CN219236184U - Heating and ventilation engineering pipeline connecting device - Google Patents
Heating and ventilation engineering pipeline connecting device Download PDFInfo
- Publication number
- CN219236184U CN219236184U CN202320473809.0U CN202320473809U CN219236184U CN 219236184 U CN219236184 U CN 219236184U CN 202320473809 U CN202320473809 U CN 202320473809U CN 219236184 U CN219236184 U CN 219236184U
- Authority
- CN
- China
- Prior art keywords
- hot
- heating
- mounting arm
- mounting
- ventilation engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010438 heat treatment Methods 0.000 title claims abstract description 17
- 238000009423 ventilation Methods 0.000 title claims abstract description 17
- 239000012943 hotmelt Substances 0.000 claims description 35
- 238000009434 installation Methods 0.000 claims description 6
- 238000002844 melting Methods 0.000 abstract description 16
- 230000008018 melting Effects 0.000 description 2
- 239000004429 Calibre Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
Landscapes
- Lining Or Joining Of Plastics Or The Like (AREA)
Abstract
The utility model discloses a heating and ventilation engineering pipeline connecting device in the technical field of heating and ventilation pipeline connection, which comprises a mounting table and two pipeline clamps fixedly arranged on the mounting table, wherein a placing component for placing a hot-melting device is arranged on the front surface of the mounting table, the placing component comprises a mounting arm and a clamp for clamping the hot-melting device, the mounting arm is transversely arranged on the front surface of the mounting table in a sliding manner, the upper end of the front side of the mounting arm is rotationally provided with the clamp, the hot-melting device can be fixed through the placing component, and a worker only needs to control the hot-melting device to tilt upwards or put down during working, so that the operation is simpler and more convenient.
Description
Technical Field
The utility model relates to the technical field of heating and ventilation pipeline connection, in particular to a heating and ventilation engineering pipeline connection device.
Background
When the nonmetallic pipeline of the heating and ventilation engineering pipe is butted with the nonmetallic pipeline, the pipeline is generally connected by adopting hot melt connection;
when carrying out the hot melt connection to the pipeline, just need use the hot melt ware, the hot melt ware can heat the interface of pipeline and melt, need use the hot melt support when carrying out the hot melt welding to heavy-calibre pipeline, have about two anchor clamps on the hot melt support, about two anchor clamps are used for the centre gripping respectively about two pipelines, then the staff holds the hot melt ware and heats the back of pipeline interface and connect again.
However, the traditional hot-melting bracket is not provided with a placement position of the hot-melting device, when in hot melting, a worker must hold the hot-melting device and then control the bracket by the other hand, so that the operation by a single person is very inconvenient, meanwhile, after the hot melting is finished, the two left and right pipelines are required to be butted, at this time, the hot-melting device is required to be taken out from the middle position of the two left and right pipelines, the hot-melting device is required to be placed at a stable position after being taken out, and the hot-melting device is required to be repeatedly taken when in hot-melting connection, so that the hot-melting bracket is not convenient to use.
Based on the above, the utility model designs a heating and ventilation engineering pipeline connecting device to solve the above problems.
Disclosure of Invention
The utility model aims to provide a heating and ventilation engineering pipeline connecting device which solves the problems of the prior art in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the heating and ventilation engineering pipeline connecting device comprises a mounting table and two pipeline clamps fixedly arranged on the mounting table, wherein a placing component used for placing a hot-melt device is arranged on the front surface of the mounting table, the placing component comprises a mounting arm and a clamp used for clamping the hot-melt device, the mounting arm is transversely arranged on the front surface of the mounting table in a sliding manner, and the upper end of the front side of the mounting arm is rotationally provided with the clamp;
as a further scheme of the utility model, the clamp comprises a base, a fixed edge and a movable edge, wherein the base is rotatably arranged at the upper end of the mounting arm, the fixed edge is fixedly arranged on one side of the base, and the movable edge is adjustably arranged on one side of the base far away from the fixed edge through a screw;
as a further scheme of the utility model, a rear locking table is fixedly arranged at the rear side of the upper end of the mounting arm, and a front locking table is fixedly arranged on the front surface of the mounting arm;
as a further scheme of the utility model, rubber pads are arranged on the opposite sides of the fixed edge and the movable edge;
as a further scheme of the utility model, the front side of the lower surface of the mounting arm is fixedly provided with a supporting leg;
as a further scheme of the utility model, the lower ends of the supporting legs are provided with rollers;
compared with the prior art, the utility model has the beneficial effects that:
this device is through sliding the setting up the installation arm in the mount table the place ahead, the rotation is provided with anchor clamps on the installation arm, can press from both sides tight hot-melt ware through anchor clamps, then the staff still can hold the hot-melt ware and carry out the left and right sides and remove, carry out normal hot-melt work, but the staff can not need to hold the hot-melt ware all the time with the hand, it is lighter in carrying out the during operation, the staff can push down the handle of hot-melt ware front end simultaneously, make the upward perk of hot-melt ware follow left and right sides and leave between two pipelines, no longer need the repeated hot-melt ware of taking away, whole device use is more convenient.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings that are needed for the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of a placement module according to the present utility model;
FIG. 3 is a schematic view of the structure of the mounting arm portion of the present utility model;
fig. 4 is a right side view schematically showing a sectional structure of a mounting arm in the present utility model.
In the drawings, the list of components represented by the various numbers is as follows:
1. a mounting table; 2. a pipe clamp; 3. a mounting arm; 4. a base; 5. fixing the edges; 6. a movable edge; 7. a screw; 8. a rear locking stage; 9. a front locking stage; 10. a rubber pad; 11. support legs;
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, the present utility model provides a technical solution: the heating and ventilation engineering pipeline connecting device comprises a mounting table 1 and two pipeline clamps 2 fixedly arranged on the mounting table 1, wherein a placement component for placing a hot-melt device is arranged on the front surface of the mounting table 1, the placement component comprises a mounting arm 3 and a clamp for clamping the hot-melt device, the mounting arm 3 is transversely arranged on the front surface of the mounting table 1 in a sliding manner, and the upper end of the front side of the mounting arm 3 is rotatably provided with the clamp;
when carrying out pipeline hot melt connection, the staff can press from both sides tight hot melt ware through anchor clamps, because installation arm 3 slides and sets up in the mount table 1 front end, so still can be free transversely remove the hot melt ware after pressing from both sides tight hot melt ware through anchor clamps, the staff can press from both sides the handle of hot melt ware front end through pipeline anchor clamps 2 next hot melt connection, make the upward perk of hot melt ware follow left and right sides between two pipelines, the next two pipelines are close to the back and are connected together about making, the staff only need control the upward perk of hot melt ware or put down at the during operation, no longer need take the hot melt ware repeatedly, the staff also need not hold the hot melt ware by hand always when the hot melt simultaneously, the operation is more simple and convenient.
In this embodiment, anchor clamps include base 4, fixed limit 5 and movable limit 6, and base 4 rotates the setting in installation arm 3 upper end, and fixed limit 5 fixed mounting is on one side on base 4, and movable limit 6 is kept away from one side of fixed limit 5 through screw rod 7 adjustable installation on base 4, through the position of rotation screw rod 7 control movable limit 6 to it presss from both sides the hot melt ware between fixed limit 5 and movable limit 6 to come to press from both sides.
In this embodiment, the rear locking platform 8 is fixedly arranged at the rear side of the upper end of the mounting arm 3, the front locking platform 9 is fixedly arranged on the front surface of the mounting arm 3, and the front and rear positions of the base 4 are limited by the front locking platform 9 and the rear locking platform 8, so that the working state and the vertical lifting state of the hot-melt machine are corresponding.
In this embodiment, rubber pads 10 are installed on the opposite sides of the fixed edge 5 and the movable edge 6, so as to prevent damage to the shell of the hot-melting device when the hot-melting device is clamped.
In this embodiment, the front side of the lower surface of the mounting arm 3 is fixedly provided with a supporting leg 11, which supports the mounting arm 3 and maintains the stability of the whole device.
In this embodiment, the lower ends of the supporting legs 11 are provided with rollers, which facilitate the movement of the mounting arm 3.
Claims (6)
1. The utility model provides a heating and ventilation engineering pipeline connecting device, includes mount table (1) and two pipeline anchor clamps (2) of fixed setting on mount table (1), its characterized in that: the hot-melt machine is characterized in that a placing component used for placing the hot-melt machine is arranged on the front surface of the mounting table (1), the placing component comprises a mounting arm (3) and a clamp used for clamping the hot-melt machine, the mounting arm (3) is arranged on the front surface of the mounting table (1) in a transversely sliding mode, and the clamp is rotationally arranged at the upper end of the front side of the mounting arm (3).
2. A heating and ventilation engineering pipe connection according to claim 1, wherein: the fixture comprises a base (4), a fixed edge (5) and a movable edge (6), wherein the base (4) is rotatably arranged at the upper end of an installation arm (3), the fixed edge (5) is fixedly installed on one side of the base (4), and the movable edge (6) is adjustably installed on one side, far away from the fixed edge (5), of the base (4) through a screw (7).
3. A heating and ventilation engineering pipe connection device according to claim 2, wherein: the rear locking table (8) is fixedly arranged at the rear side of the upper end of the mounting arm (3), and the front locking table (9) is fixedly arranged on the front surface of the mounting arm (3).
4. A heating and ventilation engineering pipe connection device according to claim 2, wherein: rubber pads (10) are arranged on the opposite surfaces of the fixed edge (5) and the movable edge (6).
5. A heating and ventilation engineering pipe connection according to claim 1, wherein: support legs (11) are fixedly arranged on the front sides of the lower surfaces of the mounting arms (3).
6. A heating and ventilation engineering pipe connection according to claim 5, wherein: the lower ends of the supporting legs (11) are provided with rollers.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320473809.0U CN219236184U (en) | 2023-03-14 | 2023-03-14 | Heating and ventilation engineering pipeline connecting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320473809.0U CN219236184U (en) | 2023-03-14 | 2023-03-14 | Heating and ventilation engineering pipeline connecting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219236184U true CN219236184U (en) | 2023-06-23 |
Family
ID=86809355
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320473809.0U Active CN219236184U (en) | 2023-03-14 | 2023-03-14 | Heating and ventilation engineering pipeline connecting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219236184U (en) |
-
2023
- 2023-03-14 CN CN202320473809.0U patent/CN219236184U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN219236184U (en) | Heating and ventilation engineering pipeline connecting device | |
| CN109130202A (en) | A kind of water pipe docking facilities of Hydroelectric Project Construction | |
| CN210587599U (en) | A new type of welding auxiliary device | |
| CN218612217U (en) | A metal fitting welding device | |
| CN214816229U (en) | An adjustable welding support device for welding | |
| CN220161678U (en) | Welding positioning fixture | |
| CN208068907U (en) | Vertical valve pillar welder | |
| CN214354295U (en) | Dedicated hot melt welding device of PE pipe | |
| CN213702331U (en) | Rear tailstock assembly welding tool for folding bicycle | |
| CN215723578U (en) | Connecting device for heating and ventilating pipeline of commodity room | |
| CN210549251U (en) | Elbow tee joint welding tool | |
| CN220993296U (en) | Welding correction device | |
| CN211054428U (en) | Positioning mechanism of hot melting tool | |
| CN214222200U (en) | Pipe angle control device | |
| CN217045088U (en) | A clamping device for a laser cutting machine | |
| CN218612553U (en) | Welding tool for copper liquid separator of central air conditioner | |
| CN215433417U (en) | Positioning device for assembling motorcycle parts | |
| CN221621283U (en) | Positioning device for welding muffler | |
| CN223185846U (en) | A jig capable of double-sided welding | |
| CN216370576U (en) | Electric welding gun capable of automatically replacing welding rod | |
| CN221231899U (en) | Clamping device for electric welding | |
| CN222134237U (en) | Milling clamp for automobile parts | |
| CN213531410U (en) | A rear shelf clamp | |
| CN212526881U (en) | Steel pipe clamping device for machining | |
| CN214111545U (en) | High-efficient stable portable hot melt machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |