CN213320104U - Reinforcing bar rack for construction - Google Patents

Reinforcing bar rack for construction Download PDF

Info

Publication number
CN213320104U
CN213320104U CN202022266312.0U CN202022266312U CN213320104U CN 213320104 U CN213320104 U CN 213320104U CN 202022266312 U CN202022266312 U CN 202022266312U CN 213320104 U CN213320104 U CN 213320104U
Authority
CN
China
Prior art keywords
sets
frame
reinforcing bar
lifting
stud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022266312.0U
Other languages
Chinese (zh)
Inventor
邵健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuancheng Lutong Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022266312.0U priority Critical patent/CN213320104U/en
Application granted granted Critical
Publication of CN213320104U publication Critical patent/CN213320104U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a reinforcing bar rack for construction, including slide rail, support frame and U type frame, the inside symmetrical sliding connection of slide rail has two sets of support frames, the inside of slide rail is horizontal installation and has runs through two sets ofly the stud of support frame, wherein two sets of the outside cover that the inside of support frame is located stud is equipped with first swivel nut, stud's left end is installed first and is revolved the handle. The utility model discloses in, at first, adopt structure with adjustable bracket spacing, can be according to the actual demand of placing of reinforcing bar, carry out the adjustment of rack bracket spacing and handle, the use is placed in the regulation of the different length reinforcing bars of both being convenient for, also promoted reinforcing bar rack's suitability simultaneously, secondly, inside is equipped with over-and-under type and removes the structure, the adjustment of the reinforcing bar rack of being convenient for removes the processing, can go up and down after removing simultaneously and accomodate the processing, the daily adjustment of the reinforcing bar rack of being convenient for removes the use to reinforcing bar rack's removal has been promoted.

