CN213390423U - Structure is protected to interim simple and easy ditch of quick construction - Google Patents
Structure is protected to interim simple and easy ditch of quick construction Download PDFInfo
- Publication number
- CN213390423U CN213390423U CN202021507868.8U CN202021507868U CN213390423U CN 213390423 U CN213390423 U CN 213390423U CN 202021507868 U CN202021507868 U CN 202021507868U CN 213390423 U CN213390423 U CN 213390423U
- Authority
- CN
- China
- Prior art keywords
- ditch
- temporary
- construction
- water channel
- simple water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model provides a temporary simple water channel dredging structure for rapid construction, wherein foldable flexible anti-seepage materials are laid on the surface and two side planes of a temporary drainage ditch or an irrigation channel, a plurality of groups of framework components are arranged between the flexible anti-seepage materials and the temporary drainage ditch or the irrigation channel, the framework components are arranged along the section of the channel, and a plurality of connecting pieces are fixedly connected between the flexible anti-seepage materials and the planes at two sides of the temporary drainage ditch or the irrigation channel; the utility model is suitable for a solve interim escape canal and irrigate the problem that the canal wastes time and energy, high input, have simple structure, it is convenient to be under construction, advantage that the expense is cheap.
Description
Technical Field
The utility model relates to an interim facility engineering technical field among municipal works, farmland hydraulic engineering, concretely relates to structure is protected to interim simple and easy folding ditch of quick construction.
Background
In municipal works project construction process, for there is not ponding in the construction process in the guarantee place, protection excavation face and exposed surface do not receive the surface runoff influence, often need set up interim escape canal, with rainwater, domestic water and the production water of during construction arrange the off-site in an organized way. In irrigation and water conservancy engineering, often also because the construction reason and cut original irrigation canal to carry out interim guarantor to cutting the position and lead to, guarantee that irrigation water does not receive the influence that the construction was cut. General interim escape canal, irrigation canal keep lead to the structure and generally adopt brick plastering ditch, concrete ditch, have greatly increased and have faced the labour cost and the material cost of establishing the engineering, and construction cycle is longer. If the ditch is directly dug, the ditch is easily blocked and damaged due to scouring, and the overflowing capacity cannot be ensured. Therefore, it is necessary to design a temporary ditch with economical cost, quick construction and simple structure.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a structure is protected to interim simple and easy folding ditch of quick construction, be applicable to the problem that solves interim escape canal and irrigate the ditch and waste time and energy, high input, have simple structure, it is convenient to be under construction, advantage that the expense is cheap.
Therefore, the utility model adopts the following technical scheme:
the utility model provides a structure is protected to interim simple and easy folding ditch of quick construction, its characterized in that: the foldable flexible anti-seepage material is laid on the surface and two side planes of the temporary drainage ditch or the irrigation ditch, a plurality of groups of framework assemblies are arranged between the flexible anti-seepage material and the temporary drainage ditch or the irrigation ditch, the framework assemblies are arranged along the cross section of the ditch, and a plurality of connecting pieces are fixedly connected between the flexible anti-seepage material and the planes on two sides of the temporary drainage ditch or the irrigation ditch.
Further: the skeleton subassembly includes the five skeletons that set up along the slot section, adopts activity knot swing joint between adjacent skeleton.
Further: the skeleton subassembly is along the equidistant setting of interim escape canal or irrigation canal extending direction, wears to be equipped with at the skeleton middle part position department of slot tank bottom and connects the rope, connects the rope and is used for concatenating multiunit skeleton subassembly.
Further: the connecting pieces are arranged at equal intervals along the extension direction of the temporary drainage ditch or the irrigation ditch.
Further: the flexible impermeable material is color stripe cloth made of Polyethylene (PE).
Further: and a stainless steel protective ring structure is arranged at the connecting part of the flexible impermeable material and the connecting piece.
Further: the connecting piece is a U-shaped nail.
Further: the paving area of the flexible impermeable material is larger than the surface area of the temporary drainage ditch or the irrigation ditch.
Further: the framework is made of PVC plastic.
Further: the connecting rope is made of nylon ropes.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model discloses execute through laying folding various cloth on interim escape canal or irrigation canal to fix through the U type nail, solved traditional interim escape canal and irrigate the problem that the canal is wasted time and energy, high input, construction cycle length, have simple process, flexible operation, the construction is quick, low cost, safe and reliable and application scope is wide advantage.
Drawings
FIG. 1 is a cross-sectional layout of the present invention;
fig. 2 is a top view of the present invention.
Description of reference numerals: 1. a flexible barrier material; 2. a connecting member; 3. a stainless steel protective ring; 4. a skeletal assembly; 5. a movable buckle; 6. connecting ropes; 7-temporary drainage ditches or irrigation ditches.
Detailed Description
The following description is made with reference to the accompanying drawings and examples, but not to be construed as limiting the invention.
As shown in fig. 1 and 2, the utility model provides a pair of structure is protected to interim simple and easy ditch of quick construction, lay collapsible flexible barrier material 1 on interim escape canal or irrigation canal 7's surface and both sides plane, the surface area that flexible barrier material 1's the area of laying is greater than interim escape canal or irrigation canal 7, flexible barrier material 1 can adopt various cloth, lay various cloth in the interim escape canal or irrigation canal 7 dug, because various cloth comprises polyethylene PE, can play sun-proof and waterproof effect, and because the compliance of various cloth, conveniently transport and be favorable to the construction of irregular ditch, various cloth demolishs the convenience after the construction period finishes, consequently, have the advantage of environmental protection and saving manpower and materials.
The framework component 4 comprises five frameworks arranged along the section of the groove, the adjacent frameworks are movably connected through movable buckles 5, the frameworks are made of PVC plastics, and the frameworks are arranged on the surface of the flexible anti-seepage material and can be connected in a bonding mode. Skeleton subassembly 4 sets up along 7 extending direction equidistant settings of interim escape canal or irrigation canal, and every 1m sets up one set of skeleton subassembly 4, wears to be equipped with at the skeleton middle part position department of slot tank bottom and connects rope 6, connects rope 6 and is used for concatenating multiunit skeleton subassembly 4, connect 6 materials of rope to be the nylon rope.
The framework component 4 can be folded, because the frameworks 4-1 and 4-5 at two sides are shortest, the framework 4-3 at the bottom of the corresponding channel in the middle is longest, the frameworks 4-2 and 4-4 at the channel walls at two sides are longer than the frameworks 4-1 and 4-5, after the drainage channel or the irrigation channel 7 is abandoned, the framework 4-1 is folded to the framework 4-2 and then folded to the framework 4-3, the framework 4-5 is folded to the framework 4-4, and finally the framework 4-3 is folded. After the skeleton is folded, the connection rope 6 is contracted, and the flexible impermeable material 1 can be folded along a temporary drainage ditch or an irrigation ditch and finally stored for next recycling. The middle of the framework 5-4 is perforated, the aperture size is larger than that of the connecting rope 6, and the connecting rope 6 can penetrate through the framework.
The connecting pieces 2 are arranged at equal intervals along the extension direction of the temporary drainage ditch or the irrigation ditch 7, the distance between every two adjacent connecting pieces 2 is 5m, the connecting pieces 2 are U-shaped nails, and due to the fact that the color strip cloth is light in weight and strong in activity, the color strip cloth can be stably fixed on the temporary drainage ditch or the irrigation ditch 7 by arranging the plurality of U-shaped nails on the planes on the two sides of the temporary drainage ditch or the irrigation ditch 7, and the color strip cloth is guaranteed not to transversely and longitudinally move; and the U-shaped nail not only can play a good role in fixing, but also is convenient to take out and is convenient to recycle after being abandoned.
And a stainless steel protection ring 3 is arranged at the connecting part of the flexible impermeable material 1 and the connecting piece 2. The connecting piece 2 passes through the stainless steel protection ring 3 and fixes the flexible impermeable material 1 on the surface of the temporary drainage ditch or the irrigation ditch 7, the stainless steel protection ring 3 can be convenient for the later stage to take out the connecting piece 2, the integrality of the color strip cloth is better ensured, and the color strip cloth can be better recycled.
The above embodiments are merely preferred technical solutions of the present invention, and it should be understood by those skilled in the art that modifications or substitutions of technical solutions or parameters in the embodiments can be made without departing from the principles and essential conditions of the present invention, and all the modifications or substitutions should be covered within the protection scope of the present invention.
Claims (10)
1. The utility model provides a structure is protected to interim simple and easy ditch of quick construction which characterized in that: the foldable flexible anti-seepage material is laid on the surface and two side planes of the temporary drainage ditch or the irrigation ditch, a plurality of groups of framework assemblies are arranged between the flexible anti-seepage material and the temporary drainage ditch or the irrigation ditch, the framework assemblies are arranged along the cross section of the ditch, and a plurality of connecting pieces are fixedly connected between the flexible anti-seepage material and the planes on two sides of the temporary drainage ditch or the irrigation ditch.
2. The fast-construction temporary simple water channel dredging structure according to claim 1, characterized in that: the skeleton subassembly includes the five skeletons that set up along the slot section, adopts activity knot swing joint between adjacent skeleton.
3. The temporary simple water channel dredging structure for rapid construction according to claim 2, characterized in that: the skeleton subassembly is along the equidistant setting of interim escape canal or irrigation canal extending direction, wears to be equipped with at the skeleton middle part position department of slot tank bottom and connects the rope, connects the rope and is used for concatenating multiunit skeleton subassembly.
4. The fast-construction temporary simple water channel dredging structure according to claim 1, characterized in that: the connecting pieces are arranged at equal intervals along the extension direction of the temporary drainage ditch or the irrigation ditch.
5. The fast-construction temporary simple water channel dredging structure according to claim 1, characterized in that: the flexible impermeable material is color stripe cloth made of Polyethylene (PE).
6. The fast-construction temporary simple water channel dredging structure according to claim 1, characterized in that: and a stainless steel protective ring structure is arranged at the connecting part of the flexible impermeable material and the connecting piece.
7. The fast-construction temporary simple water channel dredging structure according to claim 1, characterized in that: the connecting piece is a U-shaped nail.
8. The fast-construction temporary simple water channel dredging structure according to claim 1, characterized in that: the paving area of the flexible impermeable material is larger than the surface area of the temporary drainage ditch or the irrigation ditch.
9. The fast-construction temporary simple water channel dredging structure according to claim 1, characterized in that: the framework is made of PVC plastic.
10. The temporary simple water channel dredging structure for rapid construction according to claim 3, characterized in that: the connecting rope is made of nylon ropes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021507868.8U CN213390423U (en) | 2020-07-27 | 2020-07-27 | Structure is protected to interim simple and easy ditch of quick construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021507868.8U CN213390423U (en) | 2020-07-27 | 2020-07-27 | Structure is protected to interim simple and easy ditch of quick construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213390423U true CN213390423U (en) | 2021-06-08 |
Family
ID=76201977
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021507868.8U Active CN213390423U (en) | 2020-07-27 | 2020-07-27 | Structure is protected to interim simple and easy ditch of quick construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213390423U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114892576A (en) * | 2022-05-19 | 2022-08-12 | 上海勘测设计研究院有限公司 | Fast-assembling folding drainage overflows device |
-
2020
- 2020-07-27 CN CN202021507868.8U patent/CN213390423U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114892576A (en) * | 2022-05-19 | 2022-08-12 | 上海勘测设计研究院有限公司 | Fast-assembling folding drainage overflows device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213390423U (en) | Structure is protected to interim simple and easy ditch of quick construction | |
CN102975420A (en) | Composite elastic material screen cloth | |
CN206928282U (en) | Prestressed concrete porous hollow ecology stake | |
CN210177523U (en) | Ecological bank protection drainage structures of prefabricated assembled | |
CN202945572U (en) | Foldable self-balancing water retaining wall | |
CN104947628A (en) | Ecological engineering method based on gabion fixed bags with lugs | |
CN212316830U (en) | Hydraulic engineering is with ecological slope protection brick of concatenation formula | |
CN205152896U (en) | Water delivery groove is used in water conservancy construction | |
CN214530994U (en) | Water collection layer structure of urban green belt | |
CN204662625U (en) | A kind of interlock type temporary drainage groove structure | |
CN205000360U (en) | Basement structure with waterproof structure | |
CN207194116U (en) | A kind of construction site assembled temporary drain | |
CN202202306U (en) | Rib beam type reinforced concrete U-shaped ditch | |
CN112982608A (en) | Water collection layer structure of urban green belt | |
CN207295619U (en) | A kind of greening type water conservancy protective slope structure | |
CN213538840U (en) | Big rhombus sash slope protection structure of panel rock-fill dam | |
CN112064579A (en) | Device for quickly constructing flood control sub-dike and operation method thereof | |
CN217811179U (en) | Waterproof ecological retaining wall of hydraulic engineering | |
CN213086706U (en) | Flood control sub-dike device constructed by water-filled rubber bags | |
CN205116093U (en) | Easy dismouting water conservancy slope protection net | |
CN212641176U (en) | Be applied to waterproof construction of bridge case roof beam construction | |
CN217536892U (en) | Prefabricated irrigation channel | |
CN218027591U (en) | Geogrid convenient to installation | |
CN213061935U (en) | U-shaped groove for irrigation and water conservancy construction | |
CN221255382U (en) | Ecological grid building block structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |