CN213389944U - Dust device is used in building construction - Google Patents
Dust device is used in building construction Download PDFInfo
- Publication number
- CN213389944U CN213389944U CN202021011446.1U CN202021011446U CN213389944U CN 213389944 U CN213389944 U CN 213389944U CN 202021011446 U CN202021011446 U CN 202021011446U CN 213389944 U CN213389944 U CN 213389944U
- Authority
- CN
- China
- Prior art keywords
- frame
- dust device
- civil engineering
- solar cell
- water pump
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/10—Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working
Landscapes
- Cleaning By Liquid Or Steam (AREA)
Abstract
The utility model discloses a dust device for civil engineering, which comprises a frame, be provided with storage water tank, water pipe, high pressure water pump and atomizer in the frame, high pressure water pump one end leads to pipe and water tank connection, and the other end leads to pipe and is connected with atomizer, atomizer is connected with the frame, the bottom of frame is provided with wheel components, wheel components includes gyro wheel and adapting rod, and adapting rod one end can be dismantled with the bottom of frame and be connected, and the other end is connected with the gyro wheel, still be provided with power supply unit in the frame, power supply unit includes battery, electric wire and solar cell panel, and the battery passes through the electric wire to be connected with solar cell panel, and solar cell panel can dismantle with the frame and be connected, the battery passes through the electric wire and is connected with high pressure water pump, still be provided with handle assembly in. The utility model discloses the design of well high pressure water pump and atomizer can be well to the dust fall in the environment.
Description
Technical Field
The utility model relates to a building construction dust collecting equipment technical field, more specifically say, relate to a dust device is used in building construction.
Background
The condition that dust flies upward often can appear at the civil construction scene, thereby can pollute the atmospheric environment, traditional technique is mostly direct external water source of water pipe, then spray water to the external world through the shower nozzle, thereby reach the purpose of dust fall, this kind of operation is very troublesome, need artifical continuous lifting hydraulic equipment, also some building sites are provided with the dust removal sprayer, however, the dust removal sprayer among the prior art is mostly the snap-on in a place, inconvenient to its removal, in addition, in the society of energy-concerving and environment-protective, the dust removal sprayer can consume a large amount of electric quantities when using, be not conform to the energy saving and emission reduction policy of national regulation, the utility model discloses a new solution is proposed to above problem.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
To the problem that exists among the prior art, the utility model aims to provide a dust device is used in civil engineering to solve the problem that mentions in the background art.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
A dust fall device for civil construction comprises a frame, wherein a water storage tank, a water pipe, a high-pressure water pump and an atomizing nozzle are arranged on the frame, one end of the high-pressure water pump is connected with the water storage tank through the water pipe, the other end of the high-pressure water pump is connected with the atomizing nozzle through the water pipe, the atomizing nozzle is connected with the frame, a roller component is arranged at the bottom end of the frame, the roller component comprises a roller and a bearing rod, one end of the bearing rod is detachably connected with the bottom end of the frame, the other end of the bearing rod is connected with the roller, a power supply component is also arranged on the frame, the power supply component comprises a storage battery, an electric wire and a solar panel, the storage battery is connected with the solar panel through the electric wire, the solar panel is detachably connected with the frame, the storage battery is connected, one end of the lower rod body is connected with the frame, the other end of the lower rod body is connected with the upper rod body, and the handrail is installed at the top end of the upper rod body.
Preferably, the rack and the solar panel are respectively provided with first threaded holes which are symmetrical to each other, and the rack and the solar panel are detachably connected through bolts.
In any of the above aspects, preferably, the adapting rod is screwed with the frame.
In any of the above schemes, preferably, the water storage tank is provided with an observation window, and the observation window is provided with a transparent plate.
In any of the above schemes, preferably, the rack is provided with a protective box, and the storage battery and the high-pressure water pump are both arranged in the protective box.
In any of the above schemes, preferably, the protection box is provided with a plurality of heat dissipation holes.
In any of the above schemes, preferably, the roller assemblies are provided with a plurality of roller assemblies, and the roller assemblies are respectively and symmetrically installed at the bottom end of the frame.
In any of the above schemes, preferably, the upper rod body and the lower rod body are respectively provided with a plurality of second threaded holes corresponding to each other, and the upper rod body and the lower rod body are detachably connected through bolts.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
the utility model discloses the dust fall in the environment can be well to the design of crowning water pump and atomizer, in addition, the body of rod and the service position of the body of rod down can be adjusted well in the cooperation design of a plurality of screw holes on the body of rod under and to go up the body of rod, thereby adjust the use height of handrail, thereby make it can use in the crowd of different heights, in addition, solar cell panel's design can utilize solar resources well, thereby can save a large amount of electric power electric quantities, carrying lever and frame threaded connection, it dismantles and the installation to it to have made things convenient for, the design of protecting box can protect battery and high pressure water pump well.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic structural view of the protective enclosure of FIG. 1;
fig. 2 is a schematic structural view of the protective box of fig. 1.
The reference numbers in the figures illustrate:
1. frame, 2, storage water tank, 3, water pipe, 4, high pressure water pump, 5, atomizer, 6, gyro wheel, 7, adapting rod, 8, battery, 9, electric wire, 10, solar cell panel, 11, go up the body of rod, 12, the body of rod down, 13, handrail, 14, first screw hole, 15, observation window, 16, guard box, 17, louvre.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
Example (b):
referring to fig. 1-2, a dust fall device for civil construction comprises a frame 1, wherein a water storage tank 2, a water pipe 3, a high pressure water pump 4 and an atomizer 5 are arranged on the frame 1, one end of the high pressure water pump 4 is connected with the water storage tank 2 through the water pipe 3, the other end of the high pressure water pump is connected with the atomizer 5 through the water pipe 3, the atomizer 5 is connected with the frame 1, a roller assembly is arranged at the bottom end of the frame 1, the roller assembly comprises a roller 6 and a bearing rod 7, one end of the bearing rod 7 is detachably connected with the bottom end of the frame 1, the other end of the bearing rod is connected with the roller 6, a power supply assembly is further arranged on the frame 1, the power supply assembly comprises a storage battery 8, an electric wire 9 and a solar cell panel 10, the storage battery 8 is connected with the solar cell panel 10 through the electric wire 9, the solar, still be provided with the handle subassembly on the frame 1, the handle subassembly includes the body of rod 11, the body of rod 12 and handrail 13 down, and the body of rod 12 one end is connected with frame 1 down, and the other end is connected with the body of rod 11, and handrail 13 installs on the top of the body of rod 11.
In this embodiment, the rack 1 and the solar cell panel 10 are respectively provided with first threaded holes 14 which are symmetrical to each other, and the rack 1 and the solar cell panel 10 are detachably connected through bolts. The installation and the disassembly of the solar cell panel 10 are facilitated, and the use angle of the solar cell panel 10 can be adjusted.
In this embodiment, the socket bar 7 is screwed to the frame 1. The disassembly and the assembly are convenient.
In this embodiment, the water storage tank 2 is provided with an observation window 15, and the observation window 15 is provided with a transparent plate. The viewing window 15 is designed to allow a good view of the volume of water in the tank 2.
In the present embodiment, a protective box 16 is provided on the machine frame 1, and the storage battery 8 and the high-pressure water pump 4 are both provided in the protective box 16. The protective box 16 can provide a good barrier to water or dust from the outside.
In this embodiment, the protection box 16 is provided with a plurality of heat dissipation holes 17, and the heat dissipation holes 17 are provided. The plurality of heat dissipation holes 17 are designed to well dissipate heat generated by the storage battery 8 and the high pressure water pump 4 during use.
In this embodiment, the roller assemblies are provided with a plurality of roller assemblies, and are respectively and symmetrically installed at the bottom end of the frame 1. The design of a plurality of roller assemblies can support the whole equipment well, so that the whole equipment is more stable in use.
In this embodiment, go up and be provided with a plurality of second screw holes that correspond to each other on the body of rod 11 and the lower body of rod 12 respectively, go up the body of rod 11 and pass through the bolt can dismantle the connection with the lower body of rod 12, made things convenient for and dismantled and the installation to it, can adjust handrail 13's use height well simultaneously.
The working principle is as follows: when using, can absorb solar resources through solar cell panel 10 well, thereby change solar resources into the electric energy storage in battery 8, supply power to high pressure water pump 4 through battery 8, in addition, this high pressure water pump 4 also can be through external power supply line external AC power supply, high pressure water pump 4 carries water to atomizer 5, finally spray water to the external world through atomizer 5, thereby reach the purpose of dust fall, in addition, the staff can be according to actual height, adjust handrail 13's use height, adjust the position of cup jointing between body of rod 11 and the lower body of rod 12.
The above description is only the preferred embodiment of the present invention; the scope of the present invention is not limited thereto. Any person skilled in the art should also be able to cover the technical scope of the present invention by replacing or changing the technical solution and the improvement concept of the present invention with equivalents and modifications within the technical scope of the present invention.
Claims (8)
1. The utility model provides a dust device for civil engineering, includes the frame, its characterized in that, be provided with storage water tank, water pipe, high pressure water pump and atomizer in the frame, high pressure water pump one end leads to pipe and is connected with storage water tank, and the other end leads to pipe and is connected with atomizer, atomizer is connected with the frame, the bottom of frame is provided with wheel components, wheel components includes gyro wheel and adapting rod, and adapting rod one end can be dismantled with the bottom of frame and be connected, and the other end is connected with the gyro wheel, still be provided with power supply assembly in the frame, power supply assembly includes battery, electric wire and solar cell panel, and the battery passes through the electric wire and is connected with solar cell panel, and solar cell panel can dismantle with the frame and be connected, the battery passes through the electric wire and is connected with high pressure water pump, still be provided with handle, The lower rod body and the handrail, lower rod body one end and frame are connected, and the other end is connected with the last rod body, and the top at the last rod body is installed to the handrail.
2. The dust device for civil engineering of claim 1, characterized in that: the rack and the solar cell panel are respectively provided with first threaded holes which are symmetrical to each other, and the rack and the solar cell panel are detachably connected through bolts.
3. The dust device for civil engineering of claim 1, characterized in that: the bearing rod is in threaded connection with the frame.
4. The dust device for civil engineering of claim 1, characterized in that: an observation window is arranged on the water storage tank, and a transparent plate is arranged on the observation window.
5. The dust device for civil engineering of claim 1, characterized in that: the frame is provided with a protective box, and the storage battery and the high-pressure water pump are both arranged in the protective box.
6. The dust device for civil engineering of claim 5, characterized in that: be provided with the louvre on the protective housing, this louvre is provided with a plurality of.
7. The dust device for civil engineering of claim 1, characterized in that: the roller components are provided with a plurality of rollers which are respectively and symmetrically arranged at the bottom end of the frame.
8. The dust device for civil engineering of claim 1, characterized in that: and the upper rod body and the lower rod body are respectively provided with a plurality of second threaded holes corresponding to each other, and the upper rod body and the lower rod body are detachably connected through bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021011446.1U CN213389944U (en) | 2020-06-04 | 2020-06-04 | Dust device is used in building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021011446.1U CN213389944U (en) | 2020-06-04 | 2020-06-04 | Dust device is used in building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213389944U true CN213389944U (en) | 2021-06-08 |
Family
ID=76178777
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021011446.1U Expired - Fee Related CN213389944U (en) | 2020-06-04 | 2020-06-04 | Dust device is used in building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213389944U (en) |
-
2020
- 2020-06-04 CN CN202021011446.1U patent/CN213389944U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108477116A (en) | A kind of Multifunctional plant protection unmanned plane | |
CN213389944U (en) | Dust device is used in building construction | |
CN204906303U (en) | Belt cleaning device of solar photovoltaic board that electric machine control goes up and down | |
CN205936977U (en) | A base construction for wind power generation set | |
CN212452447U (en) | Water conservancy construction building bearing structure | |
CN209000672U (en) | It is a kind of can automatic heat radiation oil-immersed transformer | |
CN210581884U (en) | Monitoring rod capable of being adjusted in telescopic mode | |
CN208890124U (en) | A kind of intermediate switchgear cabinet | |
CN221096871U (en) | Water pump frequency converter control device | |
CN213132448U (en) | Energy-saving type engineering ground dust treatment device | |
CN216259776U (en) | Dust device for construction engineering | |
CN213880052U (en) | Engineering supervision and construction informatization device | |
CN215682204U (en) | Photovoltaic power generation of easily installing uses intelligent support | |
CN219252069U (en) | Dustproof equipment for construction | |
CN221151245U (en) | Photovoltaic system mounting platform suitable for high pile foundation | |
CN213032119U (en) | Environmental protection safety is with dust removal big gun | |
CN212103704U (en) | Bridge and facade wall body maintenance and repair device | |
CN208633643U (en) | A kind of communication tower equipped with installation bracket | |
CN220131790U (en) | Electrical equipment installation auxiliary stand | |
CN221000621U (en) | Bridge construction platform | |
CN210744755U (en) | Stepless compensation control device of static var generator | |
CN218041297U (en) | House type integrated photovoltaic power equipment | |
CN218549867U (en) | Photovoltaic module maintenance passageway | |
CN213001544U (en) | Dust collector for building site | |
CN218295423U (en) | Indicating lamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210608 |
|
CF01 | Termination of patent right due to non-payment of annual fee |