CN213416071U - Tower crane standard festival management system - Google Patents

Tower crane standard festival management system Download PDF

Info

Publication number
CN213416071U
CN213416071U CN202022068191.9U CN202022068191U CN213416071U CN 213416071 U CN213416071 U CN 213416071U CN 202022068191 U CN202022068191 U CN 202022068191U CN 213416071 U CN213416071 U CN 213416071U
Authority
CN
China
Prior art keywords
tower crane
standard
standard knot
information
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022068191.9U
Other languages
Chinese (zh)
Inventor
宋连玉
李楠楠
吴月华
李森
崔康基
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Fuyou Huiming Measurement And Control Equipment Co ltd
Original Assignee
Shandong Fuyou Huiming Measurement And Control Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Fuyou Huiming Measurement And Control Equipment Co ltd filed Critical Shandong Fuyou Huiming Measurement And Control Equipment Co ltd
Priority to CN202022068191.9U priority Critical patent/CN213416071U/en
Application granted granted Critical
Publication of CN213416071U publication Critical patent/CN213416071U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model relates to a tower crane standard festival management system. The system is used for reading and uploading the use state information of the standard section based on the radio frequency identification technology, acquiring standard section management data including tower crane information used in a building construction site, standard section factory information, standard section tower crane information, the use position of the standard section on a tower crane, standard section fatigue analysis evaluation, standard section inventory information and the like, and transmitting the standard section management data to a data display terminal for related management departments to look up by using a remote transmission technology. The purpose is to provide a standard knot state information safety management means for the tower crane standard knot, know the construction site standard knot situation of use, the reasonable management of supplementary construction site uses tower crane standard knot, avoids the unreasonable utilization of standard knot, guarantees tower crane safe operation.

