CN213418215U - Aerated concrete panel of pre-buried spool line box - Google Patents

Aerated concrete panel of pre-buried spool line box Download PDF

Info

Publication number
CN213418215U
CN213418215U CN202021498708.1U CN202021498708U CN213418215U CN 213418215 U CN213418215 U CN 213418215U CN 202021498708 U CN202021498708 U CN 202021498708U CN 213418215 U CN213418215 U CN 213418215U
Authority
CN
China
Prior art keywords
butt joint
joint board
box
line box
aerated concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021498708.1U
Other languages
Chinese (zh)
Inventor
杨九华
阎政军
林茂
李刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Hongliangjizhu Building Materials Co Ltd
Original Assignee
Sichuan Hongliangjizhu Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Hongliangjizhu Building Materials Co Ltd filed Critical Sichuan Hongliangjizhu Building Materials Co Ltd
Priority to CN202021498708.1U priority Critical patent/CN213418215U/en
Application granted granted Critical
Publication of CN213418215U publication Critical patent/CN213418215U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to an aerated concrete panel of pre-buried spool line box belongs to aerated concrete panel's field, including the reinforcing bar that vertically and horizontally staggered set up, still include line box and spool, the one end and the line box intercommunication of spool, be provided with fixed module on the line box, fixed module is including sliding first butt joint board and the second butt joint board that sets up on the line box, first butt joint board and second butt joint board relative movement, be provided with the regulating part that is used for adjusting first butt joint board and second butt joint board relative movement on the line box. Adjust first butt joint board and second butt joint board relative movement through the regulating part to make first butt joint board and second butt joint board support tight reinforcing bar, thereby make the line box fixed to the reinforcing bar on, simple swift need not to tie up of workman one, improve work efficiency.

Description

Aerated concrete panel of pre-buried spool line box
Technical Field
The application relates to the field of aerated concrete panels, in particular to an aerated concrete panel with a pre-buried wire tube box.
Background
The early application form of the aerated concrete mainly takes aerated concrete blocks as main materials and is mainly used for peripheral retaining walls, inner partition walls, floor slabs, roof slabs and the like of industrial and civil buildings. Usually, the steel bars are pre-embedded in the mold, and then the concrete is poured in the mold to form the concrete plate.
At present, the patent application with publication number CN208815766U discloses an aerated concrete panel of pre-buried spool line box, includes: reinforcing bar net, concrete cladding reinforcing bar net piece form concrete slab, its characterized in that: the wire box is characterized by further comprising a wire box and one or more than one wire pipe, the wire box and the wire pipe are embedded in the concrete, one end of the wire box is communicated with one end of the wire pipe, and the wire box is fixed on the steel bar through the binding belt.
Aiming at the related technologies, the inventor thinks that the binding bands are used for fixing the wire box on the steel bars when the wire box is embedded, workers need to tie up the wire box one by one, and the working efficiency is low.
SUMMERY OF THE UTILITY MODEL
For improving work efficiency, this application provides an aerated concrete panel of pre-buried spool line box.
The technical scheme provided by the application is as follows:
the utility model provides an aerated concrete panel of pre-buried spool line box, includes the reinforcing bar that vertically and horizontally staggered set up, still includes line box and spool, the one end and the line box intercommunication of spool, be provided with fixed module on the line box, fixed module is including sliding first butt joint board and the second butt joint board that sets up on the line box, first butt joint board and second butt joint board relative movement, be provided with the regulating part that is used for adjusting first butt joint board and second butt joint board relative movement on the line box.
Through adopting above-mentioned technical scheme, adjust first butt joint board and second butt joint board relative movement through the regulating part to make first butt joint board and second butt joint board support tight reinforcing bar, thereby make the line box fixed to the reinforcing bar on, simple swift need not to tie up of workman one, improve work efficiency.
Preferably, the regulating part sets up the pivot on line box including rotating, be provided with thread group in the pivot, thread group is including setting up at epaxial first screw thread section of commentaries on classics and the second screw thread section, the screw thread of first screw thread section and second screw thread section revolves to opposite, first butt plate threaded connection is in first screw thread section, second butt plate threaded connection is in the second screw thread section.
Through adopting above-mentioned technical scheme, adjust the pivot and rotate to drive first butt joint board and second butt joint board relative movement, thereby press from both sides the reinforcing bar tightly, easy operation is swift, and it facilitates to fix for the line box, thereby improves work efficiency.
Preferably, the adhesive layers for bonding the reinforcing steel bars are arranged on the surfaces, close to the second abutting plates, of the first abutting plates and the surfaces, close to the first abutting plates, of the second abutting plates.
Through adopting above-mentioned technical scheme, during first butt joint board and second butt joint board and reinforcing bar butt, the adhesive layer bonds first butt joint board and second butt joint board on the reinforcing bar, further improves the stability of being connected between reinforcing bar and the line box to the normal use of follow-up line box.
Preferably, the spool outer wall is provided with the screw rod, screw rod length direction sets up along perpendicular to spool length direction, the screw thread cover has cup jointed the sleeve on the screw rod, the sleeve can with the reinforcing bar butt.
By adopting the technical scheme, the sleeve is rotated to move on the screw rod so as to abut against the sleeve and the reinforcing steel bar, and the sleeve and the screw rod are matched to support the spool, so that convenience is provided for the use of the subsequent spool; after concrete is poured to form a concrete plate, the structural strength of the plate can be improved due to the additional arrangement of the screw rods, and the practicability is high.
Preferably, the end part of the sleeve, which is far away from the screw rod, is rotatably provided with an elastic ring, and the elastic ring is provided with a notch for the moving-in of the reinforcing steel bar.
Through adopting above-mentioned technical scheme, with the reinforcing bar from breach immigration elastic ring in, the elastic ring receives the elasticity of self to cramp the reinforcing bar, further improves the fixed effect to the spool.
Preferably, a partition board is arranged in the wire box, and a plurality of wire releasing grooves used for placing wires are formed in the partition board.
Through adopting above-mentioned technical scheme, the setting of wire arrangement groove is so that later stage wiring, prevents that the scattered online box of arranging of line from providing convenience for the use of follow-up line box.
Preferably, a radiating plate is arranged on the surface of the partition board far away from the placing groove.
Through adopting above-mentioned technical scheme, because can produce a large amount of heats during later stage is with the line, the setting of heating panel is so that the effluvium heat, avoids the high temperature and leads to circuit fault, security when improving the cable and using.
Preferably, a rubber water stop is arranged in the line pipe.
By adopting the technical scheme, the rubber waterstop has good elasticity, wear resistance, aging resistance and tear resistance, is strong in adaptive deformability and good in waterproof performance, can effectively prevent moisture from permeating, has a protection effect on cables in the cable tube, and effectively prevents the problem of damage of a cable insulating layer, so that the safety of the cables in use is improved.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the adjusting rotating shaft rotates to drive the first abutting plate and the second abutting plate to move relatively, so that the reinforcing steel bars are clamped tightly, the operation is simple and fast, one-by-one bundling of workers is not needed, and the working efficiency is improved.
2. The sleeve is rotated to move on the screw rod so as to enable the sleeve to be abutted against the steel bar, and the sleeve and the screw rod are matched to support the spool, so that convenience is provided for the use of the subsequent spool; after concrete is poured to form a concrete plate, the structural strength of the plate can be improved due to the additional arrangement of the screw rods, and the practicability is high.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present application.
FIG. 2 is a partial structure schematic diagram for showing among the line box, the spool and the reinforcing steel bar according to the embodiment of the application.
Fig. 3 is an exploded view of a fixing module and a thread set according to an embodiment of the present disclosure.
Fig. 4 is an enlarged view of a portion a in fig. 2.
Description of reference numerals: 1. reinforcing steel bars; 2. a wire box; 3. a conduit; 4. a fixed module; 41. a first butt joint plate; 42. a second butt joint plate; 5. a rotating shaft; 6. a thread group; 61. a first thread segment; 62. a second thread segment; 7. an adhesive layer; 8. a screw; 9. a sleeve; 10. an elastic ring; 11. a notch; 12. a partition plate; 13. a wire releasing groove; 14. a heat dissipation plate; 15. a rubber waterstop; 16. a mold; 17. and (4) a groove.
Detailed Description
The present application is described in further detail below with reference to the attached drawings.
The embodiment of the application discloses aerated concrete panel of pre-buried spool line box, combine figure 1 and figure 2, include reinforcing bar 1 along horizontal direction and vertical direction setting, tie up through the steel wire between two adjacent reinforcing bars 1, reinforcing bar 1 sets up in the mould 16 of waiting to pour, still include line box 2 and spool 3, the one end and the line box 2 intercommunication of spool 3, spool 3 extend to with 16 lateral wall butts of mould, the one side that spool 3 was kept away from to line box 2 runs through line box 2 and 16 lateral wall butts of mould, can form the concrete panel of pre-buried wire box 2 and spool 3 with concrete placement in mould 16.
With reference to fig. 2 and fig. 3, a fixing module 4 is arranged on the wire box 2, the fixing module 4 includes a first abutting plate 41 and a second abutting plate 42 which are slidably arranged on the wire box 2, the surface of the first abutting plate 41 close to the steel bar 1 and the surface of the second abutting plate 42 close to the steel bar 1 are both arranged to be arc surfaces attached to the steel bar 1, the first abutting plate 41 and the second abutting plate 42 move relatively, and an adjusting member for adjusting the relative movement of the first abutting plate 41 and the second abutting plate 42 is arranged on the wire box 2.
With reference to fig. 2 and 3, the adjusting member includes a rotating shaft 5 rotatably disposed on the line box 2, a groove 17 is disposed on the line box 2, the rotating shaft 5 is rotatably disposed in the groove 17, one end of the rotating shaft 5 penetrates through the groove 17 to the outside of the line box 2, the first abutting plate 41 and the second abutting plate 42 are both slidably disposed in the groove 17, a thread group 6 is disposed on the rotating shaft 5, the thread group 6 includes a first thread section 61 and a second thread section 62 disposed on the rotating shaft 5, the thread turning directions of the first thread section 61 and the second thread section 62 are opposite, the first abutting plate 41 is in threaded connection with the first thread section 61, and the second abutting plate 42 is in threaded connection with the second thread section 62; for the fixed effect of improvement to line box 2, fixed module 4 sets up two sets ofly at least, and thread group 6 and fixed module 4 one-to-one.
When the wire box 2 needs to be fixed to the steel bar 1, the rotating shaft 5 is rotated, and the first abutting plate 41 and the second abutting plate 42 move toward the direction of approaching each other, so that the first abutting plate 41 and the second abutting plate 42 abut against the steel bar 1, and the wire box 2 is fixed to the steel bar 1.
With reference to fig. 2 and 3, in order to improve the fixing effect of the wire box 2, the adhesive layers 7 for bonding the reinforcing bars 1 are disposed on the surfaces of the first abutting plate 41 and the second abutting plate 42 close to the first abutting plate 41. When first butt joint board 41 and second butt joint board 42 and reinforcing bar 1 butt, adhesive layer 7 bonds first butt joint board 41 and second butt joint board 42 on reinforcing bar 1, further improves the stability of being connected between reinforcing bar 1 and the line box 2.
As shown in fig. 2, for the convenience of later stage wiring, a partition plate 12 is arranged in the wire box 2, a plurality of wire releasing grooves 13 for placing wires are formed in the partition plate 12, the wire pipe 3 is connected with the partition plate 12, the number of the wire pipe 3 can be increased or decreased according to actual needs, a large amount of heat can be generated during later stage wiring, a heat dissipation plate 14 is arranged on the surface, away from the placing groove, of the partition plate 12, and the heat dissipation plate 14 is arranged so as to be capable of dissipating heat quickly.
Combine fig. 2 and fig. 4, because spool 3 is longer, for the use of later stage spool 3, 3 outer walls of spool are provided with screw rod 8, and 8 length direction of screw rod set up along 3 length direction of perpendicular to spool, and screw rod 8 is provided with a plurality ofly, and 3 length direction interval arrangements along spool are followed to a plurality of screw rods 8, and the screw thread has cup jointed sleeve 9 on the screw rod 8, and the tip that screw rod 8 was kept away from to sleeve 9 rotates and is provided with elastic ring 10, sets up the breach 11 that supplies reinforcing bar 1 to move into on the elastic ring 10.
The sleeve 9 is rotated to enable the sleeve 9 to move on the screw 8, the reinforcing steel bars 1 are moved into the elastic ring 10 from the notch 11, the elastic ring 10 is hooped by the reinforcing steel bars 1 under the action of self elasticity, and the sleeve 9 and the screw 8 are matched to support the conduit 3, so that convenience is brought to the use of the subsequent conduit 3; after concrete is poured to form a concrete plate, the structural strength of the plate can be improved by additionally arranging the screw rods 8, and the practicability is high.
As shown in fig. 4, in order to further improve the applicability of the wire tube 3, a rubber water stop 15 is arranged in the wire tube 3, the rubber water stop 15 extends along the length direction of the wire tube 3, and the rubber water stop 15 has good elasticity, wear resistance, aging resistance and tear resistance, is strong in adaptive deformation capacity and good in waterproof performance, can effectively prevent moisture from permeating, and has a protection effect on a cable in the wire tube 3.
The implementation principle of the embodiment of the application is as follows:
when the wire box 2 needs to be fixed to the steel bar 1, the rotating shaft 5 is rotated, and at the moment, the first abutting plate 41 and the second abutting plate 42 move towards the mutually approaching direction, so that the steel bar 1 is abutted tightly by the first abutting plate 41 and the second abutting plate 42, and when the first abutting plate 41 and the second abutting plate 42 are abutted against the steel bar 1, the adhesive layer 7 bonds the first abutting plate 41 and the second abutting plate 42 on the steel bar 1, so that the wire box 2 is fixed to the steel bar 1. The sleeve 9 is rotated to move the sleeve 9 on the screw 8, the steel bar 1 is moved from the notch 11 into the elastic ring 10, and the elastic ring 10 is clamped by the elastic force of the elastic ring 10, so that the screw 8 and the sleeve 9 support the conduit 3.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides an aerated concrete panel of pre-buried spool line box, includes reinforcing bar (1) that vertically and horizontally staggered set up, still includes line box (2) and spool (3), the one end and line box (2) intercommunication of spool (3), its characterized in that: be provided with fixed module (4) on line box (2), fixed module (4) are including sliding first butt joint board (41) and second butt joint board (42) that set up on line box (2), first butt joint board (41) and second butt joint board (42) relative movement, be provided with the regulating part that is used for adjusting first butt joint board (41) and second butt joint board (42) relative movement on line box (2).
2. The aerated concrete plate of pre-buried line pipe box of claim 1, characterized in that: the adjusting part is including rotating pivot (5) that sets up on line box (2), be provided with thread group (6) on pivot (5), thread group (6) are including setting up first screw thread section (61) and second screw thread section (62) on pivot (5), the screw thread of first screw thread section (61) and second screw thread section (62) is revolved to the opposite, first butt joint board (41) threaded connection is on first screw thread section (61), second butt joint board (42) threaded connection is on second screw thread section (62).
3. The aerated concrete plate of pre-buried line pipe box of claim 2, characterized in that: and adhesive layers (7) for bonding the reinforcing steel bars (1) are arranged on the surfaces, close to the second abutting plates (42), of the first abutting plates (41) and the surfaces, close to the first abutting plates (41), of the second abutting plates (42).
4. The aerated concrete plate of pre-buried line pipe box of claim 1, characterized in that: spool (3) outer wall is provided with screw rod (8), screw rod (8) length direction sets up along perpendicular to spool (3) length direction, screw rod (8) are gone up the screw thread and are cup jointed sleeve (9), sleeve (9) can with reinforcing bar (1) butt.
5. The aerated concrete plate of pre-buried line pipe box of claim 4, characterized in that: the end part, far away from the screw rod (8), of the sleeve (9) is rotatably provided with an elastic ring (10), and a notch (11) for the steel bar (1) to move into is formed in the elastic ring (10).
6. The aerated concrete plate of pre-buried line pipe box of claim 1, characterized in that: a partition plate (12) is arranged in the wire box (2), and a plurality of wire releasing grooves (13) used for containing wires are formed in the partition plate (12).
7. The aerated concrete plate of pre-buried line pipe box of claim 6, characterized in that: and a heat dissipation plate (14) is arranged on the surface of the partition plate (12) far away from the placing groove.
8. The aerated concrete plate of pre-buried line pipe box of claim 1, characterized in that: and a rubber water stop (15) is arranged in the line pipe (3).
CN202021498708.1U 2020-07-25 2020-07-25 Aerated concrete panel of pre-buried spool line box Active CN213418215U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021498708.1U CN213418215U (en) 2020-07-25 2020-07-25 Aerated concrete panel of pre-buried spool line box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021498708.1U CN213418215U (en) 2020-07-25 2020-07-25 Aerated concrete panel of pre-buried spool line box

Publications (1)

Publication Number Publication Date
CN213418215U true CN213418215U (en) 2021-06-11

Family

ID=76255269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021498708.1U Active CN213418215U (en) 2020-07-25 2020-07-25 Aerated concrete panel of pre-buried spool line box

Country Status (1)

Country Link
CN (1) CN213418215U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323264A (en) * 2021-06-15 2021-08-31 江苏建筑职业技术学院 Energy-saving wallboard convenient for rapid assembly and preparation method thereof
CN114215230A (en) * 2021-11-09 2022-03-22 河南新城建设有限公司 Green integrated assembly type building wallboard and installation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323264A (en) * 2021-06-15 2021-08-31 江苏建筑职业技术学院 Energy-saving wallboard convenient for rapid assembly and preparation method thereof
CN114215230A (en) * 2021-11-09 2022-03-22 河南新城建设有限公司 Green integrated assembly type building wallboard and installation method thereof

Similar Documents

Publication Publication Date Title
CN213418215U (en) Aerated concrete panel of pre-buried spool line box
CN104652668B (en) Armored integrated wall and construction method thereof
CN103774789B (en) Structural thermal insulation integration pressure-bearing template and apply the construction techniques of this template
CN211489843U (en) Steel construction cutting device for PC component
CN208310289U (en) A kind of bracing reinforcement device of reinforced concrete buildings
CN103243847A (en) Prefabricating assembling type cold molding steel floor system and construction method thereof
CN104100100B (en) The method of Tests of Reinforced Concrete Beams Strengthened With Cfrp-laminate is drawn in micro-varicose
EP1170440B1 (en) Process of strenghthening masonry walls
CN202509791U (en) Steel bar for prestressed concrete (PC steel bar) reinforcing device for reinforced concrete cylindrical frame space node core region
CN106121268B (en) The system and method for prestress rope integrative consolidation slab column
CN108316546A (en) Assembled integrated heat-insulation wall plate
CN112282158A (en) Assembled floor veneer integrated board convenient to lay ground and warm up
CN107498703A (en) The two-way automatic Tensioning mould of prestressing force mortar Decorative hanging board
CN103628675A (en) Bailey beam type formwork supporting system and construction method thereof for super high-rise transfer story crossbeam
CN206071086U (en) The system of prestress rope integrative consolidation slab column
KR101351974B1 (en) The wire binding instrument for a water-proof
CN204645358U (en) Template and floor
CN208918256U (en) A kind of concreting with internal layer reinforced mesh exempts to tear compound heat preservation die plate open
CN111155686A (en) Steel wire mesh frame composite insulation board cast-in-place concrete wall and construction method thereof
CN108930349B (en) Low-deflection profiled steel plate concrete composite board
CN212613201U (en) Steel wire net frame composite insulation board cast-in-place concrete wall
CN206844438U (en) A kind of Ribbed Bar truss concrete prefabricated base plate
CN105756279B (en) A kind of superstructure device
CN217053955U (en) Prefabricated floor connecting piece convenient to connect
CN219477540U (en) Prefabricated benefit plywood floor wiring structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant