CN213320115U - Electric power engineering operation panel device - Google Patents

Electric power engineering operation panel device Download PDF

Info

Publication number
CN213320115U
CN213320115U CN202022135964.0U CN202022135964U CN213320115U CN 213320115 U CN213320115 U CN 213320115U CN 202022135964 U CN202022135964 U CN 202022135964U CN 213320115 U CN213320115 U CN 213320115U
Authority
CN
China
Prior art keywords
plate
backup pad
bottom plate
threaded rod
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022135964.0U
Other languages
Chinese (zh)
Inventor
王计伟
孟令驰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Jusen Lvye Power Engineering Co ltd
Original Assignee
Hebei Jusen Lvye Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Jusen Lvye Power Engineering Co ltd filed Critical Hebei Jusen Lvye Power Engineering Co ltd
Priority to CN202022135964.0U priority Critical patent/CN213320115U/en
Application granted granted Critical
Publication of CN213320115U publication Critical patent/CN213320115U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Workshop Equipment, Work Benches, Supports, Or Storage Means (AREA)

Abstract

The utility model discloses an electric power engineering operation panel device, including the bottom plate, the top of bottom plate is fixed with the threaded rod, and first backup pad is installed on the top of bottom plate, and open on the surface of first backup pad has first screw hole, and the top of first backup pad is fixed with the gusset plate, and the fixed surface of gusset plate has the ladder board. First backup pad and second backup pad are rotatory around the threaded rod, and rotation angle change position to realized operating labour saving and time saving to different positions. Can many people simultaneously step on the operation panel to step on the second backup pad through the ladder board is simple swift, or goes down to first backup pad, thereby realized many people and step on the operation panel simultaneously and operated, raise the efficiency. The operating table is moved rapidly through the idler wheels, and during operation, the operating table is supported through the base plate, so that the operating table is applied rapidly and conveniently.

Description

Electric power engineering operation panel device
Technical Field
The utility model belongs to the technical field of electric power engineering, specifically be an electric power engineering operation panel device.
Background
Electric power engineering, i.e. engineering related to the production, transmission and distribution of electric energy, also broadly includes engineering of applying electricity as power and energy in various fields, and is also understood to be transmission and transformation business expansion engineering. The electric power engineering operation platform is a workbench for performing operations such as electric power engineering line connection and the like, along with the continuous progress and development of the society, the types of the electric power engineering operation platforms are more and more, and the operation is often required to be performed on the operation platform in the electric power engineering operation process.
The invention of China patent with publication number CN210879567U discloses an electric power engineering operation table device in 30.6.2020, which comprises a table top, wherein the left side of the top end of the table top is provided with a handle, the right end surface of the handle is fixedly connected with a first threaded shaft, the right end surface of the first threaded shaft is fixedly connected with a fixed shaft, the right end surface of the fixed shaft is fixedly connected with a second threaded shaft, and the outer side of the first threaded shaft and the outer side of the second threaded shaft are both spirally connected with connecting blocks. Space is saved.
The existing electric power engineering operation table device is convenient to place and transport and saves space. However, in the operation of the power engineering, the standing support plate cannot rotate to change the position, so that the operation cannot be performed on different positions, the operation table needs to be moved, and time and labor are wasted; moreover, when a single person cannot operate, the operation is inconvenient for multiple persons to operate simultaneously, and the operation efficiency is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric power engineering operation panel device to solve because the backup pad of standing can not rotation angle change position, lead to can not operating different positions, need remove the operation panel, the problem that wastes time and energy.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an electric power engineering operation panel device, includes the bottom plate, the top of bottom plate is fixed with the threaded rod, first backup pad is installed on the top of bottom plate, open on the surface of first backup pad has first screw hole, the top of first backup pad is fixed with the gusset plate, the fixed surface of gusset plate has the ladder board.
Preferably, a second supporting plate is fixed to the top end of the reinforcing plate, a second threaded hole is formed in the surface of the second supporting plate, and a limiting plate is fixed to the top end of the threaded rod.
Preferably, the bottom of bottom plate installs the gyro wheel, the pneumatic cylinder is installed on the top of bottom plate, the bottom of pneumatic cylinder is connected with the telescopic link, the bottom mounting of telescopic link has the backing plate.
Preferably, the threaded rod is perpendicular to the bottom plate, the first support plate is perpendicular to the threaded rod, the second support plate is parallel to the first support plate and forms a cross structure up and down, and the second support plate is connected with the first support plate through a reinforcing plate; the threaded rod passes through first screw hole and screw-thread fit connects.
Preferably, gusset plate and first backup pad are perpendicular, and the gusset plate is located the both ends of threaded rod, and first backup pad and second backup pad about the notch cuttype board is used for, notch cuttype board and gusset plate are perpendicular.
Preferably, the second supporting plate is perpendicular to the reinforcing plate, and the threaded rod penetrates through the second threaded hole and is in threaded fit connection.
Preferably, the telescopic rods penetrate through the bottom plate and are perpendicular to each other, and the base plate is parallel to the bottom plate.
Compared with the prior art, the utility model discloses a press dustcoat is used in elbow production:
1. be provided with first backup pad, second backup pad and threaded rod, during the use, first backup pad and second backup pad are rotatory around the threaded rod, and rotation angle change of position to realized operating labour saving and time saving to different positions.
2. Be provided with anchor strut and ladder board, during the use, can many people simultaneously step on the operation panel to step on the second backup pad through the ladder board is simple swift, or down to first backup pad, thereby realized many people and stepped on the operation panel simultaneously and operated, raise the efficiency.
3. The operating table is provided with the idler wheels and the base plate, the operating table is moved rapidly through the idler wheels during use, and the operating table is supported through the base plate during operation, so that the operating table is applied rapidly and conveniently.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a sectional view taken along the direction a-a of fig. 1 according to the present invention.
In the figure: 1. a base plate; 2. a roller; 3. a base plate; 4. a telescopic rod; 5. a hydraulic cylinder; 6. a threaded rod; 7. a first threaded hole; 8. a first support plate; 9. a step plate; 10. a reinforcing plate; 11. a second support plate; 12. a second threaded hole; 13. and a limiting plate.
Detailed Description
Referring to fig. 1 and 2, an electric power engineering operation table device includes a bottom plate 1, where the bottom plate 1 is a rectangular plate; a threaded rod 6 is fixed at the top end of the bottom plate 1, and the threaded rod 6 is vertical to the bottom plate 1; first backup pad 8 is installed on the top of bottom plate 1, and first backup pad 8 is perpendicular with threaded rod 6, and first backup pad 8 is parallel with bottom plate 1.
Referring to fig. 1 and 2, a first threaded hole 7 is formed in the surface of the first support plate 8, and the threaded rod 6 passes through the first threaded hole 7 and is in threaded fit connection; the top end of the first supporting plate 8 is fixed with a reinforcing plate 10, the reinforcing plate 10 is positioned at the two ends of the threaded rod 6, and the reinforcing plate 10 is vertical to the first supporting plate 8; stepped plate 9 is fixed on the surface of reinforcing plate 10, and stepped plate 9 and reinforcing plate 10 are perpendicular, and stepped plate 9 is used for upper and lower first backup pad 8 and second backup pad 11.
Referring to fig. 1 and 2, a second supporting plate 11 is fixed on the top end of the reinforcing plate 10, the second supporting plate 11 is perpendicular to the reinforcing plate 10, and the second supporting plate 11 is connected with the first supporting plate 8 through the reinforcing plate 10; the second supporting plate 11 and the first supporting plate 8 are parallel and form a cross structure from top to bottom, and the length of the second supporting plate 11 is not more than that of the first supporting plate 8.
Referring to fig. 1 and 2, a second threaded hole 12 is formed in the surface of the second support plate 11, and the threaded rod 6 passes through the second threaded hole 12 and is in threaded fit connection; the top end of the threaded rod 6 is fixed with a limiting plate 13, and the diameter of the limiting plate 13 is not less than that of the second threaded hole 12.
Referring to fig. 1 and 2, a roller 2 is installed at the bottom end of a bottom plate 1 for moving an operation table; the top end of the bottom plate 1 is provided with a hydraulic cylinder 5, the bottom end of the hydraulic cylinder 5 is connected with a telescopic rod 4, and the telescopic rods 4 penetrate through the bottom plate 1 and are mutually vertical; a base plate 3 is fixed at the bottom end of the telescopic rod 4, and the base plate 3 is parallel to the bottom plate 1; when the operation table is used, the backing plate 3 lands on the ground to jack up the bottom plate 1.
The working principle of the scheme is as follows: a first support plate 8 and a second support plate 11 are arranged on the surface of the threaded rod 6, and the first support plate 8 and the second support plate 11 are connected through a reinforcing plate 10.
The telescopic rod 4 drives the backing plate 3 to contract, the roller 2 lands on the ground, and the operating platform can be moved quickly.
When the operation table is used, the backing plate 3 lands to jack the bottom plate 1, and the roller 2 is lifted off; an operator gets on the first supporting plate 8 and gets on the second supporting plate 11 through the step plate 9; personnel on the ground can push the first supporting plate 8, the first supporting plate 8 and the second supporting plate 11 rotate around the threaded rod 6, the positions are changed, and different positions can be operated, so that the operation is simple and convenient; moreover, a plurality of persons can simultaneously operate different height positions by climbing the first supporting plate 8 and the second supporting plate 11, and the operation is efficient and quick.

