CN213352909U - Concrete pouring structure of high-durability electric pole - Google Patents

Concrete pouring structure of high-durability electric pole Download PDF

Info

Publication number
CN213352909U
CN213352909U CN202021200894.6U CN202021200894U CN213352909U CN 213352909 U CN213352909 U CN 213352909U CN 202021200894 U CN202021200894 U CN 202021200894U CN 213352909 U CN213352909 U CN 213352909U
Authority
CN
China
Prior art keywords
die
mould
bolster
fixedly connected
bed die
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021200894.6U
Other languages
Chinese (zh)
Inventor
常占营
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Queshan Baoyuan Cement Products Co ltd
Original Assignee
Queshan Baoyuan Cement Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Queshan Baoyuan Cement Products Co ltd filed Critical Queshan Baoyuan Cement Products Co ltd
Priority to CN202021200894.6U priority Critical patent/CN213352909U/en
Application granted granted Critical
Publication of CN213352909U publication Critical patent/CN213352909U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a concrete placement structure of high durability pole relates to the relevant technical field of pole production. The utility model discloses a bed die, go up mould, bolster and last bolster down, the inboard symmetry of bed die is seted up flutedly, bolster under the outside fixedly connected with of bed die, and fixedly connected with runs the wheel down on the bed die between the bolster down, and the bed die can be dismantled and be connected with the mould, and the inboard symmetry of going up the mould is equipped with the arch, goes up bolster on the outside fixedly connected with of mould, goes up fixedly connected with between the bolster and runs the wheel on the last mould. The utility model discloses a bolster and last bolster down can cushion the protection to bed die and last mould respectively, avoids the bed die to receive with last mould to collide with or take place the friction with ground, improves the durability of mould and bed die, and recess and arch can make the bed die better with the leakproofness of last mould border position department simultaneously, effectively avoid the inside concrete of mould to spill over.

Description

Concrete pouring structure of high-durability electric pole
Technical Field
The utility model belongs to the technical field of the pole production is relevant, especially relate to a concrete placement structure of high durability pole.
Background
The pole is the bridge of electricity, let the electricity transport each place, we common pole has the wood system pole, there is the cement pole, their height is inconsistent, stand between the plain mountain, spread throughout around people, usually the pole need form through the mould watering, current mould is used in pole production when placing and shifting, often can and ground between direct contact or take place to collide with the striking with ground, cause the mould to damage too fast, be unfavorable for the mould to use for a long time, the mould is changed too fast, production cost has been increased, and simultaneously, current mould is when pouring muddy earth, the concrete often spills over from mould edge, influence the outward appearance of whole mould on the one hand, on the other hand has also caused the waste of muddy earth, the limitation is great, can't satisfy the demand in the in-service use, so urgent need can the modified technique on the market, in order to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete placement structure of high durability pole through setting up recess, arch, bolster and last bolster down, has solved that current pole concrete placement mould durability is poor and the leakproofness is not strong between the mould, and the problem that the concrete spills over from mould edge easily.
In order to solve the technical problem, the utility model discloses a realize through following technical scheme:
the utility model relates to a concrete placement structure of high durability pole, including bed die, last mould, bolster and last bolster, the inboard symmetry of bed die is seted up flutedly, bolster under the outside fixedly connected with of bed die, run the wheel under fixedly connected with on the bed die between the bolster down, the bed die can be dismantled and be connected with the mould, the inboard symmetry of going up the mould is equipped with the arch, goes up bolster on the outside fixedly connected with of mould, goes up on the last mould between the bolster fixedly connected with and runs the wheel.
Furthermore, a sealing gasket is laid at the bottom of the groove, and the protrusion is in clearance fit with the groove.
Furthermore, lower mounting holes are symmetrically formed in two sides of the lower die, upper mounting holes are symmetrically formed in two sides of the upper die, and the lower die and the upper die are detachably connected through bolts and nuts.
Further, run the wheel down and be provided with four, and two adjacent run under between the wheel symmetry set up, go up to run the wheel and be provided with four, and two adjacent before running the wheel symmetry set up, run the wheel down and run the wheel one-to-one with last.
Furthermore, the lower buffer parts are four, the upper buffer parts are four, the lower buffer parts correspond to the upper buffer parts one by one, and the combined rotation of the upper running wheel and the lower running wheel is not influenced by the arrangement of the upper buffer parts and the lower buffer parts, so that the die can still rotate on the running wheel machine.
Further, the lower buffer piece comprises a first bolt, a first rubber pad and a lower fixing seat, the inner side face of the lower fixing seat is fixedly welded with the outer side face of the lower die, the first rubber pad is fixedly connected with the lower fixing seat through the first bolt, and a threaded hole matched with the first bolt is formed in the position, corresponding to the first rubber pad and the lower fixing seat, of the lower fixing seat.
Furthermore, the upper buffering piece comprises a second bolt, a second rubber pad and an upper fixing seat, the inner side face of the upper fixing seat is fixedly welded with the outer side face of the upper die, the second rubber pad is fixedly connected with the upper fixing seat through the second bolt, and a threaded hole matched with the second bolt is formed in the position, corresponding to the second rubber pad and the upper fixing seat.
The utility model discloses following beneficial effect has:
1. the utility model discloses a bolster and last bolster under the setting, when removing and placing bed die and last mould, the bolster can cushion the protection to the bed die down, it can cushion the protection to go up the bolster, make bed die and last mould avoid colliding with ground or other things contact as far as, after first rubber pad and second rubber pad are ageing, can carry out quick change to first rubber pad and second rubber pad through first bolt and second bolt of unscrewing, make last mould and bed die can be more durable.
2. The utility model discloses a set up recess and arch, when will going up mould and bed die butt joint, the arch can be joint in the recess simultaneously for go up the marginal position department that mould and bed die butt joint can be complete sealed, the marginal position department of avoiding going up mould and bed die spills over and mixes earth, the sealed setting of filling up simultaneously can make the leakproofness between mould and the bed die better, further strengthens the leakproofness between mould and the bed die.
Of course, it is not necessary for any product to achieve all of the above advantages simultaneously in practicing the invention.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is an internal structure view of an upper mold and a lower mold of the present invention;
FIG. 2 is an external structural view of the upper mold and the lower mold of the present invention;
FIG. 3 is a side cross-sectional view of the upper and lower cushions of the present invention;
fig. 4 is an exploded view of the protrusion and the groove of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. a lower die; 101. a groove; 102. a lower mounting hole; 103. a running wheel is arranged; 104. a gasket; 2. an upper die; 201. a protrusion; 202. an upper mounting hole; 203. a running wheel is installed; 3. a lower buffer member; 301. a first bolt; 302. a first rubber pad; 303. a lower fixed seat; 4. an upper cushion member; 401. a first bolt; 402. a second rubber pad; 403. an upper fixing seat.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-4, the utility model relates to a concrete casting structure of a high durability pole, comprising a lower mold 1, an upper mold 2, a lower buffer 3 and an upper buffer 4, wherein the inner side of the lower mold 1 is symmetrically provided with grooves 101, the outer side of the lower mold 1 is fixedly connected with the lower buffer 3, the lower mold 1 between the lower buffers 3 is fixedly connected with a lower running wheel 103, the lower mold 1 is detachably connected with the upper mold 2, the inner side of the upper mold 2 is symmetrically provided with protrusions 201, the outer side of the upper mold 2 is fixedly connected with the upper buffer 4, the upper buffer 4 is butted with the lower buffer 3 to form a buffer ring, the upper mold 2 and the lower mold 1 can be buffered through the upper buffer 4 and the lower buffer 3, the upper mold 2 and the lower mold 1 are prevented from directly contacting with the ground for friction or receiving collision impact, the upper running wheel 203 is fixedly connected on the upper mold 2 between the upper buffer 4, go up running wheel 203 and lower running wheel 103 butt joint, can form a complete running wheel for last mould 2 after the combination can be placed on running the turbine with bed die 1, along with running the synchronous rotation of wheel machine, carries out centrifugal action to the concrete of last mould 2 and the inside filling of bed die 1.
As shown in fig. 1 and 4, a sealing gasket 104 is laid at the bottom of the groove 101, the sealing gasket 104 is made of a silica gel material and is resistant to high temperature, the protrusion 201 is in clearance fit with the groove 101, the protrusion 201 can be correspondingly clamped in the groove 101 while the upper mold 2 is in butt joint with the lower mold 1, the protrusion 201 can be abutted against the sealing gasket 104, and concrete is prevented from leaking from the edge of the mold;
lower mounting holes 102 are symmetrically formed in two sides of the lower die 1, upper mounting holes 202 are symmetrically formed in two sides of the upper die 2, the lower die 1 and the upper die 2 are detachably connected through bolts and nuts, when the upper die 2 is correspondingly clamped on the lower die 1, the upper mounting holes 202 correspond to the lower mounting holes 102 one by one, then the bolts penetrate through the lower mounting holes 202 and the upper mounting holes 102, and the nuts are screwed, so that the lower die 1 and the upper die 2 can be quickly fixed;
the lower running wheels 103 are four, two adjacent lower running wheels 103 are symmetrically arranged, the upper running wheels 203 are four, the two adjacent upper running wheels 203 are symmetrically arranged in front, the lower running wheels 103 correspond to the upper running wheels 203 one by one, after the upper die 2 is in butt joint with the lower die 1, the lower running wheels 103 and the upper running wheels 203 can be closed to form a complete running wheel, then the running wheel is placed on the running wheels, the upper die 2 and the lower die 1 can be driven to rotate, and the cement filled in the die is centrifuged;
as shown in fig. 1-3, four lower buffer members 3 are provided, four upper buffer members 4 are provided, the lower buffer members 3 correspond to the upper buffer members 4 one by one, the upper buffer members 4 and the lower buffer members 3 can form a complete circular buffer member after being butted, and the device can be stably placed on the ground through the four groups of circular buffer members, and can be prevented from being greatly collided and rubbed to a certain extent;
the lower buffer piece 3 comprises a first bolt 301, a first rubber pad 302 and a lower fixed seat 303, the inner side surface of the lower fixed seat 303 is fixedly welded with the outer side surface of the lower die 1, the first rubber pad 302 is fixedly connected with the lower fixed seat 303 through the first bolt 301, effective buffering can be performed on the lower die 1 through the first rubber pad 302, and when the first rubber pad 302 is aged, the first rubber pad 302 can be removed by screwing down the first bolt 301, and the first rubber pad 302 can be replaced;
go up bolster 4 and include second bolt 401, second rubber pad 402 and go up fixing base 403, go up the medial surface of fixing base 403 and go up the lateral surface welded fastening of mould 2, second rubber pad 402 passes through second bolt 401 and last fixing base 403 fixed connection, can carry out effectual buffering to last mould 2 through second rubber pad 402, when second rubber pad 402 appears ageing, can take off second rubber pad 402 through unscrewing second bolt 401 to change second rubber pad 402.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not exhaustive and do not limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (7)

1. The utility model provides a concrete placement structure of high durability pole, includes bed die (1), goes up mould (2), down bolster (3) and last bolster (4), its characterized in that: the inner side of the lower die (1) is symmetrically provided with a groove (101), the outer side of the lower die (1) is fixedly connected with a lower buffer (3), a lower running wheel (103) is fixedly connected to the lower die (1) between the lower buffers (3), the lower die (1) is detachably connected with an upper die (2), the inner side of the upper die (2) is symmetrically provided with a protrusion (201), the outer side of the upper die (2) is fixedly connected with an upper buffer (4), and the upper die (2) between the upper buffers (4) is fixedly connected with an upper running wheel (203).
2. The concrete casting structure of a high durability electric pole as claimed in claim 1, wherein the bottom of the groove (101) is laid with a sealing gasket (104), and the protrusion (201) is in clearance fit with the groove (101).
3. The concrete pouring structure of the high-durability electric pole as recited in claim 1, wherein the lower mold (1) is symmetrically provided with lower mounting holes (102) at both sides thereof, the upper mold (2) is symmetrically provided with upper mounting holes (202) at both sides thereof, and the lower mold (1) and the upper mold (2) are detachably connected with nuts through bolts.
4. The concrete casting structure of a high durability electric pole as claimed in claim 1, wherein the lower running wheels (103) are provided in four, and two adjacent lower running wheels (103) are symmetrically disposed therebetween, the upper running wheels (203) are provided in four, and two adjacent upper running wheels (203) are symmetrically disposed in front thereof, and the lower running wheels (103) are in one-to-one correspondence with the upper running wheels (203).
5. The concrete casting structure of a high durability electric pole as recited in claim 1, wherein the lower buffer member (3) is provided with four, the upper buffer member (4) is provided with four, and the lower buffer member (3) corresponds to the upper buffer member (4) one by one.
6. The concrete pouring structure of the high-durability electric pole as claimed in claim 1, wherein the lower buffer (3) comprises a first bolt (301), a first rubber pad (302) and a lower fixed seat (303), the inner side surface of the lower fixed seat (303) is welded and fixed with the outer side surface of the lower die (1), and the first rubber pad (302) is fixedly connected with the lower fixed seat (303) through the first bolt (301).
7. The concrete pouring structure of the high-durability electric pole as recited in claim 1, wherein the upper buffer (4) comprises a second bolt (401), a second rubber pad (402) and an upper fixing seat (403), the inner side surface of the upper fixing seat (403) is welded and fixed with the outer side surface of the upper die (2), and the second rubber pad (402) is fixedly connected with the upper fixing seat (403) through the second bolt (401).
CN202021200894.6U 2020-06-26 2020-06-26 Concrete pouring structure of high-durability electric pole Expired - Fee Related CN213352909U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021200894.6U CN213352909U (en) 2020-06-26 2020-06-26 Concrete pouring structure of high-durability electric pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021200894.6U CN213352909U (en) 2020-06-26 2020-06-26 Concrete pouring structure of high-durability electric pole

Publications (1)

Publication Number Publication Date
CN213352909U true CN213352909U (en) 2021-06-04

Family

ID=76139243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021200894.6U Expired - Fee Related CN213352909U (en) 2020-06-26 2020-06-26 Concrete pouring structure of high-durability electric pole

Country Status (1)

Country Link
CN (1) CN213352909U (en)

Similar Documents

Publication Publication Date Title
CN203768806U (en) Bridge expansion joint
CN104538778A (en) Patch board housing
CN106758791A (en) Spacing energy-dissipating type vibration absorption and isolation support of bridge and preparation method thereof
CN213352909U (en) Concrete pouring structure of high-durability electric pole
CN201406662Y (en) Flexible energy dissipation pier anti-collision safety device with composite structure
CN207608812U (en) A kind of anti-device that comes to nothing of laminated rubber bearing
CN109440569A (en) A kind of luminous energy road surface
CN204749851U (en) Car oil tank fixed bolster
CN208201641U (en) A kind of compound guardrail of high rigidity
CN203256611U (en) Height-adjustable bridge handrail base
CN204940580U (en) A kind of shock absorber
CN210621424U (en) Road bridge crack reinforcing apparatus
CN211472273U (en) Anti-toppling traffic sign mounting bracket
CN204000578U (en) Lift bridge bridge plate and bridge pier linkage
CN212223672U (en) Height limiting and buffering device for municipal engineering
CN206428579U (en) The spacing energy-dissipating type vibration absorption and isolation support of bridge
CN210132611U (en) Sleeper and sleeper tool
CN108487106B (en) Combined road deceleration strip
CN206467564U (en) Rubber expansion joint device for bridge
CN204039926U (en) A kind of bridge plate-type rubber support comes to nothing punishment system
CN213476579U (en) Breaker is used in asphalt concrete road surface construction
CN215561592U (en) Road reinforcing structure for connection of track road and municipal road
CN216193757U (en) Road and bridge crack repairing structure
CN213063177U (en) Rail guard is used in railway maintenance
CN215329457U (en) Picture peg formula sound barrier with sealed effect of damping

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210604