CN213320523U - Special circumference drilling equipment of PE pipe - Google Patents

Special circumference drilling equipment of PE pipe Download PDF

Info

Publication number
CN213320523U
CN213320523U CN202022086411.0U CN202022086411U CN213320523U CN 213320523 U CN213320523 U CN 213320523U CN 202022086411 U CN202022086411 U CN 202022086411U CN 213320523 U CN213320523 U CN 213320523U
Authority
CN
China
Prior art keywords
wall
pipe
drilling equipment
storage box
rotation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022086411.0U
Other languages
Chinese (zh)
Inventor
朱娟娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Huaye Shengxin Pipe Industry Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022086411.0U priority Critical patent/CN213320523U/en
Application granted granted Critical
Publication of CN213320523U publication Critical patent/CN213320523U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drilling And Boring (AREA)

Abstract

The utility model discloses a special circumference drilling equipment of PE pipe, comprising a bottom plate, the welding has the support frame on the top outer wall of bottom plate, the welding has the roof on the top outer wall of support frame, install hydraulic telescoping rod on the bottom outer wall of roof, hydraulic telescoping rod's bottom fixedly connected with mounting bracket, be fixed with the motor on the mounting bracket, the output fixedly connected with drill arbor of motor, install the slide rail on the top outer wall of bottom plate, slide rail sliding connection has the slide, the top welding of slide has the anchor clamps subassembly, the fixed mounting has the cylinder on one side top outer wall of bottom plate, the output of cylinder and anchor clamps subassembly fixed connection, the anchor clamps subassembly includes storage box, the inside of storage box is provided with the axis of rotation, the welding has the spacer block on the outer wall of axis of rotation, the axis of rotation is located the outer wall of spacer, the rotating shaft is connected with a driven shaft through a positive thread and a negative thread respectively, and the top end of the driven shaft is connected with a clamping plate through a bearing.

Description

Special circumference drilling equipment of PE pipe
Technical Field
The utility model relates to a drilling equipment specifically is a special circumference drilling equipment of PE pipe, belongs to PE pipe processing technology field.
Background
PE is a basic plastic, and the PE pipe is an ideal pipe material for replacing a common iron water supply pipe due to the characteristics of high strength, high temperature resistance, corrosion resistance, no toxicity, wear resistance and the like, and is widely used as a carrier of fluid in the construction process of various underground pipelines at present.
The PE pipe often needs to be drilled in the use, the PE pipe needs to be moved manually when the existing circumferential drilling equipment is used for continuously drilling, all holes are difficult to guarantee to be on the same straight line, in addition, the PE pipe is not convenient to position when the PE pipe is rotated to drill, the drilling position is prone to deviation, the drilling efficiency is low, and the precision is poor.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a special circumference drilling equipment of PE pipe just lies in order to solve above-mentioned problem, can improve drilling efficiency and machining precision.
The utility model discloses a technical scheme realizes above-mentioned purpose, a special circumference drilling equipment of PE pipe, including the bottom plate, the welding has the support frame on the top outer wall of bottom plate, the welding has the roof on the top outer wall of support frame, fixedly mounted with hydraulic telescoping rod on the bottom outer wall of roof, the bottom fixedly connected with mounting bracket of hydraulic telescoping rod, fixedly mounted with the motor on the mounting bracket, the output fixedly connected with drill spindle of motor;
the fixture comprises a bottom plate and is characterized in that a slide rail is fixedly mounted on the outer wall of the top of the bottom plate, the slide rail is connected with a slide plate in a sliding mode, a fixture assembly is welded to the top end of the slide plate, an air cylinder is fixedly mounted on the outer wall of the top of one side of the bottom plate, and the output end of the air cylinder is fixedly connected with the fixture assembly.
Preferably, the anchor clamps subassembly includes the storage box, the inside of storage box is provided with the axis of rotation, the welding has the partition block on the outer wall of axis of rotation, the axis of rotation is located positive screw thread and negative thread have been seted up respectively on the outer wall of partition block both sides, the welding of one end of axis of rotation has the handle, just the handle is located the outside of storage box, the axis of rotation passes through positive screw thread with the negative thread is connected with the driven shaft respectively, the top of driven shaft is connected with splint through the bearing.
Preferably, the rotating shaft is connected with the storage box through a bearing.
Preferably, a first positioning hole is formed in the outer wall of one side of the clamping plate, and a first movable bolt is inserted into the first positioning hole.
Preferably, a rubber pad is fixedly arranged on one side wall of the clamping plate.
Preferably, an arc-shaped groove is formed in the outer wall of the top of the clamp assembly and is located right below the drill spindle.
Preferably, a second positioning hole is formed in the outer wall of the top of the storage box, and a second movable bolt is inserted into the second positioning hole.
The utility model has the advantages that: the utility model discloses a clamp subassembly that sets up is convenient for press from both sides tight fixed to the PE pipe that thickness specification is different, under the effect of arc wall, can guarantee when placing the PE pipe that it is located under the drill spindle all the time, is favorable to guaranteeing that drilling position can not appear the deviation like this, rotates the handle, drives splint through the axis of rotation and is close to each other to fix the PE pipe, start the cylinder and can drive clamp subassembly linear motion, thereby guarantee all holes all be in same straight line when carrying out continuous drilling to the PE pipe, improved the drilling precision; through the first locating hole and the first movable bolt that set up, when rotatory PE pipe was drilled, inserted the one end of first movable bolt in first locating hole, the other end was inserted and is inserted and insert the downthehole that has bored on the PE pipe to be convenient for fix a position and carry out processing next time, on the same principle, the effect of second locating hole and second movable bolt is also so.
Drawings
Fig. 1 is a front view of the overall structure of the present invention.
Fig. 2 is a sectional view of the structure of the clamp assembly of the present invention.
Fig. 3 is a top view of the storage box structure of the present invention.
In the figure: 1. the bottom plate, 2, the support frame, 3, the roof, 4, hydraulic telescoping rod, 5, the mounting bracket, 6, the motor, 7, the drill spindle, 8, the slide rail, 9, the slide, 10, anchor clamps subassembly, 11, the cylinder, 12, the storage box, 13, the axis of rotation, 14, the spacer block, 15, the handle, 16, the driven shaft, 17, splint, 18, first locating hole, 19, first activity bolt, 20, the rubber pad, 21, the arc wall, 22, the second locating hole, 23, the second activity bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a special circumferential drilling device for PE pipes comprises a bottom plate 1, a support frame 2 welded on the top outer wall of the bottom plate 1, a top plate 3 welded on the top outer wall of the support frame 2, a hydraulic telescopic rod 4 fixedly installed on the bottom outer wall of the top plate 3, a mounting frame 5 fixedly connected to the bottom end of the hydraulic telescopic rod 4, a motor 6 fixedly installed on the mounting frame 5, a drill spindle 7 fixedly connected to the output end of the motor 6, a starting motor 6 driving the drill spindle 7 to rotate, a hydraulic telescopic rod 4 driving the drill spindle 7 to move downwards, so as to drill PE pipes, a hydraulic telescopic rod 4 driving the drill spindle 7 to reset after one-time drilling, a slide rail 8 fixedly installed on the top outer wall of the bottom plate 1, a slide plate 9 slidably connected to the slide rail 8, a clamp assembly 10 welded on the top end of the slide plate 9, and a clamp and fix PE pipes of different specifications through the clamp assembly, fixed mounting has cylinder 11 on one side top outer wall of bottom plate 1, and cylinder 11's output and anchor clamps subassembly 10 fixed connection start cylinder 11, drive anchor clamps subassembly 10 and slide 9 and be linear motion on 8 directions of slide rail to all holes all are in on the same straight line when guaranteeing to carry out continuous drilling to the PE pipe.
As a technical optimization scheme of the utility model, the clamp assembly 10 comprises a storage box 12, a rotating shaft 13 is arranged inside the storage box 12, the rotating shaft 13 is connected with the storage box 12 through a bearing, a separation block 14 is welded on the outer wall of the rotating shaft 13, a positive thread and a negative thread are respectively arranged on the outer wall of the rotating shaft 13 positioned at two sides of the separation block 14, a handle 15 is welded at one end of the rotating shaft 13, the handle 15 is positioned at the outer part of the storage box 12, the rotating shaft 13 is respectively connected with a driven shaft 16 through the positive thread and the negative thread, the top end of the driven shaft 16 is connected with a clamping plate 17 through a bearing, the handle 15 is rotated, the driven shafts 16 are driven to approach each other through the rotating shaft 13, the driven shafts 16 drive the clamping plate 17,
a rubber pad 20 is fixedly arranged on one side wall of the clamping plate 17, the PE pipe can be prevented from being clamped under the action of the rubber pad 20, an arc-shaped groove 21 is formed in the outer wall of the top of the clamp assembly 10, the arc-shaped groove 21 is positioned under the drill spindle 7, the PE pipe to be processed is placed in the arc-shaped groove 21 on the storage box 12, the PE pipe can be guaranteed to be always positioned under the drill spindle 7 when being placed under the action of the arc-shaped groove 21, so that the drilling position is guaranteed not to be deviated, a first positioning hole 18 is formed in the outer wall of one side of the clamping plate 17, a first movable bolt 19 is inserted into the first positioning hole 18 in the first positioning hole 18, a second positioning hole 22 is formed in the outer wall of the top of the storage box 12, a second movable bolt 23 is inserted into the second positioning hole 22, one end of the first movable bolt 19 is inserted into the first positioning hole 18 when the PE pipe is rotated for drilling, the PE pipe, the other end of the, thereby being convenient for positioning for next processing, and similarly, the second positioning hole 22 and the second movable bolt 23 are also used, which is beneficial to improving the drilling precision.
The working principle is as follows: when the utility model is used, firstly, the PE pipe to be processed is placed in the arc groove 21 on the storage box 12, under the action of the arc groove 21, the PE pipe can be ensured to be always positioned under the drill spindle 7 when being placed, thereby ensuring that the drilling position can not generate deviation, then the handle 15 is rotated, the driven shaft 16 is driven to mutually approach through the rotating shaft 13, the driven shaft 16 drives the clamping plate 17 to mutually approach through the bearing, thereby clamping and fixing the PE pipe, under the action of the rubber pad 20, the PE pipe can be prevented from being clamped and damaged, the starting motor 6 drives the drill spindle 7 to rotate, the starting hydraulic telescopic rod 4 drives the drill spindle 7 to move downwards, thereby drilling the PE pipe, after one-time drilling is finished, the starting hydraulic telescopic rod 4 drives the drill spindle 7 to reset again, then the air cylinder 11 is started, the clamp assembly 10 and the sliding plate 9 are driven to do linear motion in the direction of the sliding rail 8, thereby guarantee all holes all be in same straight line when carrying out continuous drilling to the PE pipe, when rotatory PE pipe was drilled, insert first movable bolt 19's one end in first locating hole 18, the other end is inserted and insert the downthehole that has bored on the PE pipe to be convenient for fix a position and carry out processing next time, and in the same way, second locating hole 22 and second movable bolt 23 use equally, are favorable to improving drilling accuracy like this.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (7)

1. The utility model provides a special circumference drilling equipment of PE pipe, includes bottom plate (1), its characterized in that: the support frame (2) is welded on the outer wall of the top of the bottom plate (1), the top plate (3) is welded on the outer wall of the top of the support frame (2), the hydraulic telescopic rod (4) is fixedly installed on the outer wall of the bottom of the top plate (3), the bottom end of the hydraulic telescopic rod (4) is fixedly connected with a mounting frame (5), a motor (6) is fixedly installed on the mounting frame (5), and the output end of the motor (6) is fixedly connected with a drill spindle (7);
fixed mounting has slide rail (8) on the top outer wall of bottom plate (1), slide rail (8) sliding connection has slide (9), the top welding of slide (9) has anchor clamps subassembly (10), fixed mounting has cylinder (11) on the one side top outer wall of bottom plate (1), the output of cylinder (11) with anchor clamps subassembly (10) fixed connection.
2. The special circumferential drilling equipment for the PE pipe, according to claim 1, wherein: anchor clamps subassembly (10) are including storage box (12), the inside of storage box (12) is provided with axis of rotation (13), the welding has on the outer wall of axis of rotation (13) separates piece (14), axis of rotation (13) are located positive screw thread and negative screw thread have been seted up on the outer wall of separating piece (14) both sides respectively, the one end welding of axis of rotation (13) has handle (15), just handle (15) are located the outside of storage box (12), axis of rotation (13) pass through positive screw thread with the negative screw thread is connected with driven shaft (16) respectively, the top of driven shaft (16) is connected with splint (17) through the bearing.
3. The special circumferential drilling equipment for the PE pipe as claimed in claim 2, wherein: the rotating shaft (13) is connected with the storage box (12) through a bearing.
4. The special circumferential drilling equipment for the PE pipe as claimed in claim 2, wherein: a first positioning hole (18) is formed in the outer wall of one side of the clamping plate (17), and a first movable bolt (19) is inserted into the first positioning hole (18).
5. The special circumferential drilling equipment for the PE pipe as claimed in claim 2, wherein: a rubber pad (20) is fixedly arranged on one side wall of the clamping plate (17).
6. The special circumferential drilling equipment for the PE pipe as claimed in claim 2, wherein: an arc-shaped groove (21) is formed in the outer wall of the top of the clamp assembly (10), and the arc-shaped groove (21) is located right below the drill spindle (7).
7. The special circumferential drilling equipment for the PE pipe as claimed in claim 2, wherein: and a second positioning hole (22) is formed in the outer wall of the top of the storage box (12), and a second movable bolt (23) is inserted into the second positioning hole (22).
CN202022086411.0U 2020-09-21 2020-09-21 Special circumference drilling equipment of PE pipe Active CN213320523U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022086411.0U CN213320523U (en) 2020-09-21 2020-09-21 Special circumference drilling equipment of PE pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022086411.0U CN213320523U (en) 2020-09-21 2020-09-21 Special circumference drilling equipment of PE pipe

Publications (1)

Publication Number Publication Date
CN213320523U true CN213320523U (en) 2021-06-01

Family

ID=76065319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022086411.0U Active CN213320523U (en) 2020-09-21 2020-09-21 Special circumference drilling equipment of PE pipe

Country Status (1)

Country Link
CN (1) CN213320523U (en)

Similar Documents

Publication Publication Date Title
CN100453282C (en) Bell mouth grooving method for spigot-and-socket branch pipe bell of plastics inspection chamber
CN115156833A (en) Clamp for welding steel pipes
CN211565127U (en) Adjustable fixture for lathe machining
CN210413626U (en) Anchor clamps are used in digit control machine tool processing
CN213320523U (en) Special circumference drilling equipment of PE pipe
CN101168235A (en) Double-faced processing combined machine tool
CN211030166U (en) Plastics tubular product port chamfer device
CN218776100U (en) Numerical control lathe processing frock clamp
CN209902350U (en) Novel pipe cutting machine
CN207982766U (en) Multi-station full-automatic formation of tubes machine
CN215546652U (en) Integrated processing device for shunt three-way pipe
CN202539755U (en) Large-diameter bend flame cutter fixture
CN215545054U (en) Drilling machine for quickly drilling side wall of oilless bearing
CN210938064U (en) Turntable machine combined machine tool
CN109128304B (en) Central hole punching device for shaft
CN113275911A (en) Workpiece quick positioning and fixing device for multi-axis machining machine tool
CN112024942A (en) Pipeline perforating device for building engineering
CN215966470U (en) Complicated multi-hole site drilling frock of ultra-precision motor flange
CN220971529U (en) Steel construction boring grab
CN211661876U (en) Automobile engine backplate anchor clamps easy to assemble
CN205817027U (en) A kind of tool for drilling fixture
CN220362288U (en) Frock clamp for planer-type milling
CN215658249U (en) Flange tapping fixed station
CN205342483U (en) Aluminium prduct process structure with swivel work head
CN220554972U (en) Pipeline intersecting line welding device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231127

Address after: 831100 Sutong Small and Micro Entrepreneurship Park, Fuxi District, Fukang Industrial Park, Changji Hui Autonomous Prefecture, Xinjiang Uygur Autonomous Region (east side of Jinming Tengda Insulation Materials, south side of Haoxin Green Energy Logistics)

Patentee after: Xinjiang Huaye Shengxin Pipe Industry Co.,Ltd.

Address before: 510800 room 701, building 10, No.15 Wangting Road, Huadu District, Guangzhou City, Guangdong Province

Patentee before: Zhu Juanjuan