Claims (7)

1. An electric power engineering operation panel device, includes bottom plate (1), its characterized in that: threaded rod (6) are fixed on the top of bottom plate (1), first backup pad (8) are installed on the top of bottom plate (1), first screw hole (7) have been opened on the surface of first backup pad (8), the top of first backup pad (8) is fixed with gusset plate (10), the fixed surface of gusset plate (10) has ladder board (9).
2. An electrical engineering operation platform device according to claim 1, characterized in that: a second supporting plate (11) is fixed at the top end of the reinforcing plate (10), a second threaded hole (12) is formed in the surface of the second supporting plate (11), and a limiting plate (13) is fixed at the top end of the threaded rod (6).
3. An electrical engineering operation platform device according to claim 1, characterized in that: gyro wheel (2) are installed to the bottom of bottom plate (1), pneumatic cylinder (5) are installed on the top of bottom plate (1), the bottom of pneumatic cylinder (5) is connected with telescopic link (4), the bottom mounting of telescopic link (4) has backing plate (3).
4. An electrical engineering operation platform device according to claim 1, characterized in that: threaded rod (6) and bottom plate (1) are perpendicular, first backup pad (8) are perpendicular with threaded rod (6), threaded rod (6) pass first screw hole (7) and screw-thread fit connection.
5. An electrical engineering operation platform device according to claim 1, characterized in that: the reinforcing plate (10) is perpendicular to the first supporting plate (8), and the stepped plate (9) is perpendicular to the reinforcing plate (10).
6. An electrical engineering operation platform device according to claim 2, characterized in that: the second supporting plate (11) is perpendicular to the reinforcing plate (10), and the threaded rod (6) penetrates through the second threaded hole (12) and is in threaded fit connection.
7. An electrical engineering operation platform device according to claim 3, characterized in that: the telescopic rod (4) penetrates through the bottom plate (1) and is perpendicular to the bottom plate, and the base plate (3) is parallel to the bottom plate (1).
CN202022135964.0U 2020-09-25 2020-09-25 Electric power engineering operation panel device Active CN213320115U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022135964.0U CN213320115U (en) 2020-09-25 2020-09-25 Electric power engineering operation panel device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022135964.0U CN213320115U (en) 2020-09-25 2020-09-25 Electric power engineering operation panel device

Publications (1)

Publication Number Publication Date
CN213320115U true CN213320115U (en) 2021-06-01

Family

ID=76067295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022135964.0U Active CN213320115U (en) 2020-09-25 2020-09-25 Electric power engineering operation panel device

Country Status (1)

Country Link
CN (1) CN213320115U (en)

Similar Documents

Publication Publication Date Title
CN212609391U (en) Electrical construction installation device
CN206858005U (en) A kind of lorry movable small crane
CN205943646U (en) Distribution transformer carries platform
CN213320115U (en) Electric power engineering operation panel device
CN111554497A (en) Operating table and method for after-loading production of large special dry-type transformer
CN207551830U (en) A kind of replacement tool suitable for transformer oil-immersed pump
CN207577895U (en) A kind of steel drilling platform
CN106379829A (en) Material lifting system for construction machinery
CN203128113U (en) Material-loading lifting platform
CN213445905U (en) Convenient small-size hoisting equipment who removes
CN110271998B (en) Automatic combined lifting device for processing cylinders with various specifications
CN210313411U (en) Automatic combined type lifting device for processing cylinders of various specifications
CN209815532U (en) Lifting device for building engineering
CN203976309U (en) Build stove jacking system
CN208008387U (en) A kind of equipment elevator platform
CN111924725A (en) Building templates hoist device for house construction
CN212603509U (en) Nonmetal compensator assembling table
CN213265651U (en) Auxiliary lifting device for building construction
CN212706517U (en) Novel motor maintenance assembly and disassembly tools
CN221027421U (en) Auxiliary fixing device for building electrical construction
CN219131335U (en) Three-station manual positioner
CN210857942U (en) Building construction equipment is with supporting base convenient to remove
CN212129855U (en) Elevating gear for construction
CN214697085U (en) Strutting arrangement for civil engineering
CN220502572U (en) Assembled high-voltage motor transportation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant