CN201590609U - Frame specially used for overhauling high-voltage circuit breaker and isolating switch - Google Patents
Frame specially used for overhauling high-voltage circuit breaker and isolating switch Download PDFInfo
- Publication number
- CN201590609U CN201590609U CN 200920258132 CN200920258132U CN201590609U CN 201590609 U CN201590609 U CN 201590609U CN 200920258132 CN200920258132 CN 200920258132 CN 200920258132 U CN200920258132 U CN 200920258132U CN 201590609 U CN201590609 U CN 201590609U
- Authority
- CN
- China
- Prior art keywords
- lifting
- frame
- hoisting
- isolating switch
- arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model relates to a frame specially used for overhauling a high-voltage circuit breaker and an isolating switch, which mainly comprises a hoisting part and an insulating scaffold, wherein the hoisting part comprises a lifting hook, a hoisting base, a lifting arm and a hoisting reinforced support rod; the lifting arm is installed on a hoisting main frame; the hoisting reinforced support rod props against the bottom of the hoisting main frame; the insulating scaffold part comprises a platform framework, a supporting vertical frame, a turnover-prevention support leg, ladders, guardrails and operation platforms, wherein the turnover-prevention support leg is installed in a way of inclining outwards; the guardrails are arranged around the upper operation platform; and the two sections of ladders are respectively connected with the upper operation platform and the lower operation platform. The frame has reasonable design, light weight, simple installation operation, convenient use, safety and reliability, can lighten the labor intensity of maintainers, and improves the working efficiency; the frame can be used for overhauling switches of 110kV and below as well as disconnecting links of 220kV and below in a lifting way; the lifting arm can horizontally rotate by 120 degrees, rotate by 30 degrees up and down, and lift an object which is less than 500kg; and by adopting the frame, assembly and disassembly can be completed by 3-4 persons within 15min, and the lifting operation can be carried out by 1-2 persons.
Description
Technical field
The utility model relates to electric power system mesohigh circuit breaker and isolating switch maintenance special equipment.
Background technology
Along with the continuous development of China's economic construction, electric power system has obtained very fast development in recent years.Compactness makes common hanging device and the equipment of ascending a height can not enter the scene very easily because transformer station designs more and more in daily maintenance; Previously used service kit can not satisfy specification requirement again in new safety requirements.In order to ensure site operation personnel's safety, can effectively reduce the power failure scope again, press for the special-purpose frame of a kind of novel maintenance and solve the problem that runs in the maintenance like this.
Summary of the invention
The purpose of this utility model is in order to solve the problem of above-mentioned existence, to provide a kind of novel high-voltage circuit-breaker and isolating switch to overhaul special-purpose frame, improving the safety of electric power enterprise operation, improve the quality of maintenance, guarantee personal safety, reduce labor intensity, increase work efficiency.
Realize that the technical scheme that the utility model purpose is taked is: this device is made up of the two large divisions: lifting part and insulation scaffold part, wherein lifting partly comprises suspension hook, lifting base, arm, lifting reinforcement support bar, arm is installed on the lifting body frame, and lifting is strengthened support bar and withstood on lifting body frame bottom; The insulation scaffold partly comprises platform framework, supports stand, prevents turning over supporting leg, ladder, guardrail, operating platform that prevent turning over the outward-dipping installation of supporting leg, operating platform is installed on the platform framework up and down, is provided with guardrail around last operating platform; Two joint ladders connect operating platform and last operating platform down respectively.
Arm is connected on the lifting body frame through the lifting base, and can horizontally rotate on the lifting body frame.
Be provided with a transmission mechanism in the lifting base, the crank of outside connects transmission mechanism, and transmission mechanism can drive the angle that stay cord is regulated the arm vertical direction.
In order to make fitting operation efficient and convenient, the connection of all rod members all adopts the grafting bolt to connect.
On the leg that supports the stand lower end, be provided with tunable arrangement, can regulate the length of leg within the specific limits.
Good effect of the present utility model is: efficiently solve the existing technical problem that exists, can lift maintenance to 110kV and following switch, 220kV and following disconnecting link; Arm can horizontally rotate 120 °, rotates 30 ° up and down, and hoisting weight is less than 500 kilograms object; This repairing frame is reasonable in design, in light weight, fitting operation is simple, esy to use, safe and reliable; The use of this repairing frame can alleviate the maintainer labour intensity, strengthen coefficient of safety, increase work efficiency, 3~4 people can finish dismounting in 15 minutes, 1~2 people can lift operation.
Description of drawings
Specific implementation method
The utility model is shown in accompanying drawing 1,4,5, this device is made up of the two large divisions: lifting part and insulation scaffold part, lifting partly adopts high-strength alloy material external application insulating material to make, the insulation scaffold partly adopts high strength pipe insulating material to make, this repairing frame is overhauling on-the-spot interim assembling, makes by maintenance equipment after repairing frame is formed to be trapped among middle easy access and lifting.Wherein lifting partly comprises suspension hook 3, lifting base 1, arm 2, lifting reinforcement support bar 11, and arm 2 is installed on the lifting body frame 12, and lifting is strengthened support bar 11 and withstood on lifting body frame 12 bottoms; The bearing of arm 2 below lifting base 1 is connected on the lifting body frame 12, can horizontally rotate on lifting body frame 12; Be provided with a transmission mechanism in lifting base 1, transmission mechanism is a pair of big pinion, and crank 14 connects pinion, and pinion drive gear wheel, gear wheel drive the angle that stay cord 13 is regulated arm 2 vertical directions.
The insulation scaffold partly comprises platform framework 6, supports stand 9, anti-supporting leg 8, ladder 10, guardrail 4, the operating platform 5,7 up and down of turning over, prevent turning over supporting leg 8 outward-dipping installations, operating platform 5,7 is installed on the platform framework 6 up and down, is provided with guardrail 4 around last operating platform 5; Two joint ladders 10 connect operating platform 7 and last operating platform 5 down respectively.In order to make fitting operation efficient and convenient, the connection of all rod members all adopts grafting to be connected by bolt 15.On the leg that supports stand 9 lower ends, be provided with tunable arrangement, can regulate the length of leg within the specific limits.
The maintainer stands on the operating platform 5 when hoisting operation, safety belt can tie up on the guardrail 4, rotate lifting base 1 and adjust the direction of suspension centre, shake crank 14 and adjust the height of suspension centre, on suspension hook 3, use lifting rope or coaster or hoist crane to be connected according to different needs, lifting maintenance then with hanging object.
When not needing hoisting operation, suspension hook 3, arm 2, lifting base 1, lifting reinforcement support bar 11, lifting body frame 12 are not installed, can be used as general inspection platform and use.
Claims (5)
1. primary cut-out and isolating switch overhaul special-purpose frame, it is characterized in that: it is made up of lifting part and insulation scaffold, lifting partly comprises suspension hook, lifting base, arm, lifting reinforcement support bar, and arm is installed on the lifting body frame, and lifting is strengthened support bar and withstood on lifting body frame bottom; The insulation scaffold comprises platform framework, supports stand, prevents turning over supporting leg, ladder, guardrail, operating platform that prevent turning over the outward-dipping installation of supporting leg, operating platform is installed on the platform framework up and down, is provided with guardrail around last operating platform; Two joint ladders connect operating platform up and down respectively.
2. primary cut-out according to claim 1 and isolating switch overhaul special-purpose frame, it is characterized in that: arm is connected on the lifting body frame through the lifting base, and can horizontally rotate on the lifting body frame.
3. primary cut-out according to claim 1 and 2 and isolating switch overhaul special-purpose frame, it is characterized in that: be provided with a transmission mechanism in the lifting base, the crank of outside connects transmission mechanism, and transmission mechanism can drive the angle that stay cord is regulated the arm vertical direction.
4. primary cut-out according to claim 1 and isolating switch overhaul special-purpose frame, it is characterized in that: the connection of all rod members all adopts grafting to be connected by bolt.
5. primary cut-out according to claim 1 and isolating switch overhaul special-purpose frame, it is characterized in that: be provided with tunable arrangement on the leg that supports the stand lower end, can regulate the length of leg within the specific limits.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200920258132 CN201590609U (en) | 2009-11-16 | 2009-11-16 | Frame specially used for overhauling high-voltage circuit breaker and isolating switch |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200920258132 CN201590609U (en) | 2009-11-16 | 2009-11-16 | Frame specially used for overhauling high-voltage circuit breaker and isolating switch |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201590609U true CN201590609U (en) | 2010-09-22 |
Family
ID=42750401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200920258132 Expired - Fee Related CN201590609U (en) | 2009-11-16 | 2009-11-16 | Frame specially used for overhauling high-voltage circuit breaker and isolating switch |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201590609U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102251655A (en) * | 2011-04-22 | 2011-11-23 | 江苏省电力公司靖江市供电公司 | Multifunctional high-voltage insulated overhauling platform |
CN105811279A (en) * | 2016-03-29 | 2016-07-27 | 国家电网公司 | Multi-combination insulation mobile maintenance rack |
CN110739630A (en) * | 2018-08-27 | 2020-01-31 | 岳广琴 | Overhauling device and overhauling method for high-altitude special equipment |
-
2009
- 2009-11-16 CN CN 200920258132 patent/CN201590609U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102251655A (en) * | 2011-04-22 | 2011-11-23 | 江苏省电力公司靖江市供电公司 | Multifunctional high-voltage insulated overhauling platform |
CN105811279A (en) * | 2016-03-29 | 2016-07-27 | 国家电网公司 | Multi-combination insulation mobile maintenance rack |
CN105811279B (en) * | 2016-03-29 | 2017-06-09 | 国家电网公司 | A kind of many combination insulating mobile type repairing frames |
CN110739630A (en) * | 2018-08-27 | 2020-01-31 | 岳广琴 | Overhauling device and overhauling method for high-altitude special equipment |
CN110739630B (en) * | 2018-08-27 | 2020-12-25 | 安徽九颍智能设备有限公司 | Overhauling device and overhauling method for high-altitude special equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202054588U (en) | Hydraulic lift-type platform for overhaul and maintenance of GW-6 disconnecting links | |
CN201590609U (en) | Frame specially used for overhauling high-voltage circuit breaker and isolating switch | |
CN203654702U (en) | Operating platform for construction of reinforced concrete chimney | |
CN201817223U (en) | Suspension device for on-load tapping switches of transformers | |
CN201883922U (en) | Working platform used for overhauling electric circuit | |
CN209210319U (en) | It drives a vehicle dedicated maintenance hanging basket | |
CN201144633Y (en) | 220kv multifunctional overhaul ladder | |
CN202785388U (en) | Tower crane suspended connection stabilizing mechanism emergently used in tower crane up-lifting process | |
CN210798814U (en) | Portable high altitude maintenance platform structure | |
CN202578109U (en) | Double-upright-post type aluminum alloy accident repair tower | |
CN201941945U (en) | Mast | |
CN201635390U (en) | Automatic formwork supporting machine for high-rise building elevator shaft construction | |
CN2759025Y (en) | Platform for overhauling 220KV high-voltage isolation switch and supporting porcelain knob | |
CN203715115U (en) | Supporting point structure for self-hoisting system of portal crane | |
CN115818458A (en) | Standard knot assembling and disassembling system and operation method | |
CN2379090Y (en) | Multi-purpose miniature machine for cleaning windows | |
CN212358012U (en) | Widening platform device of hydraulic creeping formwork for quickly constructing double-limb cable tower | |
CN104627873A (en) | Safety crawling ladder structure of tower crane | |
CN203911362U (en) | Lifting mechanism for power transmission and transformation installation and maintenance | |
CN2759024Y (en) | 35KV-110KV high-voltage switch overhauling stand | |
CN204038917U (en) | Dismountable external hanging service platform | |
CN205846542U (en) | A kind of 10kV pole line switch apparatus for examination and repair | |
CN202864797U (en) | Portable assembly and disassembly frame | |
CN204633221U (en) | A kind of rotating lifting gear of power transmission line overhead ground wire | |
CN217286944U (en) | Anti-falling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100922 Termination date: 20101116 |