Description

Reinforcing bar rack for construction
Technical Field
The utility model relates to a construction technical field especially relates to a reinforcing bar rack for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite. However, the existing steel bar placing rack for building construction still has the defects that: at first, adopt the integral type structure mostly, be difficult to according to the demand of placing of actual reinforcing bar, carry out the adjustment of rack and handle, the regulation of the different length reinforcing bars of not being convenient for is placed the use, and the suitability is relatively poor, secondly, when adjusting or removing reinforcing bar rack, need manpower or fork truck to carry the processing, the operation is got up and is wasted time and energy, the daily removal of the reinforcing bar rack of not being convenient for is used, and the mobility is relatively poor.
Disclosure of Invention
The utility model aims to provide a: in order to solve the problem that the traditional steel bar placing rack for building construction is difficult to adjust and process according to the actual length of steel bars, the steel bar placing rack for building construction is provided.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a reinforcing bar rack for construction, includes slide rail, support frame and U type frame, the inside symmetrical sliding connection of slide rail has two sets of support frames, the inside of slide rail is horizontal installation and runs through two sets ofly the stud of support frame, wherein two sets of the outside cover that the inside of support frame is located stud is equipped with first swivel nut, stud's left end is installed first and is revolved the handle, and is two sets of the equal fixedly connected with U type frame in top of support frame, the top middle part fixedly connected with T type frame of slide rail.
As a further description of the above technical solution:
the front end and the rear end of the two groups of support frames are fixedly connected with sliding blocks penetrating through the sliding rails, and sliding grooves matched with the sliding blocks are formed in the front end and the rear end of the sliding rails.
As a further description of the above technical solution:
the bottom of the two groups of support frames is connected with a lifting frame in a sliding mode, and two groups of universal wheels are symmetrically installed at the bottom of the lifting frame.
As a further description of the above technical solution:
the bottom of two sets of the support frame all rotates and is connected with the lift double-screw bolt that runs through the crane, and wherein the inside of crane is located the outside cover of lift double-screw bolt and is equipped with the second swivel nut.
As a further description of the above technical solution:
and a second rotating handle is installed at the bottom end of the lifting stud.
As a further description of the above technical solution:
the bottoms of the two groups of support frames are symmetrically and fixedly connected with limiting sliding columns penetrating through the lifting frame.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
1. the utility model discloses in, structure with adjustable adopt the bracket interval, be equipped with spout and stud on the slide rail, be equipped with slider and first swivel nut on two sets of support frames simultaneously, when rotating stud through first revolving, under the transmission between stud and first swivel nut, two sets of support frames alright through the slider synchronous inside or outside slip in the spout of slide rail, the interval of two sets of U type framves also can dwindle thereupon and increase, demand can be placed according to the reality of reinforcing bar to this kind of structure, carry out the adjustment of rack bracket interval and handle, the use is placed in the regulation of the different length reinforcing bars of both being convenient for, the suitability of reinforcing bar rack has also been promoted simultaneously.
2. The utility model discloses in, inside is equipped with over-and-under type removal structure, be equipped with the crane bottom the support frame, lift double-screw bolt and second are revolved the handle, be equipped with universal wheel and second swivel nut on the crane simultaneously, when the second on rotating the lift double-screw bolt revolves the handle, under the transmission between lift double-screw bolt and second swivel nut, the crane alright carry out the adjustment of vertical direction and handle bottom the support frame, when the universal wheel contact ground of crane bottom, alright carry out the processing of carrying out the support frame, the adjustment of the reinforcing bar rack of being convenient for of this kind of structure is removed and is handled, can go up and down after removing simultaneously and accomodate the processing, the daily adjustment of the reinforcing bar rack of being convenient for removes the use, thereby.
Drawings
Fig. 1 is a schematic diagram of a structure of a steel bar placing rack for building construction provided by the utility model;
FIG. 2 is a schematic cross-sectional view taken along line A-A of the present invention;
fig. 3 is a schematic cross-sectional view at B-B of the present invention.
Illustration of the drawings:
1. a slide rail; 101. a chute; 2. a support frame; 201. a first threaded sleeve; 202. a slider; 203. a limiting sliding column; 3. a stud; 301. a first rotating handle; 4. a U-shaped frame; 5. a T-shaped frame; 6. a lifting frame; 601. a second thread insert; 7. a universal wheel; 8. a lifting stud; 801. and a second rotating handle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a reinforcing bar rack for construction, including slide rail 1, support frame 2 and U type frame 4, the inside symmetrical sliding connection of slide rail 1 has two sets of support frames 2, the inside of slide rail 1 is horizontal installation and has the stud 3 that runs through two sets of support frames 2, wherein the outside cover that the inside of two sets of support frames 2 is located stud 3 is equipped with first swivel nut 201, stud 3's left end is installed first and is revolved 301, the equal fixedly connected with U type frame 4 in top of two sets of support frames 2, slide rail 1's top middle part fixedly connected with T type frame 5, first setting to 301 soon, the user of being convenient for is handled stud 3's rotation adjustment, T type frame 5's setting, can support the bracket with the reinforcing bar middle part of bracket between two sets of U type frames 4 and handle, thereby the stability that the reinforcing bar was placed has been promoted.
Specifically, as shown in fig. 1 and 2, the front end and the rear end of the two sets of support frames 2 are fixedly connected with a sliding block 202 penetrating through the sliding rail 1, wherein the sliding groove 101 matched with the sliding block 202 is formed in the front end and the rear end of the sliding rail 1, and the arrangement of the sliding block 202 and the sliding groove 101 improves the stability of the horizontal sliding adjustment of the two sets of support frames 2 in the sliding rail 1.
Specifically, as shown in fig. 1 and 2, the bottoms of two sets of support frames 2 are slidably connected with a lifting frame 6, two sets of universal wheels 7 are symmetrically installed at the bottom of the lifting frame 6, the bottoms of the two sets of support frames 2 are rotatably connected with lifting studs 8 penetrating through the lifting frame 6, wherein the inner part of the lifting frame 6, which is positioned at the outer sides of the lifting studs 8, is sleeved with a second screw sleeve 601, a second knob 801 is installed at the bottom end of the lifting stud 8, the bottoms of the two sets of support frames 2 are symmetrically and fixedly connected with limiting slide posts 203 penetrating through the lifting frame 6, and the universal wheels 7 are arranged, so that the whole reinforcing steel bar placing frame can be moved and pushed after the universal wheels 7 contact with the ground, the lifting studs 8 and the second screw sleeves 601 are arranged, the lifting frame 6 can be conveniently adjusted in the vertical direction, the second knob 801 can be conveniently arranged, a user can conveniently rotate the, the stability of the crane 6 in the vertical direction sliding adjustment at the bottom of the support frame 2 is improved.
The working principle is as follows: when the steel bar placing frame is used, when the steel bar placing frame is required to be moved to a specified station, the lifting frame 6 can move in the vertical direction at the bottom of the support frame 2 under the transmission action between the lifting stud 8 and the second screw sleeve 601 when the second screw handle 801 on the lifting stud 8 is rotated, when the lifting frame 6 moves downwards and the universal wheel 7 at the bottom contacts the ground, the whole steel bar placing frame can be pushed, after the specified station is moved, the two groups of support frames 2 can synchronously slide inwards or outwards on the sliding rail 1 under the transmission action between the stud 3 and the first screw sleeve 201 when the spacing between the steel bar brackets needs to be adjusted according to the actual placing requirement of the steel bars, the spacing between the two groups of U-shaped frames 4 can be reduced accordingly, when the two groups of support frames 2 synchronously slide outwards, the interval of two sets of U type frame 4 just can increase thereupon, after the suitable bracket interval of adjustment, alright rotate the second and revolve handle 801, accomodate 7 box crane 6 of universal wheel to the bottom of support frame 2 inboard, alright place the reinforcing bar between two sets of U type frame 4 and T type frame 5, just accomplished the adjustment of reinforcing bar and placed the processing.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a reinforcing bar rack for construction, includes slide rail (1), support frame (2) and U type frame (4), its characterized in that, the inside symmetry sliding connection of slide rail (1) has two sets of support frames (2), the inside of slide rail (1) is horizontal installation and has runs through two sets of stud (3) of support frame (2), wherein two sets of the outside cover that the inside of support frame (2) is located stud (3) is equipped with first swivel nut (201), the left end of stud (3) is installed first and is revolved (301), and is two sets of the equal fixedly connected with U type frame (4) in top of support frame (2), the top middle part fixedly connected with T type frame (5) of slide rail (1).
2. The steel bar placing rack for building construction according to claim 1, wherein the front ends and the rear ends of the two groups of support frames (2) are fixedly connected with sliding blocks (202) penetrating through the sliding rails (1), and the front ends and the rear ends of the sliding rails (1) are provided with sliding grooves (101) matched with the sliding blocks (202).
3. The steel bar placing rack for building construction according to claim 2, wherein the bottoms of the two groups of support frames (2) are both connected with lifting frames (6) in a sliding mode, and two groups of universal wheels (7) are symmetrically installed at the bottoms of the lifting frames (6).
4. A steel bar placing rack for building construction according to claim 3, characterized in that the bottoms of the two sets of the supporting frames (2) are rotatably connected with lifting studs (8) penetrating through the lifting frame (6), wherein the second screw sleeve (601) is sleeved on the outer side of the lifting studs (8) in the lifting frame (6).
5. A steel bar placing rack for building construction according to claim 4, wherein the bottom end of the lifting stud (8) is provided with a second knob (801).
6. A steel bar placing rack for building construction according to claim 5, characterized in that the bottoms of the two groups of supporting frames (2) are symmetrically and fixedly connected with limiting sliding columns (203) penetrating the lifting frame (6).
CN202022266312.0U 2020-10-13 2020-10-13 Reinforcing bar rack for construction Expired - Fee Related CN213320104U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022266312.0U CN213320104U (en) 2020-10-13 2020-10-13 Reinforcing bar rack for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022266312.0U CN213320104U (en) 2020-10-13 2020-10-13 Reinforcing bar rack for construction

