CN213335070U - Operation equipment heat sink for mine construction - Google Patents

Operation equipment heat sink for mine construction Download PDF

Info

Publication number
CN213335070U
CN213335070U CN202021742622.9U CN202021742622U CN213335070U CN 213335070 U CN213335070 U CN 213335070U CN 202021742622 U CN202021742622 U CN 202021742622U CN 213335070 U CN213335070 U CN 213335070U
Authority
CN
China
Prior art keywords
pipe
fixedly connected
wall
box
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021742622.9U
Other languages
Chinese (zh)
Inventor
丰宏宝
张金柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongling Nonferrous Metals Group Tongguan Mine Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021742622.9U priority Critical patent/CN213335070U/en
Application granted granted Critical
Publication of CN213335070U publication Critical patent/CN213335070U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Nozzles (AREA)

Abstract

The utility model belongs to the technical field of mine construction, especially, be a mine construction uses operation equipment heat sink, including box, support and annular tube, the upper surface outer wall of box is equipped with spacing pipe, the lateral wall of spacing pipe has seted up a plurality of through-holes, the support mainly comprises mount and dead lever, the upper surface of mount with the lower surface welding of dead lever, set up threaded hole on the mount, the mount cover is established in the inside of spacing pipe, the screw thread mouth of mount with any through-hole of spacing pipe correspond, and pass through bolt fastening connection; this device can carry out the regulation of height and angle, satisfies the mine construction of different requirements and uses the cooling work of operation equipment, changes water smoke blowout position simultaneously, prevents that coal ash from to spraying attached to of subassembly and even blockking up, reduces the clearance of staff to equipment, for the staff brings the facility, improves staff's work efficiency.

Description

Operation equipment heat sink for mine construction
Technical Field
The utility model belongs to the technical field of the mine construction, concretely relates to operation equipment heat sink for mine construction.
Background
The mine is an independent production and operation unit for excavating ores in a certain mining boundary, the mine mainly comprises one or more mining workshops and some auxiliary workshops, most of the mines also comprise ore dressing fields, and in the process of mine construction, the temperature environment is severe, and a cooling device is required to be adopted for cooling operation equipment for mine construction;
because the natural condition is complicated, the operation environment is relatively poor, the spraying angle and the height of the cooling device are adapted to the site environment, and the mine site is filled with coal ash, and the coal ash can be attached to or even block the spraying opening, thereby bringing inconvenience to the work.
In order to solve the problems, the application provides a cooling device for operation equipment for mine construction.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides an operation equipment heat sink for mine construction has the characteristics of being convenient for adjust, reduce the influence of coal ash.
In order to achieve the above object, the utility model provides a following technical scheme: a cooling device for mine construction operation equipment comprises a box body, a support and an annular pipe, wherein a limiting pipe is arranged on the outer wall of the upper surface of the box body, a plurality of through holes are formed in the outer side wall of the limiting pipe, the support mainly comprises a fixing frame and a fixing rod, the upper surface of the fixing frame and the lower surface of the fixing rod are welded, a threaded hole is formed in the fixing frame, the fixing frame is sleeved inside the limiting pipe, a threaded hole of the fixing frame corresponds to any through hole of the limiting pipe and is fixedly connected with the limiting pipe through a bolt, a ventilating pipe is rotatably connected to the top end of the fixing rod, a hydraulic rod and a hydraulic cylinder are fixedly connected to the side surface of the bottom end of the fixing rod, the hydraulic cylinder is located on one side of the hydraulic rod and is connected with the hydraulic rod through an oil guide pipe, one end of the, a fan box is fixedly connected to one end, far away from the hydraulic rod, of the ventilating pipe, the ventilating pipe is communicated with the interior of the fan box, a fan is fixedly arranged in the fan box, one end, close to the hydraulic rod, of the ventilating pipe is fixedly connected with one end of the annular pipe, the inner side wall of the annular pipe is fixedly connected with a plurality of spray heads, a water inlet pipe is arranged on the outer side wall of the annular pipe, the water inlet pipe is fixedly connected with a connecting pipe, and an air outlet cover is fixedly connected to one end, far away from the ventilating pipe, of the annular pipe;
the water tank is arranged inside the box body, the water tank is fixedly connected with the bottom surface of the box body, a water injection pipe is arranged on the upper surface of the water tank, the water injection pipe penetrates through the inner wall of the upper surface of the box body and extends to the outside of the box body, a water pump is arranged on one side of the water tank, the input end of the water pump is fixedly connected with the outer side wall of the water tank and is communicated with the inside of the water tank, the output end of the water pump penetrates through the inner wall of the upper surface of the box body and extends to the outside of the box body, and the output end of the water pump is fixedly connected with one end, far away from the;
the box is kept away from the lateral wall fixedly connected with push rod of going out fan housing one side, four universal wheels of the lower surface outer wall fixedly connected with of box, four universal wheel evenly distributed is in the lower surface outer wall of box, the pneumatic cylinder the fan with the equal and outside power electric connection of water pump.
As the utility model relates to a mine construction is with preferred, a plurality of operation equipment heat sink the through-hole on the spacing pipe with spacing pipe center is the symmetric point, two liang of symmetric distributions.
As the utility model relates to an operation equipment heat sink is preferred for mine construction, the dead lever is U style of calligraphy structure.
As the utility model relates to a mine construction is with preferred, a plurality of operation equipment heat sink shower nozzle symmetric distribution is in the inside wall of annular tube.
As the utility model relates to an operation equipment heat sink is preferred for mine construction, go out the fan housing with one side that the annular tube connects is equipped with the filter screen.
Compared with the prior art, the beneficial effects of the utility model are that: this device can carry out the regulation of height and angle, satisfies the mine construction of different requirements and uses the cooling work of operation equipment, changes water smoke blowout position simultaneously, prevents that coal ash from to spraying attached to of subassembly and even blockking up, reduces the clearance of staff to equipment, for the staff brings the facility, improves staff's work efficiency.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the connection of the ring pipes in the present invention;
fig. 3 is a schematic view of the bracket structure of the present invention;
fig. 4 is a schematic side view of the bracket of the present invention;
FIG. 5 is a schematic structural view of the case of the present invention;
in the figure: 1. a box body; 101. a limiting pipe; 2. a water tank; 201. a water injection pipe; 3. a support; 301. a fixed mount; 302. fixing the rod; 4. a vent pipe; 5. a hydraulic lever; 6. a hydraulic cylinder; 7. a fan box; 8. a fan; 9. an annular tube; 901. a water inlet pipe; 10. an air outlet cover; 11. a water pump; 12. a connecting pipe; 13. a push rod; 14. a universal wheel; 15. and (4) a spray head.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
As shown in fig. 1, 2, 3, 4 and 5;
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the connection of the ring pipes in the present invention;
fig. 3 is a schematic view of the bracket structure of the present invention;
fig. 4 is a schematic side view of the bracket of the present invention;
fig. 5 is a schematic structural diagram of the box body of the present invention.
A temperature reduction device for operation equipment for mine construction comprises a box body 1, a support 3 and an annular pipe 9, wherein a limiting pipe 101 is arranged on the outer wall of the upper surface of the box body 1, a plurality of through holes are formed in the outer side wall of the limiting pipe 101, the support 3 mainly comprises a fixing frame 301 and a fixing rod 302, the upper surface of the fixing frame 301 is welded with the lower surface of the fixing rod 302, a threaded hole is formed in the fixing frame 301, the fixing frame 301 is sleeved inside the limiting pipe 101, a threaded hole of the fixing frame 301 corresponds to any through hole of the limiting pipe 101 and is fixedly connected with the through hole through a bolt, the top end of the fixing rod 302 is rotatably connected with a vent pipe 4, a hydraulic rod 5 and a hydraulic cylinder 6 are fixedly connected to the side surface of the bottom end of the fixing rod 302, the hydraulic cylinder 6 is positioned on one side of the hydraulic rod 5, one end, far away from the hydraulic rod 5, of the ventilation pipe 4 is fixedly connected with a fan box 7, the ventilation pipe 4 is communicated with the interior of the fan box 7, a fan 8 is fixedly arranged in the fan box 7, one end, close to the hydraulic rod 5, of the ventilation pipe 4 is fixedly connected with one end of the annular pipe 9, the inner side wall of the annular pipe 9 is fixedly connected with a plurality of spray heads 15, the outer side wall of the annular pipe 9 is provided with a water inlet pipe 901, the water inlet pipe 901 is fixedly connected with a connecting pipe 12, and one end, far away from the ventilation pipe 4, of the;
the water tank 2 is arranged inside the tank body 1, the water tank 2 is fixedly connected with the bottom surface of the tank body 1, the upper surface of the water tank 2 is provided with a water injection pipe 201, the water injection pipe 201 penetrates through the inner wall of the upper surface of the tank body 1 and extends to the outside of the tank body 1, one side of the water tank 2 is provided with a water pump 11, the input end of the water pump 11 is fixedly connected with the outer side wall of the water tank 2 and is communicated with the inside of the water tank 2, the output end of the water pump 11 penetrates through the inner wall of the upper surface of the tank body 1 and extends to the outside of the tank body 1, and the output end of;
the lateral wall fixedly connected with push rod 13 of the fan housing 10 one side is kept away from to box 1, four universal wheels 14 of the lower surface outer wall fixedly connected with of box 1, and four universal wheels 14 evenly distributed are at the lower surface outer wall of box 1, pneumatic cylinder 6, fan 8 and water pump 11 all with outside power electric connection.
It should be noted that: in this embodiment, the water injection pipe 201 is provided with a sealing cap to prevent foreign matters from entering the water tank 2.
It should be noted that: in this embodiment, all water piping connection departments all install the rubber pad additional, prevent the seepage condition.
In this embodiment: the staff pushes the device through the push rod 13, places the device at a working place, and the device uses an external power supply to supply power and switches on a power supply operation device; the outer wall of the upper surface of the box body 1 is provided with the limiting pipe 101, the outer wall of the limiting pipe 101 is provided with a plurality of through holes, the bracket 3 mainly comprises a fixed frame 301 and a fixed rod 302, the fixed frame 301 is provided with a threaded hole, the fixed frame 301 is sleeved inside the limiting pipe 101, the corresponding positions of a threaded port of the fixed frame 301 and the through holes on the limiting pipe 101 can be adjusted according to different working height requirements on the site, and the threaded port and the through holes are fixedly connected through bolts, so that the working height of the device can be adjusted; because the top end of the fixed rod 302 is rotatably connected with the ventilation pipe 4, the side surface of the bottom end of the fixed rod 302 is fixedly connected with the hydraulic rod 5 and the hydraulic cylinder 6, one end of the hydraulic rod 5, which is far away from the fixed rod 302, is fixedly connected with the ventilation pipe 4, the hydraulic rod 5 can be adjusted by the hydraulic cylinder 6 according to different working angle requirements on site, so that the angle of the ventilation pipe 4 is changed, and the function of adjusting the working angle is realized; the water pump 11 operates to pump the water in the water tank 2 to the inside of the annular pipe 9 through the connecting pipe 12, so that the water is sprayed through the plurality of spray nozzles 15 on the inner side wall of the annular pipe 9, coal ash can be prevented from being attached to the surfaces of the spray nozzles 15 during operation, and the water pump 11 can be started under the condition that the fan 8 is not started to symmetrically clean the plurality of spray nozzles 15; simultaneously, the fan 8 runs, can blow 15 spun water smoke of shower nozzle through a fan housing 10 looks outsides to realize the function to the mine construction operation equipment cooling, because of one side that a fan housing 10 and annular pipe 9 are connected is equipped with the filter screen, can be when out of work, prevent that large granule coal ash from getting into the inside of annular pipe 9, block up the condition of shower nozzle 15 even, bring the facility for the staff, improve staff's work efficiency.
As shown in fig. 1 and 5;
fig. 1 is a schematic structural view of the present invention;
fig. 5 is a schematic structural diagram of the box body of the present invention.
In an optional embodiment, the through holes on the limiting tubes 101 are symmetrically distributed in pairs by taking the center of the limiting tube 101 as a symmetric point.
In this embodiment: because of the through-hole on the spacing pipe 101 of a plurality of uses spacing pipe 101 center as the symmetric point, two liang of symmetric distributions are convenient for to the accurate regulation of height.
As shown in fig. 3;
fig. 3 is a schematic view of the bracket structure of the present invention.
In an alternative embodiment, the securing rod 302 is U-shaped.
In this embodiment: because the fixing rod 302 is U-shaped, the vent tube 4 can be installed in the middle of the fixing rod 302, which facilitates the adjustment of the angle of the vent tube 4.
Fig. 2 is a schematic view of the connection of the ring pipes in the present invention.
In an alternative embodiment, a plurality of spray heads 15 are symmetrically distributed on the inner side wall of the annular pipe 9.
In this embodiment: because of a plurality of shower nozzle 15 symmetric distribution is at the inside wall of annular pipe 9, can prevent that coal ash from attaching to shower nozzle 15 when the during operation, when clearing up shower nozzle 15 simultaneously, the water pump 11 is opened to the accessible for a plurality of shower nozzle 15 carries out the symmetry and cleans.
As shown in fig. 1;
fig. 1 is a schematic structural diagram of the present invention.
In an alternative embodiment, a filter screen is arranged on the side where the wind outlet cover 10 and the annular pipe 9 are connected.
In this embodiment: because the filter screen is arranged on one side where the air outlet cover 10 and the annular pipe 9 are connected, the situation that large coal ash particles enter the annular pipe 9 and even block the spray head 15 can be prevented when the device does not work.
The utility model discloses a theory of operation and use flow: the staff pushes the device through the push rod 13, places the device at a working place, and the device uses an external power supply to supply power and switches on a power supply operation device; the outer wall of the upper surface of the box body 1 is provided with the limiting pipe 101, the outer wall of the limiting pipe 101 is provided with a plurality of through holes, the bracket 3 mainly comprises a fixed frame 301 and a fixed rod 302, the fixed frame 301 is provided with a threaded hole, the fixed frame 301 is sleeved inside the limiting pipe 101, the corresponding positions of a threaded port of the fixed frame 301 and the through holes on the limiting pipe 101 can be adjusted according to different working height requirements on the site, and the threaded port and the through holes are fixedly connected through bolts, so that the working height of the device can be adjusted; because the top end of the fixed rod 302 is rotatably connected with the ventilation pipe 4, the side surface of the bottom end of the fixed rod 302 is fixedly connected with the hydraulic rod 5 and the hydraulic cylinder 6, one end of the hydraulic rod 5, which is far away from the fixed rod 302, is fixedly connected with the ventilation pipe 4, the hydraulic rod 5 can be adjusted by the hydraulic cylinder 6 according to different working angle requirements on site, so that the angle of the ventilation pipe 4 is changed, and the function of adjusting the working angle is realized; the water pump 11 operates to pump the water in the water tank 2 to the inside of the annular pipe 9 through the connecting pipe 12, so that the water is sprayed through the plurality of spray nozzles 15 on the inner side wall of the annular pipe 9, coal ash can be prevented from being attached to the surfaces of the spray nozzles 15 during operation, and the water pump 11 can be started under the condition that the fan 8 is not started to symmetrically clean the plurality of spray nozzles 15; simultaneously, the fan 8 runs, can blow 15 spun water smoke of shower nozzle through a fan housing 10 looks outsides to realize the function to the mine construction operation equipment cooling, because of one side that a fan housing 10 and annular pipe 9 are connected is equipped with the filter screen, can be when out of work, prevent that large granule coal ash from getting into the inside of annular pipe 9, block up the condition of shower nozzle 15 even, bring the facility for the staff, improve staff's work efficiency.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides an operation equipment heat sink for mine construction, includes box (1), support (3) and annular tube (9), its characterized in that: the outer wall of the upper surface of the box body (1) is provided with a limiting pipe (101), the outer wall of the limiting pipe (101) is provided with a plurality of through holes, the support (3) mainly comprises a fixing frame (301) and a fixing rod (302), the upper surface of the fixing frame (301) is welded with the lower surface of the fixing rod (302), the fixing frame (301) is provided with a threaded hole, the fixing frame (301) is sleeved inside the limiting pipe (101), a threaded hole of the fixing frame (301) corresponds to any through hole of the limiting pipe (101) and is fixedly connected with the limiting pipe through a bolt, the top end of the fixing rod (302) is rotatably connected with a vent pipe (4), the bottom end side surface of the fixing rod (302) is fixedly connected with a hydraulic rod (5) and a hydraulic cylinder (6), the hydraulic cylinder (6) is positioned on one side of the hydraulic rod (5), and the hydraulic cylinder (6) is connected with the hydraulic rod (5) through an, one end, far away from the fixed rod (302), of the hydraulic rod (5) is fixedly connected with the ventilation pipe (4), one end, far away from the hydraulic rod (5), of the ventilation pipe (4) is fixedly connected with a fan box (7), the ventilation pipe (4) is communicated with the interior of the fan box (7), a fan (8) is fixedly arranged in the fan box (7), one end, close to the hydraulic rod (5), of the ventilation pipe (4) is fixedly connected with one end of the annular pipe (9), the inner side wall of the annular pipe (9) is fixedly connected with a plurality of spray heads (15), the outer side wall of the annular pipe (9) is provided with a water inlet pipe (901), the water inlet pipe (901) is fixedly connected with a connecting pipe (12), and one end, far away from the ventilation pipe (4), of the annular pipe (9) is fixedly connected with an air outlet cover (10;
the water tank (2) is arranged inside the tank body (1), the water tank (2) is fixedly connected with the bottom surface of the tank body (1), a water injection pipe (201) is arranged on the upper surface of the water tank (2), the water injection pipe (201) penetrates through the inner wall of the upper surface of the tank body (1) and extends to the outside of the tank body (1), a water pump (11) is arranged on one side of the water tank (2), the input end of the water pump (11) is fixedly connected with the outer wall of the water tank (2) and is communicated with the inside of the water tank (2), the output end of the water pump (11) penetrates through the inner wall of the upper surface of the tank body (1) and extends to the outside of the tank body (1), and the output end of the water pump (11) is fixedly connected with one end, far away from the annular pipe (9), of the connecting pipe (12;
keep away from box (1) lateral wall fixedly connected with push rod (13) of going out fan housing (10) one side, four universal wheel (14), four of the lower surface outer wall fixedly connected with of box (1) universal wheel (14) evenly distributed be in the lower surface outer wall of box (1), pneumatic cylinder (6) fan (8) with water pump (11) all with outside power electric connection.
2. The mine construction work equipment cooling device according to claim 1, characterized in that: the through holes in the limiting pipes (101) are symmetrically distributed in pairs by taking the centers of the limiting pipes (101) as symmetrical points.
3. The mine construction work equipment cooling device according to claim 1, characterized in that: the fixing rod (302) is in a U-shaped structure.
4. The mine construction work equipment cooling device according to claim 1, characterized in that: the dry spray heads (15) are symmetrically distributed on the inner side wall of the annular pipe (9).
5. The mine construction work equipment cooling device according to claim 1, characterized in that: and a filter screen is arranged on one side where the air outlet cover (10) and the annular pipe (9) are connected.
CN202021742622.9U 2020-08-19 2020-08-19 Operation equipment heat sink for mine construction Active CN213335070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021742622.9U CN213335070U (en) 2020-08-19 2020-08-19 Operation equipment heat sink for mine construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021742622.9U CN213335070U (en) 2020-08-19 2020-08-19 Operation equipment heat sink for mine construction

Publications (1)

Publication Number Publication Date
CN213335070U true CN213335070U (en) 2021-06-01

Family

ID=76097657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021742622.9U Active CN213335070U (en) 2020-08-19 2020-08-19 Operation equipment heat sink for mine construction

Country Status (1)

Country Link
CN (1) CN213335070U (en)

Similar Documents

Publication Publication Date Title
CN213335070U (en) Operation equipment heat sink for mine construction
CN212359853U (en) Dust removal and humidification device for coal mining construction of coal mine
CN206874304U (en) A kind of portable coal mine roadway water curtain clarifier
CN206873561U (en) A kind of integral type vent hood of non-negative pressure water-supply installation
CN207073784U (en) A kind of novel rainwater collection, dedusting street lamp
CN204782855U (en) Mining rig of being furnished with dust collector
CN212818907U (en) Air purification device capable of reducing dust
CN210977568U (en) Wind-water linkage adjusting spraying device for dust fall in tunneling work
CN212079360U (en) Ventilation and dust removal device for underground mining
CN208845398U (en) A kind of temperature-dropping fan
CN208347821U (en) A kind of no nozzle anti-blocking plug cavity type is mining wind power ganged spraying
CN219836276U (en) Device for reducing dust emission on construction site
CN213389944U (en) Dust device is used in building construction
CN216457772U (en) Air purification device for paint production workshop
CN220036721U (en) Waterproof device for mine underworkings
CN213269906U (en) Tunnel lining maintenance equipment
CN212759962U (en) High-pressure washing spraying system
CN221062121U (en) Dustproof dust fall device of construction
CN213348211U (en) Dust device for coal mine construction site
CN220531184U (en) Waste gas denitrification device for hazardous waste treatment
CN220539674U (en) Mining spraying fan for mining engineering
CN212376638U (en) Pneumatic mud scraper for drilling tool
CN219243800U (en) Ventilation steel structure
CN111905498B (en) Multi-fluid intelligent dust suppression integrated equipment for dust raising of coking plant
CN212818836U (en) Civil engineering is with on-spot dust collector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221207

Address after: 244000 Beijing West Road, Tongling, Tongling, Anhui

Patentee after: TONGLING NONFERROUS METALS GROUP TONGGUAN MINE CONSTRUCTION CO.,LTD.

Address before: 244000 Beijing West Road, Tongling, Tongling, Anhui

Patentee before: Feng Hongbao

TR01 Transfer of patent right