CN213420109U - Butt joint equipment for pressure vessel pipeline installation - Google Patents
Butt joint equipment for pressure vessel pipeline installation Download PDFInfo
- Publication number
- CN213420109U CN213420109U CN202021522524.4U CN202021522524U CN213420109U CN 213420109 U CN213420109 U CN 213420109U CN 202021522524 U CN202021522524 U CN 202021522524U CN 213420109 U CN213420109 U CN 213420109U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- pressure vessel
- telescopic rod
- clip
- telescopic link
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims description 9
- 210000001503 joint Anatomy 0.000 title abstract description 21
- 238000002844 melting Methods 0.000 claims description 13
- 230000008018 melting Effects 0.000 claims description 11
- 238000003032 molecular docking Methods 0.000 claims description 7
- 230000000694 effects Effects 0.000 abstract description 12
- 238000000034 method Methods 0.000 abstract description 5
- 239000012943 hotmelt Substances 0.000 description 8
- 229910001018 Cast iron Inorganic materials 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 238000003801 milling Methods 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The utility model belongs to the technical field of the butt joint equipment technique and specifically relates to a butt joint equipment is used in pressure vessel piping erection, comprises a carrying platform, fixedly connected with frame plate on the plummer, the first telescopic link of fixedly connected with on the frame plate, fixedly connected with second telescopic link on the frame plate, the lower fastener of fixedly connected with on the first telescopic link, the other end and the second telescopic link fixed connection of lower fastener, rotate through the pivot on the second telescopic link and be connected with the fastener, go up set up threaded hole on the fastener, the surface threaded connection of screw hole has the threaded rod, the socket has been seted up on the threaded rod, fixedly connected with bracket connects on the fastener down. The utility model discloses an effect of threaded rod, socket, inserted bar and screw hole for go up the clip and can be connected by firm fixed connection down between the clip, make for pressure vessel for the piping erection when its inside, can be more stable by the butt joint.
Description
Technical Field
The utility model relates to a docking equipment technical field specifically is a pressure vessel is docking equipment for piping erection.
Background
In the pipeline engineering construction, different connection methods should be selected according to the material of the used pipes. The common steel pipe is connected with a flange plate through a threaded connection and a welding connection; the seamless steel pipe, the nonferrous metal and the stainless steel pipe are mostly welded and connected with a flange; the cast iron pipes are connected by socket joints, and a small number of cast iron pipes are connected by flanges; the plastic tubing adopts threaded connection, bonding and hot melt connection etc. more, and other non-metallic pipe connection have multiple forms again, and it is people favour to have a butt joint equipment for pressure vessel piping erection in the existing market.
However, the existing butt joint equipment for installing the pressure vessel pipeline has the following problems:
1. when the pressure vessel pipeline is placed between the upper clamping buckle and the lower clamping buckle, the existing butt joint equipment for installing the pressure vessel pipeline does not need to fixedly connect the upper clamping buckle and the lower clamping buckle, so that the unstable condition can occur in the butt joint process of the pressure vessel pipeline.
2. When the existing butt joint equipment for installing the pressure vessel pipeline is used for butt joint of the pressure vessel pipeline on the uneven ground of a device, butt joint failure of the pressure vessel pipeline can be caused due to the uneven ground.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a pressure vessel is butt joint equipment for piping erection has solved the device and has been difficult for carrying out the problem of butt joint to it when difficult fixed and unsmooth inside between clip and the lower clip.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a butt joint device for pressure vessel pipeline installation comprises a bearing platform, wherein a frame plate is fixedly connected onto the bearing platform, a first telescopic rod is fixedly connected onto the frame plate, a second telescopic rod is fixedly connected onto the frame plate, a lower clip is fixedly connected onto the first telescopic rod, the other end of the lower clip is fixedly connected with the second telescopic rod, an upper clip is rotatably connected onto the second telescopic rod through a rotating shaft, a threaded hole is formed in the upper clip, a threaded rod is connected onto the outer surface of the threaded hole in a threaded manner, a socket is formed in the threaded rod, a support is fixedly connected onto the lower clip, an inserting rod is rotatably connected onto the support and is inserted into the socket, a hot melting disc is rotatably connected onto the second telescopic rod, a back plate is fixedly connected onto the bearing platform, a first groove is formed in the back plate, a second groove is formed in the bottom of the bearing platform, fixedly connected with fan on the second recess, the bottom fixedly connected with fourth telescopic link of plummer, the surface cover of fourth telescopic link is equipped with the spring, the bottom fixedly connected with connecting plate of fourth telescopic link, the both ends of spring respectively with fourth telescopic link and connecting plate fixed connection, the bottom fixedly connected with pillar of connecting plate, the surface sliding connection of pillar has hollow post, the inside fixedly connected with fifth telescopic link of hollow post, fifth telescopic link and pillar fixed connection, the bottom fixedly connected with bottom plate of fifth telescopic link, bottom plate and hollow post fixed connection.
As an optimal technical solution of the present invention, the number of the upper clips is two, every the upper clips and every the lower clips are respectively distributed on two sides of the plummer.
As an optimal technical scheme of the utility model, the inside fixedly connected with clamping ring pad of going up the clip, the inside fixedly connected with clamping ring pad of lower clip, the clamping ring pad is the PVC pad.
As an optimal technical scheme of the utility model, the hot melt dish is rotated through the pivot and is connected with the third telescopic link, the bottom that the third telescopic link passes through rotates through pivot and plummer and connects.
As an optimal technical scheme of the utility model, fixedly connected with pull ring on the hot melt dish, fixedly connected with pushing hands on the plummer.
As an optimized technical scheme of the utility model, the quantity of fan is a plurality of, a plurality of the fan is located the clip and is under the clip down.
(III) advantageous effects
Compared with the prior art, the utility model provides a pressure vessel is butt-joint equipment for piping erection possesses following beneficial effect:
1. this butting equipment for pressure vessel piping erection through the effect of threaded rod, socket, inserted bar and screw hole for can be by firm fixed connection on going up between the clip and the lower clip, make the butting equipment for pressure vessel piping erection when inside, can be more stable by the butt joint.
2. This butting equipment for pressure vessel piping erection through the effect of pillar, hollow post and fifth telescopic link for when the device was placed on unevenness's ground, can go adjusting device according to the condition on ground, make its surface level, thereby avoid its butt joint that influences butting equipment for pressure vessel piping erection.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic side view of the present invention;
fig. 3 is a schematic structural view of the front view of the present invention;
fig. 4 is the connecting structure schematic diagram of the threaded rod and the threaded hole of the present invention.
In the figure: 1. a bearing table; 2. a frame plate; 3. a first telescopic rod; 4. a second telescopic rod; 5. mounting a clip; 6. a lower clip; 7. a clamp ring pad; 8. a threaded hole; 9. a threaded rod; 10. a socket; 11. a support; 12. Inserting a rod; 13. a hot-melting tray; 14. a third telescopic rod; 15. a pull ring; 16. a back plate; 17. a first groove; 18. a second groove; 19. a fan; 20. a pushing handle; 21. a fourth telescopic rod; 22. a spring; 23. A connecting plate; 24. a pillar; 25. a hollow column; 26. a fifth telescopic rod; 27. a base plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-4, the present invention provides the following technical solutions: a butt joint device for pressure vessel pipeline installation comprises a bearing platform 1, a frame plate 2 is fixedly connected on the bearing platform 1, a first telescopic rod 3 is fixedly connected on the frame plate 2, a second telescopic rod 4 is fixedly connected on the frame plate 2, a lower clip 6 is fixedly connected on the first telescopic rod 3, the other end of the lower clip 6 is fixedly connected with the second telescopic rod 4, an upper clip 5 is rotatably connected on the second telescopic rod 4 through a rotating shaft, a threaded hole 8 is arranged on the upper clip 5, a threaded rod 9 is connected on the outer surface of the threaded hole 8 through a thread, a socket 10 is arranged on the threaded rod 9, a bracket 11 is fixedly connected on the lower clip 6, an inserted rod 12 is rotatably connected on the bracket 11, the inserted rod 12 is inserted into the socket 10, a hot melting disc 13 is rotatably connected on the second telescopic rod 4, a back plate 16 is fixedly connected on the bearing platform 1, a first groove 17 is arranged on the back plate 16, a second groove 18, fixedly connected with fan 19 on second recess 18, the bottom fixedly connected with fourth telescopic link 21 of plummer 1, the surface cover of fourth telescopic link 21 is equipped with spring 22, the bottom fixedly connected with connecting plate 23 of fourth telescopic link 21, spring 22's both ends respectively with fourth telescopic link 21 and connecting plate 23 fixed connection, the bottom fixedly connected with pillar 24 of connecting plate 23, the surface sliding connection of pillar 24 has hollow post 25, the inside fixedly connected with fifth telescopic link 26 of hollow post 25, fifth telescopic link 26 and pillar 24 fixed connection, the bottom fixedly connected with bottom plate 27 of fifth telescopic link 26, bottom plate 27 and hollow post 25 fixed connection.