Publications (1)

Publication Number Publication Date
CN213320104U true CN213320104U (en) 2021-06-01

Family

ID=76071566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022266312.0U Expired - Fee Related CN213320104U (en) 2020-10-13 2020-10-13 Reinforcing bar rack for construction

Country Status (1)

Country Link
CN (1) CN213320104U (en)

Similar Documents

Publication Publication Date Title
CN109095278B (en) Building site uses abandonment cable coiling mechanism
CN213320104U (en) Reinforcing bar rack for construction
CN112761409B (en) Auxiliary building system for 5G signal base station
CN108891917A (en) Divide brick equipment
CN207633732U (en) A kind of scaffold of architectural engineering
CN216692417U (en) Pipe penetrating machine for polyurethane prefabricated direct-buried heat-insulation pipe
CN214871795U (en) Building wall fluting device
CN211007573U (en) Support for building
CN204938594U (en) A kind of tapetum fibrosum cuts into winding apparatus
CN212802716U (en) Civil engineering construction supporting structure
CN213115805U (en) Guardrail for construction
CN211313323U (en) Hanging flower basket device for construction
CN211053348U (en) Aluminum alloy template multiaspect synchronous grinding device
CN210067372U (en) A maintenance is laid to marble brick and is used auxiliary device for architectural decoration
CN112376873A (en) Outdoor decoration safety kit and working method thereof
CN210685325U (en) Scaffold for building
CN217832951U (en) Grinding mechanism for processing metal protective fence
CN111536381B (en) Fixing mechanism for public building electric energy quality treatment module
CN220353351U (en) Steadiness support for construction
CN210497697U (en) Protective structure is used in aluminum alloy welding wire production
CN214697080U (en) Building engineering frame roof beam strutting arrangement
CN217872599U (en) Ladder stand for building
CN112454628B (en) Cement product processing swabbing device
CN219732126U (en) Ground slotting equipment for building construction
CN216582669U (en) Feeding platform with edge protection function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210929

Address after: 242000 No. 1, leyigang Road, high tech Industrial Development Zone, Xuancheng City, Anhui Province

Patentee after: Xuancheng Lutong Construction Co.,Ltd.

Address before: 225700 No.498, group 8, Tiane village, qianduo Town, Xinghua City, Taizhou City, Jiangsu Province

Patentee before: Shao Jian

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210601

Termination date: 20211013

CF01 Termination of patent right due to non-payment of annual fee