CN213418328U - Dry hanging stone fixing structure - Google Patents

Dry hanging stone fixing structure Download PDF

Info

Publication number
CN213418328U
CN213418328U CN202020702487.9U CN202020702487U CN213418328U CN 213418328 U CN213418328 U CN 213418328U CN 202020702487 U CN202020702487 U CN 202020702487U CN 213418328 U CN213418328 U CN 213418328U
Authority
CN
China
Prior art keywords
stone material
connecting plate
stone
plate
lower connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020702487.9U
Other languages
Chinese (zh)
Inventor
陈水荣
陈雯
邵一闻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Haibin Construction Group Co ltd
Original Assignee
Zhejiang Haibin Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Haibin Construction Group Co ltd filed Critical Zhejiang Haibin Construction Group Co ltd
Priority to CN202020702487.9U priority Critical patent/CN213418328U/en
Application granted granted Critical
Publication of CN213418328U publication Critical patent/CN213418328U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a hang stone material fixed knot futilely constructs, its steadiness that can improve the installation of hanging the stone material futilely. The utility model provides a hang stone material fixed knot futilely constructs, includes first stone material and second stone material, and first stone material is located the below of second stone material, and lower connecting plate is connected with first stone material, and the upper junction plate is connected with the second stone material, and lower connecting plate, upper junction plate all with intermediate lamella fixed connection, upper junction plate supporting on intermediate lamella or lower connecting plate, the intermediate lamella is hung and is established on the fixed plate, is equipped with first expansion bolts on the fixed plate, the upper junction plate is equipped with the connecting portion that upwards extends, is equipped with waist shape hole on connecting portion, is equipped with second expansion bolts on waist shape hole.