Description

Tower crane standard festival management system
Technical Field
The utility model relates to a tower crane standard festival management system belongs to tower crane safety control's technical field.
Background
With the increasing speed of the urbanization construction process in China, the construction industry is in a rapid development stage. The tower crane (hereinafter referred to as tower crane) is widely used as a vertical transportation machine in the construction industry, and plays an important role in reducing the shortage of human resources, saving construction cost and improving working efficiency in the construction industry due to a series of characteristics of large working coverage area, simple assembly and disassembly, convenience for field construction operation and the like.
The tower crane industry in China is rapidly developed at present, is widely applied to industrial and civil building construction, faces to rapid market change and intense competitive challenge, and each large tower crane manufacturer increases research and development and manufacturing investment, and requires the tower crane to be safe, reliable, advanced, rapid and stable in operation, and tends to develop in the directions of high efficiency, intellectualization and digitization. At present, the country has released 2025 intelligent manufacturing planning, which has a theme of innovative driving development, and has a main line of information-based and industrialized deep integration to promote intelligent manufacturing. The digital network intelligentization of the manufacturing industry is the core technology of a new industrial revolution. In the field of building tower cranes, the informatization of the tower cranes is realized by combining a big data technology, and each working performance parameter of the tower cranes is recorded and tracked, so that the safety and scientific management and use of the tower cranes are of great significance.
At the present stage, the standard knot installed on the tower crane in service is managed by a building construction site in a few ways, and the relevant information of the standard knot of the tower crane used in the building site is not well known; the standard knot structure and the fatigue state standard knot are not noticed and can be used at will, and the standard knot with defects is applied to the tower crane, so that the tower body is easy to have insufficient rigidity, and safety accidents are caused. In addition, a system management means for standard knots is lacked in a building construction site, and the use condition of the existing standard knots is unknown. Therefore, a technical method which can monitor and record basic information and safety state information of the used standard section of the tower crane, upload the basic information and the safety state information to a relevant management department and scientifically and efficiently manage and control the standard section of the tower crane is needed at the present stage, so that unreasonable utilization of the standard section is avoided and safe operation of the tower crane is guaranteed.
SUMMERY OF THE UTILITY MODEL
The utility model provides a tower crane standard festival management system to prior art's not enough.
The technical scheme of the utility model is that:
a tower crane standard knot management system comprises an induction terminal, a remote management platform and a radio frequency chip installed on a tower crane standard knot; the radio frequency chip on each tower crane standard knot is provided with a unique tower crane standard knot ID code; the induction terminal is provided with a tower crane radio frequency ID number; the remote management platform is provided with an ID code database; and the induction terminal is in communication connection with the remote management platform. The specific installation position of the radio frequency chip on the standard knot of the tower crane does not influence the normal use of the standard knot of the tower crane.
Preferably, the ID code of the tower crane standard section corresponds to the basic information of the corresponding tower crane standard section; the tower crane radio frequency ID number corresponds to tower crane information; and the ID code database stores the basic information of the tower crane standard knot and the tower crane information.
And the information of the specified tower crane and the standard knot of the tower crane can be called from the database of the remote management platform through the ID code.
Further preferably, the basic information of the tower crane standard knot comprises: the manufacturing factory, the delivery time, the model of the tower crane, the standard knot number of the tower crane and the structural dimension parameters.
Preferably, the sensing terminal includes a sensing module and a data transmission module.
Preferably, the induction terminal is arranged at a fixed position of the tower crane.
Preferably, the using condition information of the standard section obtained based on the radio frequency chip technology is used and managed for the standard section of the tower crane through the remote management platform, and the using condition information comprises the following steps: the method comprises the following steps of used tower crane management, standard section delivery information management, standard section tower crane information management, standard section use position management of the tower crane, standard section fatigue analysis evaluation, standard section inventory management and the like.
The utility model has the advantages that:
the tower crane standard knot used in the construction site provides an accurate and reliable use and management means, aiming at the problem that the standard knot used has defects due to unreasonable utilization of the standard knot in the construction site, the use state information of all the standard knots is monitored, managed and recorded, the management department related to the construction is assisted to know whether the used standard knot meets the requirement of safe operation, and the standard knot with the problems is timely adjusted and replaced, so that safety accidents are avoided.
Drawings
FIG. 1 is a schematic structural diagram of a tower crane standard joint management system of the present invention;
FIG. 2 is a schematic view of the standard section management system of the tower crane according to the present invention;
the system comprises a radio frequency chip 100, a radio frequency chip 200, an induction terminal 300, a remote management platform 210, an induction module 220 and a data transmission module.
Detailed Description
The present invention will be further described with reference to the following examples and drawings, but is not limited thereto.
Examples
As shown in fig. 1.
A tower crane standard knot management system comprises an induction terminal 200, a remote management platform 300 and a radio frequency chip 100 installed on a tower crane standard knot; the radio frequency chip 100 on each tower crane standard knot is provided with a unique tower crane standard knot ID code; the induction terminal 200 is provided with a tower crane radio frequency ID number; the remote management platform 300 is provided with an ID code database; the induction terminal 200 is in communication connection with a remote management platform 300.
The ID code of the tower crane standard section corresponds to the basic information of the corresponding tower crane standard section; the tower crane radio frequency ID number corresponds to tower crane information; and the ID code database stores the basic information of the tower crane standard knot and the tower crane information.
And the information of the specified tower crane and the standard knot of the tower crane can be called from the database of the remote management platform through the ID code.
The induction terminal 200 is arranged on a fixed position-jacking sleeve frame of the tower crane. The remote management platform 300 of the present embodiment is a computer equipped with corresponding information processing function software. The sensing terminal 200 includes a sensing module 210 and a data transmission module 220. The sensing module 200 is a master control of an RFID radio frequency card and is an ultrahigh frequency medium distance read-write integrated machine with the model of HY-9602 produced by Shandong Hangyuan scientific and technological Limited, the data transmission module 220 is a wireless communication module with the model of EC100Y produced by Shanghai Shiyangtao communication technology Limited, and the radio frequency chip 100 is an electronic tag with the model of Alien Higgs-3/H3 produced by Shandong Hangyuan scientific and technological Limited.
The working method of the tower crane standard knot management system comprises the following steps:
in the process of adding (subtracting) the standard section of the tower crane, the sensing module 210 reads the radio frequency chip 100 on the passed standard section and acquires the ID code of the radio frequency chip 100. The data transmission module 220 transmits the ID code of the rf chip 100 corresponding to the jacking (or dropping) standard section read by the sensing module 210 to the remote management platform 300 in real time, and transmits information including the ID number, the installation (or removal) time, the installation (or removal) position, and the like of the tower crane at the same time.
The remote management platform 300 receives the information sent by the induction terminal 200, calls the basic information of the tower crane standard knot and the tower crane information, and performs analysis, calculation, classified display and storage management. Remote management is flat, and 300 uses the management to tower machine standard festival includes: the system has the functions of used tower crane management, factory information management of a tower crane standard section, tower crane information management for the tower crane standard section, use position management of the tower crane standard section in the tower crane, fatigue analysis and evaluation of the tower crane standard section, inventory management of the tower crane standard section and the like.
The function of managing factory information of the tower crane standard knot is that the remote management platform 300 calls basic information of the corresponding tower crane standard knot from the database based on the ID code corresponding to the tower crane standard knot sent by the induction terminal 200, and includes: the manufacturing factory, the delivery time, the model of the tower crane, the standard knot number of the tower crane and the structural dimension parameters.
The tower crane standard knot has the information management function of the tower crane, and the specific conditions of all the tower crane standard knots forming the tower crane are obtained by reading the obtained ID codes of the tower crane standard knots through the induction terminal 200 installed on each tower crane.
The function of managing the use position of the standard knot of the tower crane on the tower crane is that the remote management platform 300 analyzes and calculates the installation sequence of the whole standard knot and the installation position of each standard knot on the tower crane after the jacking of the tower crane is finished based on the ID code, the installation and disassembly time and the installation and disassembly position corresponding to the standard knot of the tower crane sent by the induction terminal 200; after the tower crane is subjected to section falling, which standard sections are detached.
The standard section fatigue analysis and evaluation function is that the remote management platform 300 obtains the fatigue state of the standard section by analysis and calculation based on the installation and removal frequency and the service time of the standard section, and performs classification management on the standard section based on whether the fatigue state of the standard section meets the use requirement of the tower crane.
The standard section inventory management function is that the remote management platform 300 obtains the service quantity information and the idle quantity information of the standard sections based on the total quantity of the standard sections read by the sensing terminal 200. And standard section inventory information management of the construction site is realized.
The contents displayed by the remote management platform 300 at the computer end or the mobile phone end in a classified manner include information about tower crane management used, factory information management of standard knots, tower crane information management for the standard knots, management of using positions of the standard knots on the tower cranes, fatigue analysis and evaluation of the standard knots, inventory management of the standard knots and the like.

Claims (5)

1. A tower crane standard knot management system is characterized by comprising an induction terminal, a remote management platform and a radio frequency chip installed on a tower crane standard knot; the radio frequency chip on each tower crane standard knot is provided with a unique tower crane standard knot ID code; the induction terminal is provided with a tower crane radio frequency ID number; the remote management platform is provided with an ID code database; and the induction terminal is in communication connection with the remote management platform.
2. The tower crane standard knot management system of claim 1, wherein the tower crane standard knot ID code corresponds to basic information of a corresponding tower crane standard knot; the tower crane radio frequency ID number corresponds to tower crane information; and the ID code database stores the basic information of the tower crane standard knot and the tower crane information.
3. The tower crane standard knot management system of claim 2, wherein the basic information of the tower crane standard knot comprises: the manufacturing factory, the delivery time, the model of the tower crane, the standard knot number of the tower crane and the structural dimension parameters.
4. The tower crane modular joint management system of claim 1, wherein the sensing terminal comprises a sensing module and a data transmission module.
5. The tower crane modular joint management system of claim 1, wherein the sensing terminal is disposed at a fixed location on the tower crane.
CN202022068191.9U 2020-09-18 2020-09-18 Tower crane standard festival management system Active CN213416071U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022068191.9U CN213416071U (en) 2020-09-18 2020-09-18 Tower crane standard festival management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022068191.9U CN213416071U (en) 2020-09-18 2020-09-18 Tower crane standard festival management system

Publications (1)

Publication Number Publication Date
CN213416071U true CN213416071U (en) 2021-06-11

Family

ID=76262770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022068191.9U Active CN213416071U (en) 2020-09-18 2020-09-18 Tower crane standard festival management system

Country Status (1)

Country Link
CN (1) CN213416071U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116362548A (en) * 2023-04-19 2023-06-30 江苏久和机械有限公司 Standard knot availability management method, system, device and storage medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116362548A (en) * 2023-04-19 2023-06-30 江苏久和机械有限公司 Standard knot availability management method, system, device and storage medium
CN116362548B (en) * 2023-04-19 2023-10-31 江苏久和机械有限公司 Standard knot availability management method, system, device and storage medium

Similar Documents

Publication Publication Date Title
CN101888408A (en) Wireless sensor network-based environment monitoring system
CN108564306B (en) Prefabricated part information acquisition and hoisting method based on LoRa technology
CN213416071U (en) Tower crane standard festival management system
CN101922288B (en) Intelligent monitoring sucker rod and monitoring system thereof
CN102185745A (en) IOT (internet of things) service system
CN102546802A (en) Radio-frequency-identification-technology-based data acquisition and instant messaging transmission system and transmission method
CN105447647A (en) Shield intelligent maintenance management system
CN201725417U (en) Environment monitoring system based on wireless sensor network
CN203894598U (en) Embedded remote monitoring device based on rebar processing equipment
CN214192204U (en) Hoisting device for prefabricated part
CN202758221U (en) Remote quality monitoring system
CN219105371U (en) Multimode environment monitoring system of thing networking
CN117372048A (en) Tracing method for tracing prefabricated part
CN202587031U (en) A data sampling and instant messaging transmission system based on the technology of radio frequency label
CN104123606A (en) Public bicycle dispatching data collecting and processing method based on radio frequency identification device (RFID)
KR102259244B1 (en) Tracking, Scheduling Method Using Member Tracking, Scheduling System
CN103106810A (en) Intelligent parking management system based on internet of things and working method thereof
CN114037403A (en) Method for efficiently sharing and managing light BIM data
CN203070549U (en) Intelligent parking management system based on Internet of things
CN212503736U (en) Tower crane safety monitoring device based on wireless sensor network
CN112200476A (en) Assembly type building full life cycle quality monitoring platform and monitoring method based on Internet of things
CN206193896U (en) Prefabricated component information management system based on thing networking
CN216311043U (en) Ground wire monitoring and management system
Wu et al. Innovative application of information management of prefabricated construction components based on BIM
CN218835588U (en) Roller information intelligent identification system of integrated crown block

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant