CN213358740U - Silt clearing device for river course restoration - Google Patents

Silt clearing device for river course restoration Download PDF

Info

Publication number
CN213358740U
CN213358740U CN202021877195.5U CN202021877195U CN213358740U CN 213358740 U CN213358740 U CN 213358740U CN 202021877195 U CN202021877195 U CN 202021877195U CN 213358740 U CN213358740 U CN 213358740U
Authority
CN
China
Prior art keywords
fixedly connected
storage box
pipe
pivot
mud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021877195.5U
Other languages
Chinese (zh)
Inventor
徐可可
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jianhua Group Environmental Protection Technology Co ltd
Original Assignee
Zhejiang Jianhua Group Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jianhua Group Environmental Protection Technology Co ltd filed Critical Zhejiang Jianhua Group Environmental Protection Technology Co ltd
Priority to CN202021877195.5U priority Critical patent/CN213358740U/en
Application granted granted Critical
Publication of CN213358740U publication Critical patent/CN213358740U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/40Protecting water resources
    • Y02A20/402River restoration

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model discloses a silt clearing device that river course was restoreed and was used, the camera includes a supporting plate, the left side fixedly connected with storage box at backup pad top, the top intercommunication on storage box right side has row material pipe, arrange the right side fixedly connected with mud pump of material pipe, mud pump's bottom fixedly connected with mud pump takes out the mud pipe, mud pump's bottom intercommunication has the connection shell, the top of backup pad is located the right side fixedly connected with motor of storage box, the output fixedly connected with pivot of motor, the first broken tooth of bottom fixedly connected with on pivot surface. The utility model discloses a backup pad, storage box, row's material pipe, dredge pump, dredge pipe, connection shell, dead lever, motor, pivot, first broken tooth, action wheel, from the cooperation of driving wheel, the broken tooth of connecting axle, second, scraping pole, battery and PLC controller, solved current silt cleaning device and blockked up easily at the during operation dredge pipe to can influence work efficiency's problem.

Description

Silt clearing device for river course restoration
Technical Field
The utility model relates to a river course restoration technical field specifically is a silt clearing device that river course was restoreed and is used.
Background
River restoration is a complete ecosystem, it not only includes the plant, still includes animal and microorganism, exchange of material energy and information has all taken place between the system inside and between system and adjacent system, have very strong dynamics, there is silt deposit in the urban river water environment, these silt can seriously pollute the water environment if can't be handled for a long time, make urban river running water environmental deterioration, consequently, carry out silt to the urban river and handle into the important way in order to promote urban development, but current silt cleaning device draws the mud pipe and easily blocks up when working, thereby can influence work efficiency, for this reason, we provide a silt cleaning device for river restoration.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a silt clearing device for river course restoration to solve the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a sludge removing device for river channel restoration comprises a supporting plate, wherein a storage box is fixedly connected to the left side of the top of the supporting plate, a discharge pipe is communicated with the top of the right side of the storage box, a sludge pump is fixedly connected to the right side of the discharge pipe, a sludge pipe is fixedly connected to the bottom of the sludge pump, a connecting shell is communicated with the bottom of the sludge pipe, a motor is fixedly connected to the top of the supporting plate and positioned on the right side of the storage box, a rotating shaft is fixedly connected to the output end of the motor, a first crushing tooth is fixedly connected to the bottom of the surface of the rotating shaft, a driving wheel is sleeved on the surface of the rotating shaft and positioned at a middle shaft, a driven wheel is meshed on the right side of the driving wheel, a connecting shaft is fixedly connected to the bottom of the driven wheel, a second crushing tooth is fixedly connected, the left side of the scraping rod is contacted with the mud pumping pipe.
Preferably, the top of the left side of the storage box is fixedly connected with a storage battery, and the left side of the storage battery is fixedly connected with a PLC (programmable logic controller).
Preferably, the left side fixedly connected with bracing piece of connecting shell internal surface, and the top fixedly connected with bearing of bracing piece, the top that the surface of pivot and be located first broken tooth and connecting axle surface all with bearing swing joint.
Preferably, the bottom of the mud pump is fixedly connected with a fixing plate, and the left side of the fixing plate is fixedly connected with the storage box.
Preferably, both sides of the top of the connecting shell are fixedly connected with fixing rods, and the tops of the fixing rods are fixedly connected with the supporting plate.
(III) advantageous effects
Compared with the prior art, the utility model provides a silt clearing device for river course restoration possesses following beneficial effect:
1. the utility model discloses place the connecting shell in silt extraction department, carry out work simultaneously with the dredge pump through PLC controller control motor, drive the pivot through the motor and rotate, the pivot drives first broken tooth and rotates, the pivot can also drive the action wheel and rotate, the action wheel drives the driven wheel and rotates, driven wheel drives the connecting axle and rotates, the connecting axle drives second broken tooth and rotates, not only can smash the silt of fixing at the bottom of a river, but also can smash stone and weeds in the silt, through the cooperation of arranging the material pipe, dredge pump and dredge pipe, can suck the silt after smashing and arrange to the storage box side by side, because driven wheel still can drive the scraping bar and rotate, consequently, the scraping bar can scrape the dredge pipe, make silt can not adhere to the inner wall of dredge pipe, cause dredge pipe to block up, solved current silt cleaning device and in operation dredge pipe easy blocking up, thereby affecting the work efficiency.
2. The utility model discloses a set up battery and PLC controller, the convenience is supplied power to the power consumption part to and opening of control power consumption part stops, through setting up bracing piece and bearing, has stabilized the work of pivot with the connecting axle, has carried out balanced support to pivot and connecting axle, has avoided pivot and connecting axle during operation unstability, through setting up the fixed plate, has stabilized the work of taking out the dredge pump, has carried on spacingly to taking out the dredge pump, has avoided taking out the dredge pump during operation to take place to rock.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic sectional view of the connecting shell of the present invention;
fig. 3 is a schematic view of the top view structure of the mud pumping pipe of the present invention.
In the figure: 1. a support plate; 2. a storage box; 3. a discharge pipe; 4. a mud pump; 5. a mud pumping pipe; 6. a connecting shell; 7. fixing the rod; 8. a motor; 9. a rotating shaft; 10. a first crushing tooth; 11. a driving wheel; 12. a driven wheel; 13. a connecting shaft; 14. a second crushing tooth; 15. a scraping rod; 16. a storage battery; 17. a PLC controller.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to be referred must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The utility model discloses a backup pad 1, storage box 2, arrange material pipe 3, dredge pump 4, dredge pipe 5, connect shell 6, dead lever 7, motor 8, pivot 9, first broken tooth 10, action wheel 11, from driving wheel 12, connecting axle 13, the broken tooth of second 14, scrape pole 15, battery 16 and PLC controller 17 part are general standard or the part that technical staff in the field knows, and its structure and principle all can learn through the technical manual or learn through conventional experimental method for this technical staff.
Referring to fig. 1-3, a sludge removing device for river channel restoration comprises a supporting plate 1, a storage tank 2 is fixedly connected to the left side of the top of the supporting plate 1, a storage battery 16 is fixedly connected to the top of the left side of the storage tank 2, a PLC controller 17 is fixedly connected to the left side of the storage battery 16, the storage battery 16 and the PLC controller 17 are arranged to conveniently supply power to and control the start and stop of the power consumption components, a discharge pipe 3 is communicated with the top of the right side of the storage tank 2, a sludge pump 4 is fixedly connected to the right side of the discharge pipe 3, a fixing plate is fixedly connected to the bottom of the sludge pump 4, the left side of the fixing plate is fixedly connected to the storage tank 2, the operation of the sludge pump 4 is stabilized by the fixing plate, the sludge pump 4 is limited, the sludge pump 4 is prevented from shaking during operation, a sludge pump 5 is fixedly connected to the bottom of the sludge pump 4, and a connecting shell 6, the two sides of the top of the connecting shell 6 are fixedly connected with fixing rods 7, the top of each fixing rod 7 is fixedly connected with the supporting plate 1, the top of the supporting plate 1 is fixedly connected with a motor 8 positioned on the right side of the storage box 2, the output end of the motor 8 is fixedly connected with a rotating shaft 9, the bottom of the surface of the rotating shaft 9 is fixedly connected with a first crushing tooth 10, the bottom of the surface of the rotating shaft 9 positioned at the middle shaft is sleeved with a driving wheel 11, the right side of the driving wheel 11 is meshed with a driven wheel 12, the bottom of the driven wheel 12 is fixedly connected with a connecting shaft 13, the left side of the inner surface of the connecting shell 6 is fixedly connected with a supporting rod, the top of the supporting rod is fixedly connected with a bearing, the surface of the rotating shaft 9 positioned at the top of the first crushing tooth 10 is movably connected with the bearing at the top of the surface, the instability of the rotating shaft 9 and the connecting shaft 13 during working is avoided, the bottom of the surface of the connecting shaft 13 is fixedly connected with a second crushing tooth 14, the top of the driven wheel 12 is fixedly connected with a scraping rod 15, and the left side of the scraping rod 15 is in contact with the mud pumping pipe 5.
When in use, the connecting shell 6 is arranged at a sludge extracting position, the PLC 17 is used for controlling the motor 8 and the sludge pump 4 to work simultaneously, the motor 8 is used for driving the rotating shaft 9 to rotate, the rotating shaft 9 is used for driving the first crushing teeth 10 to rotate, the rotating shaft 9 is also used for driving the driving wheel 11 to rotate, the driving wheel 11 is used for driving the driven wheel 12 to rotate, the driven wheel 12 is used for driving the connecting shaft 13 to rotate, the connecting shaft 13 is used for driving the second crushing teeth 14 to rotate, not only can the sludge fixed at the bottom of a river be crushed, but also can the stones and weeds in the sludge be crushed, the crushed sludge can be sucked and discharged into the storage box 2 through the matching of the discharging pipe 3, the sludge pump 4 and the sludge pipe 5, and the sludge can not be attached to the inner wall of the sludge pipe 5 because the driven wheel 12 can also drive the scraping rod 15 to rotate, cause and take out mud pipe 5 to block up, solved current silt cleaning device and taken out mud pipe 5 and blockked up easily at the during operation to can influence work efficiency's problem.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a silt clearing device for river course restoration, includes backup pad (1), its characterized in that: the left side fixedly connected with storage box (2) at backup pad (1) top, the top intercommunication on storage box (2) right side has row material pipe (3), the right side fixedly connected with mud pump (4) of arranging material pipe (3), the bottom fixedly connected with mud pipe (5) of mud pump (4), the bottom intercommunication of mud pipe (5) has connection shell (6), the top of backup pad (1) is located the right side fixedly connected with motor (8) of storage box (2), the output fixedly connected with pivot (9) of motor (8), the bottom fixedly connected with first broken tooth (10) on pivot (9) surface, the bottom cover that the surface of pivot (9) and be located axis department is equipped with action wheel (11), the right side meshing of action wheel (11) has from driving wheel (12), the bottom fixedly connected with connecting axle (13) from driving wheel (12), the bottom on the surface of the connecting shaft (13) is fixedly connected with a second crushing tooth (14), the top of the driven wheel (12) is fixedly connected with a scraping rod (15), and the left side of the scraping rod (15) is in contact with the mud pumping pipe (5).
2. The sludge removing device for river channel restoration according to claim 1, wherein: the top of the left side of the storage box (2) is fixedly connected with a storage battery (16), and the left side of the storage battery (16) is fixedly connected with a PLC (programmable logic controller) controller (17).
3. The sludge removing device for river channel restoration according to claim 1, wherein: the left side fixedly connected with bracing piece of connecting shell (6) internal surface, and the top fixedly connected with bearing of bracing piece, the top that the surface of pivot (9) is located first broken tooth (10) and connecting axle (13) surface all with bearing swing joint.
4. The sludge removing device for river channel restoration according to claim 1, wherein: the bottom of the mud pump (4) is fixedly connected with a fixing plate, and the left side of the fixing plate is fixedly connected with the storage box (2).
5. The sludge removing device for river channel restoration according to claim 1, wherein: the connecting shell is characterized in that fixing rods (7) are fixedly connected to the two sides of the top of the connecting shell (6), and the tops of the fixing rods (7) are fixedly connected with the supporting plate (1).
CN202021877195.5U 2020-09-01 2020-09-01 Silt clearing device for river course restoration Expired - Fee Related CN213358740U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021877195.5U CN213358740U (en) 2020-09-01 2020-09-01 Silt clearing device for river course restoration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021877195.5U CN213358740U (en) 2020-09-01 2020-09-01 Silt clearing device for river course restoration

Publications (1)

Publication Number Publication Date
CN213358740U true CN213358740U (en) 2021-06-04

Family

ID=76148812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021877195.5U Expired - Fee Related CN213358740U (en) 2020-09-01 2020-09-01 Silt clearing device for river course restoration

Country Status (1)

Country Link
CN (1) CN213358740U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117027093A (en) * 2023-09-18 2023-11-10 天津港航工程有限公司 Anti-fouling dredging cleaning system for port channel and use method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117027093A (en) * 2023-09-18 2023-11-10 天津港航工程有限公司 Anti-fouling dredging cleaning system for port channel and use method thereof

Similar Documents

Publication Publication Date Title
CN211421206U (en) Dredging device for urban hydraulic engineering
CN213358740U (en) Silt clearing device for river course restoration
CN210621657U (en) Marine waste collecting and treating device
CN112411659A (en) Dredging device for hydraulic engineering
CN216999905U (en) A desilting equipment for clearance of reservoir storehouse dish
CN220036157U (en) Grouting machine
CN111997122A (en) Environment-friendly river channel sediment removal device for water conservancy construction
CN112237785A (en) Sludge cleaning device for sewage treatment tank
CN115680051A (en) Underwater cleaning device for water pumping port of nuclear power station
CN213639339U (en) Pond blowdown structure of landscape architecture design
CN110566518B (en) Dredge pump with self-cleaning function
CN210210861U (en) Sludge cleaning device for hydraulic engineering
CN214329051U (en) A reservoir device of decontaminating for hydraulic engineering
CN113522904B (en) Underwater sand cleaning device
CN211646531U (en) Novel dredging equipment for aquaculture
CN217150237U (en) Construction engineering is with clear native device in on-spot stake hole
CN218900930U (en) Mud scraper convenient to clearance sedimentation tank silt
CN212688648U (en) Crack pouring device for highway engineering construction
CN216989160U (en) Underwater sewage smashing device for hydraulic and hydroelectric engineering
CN212078072U (en) River course sediment removal device for hydraulic engineering
CN220292831U (en) Ecological pond sewage disposal system of breeding
CN218436952U (en) Be used for lake clearance garbage collection device
CN211707478U (en) Blunt type hydraulic breaking hammer drill rod belt cleaning device
CN217101403U (en) Liquid grinding aid prevents deposiing storage tank
CN213773149U (en) Construction is with built on stilts drainage device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210604

CF01 Termination of patent right due to non-payment of annual fee