A kind of compound guardrail of high rigidity Download PDFInfo
- Publication number
- CN208201641U CN208201641U CN201820710783.6U CN201820710783U CN208201641U CN 208201641 U CN208201641 U CN 208201641U CN 201820710783 U CN201820710783 U CN 201820710783U CN 208201641 U CN208201641 U CN 208201641U
- Authority
- CN
- China
- Prior art keywords
- guardrail
- mixed mud
- bag
- pedestal
- high rigidity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a kind of compound guardrails of high rigidity, including mixed mud pedestal and fender rod, the side of the mixed mud pedestal is adhesively fixed by glue is provided with protective air-bag, air bag connecting groove is offered at the link position of the protective air-bag and mixed mud pedestal, the bottom end of the mixed mud pedestal is provided with guardrail base, the bottom end of the guardrail base is provided with mosaic block, and guardrail base is an integral structure with mosaic block, and the inside of mixed mud pedestal is fixedly mounted in the mosaic block, the two sides of the mosaic block are equidistant to be provided with four and pours slot, the upper surface of the guardrail base is successively equidistantly positioned there are four connector, and four connectors are fixedly connected by welding on guardrail base;By being provided with protective air-bag on the inside of mixed mud pedestal, so that people, when bridge pavement is more sliding in rain and snow, pedestrian accidentally slips, and when the inside for colliding mixed mud pedestal, protective air-bag can play the role of protection to pedestrian.
Description
Technical field
The utility model belongs to guard bar technique field, and in particular to a kind of compound guardrail of high rigidity.
Background technique
The column of guardrail is by expansion bolt or pre-buried fixes with ground.It is usually mounted to such as logistics corridor two sides, life
Is produced from equipment periphery, corner, two sides and load bed edge of door etc. are built.Guardrail is mainly used for road, factory, cell, villa, front yard
To the protection of equipment and facilities and protection in the occasions such as institute, shopping centre, public place.Guardrail is visible everywhere in we live.
The existing compound guardrail of high rigidity, when applying on bridge, people on bridge during walking, in rain
Snowy day gas, bridge pavement is relatively sliding, and head or body can be collided and be mounted on bridge people people sometimes during slipping
The compound guardrail of high rigidity on, the body of the people to slip is caused to damage, people are in hand steered guardrail, more due to weather
When cold, when the hand steered guardrail of pedestrian is walked, the position that palm is contacted with guardrail is more cold, so that process of the pedestrian in walking
In, palm feels uncomfortable, in mixed mud pedestal and guardrail by the way of pouring, so that guardrail and mixed mud pedestal connect
It connects, when pouring, for the pedestal of guardrail during pouring, the steel resources of use are larger, cannot the money that uses of effective rapid transit
The problem of source, thus it is proposed that a kind of compound guardrail of high rigidity.
Utility model content
The purpose of this utility model is to provide a kind of compound guardrails of high rigidity, to solve to propose in above-mentioned background technique
The existing compound guardrail of high rigidity, when applying on bridge, people on bridge during walking, in rain and snow,
Bridge pavement is relatively sliding, and head or body can collide the high rigidity being mounted on bridge to people to people sometimes during slipping
On compound guardrail, the body of the people to slip being caused to damage, people are in hand steered guardrail, when more cold due to weather,
When pedestrian's hand steered guardrail walking, the position that palm is contacted with guardrail is more cold, so that pedestrian is during walking, palm sense
Feel uncomfortable, in mixed mud pedestal and guardrail by the way of pouring, so that guardrail is connect with mixed mud pedestal, when pouring
For the pedestal of guardrail during pouring, the steel resources of use are larger, cannot effective rapid transit use resource the problem of.
To achieve the above object, the utility model provides the following technical solutions: a kind of compound guardrail of high rigidity, including mixed
Soil pedestal and fender rod, the side of the mixed mud pedestal is adhesively fixed by glue is provided with protective air-bag, the protection
Air bag connecting groove is offered at the link position of air bag and mixed mud pedestal, the bottom end of the mixed mud pedestal is provided with guardrail bottom
Seat, the bottom end of the guardrail base is provided with mosaic block, and guardrail base is an integral structure with mosaic block, and the mosaic block
The inside of mixed mud pedestal is fixedly mounted, the two sides of the mosaic block are equidistant to be provided with four and pour slot, the guardrail bottom
The upper surface of seat is successively equidistantly positioned there are four connector, and four connectors are fixedly connected by welding at guardrail bottom
On seat, the inside of four guardrail bases is run through in one end of the fender rod, and the fender rod is internally provided with heating wire,
One end of the heating wire is provided with heating wire and screws head, and heating wire screws head and fender rod and connects by the way that threaded engagement is fixed
It connects.
Preferably, the mixed mud pedestal is completed by primary concreting.
Preferably, the outer surface of the protective air-bag is concave structure.
Preferably, the fender rod is hollow cylinder structure.
Preferably, the protective air-bag and air bag connecting groove close adhesion.
Compared with prior art, the utility model has the beneficial effects that anti-by being provided on the inside of mixed mud pedestal
Air bag is protected, so that people, when bridge pavement is more sliding in rain and snow, pedestrian accidentally slips, when colliding in mixed mud pedestal
Side, protective air-bag can play the role of protection to pedestrian, pour slot by being provided on mosaic block, so as to mixed mud
When pedestal pours, mixed mud, which enters, pours slot, so that guardrail base connect more stable with mixed mud pedestal, reduces simultaneously
The usage amount of steel, economizes on resources, by being internally provided with heating wire in fender rod, so that in arctic weather, Ren Men
When hand steered fender rod, since outer surface of the heating wire to fender rod is heated between palm and fender rod, so that people are in hand
It is more comfortable when helping.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the guardrail base structural schematic diagram of the utility model;
Fig. 3 is the fender rod section structural schematic diagram of the utility model;
In figure: 1- protective air-bag, 2- air bag connecting groove, 3- mixed mud pedestal, 4- guardrail base, 5- connector, 6- protection
Bar, 7- mosaic block, 8- pour slot, 9- heating wire screws head, 10- heating wire.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1, Fig. 2 and Fig. 3 are please referred to, the utility model provides a kind of technical solution: a kind of compound guardrail of high rigidity, packet
Mixed mud pedestal 3 and fender rod 6 are included, the side of mixed mud pedestal 3 is adhesively fixed by glue is provided with protective air-bag 1, protection
Air bag connecting groove 2 is offered at the link position of air bag 1 and mixed mud pedestal 3, the bottom end of mixed mud pedestal 3 is provided with guardrail bottom
Seat 4, the bottom end of guardrail base 4 is provided with mosaic block 7, and guardrail base 4 is an integral structure with mosaic block 7, and mosaic block 7 is solid
Dingan County fills the inside of mixed mud pedestal 3, and the two sides of mosaic block 7 are equidistant to be provided with four and pour slot 8, guardrail base 4 it is upper
Surface is successively equidistantly positioned there are four connector 5, and four connectors 5 are fixedly connected by welding on guardrail base 4, is prevented
The inside of four guardrail bases 4 is run through in one end of guard bar 6, and fender rod 6 is internally provided with heating wire 10, one end of heating wire 10
It is provided with heating wire and screws first 9, and heating wire screws first 9 and is fixedly connected with fender rod 6 by threaded engagement.
In order to enable the intensity of mixed mud pedestal 3 is higher, in the present embodiment, it is preferred that mixed mud pedestal 3 passes through disposable
Pour completion.
For the ease of using, in the present embodiment, it is preferred that the outer surface of protective air-bag 1 is concave structure.
For the ease of the fixed installation of heating wire 10, in the present embodiment, it is preferred that fender rod 6 is hollow cylinder structure.
In order to enable the fixation of protective air-bag 1 is more stable, in the present embodiment, it is preferred that protective air-bag 1 and air bag connecting groove
2 close adhesions.
The working principle and process for using of the utility model: after the utility model is installed, so that it may use, when use
During being poured to the compound guardrail of high rigidity, when pouring mixed mud pedestal 3 using mixed mud, 7 table of mosaic block
Face pours slot 8 and can flow into mixed mud, so that guardrail base 4 and the connection of mixed mud pedestal 3 are stronger, when pedestrian is in sleet
When accidentally slipping on bridge, head or body are collided on the protective air-bag 1 of 3 inside of mixed mud pedestal for walking under weather,
The protective action to pedestrian can be effectively played, in arctic weather, pedestrian when on fender rod 6, protects hand steered
Heating wire 10 inside bar 6 can the conscientious heating in outer surface to fender rod 6 so that pedestrian hand steered when on fender rod 6, no
It can feel uncomfortable because the temperature difference of palm and fender rod 6 is larger.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of compound guardrail of high rigidity, including mixed mud pedestal (3) and fender rod (6), it is characterised in that: the mixed mud
The side of pedestal (3) is adhesively fixed by glue to be provided with protective air-bag (1), the protective air-bag (1) and mixed mud pedestal (3)
Link position at offer air bag connecting groove (2), the bottom end of the mixed mud pedestal (3) is provided with guardrail base (4), described
The bottom end of guardrail base (4) is provided with mosaic block (7), and guardrail base (4) is an integral structure with mosaic block (7), and described
The inside of mixed mud pedestal (3) is fixedly mounted in mosaic block (7), and the two sides of the mosaic block (7) are equidistant to be provided with four and pour
It builds slot (8), the upper surface of the guardrail base (4) is successively equidistantly positioned there are four connector (5), and four connectors
(5) it is fixedly connected by welding on guardrail base (4), four guardrail bases (4) are run through in one end of the fender rod (6)
Inside, the fender rod (6) is internally provided with heating wire (10), and one end of the heating wire (10) is provided with heating wire rotation
Syncephalon (9), and heating wire screws head (9) and is fixedly connected with fender rod (6) by threaded engagement.
2. the compound guardrail of a kind of high rigidity according to claim 1, it is characterised in that: the mixed mud pedestal (3) is logical
Cross primary concreting completion.
3. the compound guardrail of a kind of high rigidity according to claim 1, it is characterised in that: outside the protective air-bag (1)
Surface is concave structure.
4. the compound guardrail of a kind of high rigidity according to claim 1, it is characterised in that: the fender rod (6) is hollow
Cylindrical structure.
5. the compound guardrail of a kind of high rigidity according to claim 1, it is characterised in that: the protective air-bag (1) and gas
Capsule connecting groove (2) close adhesion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820710783.6U CN208201641U (en) | 2018-05-14 | 2018-05-14 | A kind of compound guardrail of high rigidity |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820710783.6U CN208201641U (en) | 2018-05-14 | 2018-05-14 | A kind of compound guardrail of high rigidity |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208201641U true CN208201641U (en) | 2018-12-07 |
Family
ID=64519900
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820710783.6U Expired - Fee Related CN208201641U (en) | 2018-05-14 | 2018-05-14 | A kind of compound guardrail of high rigidity |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208201641U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109577187A (en) * | 2018-12-26 | 2019-04-05 | 山东省交通规划设计院 | A kind of Bridge guardrail |
CN113559568A (en) * | 2021-06-25 | 2021-10-29 | 淮北市中芬矿山机器有限责任公司 | Central transmission thickener with segmented automatic rake lifting mechanism |
CN114351583A (en) * | 2022-01-12 | 2022-04-15 | 山东高速股份有限公司 | Reinforced flexible anti-collision wall for highway bridge and construction method thereof |
-
2018
- 2018-05-14 CN CN201820710783.6U patent/CN208201641U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109577187A (en) * | 2018-12-26 | 2019-04-05 | 山东省交通规划设计院 | A kind of Bridge guardrail |
CN113559568A (en) * | 2021-06-25 | 2021-10-29 | 淮北市中芬矿山机器有限责任公司 | Central transmission thickener with segmented automatic rake lifting mechanism |
CN114351583A (en) * | 2022-01-12 | 2022-04-15 | 山东高速股份有限公司 | Reinforced flexible anti-collision wall for highway bridge and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208201641U (en) | A kind of compound guardrail of high rigidity | |
CN207828770U (en) | A kind of support construction for preventing bumping at bridge-head | |
KR101007728B1 (en) | Guardrail | |
CN208346707U (en) | A kind of ultralow gear wheel protective fence of highway security | |
CN209652775U (en) | A kind of road and bridge crack bracing means | |
CN103628401B (en) | A kind of combination type square aluminum alloy pedestrian bridge | |
CN204252005U (en) | The anti-skidding facility of ladder access formula pedestrian overcrossing | |
CN204097930U (en) | A kind of protector of Railway Bridges And Piers | |
CN111088753A (en) | Bridge guardrail | |
CN205576804U (en) | Seal formula combination guardrail | |
CN207673123U (en) | A kind of project installation protection fence | |
CN208857620U (en) | A kind of reassembling type composite road surface structure | |
CN206467567U (en) | Big displacement equal distance deflection expansion joint | |
CN206090221U (en) | Steel -concrete structure curb stone | |
CN207420066U (en) | A kind of horizontal post-cast strip temporary blocking device | |
CN205742032U (en) | A kind of novel concrete guardrail | |
CN210827005U (en) | Hand-held double-wheel road roller | |
CN107119605A (en) | Can be stopped roadside guardrail | |
CN201598586U (en) | Multifunctional guard rail for express highway, high-grade highway or common highway | |
CN110965428A (en) | Curb boundary structure and laying device thereof | |
CN203904832U (en) | Multifunctional rubber expansion and contraction device | |
CN206110537U (en) | Cement mortar stair angle steel external corner angle bead device of marking time | |
CN213709191U (en) | Assembled bridge deck pavement structure | |
CN220301107U (en) | A luminous ceramic tile of simple and convenient installation formula for safety warning reminds | |
CN204125877U (en) | A kind of protector of center pile of road overpass bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181207 Termination date: 20190514 |