CN213328684U - Bridge construction operation platform convenient to installation - Google Patents

Bridge construction operation platform convenient to installation Download PDF

Info

Publication number
CN213328684U
CN213328684U CN202021658204.1U CN202021658204U CN213328684U CN 213328684 U CN213328684 U CN 213328684U CN 202021658204 U CN202021658204 U CN 202021658204U CN 213328684 U CN213328684 U CN 213328684U
Authority
CN
China
Prior art keywords
frame
ladder cage
bridge
descending ladder
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021658204.1U
Other languages
Chinese (zh)
Inventor
王刚
宋九武
王建业
吴靖江
郭永富
陈红闯
田广辉
陈致昂
王志祥
闫一川
李航
要胜利
刘衍行
王莉莉
杨凯旋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN202021658204.1U priority Critical patent/CN213328684U/en
Application granted granted Critical
Publication of CN213328684U publication Critical patent/CN213328684U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a bridge construction operation platform convenient to install, including the descending ladder cage of J-shaped, be equipped with the subassembly that slides on the descending ladder cage, the lower extreme of descending ladder cage is equipped with the fixed plate, articulates on the fixed plate to have the returning face plate, the lower extreme and the construction platform of descending ladder cage are connected; the construction platform comprises a rear frame, the rear frame is connected with a descending ladder cage, the left end and the right end of the rear frame are hinged to an end frame, the lower end of the rear frame is hinged to the rear end of a bottom frame, the front end of the bottom frame is hinged to a front frame, and the end frame is detachably connected with the bottom frame and the front frame respectively. The utility model has the advantages that: the construction platform adopts a detachable connection mode, the operation platform can be directly integrally hoisted in place, and then the combined construction platform is installed; the construction time of the bridge drain pipe is effectively shortened, the investment of mechanical equipment is reduced, and a large amount of time and labor input are saved; the preparation is simple, the material cost is low, the capital and material investment can be saved by more than 50% compared with the similar system, and the operation is simple and convenient.

