated ] cable tied in a bundle can place and press from both sides tightly at clamp splice A and clamp splice B's middle part, the circumference surface through fixed block A is provided with several fixture block B, and fixture block C and several fixture block B mutually support, make the hand wheel when rotatory flare-out, fixed block A has the effect.
Drawings
FIG. 1 is a schematic diagram of the present invention;
fig. 2 is a schematic top view of the present invention;
FIG. 3 is a front view of the present invention;
fig. 4 is a schematic diagram of the present invention at a part enlarged in fig. 3.
In the figure: 1. a housing; 2. a connecting rod; 3. a hand wheel; 4. a grip; 5. a hook; 6. a fixed block A; 7. A fixed block B; 8. a clamping block A; 9. a clamping block B; 10. a clamping block C; 11. a positioning column; 12. a spring; 13. A steel wire; 14. a fixing plate; 15. a clamping block A; 16. a clamping block B; 17. a bolt; 18. placing the groove A; 19. A placing groove B; 20. anti-skid lines; 21. a through groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the utility model relates to a full water-blocking parallel bundling aerial cable, which comprises a housing 1, wherein the front end and the rear end of the housing 1 are provided with through holes a, the left end and the right end of the housing 1 are respectively penetrated into the housing 1 by the two through holes a, the housing 1 is provided with a connecting rod 2 inside, the connecting rod 2 is arranged inside the two through holes a, the front end of the connecting rod 2 is provided with a hand wheel 3, the front end of the hand wheel 3 is provided with a handle 4, the right end of the housing 1 is provided with a hook 5, the front part of the connecting rod 2 is provided with a fixing block a6, the front end of the fixing block a6 is provided with a clamping groove which penetrates into the rear end of the fixing block a6, the front part of the connecting rod 2 is provided with a clamping block a8, the clamping block a8 is mutually matched with the clamping groove, the rear part of the connecting rod, the circumference surface of the fixed block A6 is provided with a plurality of clamping blocks B9, the right part of the front end in the shell 1 is provided with a clamping block C10, the bottom end of the clamping block C10 is provided with a fixing plate 14, the fixing plate 14 is installed in the shell 1 through welding, a positioning column 11 is arranged between the clamping block C10 and the fixing plate 14, a spring 12 is installed in the positioning column 11, a clamping block C10 is matched with a plurality of clamping blocks B9, the middle part of the connecting rod 2 is provided with a steel wire 13, the steel wire 13 is connected with a hook 5, the right part of the interior of the shell 1 is provided with a clamping block, the clamping block comprises a 539A 15 and a clamping block B7, the clamping block A15 is positioned at the top of the clamping block B16, the front part and the rear part of the clamping block A15 are respectively provided with through holes B, the two through holes B penetrate through the top end of the clamping block A15 to the bottom end of the clamping block A15, the, two through-holes B are respectively through bolt 17 and screwed hole interconnect, the bottom of clamp splice A15 is provided with four standing groove A18, and four standing groove A18 all run through to the left end of clamp splice A15 in the right-hand member of clamp splice A15, the top of clamp splice B16 is provided with four standing groove B19, and four standing groove B19 all run through to the left end of clamp splice B16 in the right-hand member of clamp splice B16, the bottom of clamp splice A15 pastes tightly each other with the top of clamp splice B16, place through the overhead cable and press from both sides tightly in the middle part of clamp splice A15 and clamp splice B16, make the hand wheel 3 that rotates can realize straightening of the overhead cable that gathers a bunch.
Spacing grooves are formed between each placing groove A and each placing groove B and between the adjacent placing groove A and each placing groove B, so that the bunched overhead cables cannot be damaged by being clamped in the clamping blocks A15 and the clamping blocks B16.
Wherein, the bottom of casing 1's inside is provided with logical groove 21 to lead to groove 21 and run through to casing 1's bottom in casing 1's bottom, make the overhead cable tied in a bundle overlength, can pass through groove 21 and place.
Wherein, the surface of the handle 4 is provided with a plurality of anti-skid lines 20, when the handle 4 is used, the friction force of the handle 4 is increased.
The top edge angle of the right end of the shell 1 is set to be an arc, so that the surface of the bunched overhead cable cannot be scratched when the bunched overhead cable is placed.
Wherein, the material of the handle 4 is rubber, so that the handle 4 has an insulating effect.
In summary, when the totally water-blocking parallel bundled overhead cable is used, the bundled overhead cable is firstly placed in the clamping block B16, then the clamping block A15 is placed at the top end of the clamping block B16, and the clamp block A15 and the clamp block B16 are fixed through a bolt 17, finally the hook 5 and a hook in the telegraph pole are fixed, if the bunched overhead cable is too long, the bunched overhead cable can pass through the through groove 21 to be placed, the hand wheel 3 is used for rotating the connecting rod 2, because the clamping block A8 is matched with the clamping groove, so that the connecting rod 2 rotates to drive the fixing block A6 to rotate, the middle part of the connecting rod 2 is provided with the steel wire 13, and the steel wire 13 and the hook 5 are connected with each other, the fixing block A6 and the fixing block B7 can limit the range of the back and forth movement of the steel wire 13, and the connecting rod 2 rotates to wind the steel wire 13 on the surface of the connecting rod 2, so that the device is driven to straighten the bundled overhead cable.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a parallelly restrainted aerial [ insulated ] cable of blocking water entirely, includes casing (1), its characterized in that: the front end and the rear end of the shell (1) are provided with through holes A, the two through holes A are respectively penetrated into the shell (1) from the left end and the right end of the shell (1), the connecting rod (2) is arranged in the two through holes A, the front end of the connecting rod (2) is provided with a hand wheel (3), the front end of the hand wheel (3) is provided with a handle (4), the right end of the shell (1) is provided with a hook (5), the front part of the connecting rod (2) is provided with a fixed block A (6), the front end of the fixed block A (6) is provided with a clamping groove, the clamping groove is penetrated into the rear end from the front end of the fixed block A (6), the front part of the connecting rod (2) is provided with a clamping block A (8), the clamping block A (8) is matched with the clamping groove, the rear part of the connecting rod (, the fixing block B (7) is cylindrical, a plurality of clamping blocks B (9) are arranged on the circumferential surface of the fixing block A (6), a clamping block C (10) is arranged at the right part of the front end in the shell (1), a fixing plate (14) is arranged at the bottom end of the clamping block C (10), the fixing plate (14) is installed in the shell (1) through welding, a positioning column (11) is arranged between the clamping block C (10) and the fixing plate (14), a spring (12) is installed in the positioning column (11), the clamping block C (10) is matched with the clamping blocks B (9), a steel wire (13) is arranged in the middle of the connecting rod (2), the steel wire (13) is connected with the hook (5), a clamping block is arranged at the right part of the interior of the shell (1) and comprises a clamping block A (15) and a clamping block B (16), and the clamping block A (15) is located at the top of the clamping block B (16), the front part and the rear part of the clamping block A (15) are respectively provided with a through hole B, the two through holes B penetrate through the top end of the clamping block A (15) to the bottom end of the clamping block A (15), the front end and the rear end of the clamping block B (16) are respectively provided with a threaded hole, the two threaded holes are respectively matched with the two through holes B, the two through holes B are respectively connected with the threaded holes through bolts (17), the bottom end of the clamping block A (15) is provided with four placing grooves A (18), and the four placing grooves A (18) are all penetrated from the right end of the clamping block A (15) to the left end of the clamping block A (15), the top end of the clamping block B (16) is provided with four placing grooves B (19), and the four placing grooves B (19) are all penetrated from the right end of the clamping block B (16) to the left end of the clamping block B (16), the bottom end of the clamping block A (15) is tightly attached to the top end of the clamping block B (16).
2. A fully water-blocking parallel bundled overhead cable as claimed in claim 1, characterised in that: and a spacing groove is arranged between each placing groove A (18) and each placing groove B (19) and the adjacent placing groove A (18) and each placing groove B (19).
3. A fully water-blocking parallel bundled overhead cable as claimed in claim 1, characterised in that: the bottom end of the inside of the shell (1) is provided with a through groove (21), and the through groove (21) penetrates through the bottom end of the shell (1) at the bottom end of the shell (1).
4. A fully water-blocking parallel bundled overhead cable as claimed in claim 1, characterised in that: the surface of the handle (4) is provided with a plurality of anti-skid lines (20).
5. A fully water-blocking parallel bundled overhead cable as claimed in claim 1, characterised in that: the top edge angle of the right end of the shell (1) is set to be a circular arc.
6. A fully water-blocking parallel bundled overhead cable as claimed in claim 1, characterised in that: the grip (4) is made of rubber.
CN202022174494.9U 2020-09-28 2020-09-28 Full-water-blocking parallel bundling overhead cable Active CN213459193U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022174494.9U CN213459193U (en) 2020-09-28 2020-09-28 Full-water-blocking parallel bundling overhead cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022174494.9U CN213459193U (en) 2020-09-28 2020-09-28 Full-water-blocking parallel bundling overhead cable

Publications (1)

Publication Number Publication Date
CN213459193U true CN213459193U (en) 2021-06-15

Family

ID=76283431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022174494.9U Active CN213459193U (en) 2020-09-28 2020-09-28 Full-water-blocking parallel bundling overhead cable

Country Status (1)

Country Link
CN (1) CN213459193U (en)

Similar Documents

Publication Publication Date Title
US4512828A (en) Cable holding and positioning apparatus and splicing method
CN204573525U (en) A kind of fastening-connecting device for fixed object on cylinder
CN213459193U (en) Full-water-blocking parallel bundling overhead cable
CN102507312A (en) Umbilical cable tensile testing fixture and its mounting method
CN211698294U (en) Connector for optical cable installation
CN210443950U (en) Cable staple bolt that electric power engineering used
CN210608373U (en) Cable rack for construction of electric automation engineering
CN210296760U (en) Anti-drop device of power cable connector
CN210272976U (en) Multi-core crosslinked polyethylene insulated power cable with double-layer steel tape armored polyvinyl chloride sheath
CN218415581U (en) First device is shelled to cable
CN211655598U (en) Adjustable cable fixing device for power communication
CN215497483U (en) Wiring ware is used in distribution installation
CN210404561U (en) Tightener for electric power engineering cable installation
CN111030022B (en) Wire stockbridge damper antiskid
CN211393337U (en) Photoelectric composite cable convenient to roll
CN213990069U (en) Wire clamp for telegraph pole
CN217505931U (en) Wiring device for overhead line parameter measurement
CN220553774U (en) Cable clamping limiting structure
CN217444994U (en) Insulating strain clamp for power transmission
CN212062963U (en) Multi-thread doubling frock of quick variable pitch
CN214976708U (en) Tensile interval adjusting device of cable wire drawing machine
CN215008595U (en) Contact surface adjustable parallel groove clamp
CN218677577U (en) Electric power installation lead wire anchor clamps
CN217956144U (en) Novel power wire equipment clamp
CN213460136U (en) Power connector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant