CN213395393U - Discharge pipe structure of burner - Google Patents
Discharge pipe structure of burner Download PDFInfo
- Publication number
- CN213395393U CN213395393U CN202022277402.XU CN202022277402U CN213395393U CN 213395393 U CN213395393 U CN 213395393U CN 202022277402 U CN202022277402 U CN 202022277402U CN 213395393 U CN213395393 U CN 213395393U
- Authority
- CN
- China
- Prior art keywords
- motor
- conveyer pipe
- fuel
- burner
- mount
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)
Abstract
The utility model discloses a tubular construction under combustor, including the conveyer pipe, the mount is installed through the bolt to the one end of conveyer pipe, the motor is installed through the bolt in one side of mount, the shaft coupling is installed to the output of motor, the one end of shaft coupling is connected with the axis of rotation, the outer wall welding of axis of rotation has the auger, one side of conveyer pipe is connected with the feeder hopper, the conveyer pipe is including square pipeline and semicircle pipeline, the opposite side of mount is connected with the mounting panel, open one side of mounting panel has the mounting hole, the one end of conveyer pipe is fixed with the connecting plate, open one side of connecting plate has the connecting hole, the top of feeder hopper is fixed with. The utility model discloses reduce the operating time of motor, improve the life-span that the motor used, can reduce the resistance of fuel to the motor when the motion in the conveyer pipe simultaneously, the material of coming out can not crushed, and the original crushing fuel of relative ratio is resistant burning more, and the dust also reduces relatively after the fuel burning simultaneously.
Description
Technical Field
The utility model relates to a combustor technical field especially relates to a combustor blanking tube structure.
Background
In the broad concept of a burner, a household water heater, a gas stove, a lighter, etc. can be considered as one of the burners. In its operating principle, a burner can be defined as a device that converts a substance into heat energy by a chemical reaction, i.e., combustion, i.e., air and fuel are mixed in a proper ratio by a premixing device to be sufficiently combusted.
In the burner blanking pipe structure in the prior art, if firepower is maintained at a high position for a long time, the required working time of a motor is longer, the service life of the motor is shorter, the resistance of the fuel to the motor when the fuel moves in a conveying pipe is larger due to the fact that the size of the fuel is usually irregular, the discharged material can be crushed, the pulverized fuel is not resistant to burning, and meanwhile, dust is relatively more after the fuel burns. Therefore, it is desirable to design a burner discharge tube structure to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the operating time of the motor that exists among the prior art longer, lead to the life-span that the motor used shorter, the resistance to the motor when fuel moves in the conveyer pipe is great, and the material that comes out can be crushed, and crushing fuel is not resistant burning, and the dust is also more relatively shortcoming after the fuel burning simultaneously, and the burner blanking tube structure that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a combustor blanking tube structure, includes the conveyer pipe, the mount is installed through the bolt to the one end of conveyer pipe, the motor is installed through the bolt in one side of mount, the shaft coupling is installed to the output of motor, the one end of shaft coupling is connected with the axis of rotation, the outer wall welding of axis of rotation has the auger, one side of conveyer pipe is connected with the feeder hopper, the conveyer pipe is including square pipeline and semicircle pipeline.
Furthermore, the other side of the fixing frame is connected with a mounting plate, and one side of the mounting plate is provided with a mounting hole.
Furthermore, a connecting plate is fixed at one end of the conveying pipe, and a connecting hole is formed in one side of the connecting plate.
Furthermore, a fixing plate is fixed at the top of the feed hopper, and a fixing hole is formed in the top of the fixing plate.
The utility model has the advantages that:
1. through the arrangement of the square pipeline and the semicircular pipeline, the size of the installation space of the conveying pipe can be unchanged by combining the square pipeline and the semicircular pipeline; the thickness, the space and the inner and outer diameter of the packing auger are not changed; the unchangeable condition of motor setting parameter improves the output quantity to the fuel, thereby reduce the operating time of motor, the life-span that the improvement motor used, simultaneously can reduce the resistance to the motor of fuel when the intraductal motion of conveyer, the material of coming out can not be crushed, the original crushing fuel of relative ratio is resistant burning more, dust also reduces relatively after the fuel burning simultaneously, it is easier that the square back location that the first half of conveyer pipe changes into square pipeline is more, need not use correction instrument and just can set level the unloading tubular construction, the time of unloading tubular construction correction has been saved, the work efficiency of unloading tubular construction installation has been improved.
2. Through feeder hopper, fixed plate and the fixed orifices that sets up, area when the feeder hopper can increase the conveyer pipe feeding satisfies the demand of conveyer pipe feeding, and fixed plate and fixed orifices pass through the bolt be convenient for be connected with fuel pipe, improve the convenience of unloading tubular construction installation.
Drawings
Fig. 1 is a schematic view of an overall structure of a burner blanking tube structure according to the present invention;
fig. 2 is an explosion structure diagram of a burner feed pipe structure provided by the present invention;
fig. 3 is a schematic view of a conveying pipe structure of a burner blanking pipe structure according to the present invention;
fig. 4 is a schematic diagram of a cross-sectional structure of a duct of a burner discharge tube structure according to the present invention.
In the figure: the device comprises a conveying pipe 1, a fixing frame 2, a motor 3, a coupler 4, a rotating shaft 5, an auger 6, a mounting plate 7, mounting holes 8, connecting plates 9, connecting holes 10, a feeding hopper 11, a fixing plate 12, fixing holes 13, a square pipeline 14 and a semicircular pipeline 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When a component is referred to as being "connected" to another component, it can be directly connected to the other component or intervening components may also be present. When a component is referred to as being "disposed on" another component, it can be directly on the other component or intervening components may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1 to 4, a burner feeding pipe structure includes a conveying pipe 1, a fixing frame 2 is installed at one end of the conveying pipe 1 through a bolt, a motor 3 is installed at one side of the fixing frame 2 through a bolt, a coupler 4 is installed at an output end of the motor 3, one end of the coupler 4 is connected with a rotating shaft 5, an auger 6 is welded on an outer wall of the rotating shaft 5, the motor 3 drives the rotating shaft 5 to rotate through the coupler 4, the auger 6 is driven to rotate by the rotating shaft 5, the auger 6 can drive fuel to move in the conveying pipe 1 by rotating, a feeding hopper 11 is connected at one side of the conveying pipe 1, the feeding area of the conveying pipe 1 can be increased by the feeding hopper 11, the feeding requirement of the conveying pipe 1 is met, the conveying pipe 1 includes a square pipe 14 and a semicircular pipe 15, the output of the fuel can be increased, thereby reduce motor 3's operating time, improve the life-span that motor 3 used, simultaneously can reduce the resistance to motor 3 when fuel moves in conveyer pipe 1, the material of coming out can not be crushed, the original crushing fuel of relative ratio is more resistant to burn, the dust also reduces relatively after the fuel burning simultaneously, it is easier to fix a position after the square that conveyer pipe 1 first part changed into square pipeline 14, need not use correction tool and just can set level the unloading tubular construction, the time of unloading tubular construction correction has been saved, the work efficiency of unloading tubular construction installation has been improved.
Furthermore, the other side of mount 2 is connected with mounting panel 7, and mounting hole 8 has been opened to one side of mounting panel 7, and mounting panel 7 can be according to the one end at conveyer pipe 1 through bolt through mounting hole 8.
Furthermore, a connecting plate 9 is fixed at one end of the conveying pipe 1, a connecting hole 10 is formed in one side of the connecting plate 9, and the mounting plate 7 can be conveniently mounted on the connecting plate 9 through bolts.
Furthermore, a fixing plate 12 is fixed at the top of the feed hopper 11, a fixing hole 13 is formed in the top of the fixing plate 12, the fixing plate 12 and the fixing hole 13 are connected with a fuel pipeline conveniently through bolts, and the convenience of installation of the blanking pipe structure is improved.
The working principle is as follows: when in use, the fixing plate 12 and the fixing hole 13 are conveniently connected with a fuel pipeline through bolts, the convenience of the installation of the blanking pipe structure is improved, the feeding hopper 11 can increase the area of the conveying pipe 1 during feeding and meet the feeding requirement of the conveying pipe 1, the conveying pipe 1 adopts the combination of the square pipeline 14 and the semicircular pipeline 15 to improve the output quantity of fuel under the condition that other parameters are inconvenient, thereby reducing the working time of the motor 3 and prolonging the service life of the motor 3, simultaneously reducing the resistance of the fuel to the motor 3 when the fuel moves in the conveying pipe 1, the discharged material can not be crushed, compared with the prior crushed fuel, the fuel is more burning-resistant, meanwhile, the dust is relatively reduced after the fuel is burnt, the positioning is easier after the upper half part of the conveying pipe 1 is changed into the square of the square pipeline 14, the blanking pipe structure can be flattened without using a correcting tool, and the time for correcting the, the work efficiency of unloading tubular construction installation has been improved.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (4)
1. The utility model provides a combustor blanking tube structure, includes conveyer pipe (1), its characterized in that, mount (2) are installed through the bolt to the one end of conveyer pipe (1), motor (3) are installed through the bolt to one side of mount (2), shaft coupling (4) are installed to the output of motor (3), the one end of shaft coupling (4) is connected with axis of rotation (5), the outer wall welding of axis of rotation (5) has auger (6), one side of conveyer pipe (1) is connected with feeder hopper (11), conveyer pipe (1) is including square pipeline (14) and semicircle pipeline (15).
2. The burner blanking pipe structure as claimed in claim 1, wherein the other side of the fixing frame (2) is connected with a mounting plate (7), and one side of the mounting plate (7) is provided with a mounting hole (8).
3. The burner blanking tube structure as claimed in claim 1, characterized in that a connecting plate (9) is fixed to one end of the conveying tube (1), and a connecting hole (10) is formed in one side of the connecting plate (9).
4. The burner blanking tube structure as claimed in claim 1, wherein a fixing plate (12) is fixed to the top of the feeding hopper (11), and a fixing hole (13) is formed in the top of the fixing plate (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022277402.XU CN213395393U (en) | 2020-10-14 | 2020-10-14 | Discharge pipe structure of burner |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022277402.XU CN213395393U (en) | 2020-10-14 | 2020-10-14 | Discharge pipe structure of burner |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213395393U true CN213395393U (en) | 2021-06-08 |
Family
ID=76187376
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022277402.XU Active CN213395393U (en) | 2020-10-14 | 2020-10-14 | Discharge pipe structure of burner |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213395393U (en) |
-
2020
- 2020-10-14 CN CN202022277402.XU patent/CN213395393U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213395393U (en) | Discharge pipe structure of burner | |
CN205664358U (en) | Biomass combustor | |
CN205678697U (en) | A kind of feeding structure of macro-organism matter powder combustion device | |
CN211084052U (en) | Biomass fixed fuel efficient combustion furnace | |
CN107806629A (en) | A kind of energy saving and environment friendly bio-fuel stove | |
CN206617927U (en) | A kind of biologic grain combustor of high impulse igniter | |
KR101058889B1 (en) | A burner that use pellet fuel | |
CN220436557U (en) | Reverse burning prevention electric deslagging biomass burner | |
CN219222388U (en) | Pulverized coal and natural gas integrated dual-fuel burner | |
CN206478628U (en) | A kind of biomass combustion machine | |
CN219955310U (en) | Rotary boiler | |
CN213178274U (en) | Biomass combustion boiler | |
CN215174971U (en) | Biomass particle combustion furnace with high combustion efficiency | |
CN220303626U (en) | Biomass particle boiler convenient to pay-off | |
CN216079767U (en) | High-efficiency smokeless combustion boiler | |
CN219494154U (en) | Tempering preventing device of mechanical biomass burner | |
CN212511111U (en) | Biomass gasification combustion furnace | |
CN211854081U (en) | Energy-saving emission-reducing decomposing furnace | |
CN212132632U (en) | Assembled heating stove | |
CN2348258Y (en) | Vertical spiral discharge coal-fired machine | |
CN217584422U (en) | Pulverized coal burner with adjustable air supply quantity | |
CN220083104U (en) | Combustor for industrial baking device | |
CN220355453U (en) | High-efficient burning boiler | |
CN212673186U (en) | Frequency conversion automatic control boiler with built-in precombustion chamber | |
CN212316042U (en) | Rotary furnace plate of gasification cracking furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |