CN213448560U - Prefabricated piping lane - Google Patents

Prefabricated piping lane Download PDF

Info

Publication number
CN213448560U
CN213448560U CN202022094145.6U CN202022094145U CN213448560U CN 213448560 U CN213448560 U CN 213448560U CN 202022094145 U CN202022094145 U CN 202022094145U CN 213448560 U CN213448560 U CN 213448560U
Authority
CN
China
Prior art keywords
connecting plate
piping lane
pipe gallery
adjacent
right connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022094145.6U
Other languages
Chinese (zh)
Inventor
王德波
刘忠胜
吕涛
刘学军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weihai Yuquan New Building Materials Co ltd
Original Assignee
Weihai Yuquan New Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weihai Yuquan New Building Materials Co ltd filed Critical Weihai Yuquan New Building Materials Co ltd
Priority to CN202022094145.6U priority Critical patent/CN213448560U/en
Application granted granted Critical
Publication of CN213448560U publication Critical patent/CN213448560U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a prefabricated piping lane, it includes the piping lane, the first half of face is connected in the piping lane left side has set firmly left connecting plate, the latter half of face is connected in the piping lane right side has set firmly right connecting plate, left side connecting plate is hollow arc form with right connecting plate, the shape of left side connecting plate and right connecting plate is the same with the shape of the first half of face is connected in the piping lane left side and the piping lane right side respectively, the piping lane wholly is the zigzag shape, the left connecting plate and the right connecting plate looks adaptation of adjacent piping lane, the left connecting plate and the right connecting plate of adjacent piping lane are the joint formula and are connected. Make two adjacent piping lane connect steadily, make the inside all kinds of facilities that are equipped with of piping lane better protection, this application has the effect of preventing to take place mutual slip between the adjacent piping lane.

Description

Prefabricated piping lane
Technical Field
The application relates to the field of prefab, especially, relate to a prefabricated piping lane.
Background
With the rapid development of socioeconomic performance in China, many transmission pipelines are laid underground at present in order to beautify cities and enhance the underground utilization rate of the cities. But traditional direct-buried pipeline occupies the road underground space more, and the laying of pipeline often can not be synchronous with road construction simultaneously, causes the road to excavate frequently, not only seriously influences the normal current of road, also brings environmental pollution problems such as serious noise and raise dust simultaneously, and the traffic and the life agent of giving people are very big inconvenient, have consequently appeared laying pipeline's piping lane structure. Pipe gallery, i.e. the corridor of the pipeline. Many of the pipes in chemical and related plants are grouped together and arranged along the outside of the plant or building, typically in the air, supported by supports, in a manner similar to a corridor. There are also a few pipe galleries located underground. In order to reduce the workload of site operation in laying pipe gallery structures, prefabricated pipe galleries which are directly made are generally adopted.
The prior Chinese patent with publication number CN101586709B discloses a precast concrete pipe gallery, which comprises a gallery body and a gallery, wherein the gallery is manufactured in the gallery body, the cross section of the gallery is square, the gallery body is cylindrical, and a bearing port and a plug port are coaxially and fixedly arranged at two ends of the gallery body respectively.
To the correlation technique among the above-mentioned, the inventor thinks, the prefabricated piping lane of using in engineering practice at present, the left side of piping lane is connected the face and is connected with the right side of piping lane between the face laminating and be connected, but the stability of connecting between two adjacent prefabricated piping lanes is not enough, is difficult to realize the fixed connection between the adjacent piping lane, and the removal of fore-and-aft direction or the slip of left and right directions can take place between the adjacent piping lane, has the unstable defect in piping lane position.
SUMMERY OF THE UTILITY MODEL
In order to couple together two adjacent pipe galleries steadily, prevent to take place mutual slip between the adjacent pipe gallery, this application provides a prefabricated pipe gallery.
The application provides a prefabricated piping lane adopts following technical scheme:
the utility model provides a prefabricated pipe gallery, including the piping lane, the first half of the face is connected on the piping lane left side has set firmly left connecting plate, the latter half of the face is connected on the piping lane right side has set firmly right connecting plate, left side connecting plate is hollow arc form with right connecting plate, the shape of left side connecting plate and right connecting plate is the same with the shape of the face the latter half is connected on the piping lane left side connection face first half and the piping lane right side respectively, the whole zigzag shape that is of piping lane, the left connecting plate and the right connecting plate looks adaptation of adjacent piping lane, the left connecting plate and the right connecting plate of adjacent piping lane are the joint formula.
Through adopting the above technical scheme, when the installation piping lane, the left connecting plate of piping lane is connected rather than the right connecting plate of the adjacent piping lane in right side, the right connecting plate of piping lane is connected rather than the left connecting plate of the adjacent piping lane in left side, at this moment, the right connecting plate top of the adjacent piping lane in its left side is arranged in to the left connecting plate of piping lane, the top of the right connecting plate of piping lane is arranged in to the left connecting plate of the adjacent piping lane in its right side, make the mutual joint of connecting plate about the adjacent piping lane, realize the more firm connection between the adjacent piping lane, make the relative position between the piping lane more stable, be difficult for sliding.
Optionally, the one end that the face is connected on the left side of pipe rack is kept away from to left side connecting plate is less than the one end that left side connecting plate is close to the face is connected on the left side of pipe rack, and the one end that the face is connected on the right side of pipe rack is kept away from to right side connecting plate is less than the one end that right side connecting plate is close to the face is.
Through adopting above-mentioned technical scheme, there is certain slope in the face between the horizontally connect of left connecting plate and right connecting plate, and the side view of left connecting plate and right connecting plate is right angle trapezoidal form, and when left connecting plate and right connecting plate joint, the inclined plane makes the joint structure between left connecting plate and the right connecting plate more firm, makes the joint structure between the adjacent piping lane more stable, improves the stability that the piping lane is connected, makes it difficult for taking place mutual slip.
Optionally, a sealing strip is fixedly arranged at the joint of the left connecting plate and the right connecting plate.
Through adopting above-mentioned technical scheme, the sealing strip makes can realize closed being connected between two adjacent piping lane's left connecting plate and the right connecting plate, prevents that external sand and dust and rainwater from getting into the piping lane, keeps the piping lane internal environment to be in the clean and tidy state relatively, improves the ability of the inside facility of piping lane protection.
Optionally, a plurality of fixed blocks have been set firmly on the horizontal slope surface of left side connecting plate, have seted up a plurality of fixed slots on the horizontal slope surface of right side connecting plate, and the fixed block is located the fixed slot under, fixed block and fixed slot looks adaptation.
Through adopting above-mentioned technical scheme, when two adjacent piping lane were installed together, the fixed block between two adjacent piping lane can the disect insertion fixed slot, and connection structure between fixed slot and the fixed block makes the connection between two adjacent piping lane more firm to the stability of piping lane connection has further been strengthened.
Optionally, a damping spring is fixedly arranged in front of the left connecting plate and the right connecting plate and is located between the fixing block and the fixing groove.
Through adopting above-mentioned technical scheme, when the piping lane received external crowded extrusion, damping spring between the piping lane was taken place elastic deformation by external force extrusion, can reduce the interact power between left connecting plate and the right connecting plate, prevents that left connecting plate and right connecting plate from because hard extrusion breaks off, and damping spring has protected the piping lane effectively, improves the practicality of piping lane.
Optionally, the stopper has set firmly respectively in the vertical direction of left side connecting plate and right connecting plate junction, and the stopper is parallel with the vertical direction of left connecting plate, has seted up the spacing groove in the vertical direction of right connecting plate and left connecting plate junction, and the spacing groove is parallel with the vertical direction of right connecting plate, and the stopper is located the spacing groove just right-hand internal and slides along the direction of spacing groove, stopper and spacing groove looks adaptation.
Through adopting above-mentioned technical scheme, when splicing two adjacent pipe galleries, earlier one pipe gallery position fixation, place next pipe gallery in preceding pipe gallery rear again, the stopper and the spacing groove of looks adaptation slide each other between the left connecting plate of adjacent pipe gallery and the right connecting plate this moment to make the installation work between two adjacent pipe galleries more simple and convenient, stopper and spacing groove also make difficult emergence horizontal slip between two adjacent pipe galleries, increase the stability of pipe gallery installation.
Optionally, the limiting block and the limiting groove are both trapezoidal.
Through adopting above-mentioned technical scheme, stopper and spacing groove pass through the mutual joint of trapezoidal shape, have not only guaranteed to be difficult for taking place horizontal slip between two adjacent piping lane, have also avoided sliding around taking place between two adjacent piping lanes, make the joint structure between two adjacent piping lanes more firm.
Optionally, two openings have been seted up respectively at the both ends at piping lane top, and four cutting of piping lane top fixedly connected with, the cutting are the U-shaped, and the cutting runs through and goes out from two openings that adjacent piping lane is neighbouring respectively.
Through adopting above-mentioned technical scheme, when the installation piping lane, the lifting rope can go deep into in the opening at piping lane top, and four openings make the piping lane can be hoisted by the lifting machine level, realize the joint formula between two adjacent piping lanes of being convenient for and connect, and the installation back that finishes, the cutting inserts the opening and plugs up the opening, can make the connection structure between the adjacent piping lane more stable, can prevent again that external silt and sewage from passing through inside the opening entering piping lane.
Optionally, the pipe gallery surface spraying has resistant rain-wash's protective layer.
Through adopting above-mentioned technical scheme, at the in-process of preparation piping lane, in the use of piping lane, the protective layer can protect the piping lane surface by rainwater erosion, prevents that the piping lane surface from being corroded by the rainwater, prolongs the life of piping lane.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when the installation piping lane, the left connecting plate of piping lane is connected rather than the right connecting plate of the adjacent piping lane in right side, the right connecting plate of piping lane is connected rather than the left connecting plate of the adjacent piping lane in left side, at this moment, the right connecting plate top of the adjacent piping lane in its left side is arranged in to the left connecting plate of piping lane, the top of the right connecting plate of piping lane is arranged in to the left connecting plate of the adjacent piping lane in its right side, make the mutual joint of connecting plate about the adjacent piping lane, realize the more firm connection between the adjacent piping lane, make the relative position between the piping lane more stable, be difficult for sliding.
2. When the piping lane received external crowded extrusion, damping spring between the piping lane was taken place elastic deformation by external force extrusion, can reduce the interact power between left connecting plate and the right connecting plate, prevents that left connecting plate and right connecting plate from because hard extrusion breaks, and damping spring has protected the piping lane effectively, improves the practicality of piping lane.
3. The sealing strip makes can realize closed being connected between two adjacent piping lane's left connecting plate and the right connecting plate, prevents that external sand and dust and rainwater from getting into the piping lane, keeps the piping lane internal environment to be in the clean and tidy state of relative drying, improves the ability of its inside facility of piping lane protection.
Drawings
Fig. 1 is a schematic structural view of adjacent tube lanes in the example.
FIG. 2 is a schematic structural diagram of a right connecting plate of the pipe gallery in the embodiment.
Fig. 3 is a schematic structural view of a damper spring in the embodiment.
Description of reference numerals: 1. a pipe gallery; 2. a left connecting plate; 3. a right connecting plate; 4. a limiting block; 5. a limiting groove; 6. a fixed block; 7. fixing grooves; 8. a sealing strip; 9. an opening; 10. cutting; 11. a protective layer; 12. a shock absorbing spring.
Detailed Description
The present application is described in further detail below with reference to the accompanying drawings.
The embodiment of the application discloses prefabricated piping lane.
Referring to fig. 1, a prefabricated pipe gallery, including pipe gallery 1, in the work progress of 1 construction of pipe gallery, directly will make 1 concatenation of pipe gallery in advance together, through realizing the connection between two adjacent pipe galleries 1, and then make a plurality of pipe galleries 1 link together to realize the construction of whole pipe gallery 1.
Referring to fig. 1, the first half of the face is connected on the 1 left side of piping lane has set firmly left connecting plate 2, the latter half of the face is connected on the 1 right side of piping lane has set firmly right connecting plate 3, left side connecting plate 2 is hollow arc form with right connecting plate 3, left side connecting plate 2 and right connecting plate 3's shape is the same with the shape of the face the first half is connected on the 1 left side of piping lane and piping lane 1 respectively, left side connecting plate 2 is close to the cross section of piping lane 1 and is connected the cross section integral type of the first half with the 1 left side of piping lane and be connected, right side connecting plate 3 is close to the cross section of piping lane 1 and is connected the cross section. Pipe gallery 1 wholly is the Z word shape, and adjacent pipe gallery 1's left connecting plate 2 and right connecting plate 3 looks adaptation are connected to the joint formula between pipe gallery 1 and the adjacent pipe gallery 1. When installation piping lane 1, left connecting plate 2 of piping lane 1 is connected rather than the right connecting plate 3 of the adjacent piping lane 1 in right side, right connecting plate 3 of piping lane 1 is connected rather than the left connecting plate 2 of the adjacent piping lane 1 in left side, at this moment, right connecting plate 3 top of the adjacent piping lane 1 in its left side is arranged in to left connecting plate 2 of piping lane 1, the top of right connecting plate 3 of piping lane 1 is arranged in to left connecting plate 2 of the adjacent piping lane 1 in its right side, make the mutual joint of connecting plate 3 about the adjacent piping lane 1, realize the more firm connection between the adjacent piping lane 1, can not rock because of not having interconnect between two adjacent piping lane 1, make the relative position between the adjacent piping lane 1 more stable, be difficult for taking place relative slip, guarantee the installation quality of piping lane 1.
Referring to fig. 1, the one end that left side connecting plate 2 kept away from 1 left side of piping lane is less than the one end that left side connecting plate 2 is close to 1 left side of piping lane and connects the face, and the one end that right side connecting plate 3 kept away from 1 right side of piping lane is less than the one end that right side connecting plate 3 is close to 1 right side of piping lane and connects the face, and 2 tops of left side connecting plate are domatic shape, and 3 bottoms of right side connecting plate are dom. Domatic shape looks adaptation that exists between left connecting plate 2 and right connecting plate 3's the horizontally connect, left side connecting plate 2 is right angle trapezoidal form with right connecting plate 3's side view, when left connecting plate 2 and right connecting plate 3 joint, left connecting plate 2 inclined plane top is arranged in on right connecting plate 3's inclined plane, the inclined plane makes the joint structure between left connecting plate 2 and the right connecting plate 3 more firm, make the joint structure between adjacent piping lane 1 more stable, improve the stability that piping lane 1 connects, make it difficult for taking place mutual slip.
Referring to fig. 1 and 2, stopper 4 has set firmly respectively in the vertical direction of left side connecting plate 2 and the 3 junctions of right side connecting plate, stopper 4 is parallel with the vertical direction of left side connecting plate 2, spacing groove 5 has been seted up in the vertical direction of right side connecting plate 3 and the 2 junctions of left side connecting plate, spacing groove 5 is parallel with the vertical direction of right side connecting plate 3, stopper 4 is located spacing groove 5 just right-hand interior and slides along the direction of spacing groove 5, stopper 4 and 5 looks adaptations of spacing groove. When splicing two adjacent pipe galleries 1, fix preceding pipe gallery 1 position well earlier, place back pipe gallery 1 in preceding pipe gallery 1 rear again, stopper 4 and spacing groove 5 mutual slip of looks adaptation between left connecting plate 2 and the right connecting plate 3 of adjacent pipe gallery 1 this moment, when the installation is accomplished, inside 5 spacing grooves are arranged in completely to stopper 4, thereby make the installation between two adjacent pipe galleries 1 more simple and convenient, stopper 4 also makes difficult the emergence horizontal slip between two adjacent pipe galleries 1 with spacing groove 5, increase the stability of the installation of pipe gallery 1.
Referring to fig. 1 and 2, the stopper 4 and the stopper groove 5 are each in a trapezoidal shape. Stopper 4 and spacing groove 5 are through the mutual joint of trapezoidal form, and trapezoidal joint has not only guaranteed to be difficult for taking place horizontal slip between two adjacent piping lane 1, has also avoided sliding around taking place between two adjacent piping lane 1, makes the joint structure between two adjacent piping lane 1 more firm.
Referring to fig. 1, a plurality of fixed blocks 6 are fixedly arranged on the horizontal slope surface of the left connecting plate 2, a plurality of fixed grooves 7 are formed in the horizontal slope surface of the right connecting plate 3, the fixed blocks 6 are located under the fixed grooves 7, and the fixed blocks 6 are matched with the fixed grooves 7. When two adjacent pipe racks 1 are installed together, the fixing blocks 6 between two adjacent pipe racks 1 can be directly inserted into the fixing grooves 7, and the connecting structure between the fixing grooves 7 and the fixing blocks 6 enables the connection between two adjacent pipe racks 1 to be more stable, so that the connection stability of the pipe racks 1 is further enhanced.
Referring to fig. 3, a damping spring 12 is fixedly disposed in front of the left connecting plate 2 and the right connecting plate 3, and the damping spring 12 is disposed between the fixing block 6 and the fixing groove 7. When piping lane 1 received external crowded extrusion, damping spring 12 between piping lane 1 was taken place elastic deformation by external force extrusion, can effectively reduce the interact power between left connecting plate 2 and the right connecting plate 3, prevents that left connecting plate 2 and right connecting plate 3 from because hard extrusion breaks off, and damping spring 12 has protected piping lane 1 effectively, improves piping lane 1's practicality.
Referring to fig. 1 and 2, a sealing strip 8 is fixedly arranged at the joint of the left connecting plate 2 and the right connecting plate 3. Sealing strip 8 makes can realize closed being connected between two adjacent 1's of pipe gallery left connecting plate 2 and right connecting plate 3, prevents that external sand and dust and rainwater from getting into pipe gallery 1, keeps 1 internal environment of pipe gallery to be in the clean and tidy state relatively, improves 1 ability of protecting its internal facilities of pipe gallery.
Referring to fig. 1, two openings 9 have been seted up respectively at the both ends at 1 top of pipe gallery, and four cutting 10 of 1 top fixedly connected with of pipe gallery, cutting 10 are the U-shaped, and cutting 10 runs through and goes out in two openings 9 that adjacent pipe gallery 1 is neighbouring respectively. When installation piping lane 1, in the lifting rope can go deep into opening 9 at 1 top of piping lane, four openings 9 make piping lane 1 can be hoisted by the lifting machine level, realize the joint formula between two adjacent piping lanes 1 of being convenient for and connect, the installation back that finishes, cutting 10 inserts opening 9 and plugs up opening 9, can make the connection structure between the adjacent piping lane 1 more stable, can prevent again that external silt and sewage from getting into inside 1 of piping lane through opening 9.
Referring to fig. 1 and 2, the surface of the pipe gallery 1 is coated with a protective layer 11 which is resistant to rain wash. In the use of piping lane 1, protective layer 11 can protect 1 surface of piping lane by rainwash, prevents that 1 surface of piping lane from being corroded by the rainwater, prolongs 1's of piping lane life.
The implementation principle of a prefabricated piping lane of the embodiment of this application does: the multiple joint structure between left connecting plate 2 and the right connecting plate 3 between two adjacent piping lane 1 makes the connectivity between the piping lane 1 more firm, prevents that piping lane 1 from taking place to slide each other, makes the installation of piping lane 1 operate more portably, also makes piping lane 1 play a role better in the use.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. The utility model provides a prefabricated piping lane which characterized in that: including piping lane (1), the first half of the face is connected in piping lane (1) left side has set firmly left connecting plate (2), the latter half of the face is connected in piping lane (1) right side has set firmly right connecting plate (3), left side connecting plate (2) are hollow arc form with right connecting plate (3), the shape of left side connecting plate (2) and right connecting plate (3) is the same with the shape of the face the latter half is connected in piping lane (1) left side connection face first half and piping lane (1) right side respectively, piping lane (1) wholly is the Z word shape, left connecting plate (2) and right connecting plate (3) looks adaptation of adjacent piping lane, left connecting plate (2) and right connecting plate (3) of adjacent piping lane (1) are the joint formula and are connected.
2. A prefabricated pipe gallery according to claim 1, characterized in that: left side connecting plate (2) are kept away from one end that pipe gallery (1) left side was connected the face and are less than the one end that left side connecting plate (2) are close to pipe gallery (1) left side connection face, and the one end that pipe gallery (1) right side was connected face is kept away from in right side connecting plate (3) one end that is less than right side connecting plate (3) and is close to pipe gallery (1) right side connection face.
3. A prefabricated pipe gallery according to claim 2, characterized in that: and a sealing strip (8) is fixedly arranged at the joint of the left connecting plate (2) and the right connecting plate (3).
4. A prefabricated pipe gallery according to claim 2, characterized in that: a plurality of fixing blocks (6) are fixedly arranged on the horizontal slope surface of the left connecting plate (2), a plurality of fixing grooves (7) are formed in the horizontal slope surface of the right connecting plate (3), the fixing blocks (6) are located under the fixing grooves (7), and the fixing blocks (6) are matched with the fixing grooves (7).
5. A prefabricated pipe gallery according to claim 4, characterized in that: damping spring (12) have set firmly before left connecting plate (2) and right connecting plate (3), damping spring (12) are located between fixed block (6) and fixed slot (7).
6. A prefabricated pipe gallery according to claim 1, characterized in that: stopper (4) have set firmly respectively in the vertical direction of left side connecting plate (2) and right connecting plate (3) junction, stopper (4) are parallel with the vertical direction of left connecting plate (2), spacing groove (5) have been seted up in the vertical direction of right connecting plate (3) and left connecting plate (2) junction, spacing groove (5) are parallel with the vertical direction of right connecting plate (3), stopper (4) are located spacing groove (5) right-hand interior and slide along the direction of spacing groove (5), stopper (4) and spacing groove (5) looks adaptation.
7. A prefabricated pipe gallery according to claim 6, characterized in that: the limiting blocks (4) and the limiting grooves (5) are both trapezoidal.
8. A prefabricated pipe gallery according to claim 1, characterized in that: two openings (9) have been seted up respectively to the both ends at piping lane (1) top, and four cutting (10) of piping lane top fixedly connected with, cutting (10) are the U-shaped, and cutting (10) run through and go out in two openings (9) adjacent from adjacent piping lane (1) respectively.
9. A prefabricated pipe gallery according to claim 1, characterized in that: the surface of the pipe gallery (1) is coated with a protective layer (11) resistant to rain wash.
CN202022094145.6U 2020-09-22 2020-09-22 Prefabricated piping lane Expired - Fee Related CN213448560U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022094145.6U CN213448560U (en) 2020-09-22 2020-09-22 Prefabricated piping lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022094145.6U CN213448560U (en) 2020-09-22 2020-09-22 Prefabricated piping lane

Publications (1)

Publication Number Publication Date
CN213448560U true CN213448560U (en) 2021-06-15

Family

ID=76326921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022094145.6U Expired - Fee Related CN213448560U (en) 2020-09-22 2020-09-22 Prefabricated piping lane

Country Status (1)

Country Link
CN (1) CN213448560U (en)

Similar Documents

Publication Publication Date Title
CN100580195C (en) Large depth underground continuous wall water-stop joint device
CN213448560U (en) Prefabricated piping lane
CN215519142U (en) Lap joint assembly type energy-saving building
CN113700145B (en) Modular assembly type steel structure house system
CN202810873U (en) Pipe curtain connection buckle
CN201696055U (en) Multi-span flat arch tunnel structure
CN204370417U (en) A kind of for base pit engineering external corner or the road place of going along with sb. to guard him to drawing cable bolting structure
CN215926282U (en) Steel construction connecting device for civil engineering
CN209816915U (en) Double-circular shield construction comprehensive pipe gallery
CN211057848U (en) Circular utility tunnel extensible structure of individual layer
CN210106874U (en) Slurry-proof pipeline sheath for oil platform
CN210684774U (en) Assembled concrete utility tunnel is connected to slot type
CN211500718U (en) Deep drainage regulation tunnel prevents that silt is long-pending and is convenient for mechanical section of dredging
CN210507520U (en) City utility tunnel structure
CN210766884U (en) Underground cover plate ditch suitable for pipeline collection
CN210798971U (en) Construction structure for realizing maximization of single shield tunneling length in core urban area
CN113136989A (en) Assembled shear force wall tooth's socket type connection structure
CN112343622A (en) Method for realizing underground space trenchless construction by adopting pre-constructed permanent shell
CN111997074A (en) Interim assembled concrete retaining platform subassembly
CN209816907U (en) Assembled concrete utility tunnel
CN216872814U (en) Arrangement structure of cable trench cross nodes
CN219753298U (en) Temporary plugging structure for comprehensive pipe rack construction
CN220014549U (en) Protection device for construction
CN113718784B (en) High-water-level loess stratum multi-track railway composite overhead system and construction method thereof
CN214614171U (en) Building structure built on underground water delivery pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210615