CN213415828U - Threading construction device for building electrical engineering - Google Patents

Threading construction device for building electrical engineering Download PDF

Info

Publication number
CN213415828U
CN213415828U CN202022080013.8U CN202022080013U CN213415828U CN 213415828 U CN213415828 U CN 213415828U CN 202022080013 U CN202022080013 U CN 202022080013U CN 213415828 U CN213415828 U CN 213415828U
Authority
CN
China
Prior art keywords
support
fixed
handle
belt
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022080013.8U
Other languages
Chinese (zh)
Inventor
谢国栋
游本菊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022080013.8U priority Critical patent/CN213415828U/en
Application granted granted Critical
Publication of CN213415828U publication Critical patent/CN213415828U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a threading construction device for building electrical engineering, which comprises a first bracket, a second bracket, a third bracket, an air pump, a pneumatic chute, a first transmission shaft, a motor, a V belt, a base and a scroll, the first transmission shaft is fixed with the reel, the base is fixed with a boss, the motor is fixed on the boss, the motor is connected with one end of the second transmission shaft, the other end of the base is provided with a third bracket, the third bracket is provided with a first rolling shaft and a second rolling shaft, the pneumatic chute is connected with the air pump, a universal wheel emergency braking system is fixed below the base, this building electrical engineering threading construction equipment, it is convenient to remove, can realize automatic reason line, automatic spiral, processes such as automatic clearance, convenient and simple during the use, rotate also can continue work through the handle when not having the electricity.

Description

Threading construction device for building electrical engineering
Technical Field
The utility model relates to a building electrical technology field specifically is a building electrical engineering threading construction equipment.
Background
As is well known, the existing threading construction device for building electrical engineering is an auxiliary device for building electrical engineering, and is widely used in the field of building electrical engineering.
For example, the patent publication "CN 210693275U" is named as: the utility model discloses a threading construction device for building electrical engineering, relating to the technical field of building electrical construction and comprising a bottom plate and a bracket, the bracket is fixedly connected on the bottom plate, a driving motor is arranged on the bracket, a through hole is arranged on the bracket, the output shaft of the driving motor passes through the through hole and is connected with a rotating rod, the other end of the rotating rod is provided with an installation groove, a control rod is connected with the inner circumference of the mounting groove in a limiting and axial sliding way, a mounting hole is arranged on the control rod in a radial penetrating way, install an elastic component in the mounting hole, a plurality of and elastic component complex hemispherical recesses have been seted up along the axial to the mounting groove inside wall, the one end tip fixedly connected with baffle that the control lever is located the mounting groove outside. The utility model has the characteristics of can increase the rolling volume of receipts reel and occupy small.
The existing threading construction device for the building electrical engineering is found in use, is inconvenient to move, cannot realize semi-automatic winding, is low in working efficiency, and leads to poor practicability.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building electrical engineering threading construction equipment of compact structure, effect ideal.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a threading construction device for building electrical engineering comprises a first support, a second support, a third support, an air pump, a pneumatic chute, a first transmission shaft, a motor, a V belt, a base and a scroll, wherein one end of the base is provided with the first support, the first support is welded on the base, a hole is formed above the first support, the first transmission shaft penetrates through the hole and is arranged on the first support, the scroll is fixed on the first transmission shaft, one end of the first transmission shaft is connected with a handle wheel, the other end of the first transmission shaft is connected with a first belt wheel, a first belt groove is formed in the first belt wheel, the V belt is arranged in the first belt groove, one end of the V belt is connected with the first belt wheel, the other end of the V belt is connected with the second belt wheel, the second belt wheel is provided with a second belt groove, the V belt is arranged in the second belt groove, a hole is arranged below the first support, a boss is fixed on the base, the motor is fixed on the boss, the motor is connected with one end of a second transmission shaft, the other end of the second transmission shaft penetrates through the hole and is connected with the second belt wheel, a third support is arranged at the other end of the base and is welded on the base, a first rolling shaft and a second rolling shaft are arranged on the third support, the first rolling shaft is fixed on the third support through a connecting shaft, the second rolling shaft is fixed above the first rolling shaft, a second support is arranged between the first support and the third support, the second support is welded on the base, a hole is arranged on the second support, and the pneumatic sliding chute is fixed on the second support through the hole, the pneumatic sliding groove is connected with the air pump, a convex block is arranged in the pneumatic sliding groove and can slide in the pneumatic sliding groove, a second roller is fixed on the convex block, and a universal wheel emergency braking system is fixed below the base.
In order to make the engineering only twine on the spool with the line, the utility model discloses the improvement has, the spool both ends are provided with the baffle, the baffle welding is in on the spool.
In order to carry out certain clearance to the engineering line in the spiral, the utility model discloses the improvement has, be fixed with the brush on the first roller bearing, be fixed with the brush on the second roller bearing.
In order to prevent the edge of ply-yarn drill at first roller bearing and second roller bearing for the engineering, the utility model discloses the improvement has, first roller bearing with be provided with first gyro wheel between the second roller bearing, first gyro wheel passes through the fixed block fixed, the fixed block welding is in on the third support.
In order to make the lug and the effectual arrangement engineering of second roller bearing use the position of line on the spool, the utility model discloses the improvement has, inherent position sensor on the lug.
In order to still can realize the spiral when the device does not have the electricity, the utility model discloses the improvement has, the handle takes turns to and is provided with the handle groove, the handle takes turns to and is provided with the handle, the handle sets up in the handle groove, the handle with the handle groove is releasable connection.
In order to place the handle accuracy in the handle inslot, and the during operation does not skid, the utility model discloses the improvement has, the handle inslot is provided with spacing hole, the handle bottom is provided with the stopper.
(III) advantageous effects
Compared with the prior art, the utility model provides a building electrical engineering threading construction equipment possesses following beneficial effect:
this building electrical engineering threading construction equipment through mutually supporting of a plurality of band pulleys and spool, it is convenient to remove, can realize automatic reason line, automatic spiral, process such as automatic clearance, and convenient and simple during the use also can continue work through handle rotation when not having the electricity.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a portion of the enlarged structure of FIG. 1;
FIG. 3 is a schematic view of a portion of the enlarged structure of FIG. 1 at B according to the present invention;
fig. 4 is a side view of the present invention.
Number 1 in the drawing, first pulley; 2. a V-band; 3. a first bracket; 4. a reel; 5. a first drive shaft; 6. a handle wheel; 7. a second pulley; 8. a second drive shaft; 9. an electric motor; 10. a third support; 11. a universal wheel; 12. a base; 13. a first roller; 14. a second roller; 15. a first roller; 16. A fixed block; 17. a second bracket; 18. an air pump; 19. a position sensor; 20. a pneumatic chute; 21. A second roller; 22. a first belt groove; 23. a second belt groove; 24. a baffle plate; 25. a bump; 26. a handle; 27. a handle slot; 28. a limiting hole; 29. a limiting block; 30. a boss; 31. and a brush.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a threading construction device for building electrical engineering comprises a first bracket 3, a second bracket 17, a third bracket 10, an air pump 18, a pneumatic chute 20, a first transmission shaft 5, a motor 9, a V-belt 2, a base 12 and a reel 4, wherein the first bracket 3 is arranged at one end of the base 12, the first bracket 3 is welded on the base 12, a hole is arranged above the first bracket 3, the first transmission shaft 5 is arranged on the first bracket 3 through the hole, the reel 4 is fixed on the first transmission shaft 5, one end of the first transmission shaft 5 is connected with a handle wheel 6, the other end of the first transmission shaft 5 is connected with a first belt pulley 1, a first belt groove 22 is arranged on the first belt pulley 1, the V-belt 2 is arranged in the first belt groove 22, one end of the V-belt 2 is connected with the first belt pulley 1, the other end of the V belt 2 is connected with a second belt pulley 7, the second belt pulley 7 is provided with a second belt pulley 23, the V belt 2 is arranged in the second belt pulley 23, a hole is formed below the first support 3, a boss 30 is fixed on the base 12, the motor 9 is fixed on the boss 30, the motor 9 is connected with one end of a second transmission shaft 8, the other end of the second transmission shaft 8 penetrates through the hole to be connected with the second belt pulley 7, a third support 10 is arranged at the other end of the base 12, the third support 10 is welded on the base 12, a first rolling shaft 13 and a second rolling shaft 14 are arranged on the third support 10, the first rolling shaft 13 is fixed on the third support 10 through a connecting shaft, the second rolling shaft 14 is fixed on the third support 10 through a connecting shaft, and the second rolling shaft 14 is fixed above the first rolling shaft 13, first support 3 with be provided with second support 17 between the third support 10, second support 17 welding is in on the base 12, be provided with the hole on the second support 17, pneumatic spout 20 passes through the hole to be fixed on the second support 17, pneumatic spout 20 with air pump 18 links to each other, be provided with lug 25 in the pneumatic spout 20, lug 25 can slide in the pneumatic spout 20, be fixed with second gyro wheel 21 on the lug 25, base 12 below is fixed with universal wheel 11 emergency braking system.
The two ends of the reel 4 are provided with baffles 24, the baffles 24 are welded on the reel 4, and in order to wind the engineering wire on the reel 4 only.
The first roller 13 is fixed with a brush 31, and the second roller 14 is fixed with a brush 31, so that the engineering thread can be cleaned at the same time of winding the thread.
A first roller 15 is arranged between the first roller 13 and the second roller 14, the first roller 15 is fixed by a fixing block 16, the fixing block 16 is welded on the third bracket 10, and the first roller 13 and the second roller 14 are clamped at the edges of the first roller 13 and the second roller 14 in order to prevent engineering wires from being used.
A position sensor 19 is attached to the projection 25, in order to effectively align the position of the projection 25 and the second roller 14 on the reel 4.
The handle wheel 6 is provided with a handle groove 27, the handle wheel 6 is provided with a handle 26, the handle 26 is arranged in the handle groove 27, the handle 26 and the handle groove 27 are detachably connected, and therefore the winding can be realized when the device is not powered.
A limiting hole 28 is arranged in the handle groove 27, and a limiting block 29 is arranged at the bottom of the handle 26, so that the handle 26 can be accurately placed in the handle groove 27 and does not slip during working.
In summary, when the threading construction device for electrical engineering of buildings is used, firstly, the engineering thread passes through the gap between the first roller 13 and the second roller 14, the hairbrush 31 on the first roller 13 and the second roller 14 has a certain cleaning effect on the engineering thread, the first roller 15 is further arranged between the first roller 13 and the second roller 14 to prevent the engineering thread from being clamped on the third bracket 10, then the engineering thread is placed on the second roller 21 on the pneumatic chute 20, the second roller 21 is connected with the lug 25 capable of sliding on the pneumatic chute 20, the position sensor 19 on the lug 25 can enable the lug 25 to move accurately, the movement system formed by the air pump 18 and the pneumatic chute 20 enables the lug 25 to reciprocate, the engineering thread is arranged on the reel 4 through the limitation of the second roller 21, the motor 9 is started to drive the second transmission shaft 8 to rotate, the second transmission shaft 8 drives the second belt pulley 7 to rotate, second band pulley 7 passes through V area 2 and gives first band pulley 1 with power transmission, and first band pulley 1 drives first transmission shaft 5 and rotates, and first transmission shaft 5 drives spool 4 and tightens up the engineering line, and when having a power failure, with handle 26 through stopper 29 with spacing hole 28 cooperation accurate insert handle 26 in handle groove 27 and drive handle wheel 6 and rotate, handle wheel 6 drives spool 4 and rotates the spiral, the device can accomplish through universal wheel 11 of base 12 and its braking system and remove or brake.
In this example: the motor, the air pump and the position sensor are conventional electric elements in the electrical field of buildings, and the V belt adopts a GB/T12730 and 2002V belt.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a building electrical engineering threading construction device, includes first support (3), second support (17), third support (10), air pump (18), pneumatic spout (20), first transmission shaft (5), motor (9), V area (2), base (12) and spool (4), its characterized in that: the utility model discloses a V belt conveyor, including base (12), first support (3) welding on base (12), first support (3) top is provided with the hole, first transmission shaft (5) run through the hole and set up on first support (3), be fixed with on first transmission shaft (5) spool (4), first transmission shaft (5) one end is connected with handle wheel (6), the first transmission shaft (5) other end is connected with first band pulley (1), be provided with first belt groove (22) on first band pulley (1), V belt (2) set up in first belt groove (22), the one end of V belt (2) with first band pulley (1) is connected, the other end of V belt (2) is connected with second band pulley (7), second band pulley (7) are provided with second belt groove (23), the V belt (2) is arranged in the second belt groove (23), a hole is formed in the lower portion of the first support (3), a boss (30) is fixed on the base (12), the motor (9) is fixed on the boss (30), the motor (9) is connected with one end of the second transmission shaft (8), the other end of the second transmission shaft (8) penetrates through the hole to be connected with the second belt wheel (7), the other end of the base (12) is provided with a third support (10), the third support (10) is welded on the base (12), a first rolling shaft (13) and a second rolling shaft (14) are arranged on the third support (10), the first rolling shaft (13) is fixed on the third support (10) through a connecting shaft, and the second rolling shaft (14) is fixed on the third support (10), second roller bearing (14) are fixed first roller bearing (13) top, first support (3) with be provided with second support (17) between third support (10), second support (17) welding is in on base (12), be provided with the hole on second support (17), pneumatic spout (20) are fixed through the hole on second support (17), pneumatic spout (20) with air pump (18) link to each other, be provided with lug (25) in pneumatic spout (20), lug (25) can slide in pneumatic spout (20), be fixed with second gyro wheel (21) on lug (25), base (12) below is fixed with universal wheel (11) emergency braking system.
2. The threading construction device for the building electrical engineering according to claim 1, characterized in that: and two ends of the reel (4) are provided with baffle plates (24), and the baffle plates (24) are welded on the reel (4).
3. The threading construction device for the building electrical engineering according to claim 1, characterized in that: the first roller (13) is fixed with a hairbrush (31), and the second roller (14) is fixed with a hairbrush (31).
4. The threading construction device for the building electrical engineering according to claim 1, characterized in that: a first roller (15) is arranged between the first roller (13) and the second roller (14), the first roller (15) is fixed through a fixing block (16), and the fixing block (16) is welded on the third support (10).
5. The threading construction device for the building electrical engineering according to claim 1, characterized in that: a position sensor (19) is attached to the projection (25).
6. The threading construction device for the building electrical engineering according to claim 1, characterized in that: be provided with handle groove (27) on handle wheel (6), be provided with handle (26) on handle wheel (6), handle (26) set up in handle groove (27), handle (26) with handle groove (27) are releasable connection.
7. The threading construction device for the building electrical engineering according to claim 6, characterized in that: a limiting hole (28) is formed in the handle groove (27), and a limiting block (29) is arranged at the bottom of the handle (26).
CN202022080013.8U 2020-09-20 2020-09-20 Threading construction device for building electrical engineering Expired - Fee Related CN213415828U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022080013.8U CN213415828U (en) 2020-09-20 2020-09-20 Threading construction device for building electrical engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022080013.8U CN213415828U (en) 2020-09-20 2020-09-20 Threading construction device for building electrical engineering

Publications (1)

Publication Number Publication Date
CN213415828U true CN213415828U (en) 2021-06-11

Family

ID=76263208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022080013.8U Expired - Fee Related CN213415828U (en) 2020-09-20 2020-09-20 Threading construction device for building electrical engineering

Country Status (1)

Country Link
CN (1) CN213415828U (en)

Similar Documents

Publication Publication Date Title
CN104300748A (en) Drawing die coil inserting apparatus of motor stator iron core
CN213415828U (en) Threading construction device for building electrical engineering
CN204179883U (en) The drawing-die coil inserting apparatus of motor stator core
CN110980404B (en) Take-up is used in data line production
CN208135621U (en) A kind of synchronization take-up for double plate fork winch
CN202038784U (en) Steel wire rope winding device
CN112645148B (en) High-speed bobbin winder for spinning
CN213771133U (en) Coiling device with anti-winding function for lorry-mounted crane
CN210984395U (en) Cable is to hinge device
CN210456951U (en) Plastic pipe coiler device
CN210685945U (en) Belt-driven tower type oil pumping unit
CN211440319U (en) Direct-drive type alternating current-direct current chain saw
CN209009817U (en) A kind of buffer storage for cable winding
CN219436301U (en) 4 socket belt pulley drum
CN213445536U (en) Cable coil roller
CN210312899U (en) Wire accumulating mechanism of inverted plum blossom wire winding machine
CN215092809U (en) Rust removal device for anchor cable recovery
CN105499351A (en) Roller-variable automatic edge rolling machine
CN211496423U (en) Automatic cone winder with electronic yarn clearer
CN209467949U (en) A kind of Communication Engineering cable coiling device
CN219860440U (en) Hanging basket lifting machine
CN221070438U (en) Winding device
CN210110527U (en) Winding system for producing inductor by automatic winding machine
CN215478875U (en) Steel wire rope revolving structure
CN209777912U (en) Winding machine connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210611

Termination date: 20210920

CF01 Termination of patent right due to non-payment of annual fee