Description

Bridge construction operation platform convenient to installation
Technical Field
The utility model relates to a bridge construction field especially indicates a bridge construction operation platform convenient to installation.
Background
Along with the scientific and technical progress in the last two years, urban overpasses are more and more popularized, the requirement on the appearance concrete impression quality of bridges is gradually improved, and the guardrail is not a main stressed structure in bridge engineering, but along with the improvement of quality standards, all construction parties pay particular attention to the appearance quality of the guardrail.
The quality of the engineering quality and the accuracy of the geometric dimension directly influence the overall image of the engineering, so the quality requirement standard is very high, and how to ensure the geometric dimension and the beautiful appearance of the crash barrier is the goal pursued by construction units. When the guardrail of current bridge was repaired, often adopted fixed string basket, the efficiency of construction is low, and the workman need hang the basket from top to bottom repeatedly, removes repeatedly, fixes and hangs the basket.
SUMMERY OF THE UTILITY MODEL
The utility model provides a bridge construction operation platform convenient to installation has solved the problem that current fixed string basket efficiency of construction is low.
The technical scheme of the utility model is realized like this: a bridge construction operation platform convenient to install comprises a J-shaped descending ladder cage, wherein a sliding assembly is arranged at the inner end of the descending ladder cage and is in sliding fit with a bridge guardrail;
the construction platform comprises a rear frame, the rear frame is connected with a descending ladder cage, the left end and the right end of the rear frame are hinged to an end frame, the lower end of the rear frame is hinged to the rear end of a bottom frame, the front end of the bottom frame is hinged to a front frame, and the end frame is detachably connected with the bottom frame and the front frame respectively.
The descending ladder cage is formed by connecting steel pipes.
The sliding assembly comprises an outer pulley, an upper pulley and an inner pulley, the outer pulley is matched with the outer side of the bridge guardrail, the upper pulley is matched with the upper side of the bridge guardrail, and the inner pulley is matched with the inner side of the bridge guardrail.
The outer pulley, the upper pulley and the inner pulley are respectively provided with a front pulley and a rear pulley.
The outer pulley and the inner pulley are both obliquely arranged and are at the lower ends with the contact end of the bridge guardrail.
The bridge guardrail on be equipped with the electronic box, outer pulley is located the downside of electronic box.
The descending ladder cage is welded with the fixing plate.
The fixed plate is connected with the turnover plate through a hinge.
The down ladder cage is provided with a bayonet lock in a penetrating way, and the bayonet lock is matched with the turnover plate in a clamping way.
The turnover plate is opposite to the ladder of the descending ladder cage.
The rear frame, the front frame and the end frame are side rectangular frames formed by connecting steel pipes, the steel pipes are arranged in the side rectangular frames in a diagonal mode, the bottom frame is a bottom rectangular frame formed by connecting the steel pipes, and a walking plate is arranged on the bottom rectangular frame.
The rear frame is hinged with the end frame through pipe hinge pieces, the rear frame is hinged with the bottom frame through pipe hinge pieces, the bottom frame is hinged with the front frame through pipe hinge pieces, each pipe hinge piece comprises two pipe clamps, and the two pipe clamps are hinged through rotating shafts.
The end frame is provided with a clamping sleeve, the descending ladder cage, the front frame and the bottom frame are provided with clamping ends, and the clamping ends extend into the clamping sleeve and are connected with the clamping sleeve through fixing bolts.
The utility model has the advantages that:
1. the construction platform adopts the detachable connected mode, can directly put operation platform integral hoisting in place, then installation combination construction platform.
2. Effectively shorten bridge drain pipe engineering time, reduce mechanical equipment input, save a large amount of time and human input.
3. The preparation is simple, the material cost is low, the capital and material investment can be saved by more than 50% compared with the similar system, and the operation is simple and convenient.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a front view of the present invention.
Fig. 2 is a top view of the present invention.
Fig. 3 is a sectional view of the utility model A-A.
Fig. 4 is a sectional view of the present invention taken along line B-B.
Fig. 5 is a schematic view of the clamping structure of the present invention.
In the figure: 1-descending ladder cage, 2-sliding assembly, 3-fixing plate, 4-overturning plate, 5-construction platform, 6-bridge guardrail, 51-rear frame, 52-front frame, 53-end frame, 54-bottom frame, 55-walking plate, 56-clamping sleeve, 57-clamping end and 58-fixing bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
As shown in figures 1-5, the bridge construction operation platform convenient to install comprises a J-shaped descending ladder cage 1, wherein the J-shaped descending ladder cage is opposite to the position and shape of a bridge guardrail, so that the descending ladder cage is hooked on the bridge guardrail. Descending ladder cage 1 is formed by the steel pipe connection for the installation slides the subassembly to support and connect construction platform 5, form the ladder that the workman climbed from top to bottom on the descending ladder cage.
The inner of descending ladder cage 1 is equipped with and slides subassembly 2, slides subassembly 2 and 6 sliding fit of bridge railing, realizes the free slip of descending ladder cage on bridge railing. The construction position can be adjusted at will, and the hanging basket is dismantled and fixed without repeated up and down operation of workers so as to adjust the construction position.
The sliding assembly 2 comprises an outer pulley, an upper pulley and an inner pulley, wherein the outer pulley, the upper pulley and the inner pulley are arranged in a front-back mode, and sliding stability is guaranteed. The cooperation of the outside of outer pulley and bridge railing 6, the cooperation of the upside of upper pulley and bridge railing 6, the cooperation of interior pulley and bridge railing 6's inboard realizes down trilateral sliding fit of ladder cage and bridge railing, guarantees gliding reliable and stable.
The outer pulley and the inner pulley are all obliquely arranged and are low-end in contact with the bridge guardrail 6, so that the inner and outer pulleys are matched with the inclined plane of the inner end and the outer end of the bridge guardrail, and the pulleys are prevented from generating large bending moment. The outer pulley is located the downside of electronic box, takes place to interfere with the electronic box when avoiding outer pulley walking, and the electronic box is the block terminal of electric appliances such as street lamp on the bridge railing.