Description

Dry hanging stone fixing structure
Technical Field
The utility model belongs to the technical field of the building, specifically speaking relates to a hang stone material fixed knot futilely and construct.
Background
The dry hanging stone is a decorative material of building wall surfaces, and in the prior art, the stone is directly hung on the wall surfaces through metal hanging pieces. The metal pendant supplies two stone materials that form the upper and lower distribution to install simultaneously, and the metal pendant passes through the structure of inflation screw to be fixed on the wall.
In this kind of mounting structure, for the wall, the metal pendant only sets up a fixed point, when this expansion screw assembly is not standard or appear destroying in the installation and fail in time to discover, leads to the dry stone material of hanging to drop and causes danger easily.
Disclosure of Invention
The utility model aims at providing a hang stone material fixed knot futilely constructs, its steadiness that can improve the installation of hanging the stone material futilely.
In order to solve the technical problem, the utility model discloses a technical scheme is:
the utility model provides a hang stone material fixed knot futilely constructs, includes first stone material and second stone material, and first stone material is located the below of second stone material, and lower connecting plate is connected with first stone material, and the upper junction plate is connected with the second stone material, and lower connecting plate, upper junction plate all with intermediate lamella fixed connection, upper junction plate supporting on intermediate lamella or lower connecting plate, the intermediate lamella is hung and is established on the fixed plate, is equipped with first expansion bolts on the fixed plate, the upper junction plate is equipped with the connecting portion that upwards extends, is equipped with waist shape hole on connecting portion, is equipped with second expansion bolts on waist shape hole.
On the basis of the above scheme and as a preferable scheme of the scheme: all be provided with fixed slot and last fixed slot on first stone material and the second stone material, the last fixed slot on the first stone material supplies connecting plate to connect down, and the fixed slot supplies the upper junction plate to connect down on the second stone material.
On the basis of the above scheme and as a preferable scheme of the scheme: the upper connecting plate is directly positioned above the lower connecting plate, and the whole top surface of the lower connecting plate is a plane and is used for placing the upper connecting plate.
On the basis of the above scheme and as a preferable scheme of the scheme: and sealant is arranged between the first stone and the second stone.
On the basis of the above scheme and as a preferable scheme of the scheme: resin glue is filled in the upper fixing groove and the lower fixing groove.
On the basis of the above scheme and as a preferable scheme of the scheme: the second expansion bolt is not in contact with or in forced contact with the upper part of the second kidney-shaped hole.
Compared with the prior art, the utility model outstanding and profitable technological effect is:
the utility model discloses a hang stone material fixed knot futilely constructs has adopted second expansion bolts and lower connecting plate, upper junction plate all with intermediate lamella fixed connection's structure, appears droing or after damaging when first expansion bolts, realizes the atress to first stone material and second stone material by second expansion bolts to improve the steadiness of hanging the installation of stone material futilely, can reduce or avoid hanging droing that the stone material causes because of fixed reason futilely.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic structural diagram of the upper connecting plate of the present invention.
Detailed Description
In order to make the purpose, technical solutions and advantages of the present application clearer, the technical solutions in the embodiments will be clearly and completely described below with reference to the drawings in the embodiments, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all the embodiments. All other embodiments obtained by a person skilled in the art without making any inventive step, based on the given embodiments, fall within the scope of protection of the present application.
In the description of the present application, it is to be understood that the terms "upper", "lower", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are only for convenience in describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present application.
In the description of the present application, the terms "first", "second", and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implying any number of technical features indicated.
The utility model discloses a hang stone material fixed knot futilely constructs, it is used for fixing the stone material on the building. When the stone material fixing structure is used specifically, the upper and lower two adjacent stone material fixing structures are hung in a shared mode, and more than two stone material fixing structures can be arranged in the width direction of the stone material.
The utility model discloses a hang stone material fixed knot futilely constructs, including first stone material 1 and second stone material 2, first stone material 1 is located the below of second stone material 2, and lower connecting plate 3 is connected with first stone material 1, and upper junction plate 4 is connected with second stone material 2. In this embodiment, the first stone 1 and the second stone 2 are provided with a lower fixing groove 51 and an upper fixing groove 52. The upper fixing grooves 52 of the first stone 1 are connected with the lower connecting plates 3, and the lower fixing grooves 51 of the second stone 2 are connected with the upper connecting plates 4. As shown in the drawings, the lower connecting plate 3 and the upper connecting plate 4 are provided with fixing portions 50 for inserting into lower fixing grooves 51 and upper fixing grooves 52 in a specific application.
Lower connecting plate 3, upper junction plate 4 all with intermediate plate 6 fixed connection, in this embodiment, lower connecting plate 3, upper junction plate 4 and intermediate plate 6 all are provided with the through-hole to supply bolt 61 to pass, thereby utilize bolt 61 will, lower connecting plate 3, upper junction plate 4 and intermediate plate 6 fixed connection together.
In the present embodiment, the upper connecting plate 4 is supported on the lower connecting plate 3. Specifically, as shown in the drawing, the lower connecting plate 3 is mounted above the intermediate plate 6, and the upper connecting plate 4 is mounted above the lower connecting plate 3, whereby the intermediate plate 6 provides a supporting force for the upper connecting plate 4 through the lower connecting plate 3. As another example, the upper connecting plate 4 is supported on the middle plate 6, specifically, the lower connecting plate 3 is positioned below the middle plate 6, and the upper connecting plate 4 is positioned above the middle plate 6.
The intermediate plate 6 is hung on the fixing plate 7, and the fixing plate 7 is provided with a first expansion bolt 81.
The upper connecting plate 4 is provided with a connecting part 41 extending upwards, and a waist-shaped hole 42 is arranged on the connecting part 41. The waist-shaped hole 42 extends in the up-down direction, and a second expansion bolt 82 is provided in the waist-shaped hole 42. In a specific application, the second expansion bolt 82 is fixed on a wall of a building, and the second expansion bolt 82 is not in contact with or in forced contact with the upper part of the second kidney-shaped hole 42, that is, the force applied by the second stone 2 to the upper connecting plate 4 is not directly applied to the second expansion bolt 82, but is transmitted to the first expansion bolt 81 through the upper connecting plate 4, the lower connecting plate 3, the middle plate 6 and the fixing plate 7. Under the general condition, the utility model discloses a hang stone material fixed knot futilely constructs mainly relies on first expansion bolts 81 to realize the atress to first stone material 1 and second stone material 2, appears droing or after damaging when first expansion bolts 81, realizes the atress to first stone material 1 and second stone material 2 by second expansion bolts 82 to improve and hang the steadiness of stone material installation futilely, can reduce or avoid hanging the droing that the stone material causes because of fixed reason futilely.
In this embodiment, the upper connecting plate 4 is located directly above the lower connecting plate 3, and the top surface 31 of the lower connecting plate 3 is generally planar for the upper connecting plate 4 to rest on. Because the top surface 31 of the lower connecting plate 3 is a plane as a whole, the structure is simple and the forming is easy.
In this embodiment, the sealant 91 is disposed between the first stone 1 and the second stone 2. Adopt sealed gluey structure, play sealed effect, also can beautify the gap between first stone material 1 and the second stone material 2 simultaneously.
In the present embodiment, the resin glue 92 is filled in both the upper fixing groove 52 and the lower fixing groove of the first stone 1, and the resin glue 92 is filled in both the upper fixing groove and the lower fixing groove 51 of the second stone 2. Through the structure that sets up the resin and glue, eliminate the lower connecting plate 3 and first stone material 1 and the clearance between upper junction plate 4 and the second stone material 2, make lower connecting plate 3 and first stone material 1 and upper junction plate 4 be connected more reliably, more firm with second stone material 2.
The above-mentioned embodiment is only the preferred embodiment of the present invention, and does not limit the protection scope of the present invention according to this, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (6)

1. The utility model provides a hang stone material fixed knot futilely constructs, includes first stone material and second stone material, and first stone material is located the below of second stone material, and lower connecting plate is connected with first stone material, and the upper junction plate is connected its characterized in that with the second stone material: lower connecting plate, upper junction plate all with intermediate lamella fixed connection, the upper junction plate supporting is on intermediate lamella or lower connecting plate, and the intermediate lamella is hung and is established on the fixed plate, is equipped with first expansion bolts on the fixed plate, the upper junction plate is equipped with the connecting portion that upwards extends, is equipped with waist shape hole on connecting portion, is equipped with second expansion bolts on waist shape hole.
2. The dry-hang stone fixing structure as claimed in claim 1, wherein: all be provided with fixed slot and last fixed slot on first stone material and the second stone material, the last fixed slot on the first stone material supplies connecting plate to connect down, and the fixed slot supplies the upper junction plate to connect down on the second stone material.
3. The dry-hang stone fixing structure as claimed in claim 1, wherein: the upper connecting plate is directly positioned above the lower connecting plate, and the whole top surface of the lower connecting plate is a plane and is used for placing the upper connecting plate.
4. The dry-hang stone fixing structure as claimed in claim 1, wherein: and sealant is arranged between the first stone and the second stone.
5. The dry-hang stone fixing structure as claimed in claim 2, characterized in that: resin glue is filled in the upper fixing groove and the lower fixing groove.
6. The dry-hang stone fixing structure as claimed in claim 1, wherein: the second expansion bolt is not in contact with or in forced contact with the upper part of the second kidney-shaped hole.
CN202020702487.9U 2020-04-30 2020-04-30 Dry hanging stone fixing structure Expired - Fee Related CN213418328U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020702487.9U CN213418328U (en) 2020-04-30 2020-04-30 Dry hanging stone fixing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020702487.9U CN213418328U (en) 2020-04-30 2020-04-30 Dry hanging stone fixing structure

Publications (1)

Publication Number Publication Date
CN213418328U true CN213418328U (en) 2021-06-11

Family

ID=76223364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020702487.9U Expired - Fee Related CN213418328U (en) 2020-04-30 2020-04-30 Dry hanging stone fixing structure

Country Status (1)

Country Link
CN (1) CN213418328U (en)

Similar Documents

Publication Publication Date Title
CN202081538U (en) Glass combined clamp in point connection type glass curtain wall
CN213418328U (en) Dry hanging stone fixing structure
CN214531684U (en) Stone dry-hanging installation device
CN213508987U (en) Window edge sealing fixing piece of assembled building external wall heat insulation integrated plate
CN213508989U (en) Assembled heat preservation sandwich wallboard
CN212427880U (en) Wall surface hanging system
CN208950225U (en) It is a kind of for decorative panel to be installed to the mounting structure of metope
CN203284922U (en) Hanging-buckle type pendant for curtain walls
CN210369632U (en) Assembled stair for building
CN210122787U (en) Light-weight type environment-friendly calcium silicate board
CN207296086U (en) All steel section bar cassette partition-type structures
CN107201816B (en) Hanging plate, hanging piece, mounting node of hanging plate and preparation method of hanging plate
CN216865613U (en) Curtain wall structure of water sports hall
CN205976156U (en) Marble is pendant futilely
CN209779980U (en) Mounting assembly structure of glass curtain wall
CN216949254U (en) Dry-hanging stone system
CN217812086U (en) Wallboard installation spiral leveling subassembly
CN217949478U (en) Curtain wall mounting structure
CN211974157U (en) Butterfly buckle assembly type wallboard structure
CN219671959U (en) Wallboard fixing piece for hanging wall surface
CN216865565U (en) Wall structure of water sports hall
CN212777222U (en) Connecting member
CN217500907U (en) Double-layer ALC board external wall external hanging installation structure
CN215716150U (en) Novel split type anchoring part for building insulation board
CN206636022U (en) A kind of suspending aluminum veneer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210611

CF01 Termination of patent right due to non-payment of annual fee