In the embodiment, the frame plate 2 is located on both sides of the bearing platform 1 and is used for fixing the first telescopic rod 3 and the second telescopic rod 4, the first telescopic rod 3 and the second telescopic rod 4 are both electric push rods, so that the pressure vessel pipeline can be connected more closely, when the threaded rod 9 and the threaded hole 8 are in threaded connection completely, the position of the socket 10 is right in front of the inserted rod 12, the inserted rod 12 can rotate under the action of the rotating shaft, the inserted rod 12 can be inserted into the socket 10 after rotating, in this action, the threaded rod 9 moves out than the year to cause looseness between the upper clamp 5 and the lower clamp 6, the hot melting disc 13 is located in the middle of the bearing platform 1, both sides of the bearing platform 1 can perform hot melting on the pressure vessel pipeline, in the process of rotating the hot melting disc 13 to the first groove 17, the third telescopic rod 14 plays a supporting role, and simultaneously, when the hot melting disc 13 is not rotated, the third telescopic link 14 also plays the effect of support to it, the effect of fourth telescopic link 21 and spring 22 plays buffering absorbing effect to the device, avoid it to cause the influence to the water pipe of hot melt in-process because of external force, fifth telescopic link 26 is electric putter also, when fifth telescopic link 26 starts, alright in order to adjust the position of pillar 24, thereby can change the height of device, the fifth telescopic link 26 of both sides can not synchronous start, its purpose is in order to be in uneven ground, can go to adjust the level on plummer 1 surface through fifth telescopic link 26, avoid causing the influence to the butt joint of pressure vessel pipeline.
Specifically, the number of the upper clips 5 is two, and each upper clip 5 and each lower clip 6 are respectively distributed on two sides of the carrier table 1.
In this embodiment, one upper clip 5 and one lower clip 6 are a set, and two sets of upper clips 5 and lower clips 6 are respectively used for placing pressure vessel pipes on two sides, and the pressure vessel pipes on two sides are fixed, so that the two pressure vessel pipes can be conveniently butted.
Specifically, the inside of the upper clip 5 is fixedly connected with a clip pad 7, the inside of the lower clip 6 is fixedly connected with a clip pad 7, and the clip pad 7 is a PVC pad.
In this embodiment, when the PVC pad is used, the upper clip 5 and the lower clip 6 are placed to fix the pressure vessel pipe, so as to damage the pressure vessel pipe, and protect the pressure vessel pipe.
Specifically, the hot melting disc 13 is rotatably connected with a third telescopic rod 14 through a rotating shaft, and the bottom of the third telescopic rod 14 is rotatably connected with the bearing platform 1 through the rotating shaft.
In this embodiment, the effect of supporting hot melt dish 13 is played during the effect of third telescopic link 14, and when hot melt dish 13 in the condition of rotation and non-rotation, third telescopic link 14 all can make it can be more stable.
Specifically, the hot melting disc 13 is fixedly connected with a pull ring 15, and the bearing platform 1 is fixedly connected with a push handle 20.
In this embodiment, the pull ring 15 is used to pull the hot melt disk 13 to place the hot melt disk 13 on the first groove 17.
Specifically, the number of the fans 19 is several, and the several fans 19 are located right below the upper clip 5 and the lower clip 6.
In this embodiment, the fan 19 is used to rapidly cool the pressure vessel pipelines after the completion of the connection, so that the two pressure vessel pipelines can be connected more tightly.
The utility model discloses a theory of operation and use flow: when the pressure vessel pipeline is placed on the lower clip 6, the upper clip 5 is covered, the threaded rod 9 is rotated to enable the threaded rod 9 to be in threaded connection with the threaded hole 8, after the threaded rod 9 is inserted into the threaded hole 8, the inserted rod 12 is inserted into the inserting hole 10, the effect of fixing the upper clip 5 and the lower clip 6 can be achieved, the pressure vessel pipeline can be more stable when being butted, after the pressure vessel pipelines on two sides are placed and fixed, the pipeline openings of the two pipelines are ground flat by using a milling cutter, the ground pipelines are hot-melted by the pull ring 15, the pull ring 15 is placed in the first groove 17 after hot melting is completed, the first telescopic rod 3 and the second telescopic rod 4 are started again, the pressure vessel pipelines on two sides can be aligned, the two pipelines after alignment can be butted, after connection is completed, the second groove 18 is started, the connected pipelines can be quickly heated, be convenient for its better fixed connection, through the effect of pillar 24, hollow post 25 and fifth telescopic link 26, can be so that the device on some unevenness's ground, can be according to the effect height of the condition adjusting device on ground for it can be better dock the pressure vessel pipeline, avoid it to lead to the butt joint failure because of the reason of unevenness on ground.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (6)
1. The utility model provides a pressure vessel is butt-joint equipment for piping erection, includes plummer (1), its characterized in that: the frame plate (2) is fixedly connected to the bearing platform (1), the first telescopic rod (3) is fixedly connected to the frame plate (2), the second telescopic rod (4) is fixedly connected to the frame plate (2), the lower clip (6) is fixedly connected to the first telescopic rod (3), the other end of the lower clip (6) is fixedly connected to the second telescopic rod (4), the upper clip (5) is rotatably connected to the second telescopic rod (4) through a rotating shaft, a threaded hole (8) is formed in the upper clip (5), a threaded rod (9) is connected to the outer surface of the threaded hole (8) in a threaded manner, a socket (10) is formed in the threaded rod (9), a support (11) is fixedly connected to the lower clip (6), an inserting rod (12) is rotatably connected to the support (11), the inserting rod (12) is inserted into the socket (10), and a hot-melting disc (13) is rotatably connected to the second telescopic rod (4), fixedly connected with backplate (16) on plummer (1), first recess (17) have been seted up on backplate (16), second recess (18) have been seted up to the bottom of plummer (1), fixedly connected with fan (19) on second recess (18), the bottom fixedly connected with fourth telescopic link (21) of plummer (1), the surface cover of fourth telescopic link (21) is equipped with spring (22), the bottom fixedly connected with connecting plate (23) of fourth telescopic link (21), the both ends of spring (22) respectively with fourth telescopic link (21) and connecting plate (23) fixed connection, the bottom fixedly connected with pillar (24) of connecting plate (23), the surface sliding connection of pillar (24) has hollow post (25), the inside fixedly connected with fifth telescopic link (26) of hollow post (25), the fifth telescopic rod (26) is fixedly connected with the support column (24), the bottom of the fifth telescopic rod (26) is fixedly connected with a bottom plate (27), and the bottom plate (27) is fixedly connected with the hollow column (25).
2. The docking apparatus for pipeline installation of a pressure vessel according to claim 1, wherein: the number of the upper clamping buckles (5) is two, and each upper clamping buckle (5) and each lower clamping buckle (6) are respectively distributed on two sides of the bearing platform (1).
3. The docking apparatus for pipeline installation of a pressure vessel according to claim 1, wherein: go up the inside fixedly connected with clamp ring pad (7) of clip (5), the inside fixedly connected with clamp ring pad (7) of clip (6) down, clamp ring pad (7) are the PVC pad.
4. The docking apparatus for pipeline installation of a pressure vessel according to claim 1, wherein: the hot melting plate (13) is rotatably connected with a third telescopic rod (14) through a rotating shaft, and the bottom of the third telescopic rod (14) is rotatably connected with the bearing platform (1) through the rotating shaft.
5. The docking apparatus for pipeline installation of a pressure vessel according to claim 1, wherein: the hot melting disc (13) is fixedly connected with a pull ring (15), and the bearing platform (1) is fixedly connected with a push handle (20).
6. The docking apparatus for pipeline installation of a pressure vessel according to claim 1, wherein: the number of the fans (19) is a plurality, and the fans (19) are located right below the upper clamp buckles (5) and the lower clamp buckles (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021522524.4U CN213420109U (en) | 2020-07-28 | 2020-07-28 | Butt joint equipment for pressure vessel pipeline installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021522524.4U CN213420109U (en) | 2020-07-28 | 2020-07-28 | Butt joint equipment for pressure vessel pipeline installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213420109U true CN213420109U (en) | 2021-06-11 |
Family
ID=76255196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021522524.4U Expired - Fee Related CN213420109U (en) | 2020-07-28 | 2020-07-28 | Butt joint equipment for pressure vessel pipeline installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213420109U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113606398A (en) * | 2021-08-10 | 2021-11-05 | 吉林建筑大学 | Drainage pipe connecting device for bridge construction |
-
2020
- 2020-07-28 CN CN202021522524.4U patent/CN213420109U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113606398A (en) * | 2021-08-10 | 2021-11-05 | 吉林建筑大学 | Drainage pipe connecting device for bridge construction |
CN113606398B (en) * | 2021-08-10 | 2022-11-18 | 吉林建筑大学 | Drainage pipe connecting device for bridge construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2019095777A1 (en) | Irregular pipe welding fixture | |
CN213420109U (en) | Butt joint equipment for pressure vessel pipeline installation | |
CN211288989U (en) | Pipeline connecting device for hydraulic engineering | |
CN111546641A (en) | Hot-melting connection process for PE plastic pipes | |
CN213888916U (en) | Be applied to pipeline welded mounting fixture | |
CN218118860U (en) | Pipeline connection supporting mechanism for water conservancy construction | |
CN217618651U (en) | Self-adaptive tool for pipeline welding | |
CN212218021U (en) | Straight welded pipe welding seam grinding device | |
CN212239882U (en) | Clamping device for building welding | |
CN209703555U (en) | A kind of novel piping lane support system | |
CN207414673U (en) | A kind of solar photovoltaic bracket welds positioning tool | |
CN214082915U (en) | Precision plastic pipeline rapid welding equipment | |
CN218874303U (en) | Water conservancy pipeline butt joint supports auxiliary frame | |
CN207272993U (en) | A kind of mobile phone screen clamping device | |
CN213646491U (en) | Pipeline hot melting fixture | |
CN221270215U (en) | Welding joint aligning device for stainless steel welding pipe | |
CN220260001U (en) | Galvanized sheet welding machine | |
CN221880466U (en) | Connecting device | |
CN217530766U (en) | Corrugated pipe butt joint device | |
CN219236184U (en) | Heating and ventilation engineering pipeline connecting device | |
CN215999246U (en) | Welding processing platform for building | |
CN213512503U (en) | Pipeline connecting device for electrical installation of automation equipment | |
CN214641507U (en) | Adjustable pipe welding tool | |
CN219151967U (en) | Refractory clay mounting welding jig | |
CN218599011U (en) | Pipeline interfacing apparatus is used in running water construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210611 |
|
CF01 | Termination of patent right due to non-payment of annual fee |