The lower extreme welding of down ladder cage 1 has fixed plate 3, and fixed plate 3 is used for personnel's the construction of standing, makes things convenient for the workman to repair the outside of guardrail, guarantees that the outward appearance of guardrail is neat, image good.
Articulated through the hinge on the fixed plate 3 have returning face plate 4 to returning face plate 4 is relative with the ladder of descending ladder cage 1, when the workman need be down on the construction platform, opens the returning face plate, opens a passageway that can pass through, makes personnel can be smoothly down to the construction platform.
Wear to be equipped with the bayonet lock on the down ladder cage 1, bayonet lock and 4 card settings of returning face plate cooperate, when the workman carries out the guardrail repaiies, block the returning face plate with the bayonet lock, avoid its activity, guarantee the fixed of returning face plate, when the workman need pass through the fixed plate, take the bayonet lock out, make the returning face plate freely overturn.
The construction platform 5 comprises a rear frame 51, a front frame 52, an end frame 53 and a base frame 54. The rear frame 51, the front frame 52 and the end frame 53 are side rectangular frames formed by connecting steel pipes, and the steel pipes arranged diagonally are arranged inside the side rectangular frames to enclose and shield workers. The bottom frame 54 is a bottom rectangular frame formed by connecting steel pipes, and a walking plate 55 is arranged on the bottom rectangular frame and used for standing construction of personnel.
The left end and the right end of the rear frame 51 are hinged with the end frame 53 through pipe hinges, the lower end of the rear frame 51 is hinged with the rear end of the bottom frame 54 through pipe hinges, the front end of the bottom frame 54 is hinged with the front frame 52 through pipe hinges, and the end frame 53 is detachably connected with the bottom frame 54 and the front frame 52 respectively.
Because the construction platform is arranged below the bridge, the construction platform with the fixed structure cannot be installed on the bridge guardrail, the foldable structure is adopted, the construction platform is unfolded when the descending ladder cage is hoisted, and the descending ladder cage can be simply and quickly placed on the bridge guardrail. And then the construction platforms are combined and connected to form a stable construction platform.
The pipe hinge part comprises two pipe clamps, the pipe clamps are used for clamping and fixing steel pipes on two hinged frames, and the two pipe clamps are hinged through a rotating shaft to realize hinged connection of the two frames. The clamping sleeve 56 is welded on the end frame 53, the clamping end 57 is welded on the descending ladder cage 1, the front frame 52 and the bottom frame 54, and the clamping end 57 extends into the clamping sleeve 56 and is connected with the clamping sleeve 56 through the fixing bolt 58, so that the detachable connection of the construction platform is realized.
Because construction platform extends to the below of bridge, can be under construction the drain pipe, improve operation platform's functionality and utilization ratio.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. The utility model provides a bridge construction operation platform convenient to installation, includes descending ladder cage (1) of J-shaped, its characterized in that: the inner end of the descending ladder cage (1) is provided with a sliding assembly (2), the sliding assembly (2) is in sliding fit with a bridge guardrail (6), the lower end of the descending ladder cage (1) is provided with a fixed plate (3), the fixed plate (3) is hinged with a turnover plate (4), and the lower end of the descending ladder cage (1) is connected with a construction platform (5);
construction platform (5) include rear frame (51), and rear frame (51) are connected with descending ladder cage (1), and both ends are articulated with end frame (53) about rear frame (51), and the lower extreme of rear frame (51) is articulated with the rear end of underframe (54), and the front end of underframe (54) is articulated with preceding frame (52), and end frame (53) can dismantle with underframe (54), preceding frame (52) respectively and be connected.
2. A bridge construction operation platform convenient to install according to claim 1, wherein: the descending ladder cage (1) is formed by connecting steel pipes.
3. A bridge construction operation platform convenient to install according to claim 1, wherein: the sliding assembly (2) comprises an outer pulley, an upper pulley and an inner pulley, the outer pulley is matched with the outer side of the bridge guardrail (6), the upper pulley is matched with the upper side of the bridge guardrail (6), and the inner pulley is matched with the inner side of the bridge guardrail (6).
4. A bridge construction operation platform convenient to install according to claim 3, wherein: the outer pulley and the inner pulley are both obliquely arranged and are at the lower ends with the contact end of the bridge guardrail (6).
5. A bridge construction operation platform convenient to install according to claim 1, wherein: the bridge guardrail (6) on be equipped with the electronic box, outer pulley is located the downside of electronic box.
6. A bridge construction operation platform convenient to install according to claim 1, wherein: the descending ladder cage (1) is provided with a bayonet lock in a penetrating way, and the bayonet lock is matched with the turnover plate (4) in a clamping way.
7. A bridge construction operation platform convenient to install according to claim 1, wherein: the turnover plate (4) is opposite to the ladder of the descending ladder cage (1).
8. A bridge construction operation platform convenient to install according to claim 1, wherein: the rear frame (51), the front frame (52) and the end frame (53) are side rectangular frames formed by connecting steel pipes, the steel pipes which are arranged diagonally are arranged inside the side rectangular frames, the bottom frame (54) is a bottom rectangular frame formed by connecting steel pipes, and a running plate (55) is arranged on the bottom rectangular frame.
9. A bridge construction work platform facilitating installation according to claim 1 or 8, wherein: the rear frame (51) is hinged to the end frame (53), the rear frame (51) is hinged to the bottom frame (54), the bottom frame (54) is hinged to the front frame (52) through pipe hinges, each pipe hinge comprises two pipe clamps, and the two pipe clamps are hinged to each other through a rotating shaft.
10. A bridge construction work platform facilitating installation according to claim 1 or 8, wherein: the end frame (53) is provided with a clamping sleeve (56), the descending ladder cage (1), the front frame (52) and the bottom frame (54) are provided with clamping ends (57), and the clamping ends (57) extend into the clamping sleeve (56) and are connected with the clamping sleeve (56) through fixing bolts (58).
CN202021658204.1U 2020-08-11 2020-08-11 Bridge construction operation platform convenient to installation Active CN213328684U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021658204.1U CN213328684U (en) 2020-08-11 2020-08-11 Bridge construction operation platform convenient to installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021658204.1U CN213328684U (en) 2020-08-11 2020-08-11 Bridge construction operation platform convenient to installation

Publications (1)

Publication Number Publication Date
CN213328684U true CN213328684U (en) 2021-06-01

Family

ID=76095319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021658204.1U Active CN213328684U (en) 2020-08-11 2020-08-11 Bridge construction operation platform convenient to installation

Country Status (1)

Country Link
CN (1) CN213328684U (en)

Similar Documents

Publication Publication Date Title
CN213328684U (en) Bridge construction operation platform convenient to installation
CN213328685U (en) Bridge construction operation platform
CN2383905Y (en) Portable combined lift scaffold
CN105971262A (en) Folding tool type wall attachment supporting working platform
CN214576005U (en) Simple shaping passage stair device for all-steel climbing frame
CN211873902U (en) Collapsible material protector that connects
CN201590609U (en) Frame specially used for overhauling high-voltage circuit breaker and isolating switch
CN219411752U (en) Foldable operation platform suitable for high-altitude operation
CN218714909U (en) Scaffold convenient to installation
CN212226681U (en) Novel combined aluminum profile structure
CN212688736U (en) C-shaped hook capable of being used for integral mounting and dismounting of guy rope hanging basket
CN211172770U (en) Cast-in-place oblique roofing operation platform of heavy grade
CN215329415U (en) Suspension cross beam for guyed cradle
CN213868827U (en) Modular support platform convenient to equipment
CN218562980U (en) Electric self-elevating protective platform in elevator shaft
CN212201478U (en) Safety operation platform of ascending a height
CN211819172U (en) Be used for bank supervisory equipment maintenance with folding cat ladder of carrying of being convenient for
CN212562401U (en) Device for installing and overhauling air conditioner external unit of existing building
CN212271565U (en) Sectional type integral lifting aluminum alloy climbing frame
CN214785792U (en) Scaffold convenient to move
CN218787056U (en) Guardrail locking structure of folding ladder frame
CN211474591U (en) Aluminum profile thickening inner side added C-shaped reinforcing rib
CN210597081U (en) PC steel bar electric pole
CN208898368U (en) Steel bends bridge mainboard Lift-on/Lift-off System
CN2705536Y (en) Hinged communication rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant