CN213418436U - Overhanging scaffold for construction engineering - Google Patents

Overhanging scaffold for construction engineering Download PDF

Info

Publication number
CN213418436U
CN213418436U CN202022138421.4U CN202022138421U CN213418436U CN 213418436 U CN213418436 U CN 213418436U CN 202022138421 U CN202022138421 U CN 202022138421U CN 213418436 U CN213418436 U CN 213418436U
Authority
CN
China
Prior art keywords
bottom plate
fixedly connected
connecting block
connecting rod
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022138421.4U
Other languages
Chinese (zh)
Inventor
张博文
牛春霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022138421.4U priority Critical patent/CN213418436U/en
Application granted granted Critical
Publication of CN213418436U publication Critical patent/CN213418436U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a scaffold frame of encorbelmenting for building engineering construction relates to scaffold frame technical field, including wall body and fixed knot structure, the fixed surface of wall body is connected with the link, the fixed surface of link is connected with the support frame, the other end and the wall body fixed connection of support frame, the upper surface of link is with the help of fixed knot structure fixedly connected with bottom plate, the surface of link is equipped with fixed knot and constructs, fixed knot constructs including the lantern ring, the inner wall and the link fixed connection of the lantern ring, the fixed surface of the lantern ring is connected with the connecting block, the inside of connecting block is inserted and is equipped with the connecting rod, the surface and the connecting block sliding connection of connecting rod, the lateral wall of connecting block is equipped with the square plate, the square plate is close to the one. The utility model discloses, solved traditional scaffold and used steel wire strip to connect the bottom plate when putting up usually, a steel wire is twisted up very troublesome, and also very troublesome problem when dismantling.

Description

Overhanging scaffold for construction engineering
Technical Field
The utility model relates to a scaffold technical field especially relates to building engineering construction is with scaffold frame of encorbelmenting.
Background
The scaffold is a working platform which is erected for ensuring each construction process to be carried out smoothly; the scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form.
Along with the development of society, the building is more and more, and the use of scaffold frame is more and more extensive, and the construction of scaffold frame also has a relation to workman's life safety, and traditional scaffold frame uses steel wire strip to connect the bottom plate when constructing usually, and it is very troublesome that a steel wire is twisted up, and is also very troublesome when dismantling.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the builder's jack is used in the building engineering construction that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the cantilever scaffold for the construction of the building engineering comprises a wall body and a fixing structure, wherein a connecting frame is fixedly connected to the surface of the wall body, a supporting frame is fixedly connected to the surface of the connecting frame, the other end of the supporting frame is fixedly connected with the wall body, a bottom plate is fixedly connected to the upper surface of the connecting frame by means of the fixing structure, a fixing structure is arranged on the surface of the connecting frame and comprises a sleeve ring, the inner wall of the sleeve ring is fixedly connected with the connecting frame, a connecting block is fixedly connected to the surface of the sleeve ring, a connecting rod is inserted into the connecting block, the surface of the connecting rod is slidably connected with the connecting block, a square plate is arranged on the side wall of the connecting block, a cylinder is fixedly connected to one end, close to the connecting block, of the square plate, a connecting column is fixedly connected to the bottom, and one end of the gear, which is far away from the connecting column, is in threaded connection with a bolt, and the other end of the bolt is in threaded connection with the connecting column.
Preferably, the shape of connecting rod is hook form, and the long arm end of hook form connecting rod is inserted and is established in the inside of bottom plate and be connected with the connecting block, the short arm end of connecting rod is inserted and is established on the surface of bottom plate, and the connecting rod long arm end is close to the one end of connecting block and has seted up the circular slot, the shape looks adaptation of cylindrical shape and circular slot.
Preferably, the connecting block is provided with a connecting groove relative to the position of the cylinder, and the cylinder is connected with the connecting block and the connecting rod in a sliding manner by means of the connecting groove.
Preferably, the quantity of square plate is two, and two equal fixedly connected with stock of one end that square plate is close to each other, two the stock is located the both sides of gear respectively.
Preferably, the upper surface of bottom plate is equipped with clean structure, clean structure includes the broom, the surface and the bottom plate of broom are with the help of bolt swing joint, the one end fixedly connected with baffle of wall body is kept away from to the bottom plate, the surface of bottom plate is equipped with collects the box, the fixed surface of collecting the box is connected with the rectangular piece, the one end fixedly connected with cutting that the rectangular piece is close to the bottom plate.
Preferably, the number of the long blocks is two, the two long blocks are respectively positioned at two sides of the collecting box, the surface of the bottom plate is provided with slots, and the sizes of the slots are matched with the sizes of the inserting strips.
Compared with the prior art, the utility model has the advantages and positive effects that,
1. in the utility model, through setting up the fixed structure, when needing to set up the bottom plate, first place the bottom plate on the surface of the lantern ring, four lantern rings will prop up the bottom plate at the same plane of bottom at this moment, then insert the connecting rod in bottom plate and connecting block, the long arm end of connecting rod is inserted inside the connecting block at this moment, and circular slot and spread groove are located the same line, at this moment, the gear is rotated, the gear will drive two long poles to move towards one end that is close to each other, the long pole will drive the square plate to move, the square plate will drive the cylinder to insert inside the connecting rod with the help of spread groove, circular slot, screw up the bolt on the gear surface at this moment, the bolt will fix the gear and prevent the gear from becoming flexible, at this moment the cylinder will restrict the movement of connecting rod, will keep the connection of bottom plate and link, it is usually to use the steel wire strip to connect, and is troublesome when disassembled.
2. In the utility model, through arranging the cleaning structure, because the bottom plate is solid, building materials are easy to be accumulated on the bottom plate when in construction, and after more chips are accumulated, workers are easy to slip when moving and are injured, therefore, after more chips are accumulated on the surface of the bottom plate, the broom on the surface of the bottom plate is taken up, the surface of the bottom plate is provided with the placing groove, and the shape of the placing groove is matched with that of the broom, therefore, the broom cannot influence the walking of the workers at ordinary times, then the broom cleans the chips along the surface of the bottom plate, cleans the chips along the bottom plate towards the direction of the baffle, when the chips touch the baffle, the chips fall into the collecting box along the baffle, then the inserting strips on the surface of the collecting box are taken out from the surface of the bottom plate, the collecting box is taken away by the workers, the problem of multilayer when in construction due to scaffolds is solved, if the chips are cleaned at will, easily influence the construction of bottom workers.
Drawings
Fig. 1 is a schematic perspective view of the cantilever scaffold for construction of building engineering according to the present invention;
fig. 2 is a partial schematic view of the fixing structure of the overhanging scaffold for construction of building engineering of the present invention;
fig. 3 is a schematic view of the bottom side structure of fig. 2 in the overhanging scaffold for construction of construction engineering of the present invention;
fig. 4 is the utility model provides a building engineering construction is with partial schematic diagram of clean structure in the scaffold frame of encorbelmenting.
Illustration of the drawings: 1. a wall body; 2. a connecting frame; 3. a support frame; 4. a base plate; 5. a fixed structure; 51. a collar; 52. connecting blocks; 53. a connecting rod; 54. a square plate; 55. a cylinder; 56. a long rod; 57. connecting columns; 58. a gear; 6. cleaning the structure; 61. a broom; 62. a baffle plate; 63. a collection box; 64. a long block; 65. and (5) cutting.
Detailed Description
In order to make the above objects, features and advantages of the present invention more clearly understood, the present invention will be further described with reference to the accompanying drawings and examples. It should be noted that the embodiments and features of the embodiments of the present application may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced in other ways than those specifically described herein, and therefore the present invention is not limited to the limitations of the specific embodiments of the present disclosure.
Embodiment 1, as shown in fig. 1-4, the utility model provides a scaffold frame of encorbelmenting for building engineering construction, including wall body 1 and fixed knot structure 5, the fixed surface of wall body 1 is connected with link 2, and the fixed surface of link 2 is connected with support frame 3, the other end and the fixed connection of wall body 1 of support frame 3, the upper surface of link 2 is with the help of fixed knot structure 5 fixedly connected with bottom plate 4, and the surface of link 2 is equipped with fixed knot structure 5.
The specific arrangement and function of the holding structure 5 and the cleaning structure 6 will be described in detail below.
As shown in fig. 1 and 2, the fixing structure 5 includes a collar 51, an inner wall of the collar 51 is fixedly connected with the connecting frame 2, a connecting block 52 is fixedly connected to a surface of the collar 51, a connecting rod 53 is inserted into the connecting block 52, a surface of the connecting rod 53 is slidably connected with the connecting block 52, a square plate 54 is arranged on a side wall of the connecting block 52, a cylinder 55 is fixedly connected to one end of the square plate 54 close to the connecting block 52, a connecting column 57 is fixedly connected to a bottom end of the collar 51, a gear 58 is sleeved on a surface of the connecting column 57, the inner wall of the gear 58 is rotatably connected with the connecting column 57, a bolt is screwed to one end of the gear 58 far from the connecting column 57, the other end of the bolt is screwed with the connecting column 57, the connecting rod 53 is hook-shaped, a long arm end of the hook-shaped connecting rod 53 is inserted into, and connecting rod 53 long arm end is close to the one end of connecting block 52 and has been seted up the circular slot, the shape looks adaptation of the shape of cylinder 55 and circular slot, the connecting groove has been seted up for the position of cylinder 55 to connecting block 52, cylinder 55 is with the help of connecting groove and connecting block 52, connecting rod 53 sliding connection, the quantity of square plate 54 is two, the equal fixedly connected with stock 56 of one end that two square plates 54 are close to each other, two stock 56 are located the both sides of gear 58 respectively.
The whole fixing structure 5 has the effects that by arranging the fixing structure 5, when the bottom plate 4 needs to be erected, the bottom plate 4 is firstly placed on the surfaces of the lantern rings 51, then the four lantern rings 51 support the bottom plate 4 on the same plane at the bottom, then the connecting rod 53 is inserted into the bottom plate 4 and the connecting block 52, the long arm end of the connecting rod 53 is inserted into the connecting block 52, the circular groove and the connecting groove are positioned on the same line, the gear 58 is rotated, the gear 58 drives the two long rods 56 to move towards one end close to each other, the long rod 56 drives the square plate 54 to move, the square plate 54 drives the cylinder 55 to be inserted into the connecting rod 53 through the connecting groove and the circular groove, the bolt on the surface of the gear 58 is screwed at the moment, the bolt fixes the gear 58 to prevent the gear 58 from loosening, the cylinder 55 limits the movement of the connecting rod 53 at the moment, the connection between the bottom plate 4 and the connecting frame 2 is kept, the problem that the traditional scaffold usually uses, a problem that a wire is very troublesome to screw up and troublesome to disassemble.
As shown in fig. 1 and 4, the upper surface of the bottom plate 4 is provided with a cleaning structure 6, the cleaning structure 6 comprises a broom 61, the surface of the broom 61 is movably connected with the bottom plate 4 through a bolt, the bottom plate 4 is far away from a baffle 62 fixedly connected with one end of the wall body 1, the surface of the bottom plate 4 is provided with a collecting box 63, the surface of the collecting box 63 is fixedly connected with a long block 64, the long block 64 is close to an inserting strip 65 fixedly connected with one end of the bottom plate 4, the number of the long blocks 64 is two, the two long blocks 64 are respectively positioned at two sides of the collecting box 63, a slot is formed in the surface of the bottom plate 4, and the size of the slot is.
The whole cleaning structure 6 achieves the effect that, by arranging the cleaning structure 6, because the bottom plate 4 is solid, building materials are easy to accumulate on the bottom plate 4 when in construction, and after more chips are accumulated, workers are easy to slip and hurt when moving, therefore, when more chips are accumulated on the surface of the bottom plate 4, the broom 61 on the surface of the bottom plate 4 is taken up, the surface of the bottom plate 4 is provided with a placing groove, and the shape of the placing groove is matched with that of the broom 61, therefore, the broom 61 cannot influence the walking of the workers at ordinary times, then the broom 61 cleans the chips along the surface of the bottom plate 4, cleans the chips along the bottom plate 4 towards the baffle plate 62, when the chips touch the baffle plate 62, because the baffle plate 62 is inclined, the chips fall into the collecting box 63 along the baffle plate 62, then the inserting strips 65 on the surface of the collecting box 63 are drawn out from the surface of the bottom plate 4, and the workers take the collecting box 63 away, the problem of because the construction of scaffold frame during multilayer, if sweep the piece at will, influence the construction of bottom workman easily is solved.
The whole working principle is that, by arranging the fixing structure 5, when the bottom plate 4 needs to be set up, the bottom plate 4 is firstly placed on the surface of the lantern ring 51, then the four lantern rings 51 support the bottom plate 4 on the same plane of the bottom part, then the connecting rod 53 is inserted into the bottom plate 4 and the connecting block 52, at the moment, the long arm end of the connecting rod 53 is inserted into the connecting block 52, and the circular groove and the connecting groove are positioned on the same line, at the moment, the gear 58 is rotated, the gear 58 drives the two long rods 56 to move towards one end close to each other, the long rod 56 drives the square plate 54 to move, the square plate 54 drives the cylinder 55 to be inserted into the connecting rod 53 through the connecting groove and the circular groove, at the moment, the bolt on the surface of the gear 58 is screwed, the gear 58 is fixed by the bolt to prevent the gear 58 from loosening, at the moment, the cylinder 55 limits the movement of, because the bottom plate 4 is solid, building materials are easy to accumulate on the bottom plate 4 during construction, and after more chips are accumulated, workers are easy to slip and hurt when moving, when more chips are accumulated on the surface of the bottom plate 4, the broom 61 on the surface of the bottom plate 4 is picked up, the surface of the bottom plate 4 is provided with the placing groove, the shape of the placing groove is matched with that of the broom 61, therefore, the broom 61 cannot influence the walking of the workers at ordinary times, then the broom 61 is used for cleaning the chips along the surface of the bottom plate 4, the chips are cleaned along the bottom plate 4 towards the direction of the baffle plate 62, when the chips meet the baffle plate 62, the chips fall into the collecting box 63 along the baffle plate 62, then the inserting strips 65 on the surface of the collecting box 63 are drawn out from the surface of the bottom plate 4, and the workers take the collecting box 63 away.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in other forms, and any person skilled in the art may use the above-mentioned technical contents to change or modify the equivalent embodiment into equivalent changes and apply to other fields, but any simple modification, equivalent change and modification made to the above embodiments according to the technical matters of the present invention will still fall within the protection scope of the technical solution of the present invention.

Claims (6)

1. Builder's jack is encorbelmented to building engineering construction, including wall body (1) and fixed knot structure (5), its characterized in that: the wall body is characterized in that a connecting frame (2) is fixedly connected to the surface of the wall body (1), a supporting frame (3) is fixedly connected to the surface of the connecting frame (2), the other end of the supporting frame (3) is fixedly connected with the wall body (1), a bottom plate (4) is fixedly connected to the upper surface of the connecting frame (2) through a fixing structure (5), a fixing structure (5) is arranged on the surface of the connecting frame (2), the fixing structure (5) comprises a lantern ring (51), the inner wall of the lantern ring (51) is fixedly connected with the connecting frame (2), a connecting block (52) is fixedly connected to the surface of the lantern ring (51), a connecting rod (53) is inserted into the connecting block (52), the surface of the connecting rod (53) is slidably connected with the connecting block (52), a square plate (54) is arranged on the side wall of the connecting block (52), a cylinder (55) is fixedly connected to one end, close to, the bottom fixedly connected with spliced pole (57) of lantern ring (51), the surface cover of spliced pole (57) has gear (58), the inner wall and the spliced pole (57) of gear (58) rotate to be connected, the one end threaded connection that spliced pole (57) was kept away from in gear (58) has the bolt, the other end and spliced pole (57) threaded connection of bolt.
2. The cantilever scaffold for construction of building engineering according to claim 1, wherein: the shape of connecting rod (53) is the hook form, and the long arm end of hook form connecting rod (53) is inserted and is established the inside of bottom plate (4) and be connected with connecting block (52), the short arm end of connecting rod (53) is inserted and is established the surface of bottom plate (4), and connecting rod (53) long arm end is close to the one end of connecting block (52) and has seted up the circular slot, the shape of cylinder (55) and the shape looks adaptation of circular slot.
3. The cantilever scaffold for construction of building engineering according to claim 1, wherein: the connecting block (52) is provided with a connecting groove relative to the position of the cylinder (55), and the cylinder (55) is connected with the connecting block (52) and the connecting rod (53) in a sliding mode through the connecting groove.
4. The cantilever scaffold for construction of building engineering according to claim 1, wherein: the number of the square plates (54) is two, the two square plates (54) are fixedly connected with long rods (56) at one ends close to each other, and the two long rods (56) are respectively positioned at two sides of the gear (58).
5. The cantilever scaffold for construction of building engineering according to claim 1, wherein: the upper surface of bottom plate (4) is equipped with clean structure (6), clean structure (6) are including broom (61), the surface and bottom plate (4) of broom (61) are with the help of bolt swing joint, one end fixedly connected with baffle (62) of wall body (1) are kept away from in bottom plate (4), the surface of bottom plate (4) is equipped with collects box (63), the fixed surface of collecting box (63) is connected with rectangular block (64), the one end fixedly connected with cutting (65) that rectangular block (64) are close to bottom plate (4).
6. The overhanging scaffold for construction of construction engineering according to claim 5, wherein: the number of the long blocks (64) is two, the two long blocks (64) are respectively positioned at two sides of the collecting box (63), the surface of the bottom plate (4) is provided with slots, and the sizes of the slots are matched with those of the inserting strips (65).
CN202022138421.4U 2020-09-25 2020-09-25 Overhanging scaffold for construction engineering Active CN213418436U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022138421.4U CN213418436U (en) 2020-09-25 2020-09-25 Overhanging scaffold for construction engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022138421.4U CN213418436U (en) 2020-09-25 2020-09-25 Overhanging scaffold for construction engineering

Publications (1)

Publication Number Publication Date
CN213418436U true CN213418436U (en) 2021-06-11

Family

ID=76265026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022138421.4U Active CN213418436U (en) 2020-09-25 2020-09-25 Overhanging scaffold for construction engineering

Country Status (1)

Country Link
CN (1) CN213418436U (en)

Similar Documents

Publication Publication Date Title
CN213418436U (en) Overhanging scaffold for construction engineering
CN210947655U (en) Intelligent combined mounting frame for building
CN208039790U (en) A kind of movable type scaffold bracket for overhead construction of building engineering
CN210767933U (en) Safety protection type scaffold for construction
CN213234191U (en) Scaffold for building construction
CN214301326U (en) A basket is hung in construction for building municipal works
CN210263824U (en) Scaffold frame of building engineering construction usefulness
CN211817858U (en) Hanging flower basket platform for building engineering
CN210049679U (en) Safety device for road and bridge engineering
CN210798251U (en) But scaffold of automatically regulated height
CN211226135U (en) Building stones handling device
CN109779223B (en) Assembly type building external hanging platform
CN219949275U (en) Cement bin convenient to transportation
CN215797925U (en) Novel tubular pile hoist and mount is from couple
CN213260194U (en) Anti-collapse supporting base for dry-mixed mortar tank
CN214402640U (en) Installation mechanism of steel frame for building
CN214785814U (en) Shaped steel scaffold frame of encorbelmenting convenient to put thing
CN215055431U (en) Length-adjustable concrete pouring string tube device matched with jacking platform
CN219260750U (en) Hanging basket for bridge side construction
CN213742437U (en) Connecting mechanism for connecting scaffold with protective net
CN216840474U (en) Scaffold for building engineering
CN220100548U (en) Scaffold capable of increasing gallery length
CN209620540U (en) A kind of decoration steel structure scaffold
CN217759868U (en) Scaffold frame for collapsible building construction
CN216516774U (en) Scaffold for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant