CN213301298U - Monitoring system for prefabricated stand column - Google Patents
Monitoring system for prefabricated stand column Download PDFInfo
- Publication number
- CN213301298U CN213301298U CN202022189318.2U CN202022189318U CN213301298U CN 213301298 U CN213301298 U CN 213301298U CN 202022189318 U CN202022189318 U CN 202022189318U CN 213301298 U CN213301298 U CN 213301298U
- Authority
- CN
- China
- Prior art keywords
- measuring rod
- prefabricated
- data terminal
- stand column
- monitoring system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
The utility model discloses a monitoring system for a prefabricated stand column, which comprises a prefabricated stand column, wherein a measuring rod prefabricated hole is reserved on the prefabricated stand column along the height direction of the prefabricated stand column, and a measuring rod is arranged in the measuring rod prefabricated hole; the measuring rod is characterized in that the measuring rod prefabricated hole is communicated with a data terminal installation reserved cavity at the top of the measuring rod prefabricated hole, a data terminal is arranged in the data terminal installation reserved cavity, and the data terminal is connected with the measuring rod. The utility model has the advantages that: the measuring rod is arranged on the prefabricated stand column, and the service condition of the prefabricated stand column is monitored according to data obtained by measuring the measuring rod.
Description
Technical Field
The utility model belongs to the technical field of the track traffic technique and specifically relates to a monitoring system for prefabricating stand.
Background
Under the prior art, the service life of the prefabricated stand column on the track slab can not be known accurately, and the prefabricated stand column can still be used under the condition that the prefabricated stand column is damaged, so that the adverse effect on the railway operation is easily caused, and the potential safety hazard of the track exists.
Therefore, there is a high necessity for a monitoring system for a prefabricated track slab, which solves the aforementioned problems in the prior art.
Disclosure of Invention
The utility model aims at providing a monitoring system for prefabricating stand according to above-mentioned prior art is not enough, through set up the measuring stick on prefabricating the stand, according to the data that the measuring stick measurement obtained, monitors prefabricating stand behaviour in service.
The utility model discloses the purpose is realized accomplishing by following technical scheme:
a monitoring system for prefabricating a column, characterized in that: the device comprises a prefabricated upright post, wherein a measuring rod prefabricated hole is reserved in the prefabricated upright post along the height direction of the prefabricated upright post, and a measuring rod is arranged in the measuring rod prefabricated hole; the measuring rod is characterized in that the measuring rod prefabricated hole is communicated with a data terminal installation reserved cavity at the top of the measuring rod prefabricated hole, a data terminal is arranged in the data terminal installation reserved cavity, and the data terminal is connected with the measuring rod.
The measuring rod comprises a plurality of measuring rod single bodies, and the measuring rod single bodies are connected in sequence.
The data terminal is provided with a reserved cavity and sealed through a sealing cover.
And a solar cell panel is installed on the top surface of the prefabricated stand column, is respectively connected with the measuring rod and the data terminal and supplies power to the measuring rod and the data terminal.
The utility model has the advantages that: the measuring rod is arranged on the prefabricated stand column, and the service condition of the prefabricated stand column is monitored according to data obtained by measuring the measuring rod.
Drawings
Fig. 1 is a schematic structural diagram of a monitoring system for a prefabricated stand column in the present invention;
fig. 2 is a schematic view of the connection of the internal measuring rod of the present invention.
Detailed Description
The features of the present invention and other related features are described in further detail below by way of example in conjunction with the accompanying drawings to facilitate understanding by those skilled in the art:
as shown in fig. 1-2, the scores are represented as: the device comprises a prefabricated upright post 1, a measuring rod prefabricated hole 2, a measuring rod 3, a data terminal installation reserved cavity 4, a sealing cover 5, a measuring rod single body 51, a measuring rod single body 52, a measuring rod single body 53, a measuring rod single body 54 and a measuring rod single body 55.
Example (b): as shown in fig. 1-2, the present embodiment relates to a monitoring system for a prefabricated vertical column, which mainly includes a prefabricated vertical column 1, a measuring rod 3 and a data terminal, wherein the height of the prefabricated vertical column 1 is 5m in the present embodiment. A measuring rod prefabricating hole 2 is reserved in the prefabricated upright column 1 along the height direction of the prefabricated upright column, and a measuring rod 3 is installed in the measuring rod prefabricating hole 2; the top of the measuring rod prefabricated hole 2 is provided with a data terminal installation reserved cavity 4, the data terminal is installed in the data terminal installation reserved cavity 4, and the data terminal is connected with the measuring rod 3 through a connecting wire; a sealing cover 5 is arranged at the opening of the data terminal installation reserved cavity 4, and the data terminal installation reserved cavity 4 can be sealed through the sealing cover 5; install solar cell panel on the 1 top surface of prefabricated stand, solar cell panel is connected with measuring stick 3, data terminal respectively, for measuring stick 3 and data terminal power supply.
In this embodiment, data terminal installation reservation cavity 4 is linked together with measuring stick prefabricated hole 2, and the inside between measuring stick 3 and the data terminal of being convenient for is walked the line, compact structure, reasonable in design.
As shown in fig. 2, the measuring rod 3 is composed of 5 measuring rod units connected in sequence, each measuring rod unit has a length of 1m, specifically, the 5 measuring rod units are numbered as measuring rod units 51-55 in sequence, the 5 measuring rod units are connected together in sequence according to the digital arrangement sequence to form the measuring rod 3, and the top end or the bottom end (measuring rod unit 51 or 55) of the measuring rod 3 is truncated and inserted into the measuring rod prefabricated hole 4. Wherein, 5 measuring stick monomers link together through the connecting wire in advance, treat that measuring stick 3 is whole to be inserted in measuring stick prefabricated hole 2, be connected with the data terminal in the data terminal installation reservation cavity 4 again.
In this embodiment, measuring stick 3 is connected with data terminal through the connecting wire, and measuring stick 3 can give data terminal with the data transmission who measures, and through data terminal's data display, the operating condition of prefabricated stand 1 can be known directly perceivedly to the staff, can be with the life of monitoring prefabricated stand 1.
Although the conception and the embodiments of the present invention have been described in detail with reference to the drawings, those skilled in the art will recognize that various changes and modifications can be made therein without departing from the scope of the appended claims, and therefore, the description thereof is not repeated herein.
Claims (4)
1. A monitoring system for prefabricating a column, characterized in that: the device comprises a prefabricated upright post, wherein a measuring rod prefabricated hole is reserved in the prefabricated upright post along the height direction of the prefabricated upright post, and a measuring rod is arranged in the measuring rod prefabricated hole; the measuring rod is characterized in that the measuring rod prefabricated hole is communicated with a data terminal installation reserved cavity at the top of the measuring rod prefabricated hole, a data terminal is arranged in the data terminal installation reserved cavity, and the data terminal is connected with the measuring rod.
2. A monitoring system for a prefabricated column according to claim 1, wherein: the measuring rod comprises a plurality of measuring rod single bodies, and the measuring rod single bodies are connected in sequence.
3. A monitoring system for a prefabricated column according to claim 1, wherein: the data terminal is provided with a reserved cavity and sealed through a sealing cover.
4. A monitoring system for a prefabricated column according to claim 1, wherein: and a solar cell panel is installed on the top surface of the prefabricated stand column, is respectively connected with the measuring rod and the data terminal and supplies power to the measuring rod and the data terminal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022189318.2U CN213301298U (en) | 2020-09-29 | 2020-09-29 | Monitoring system for prefabricated stand column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022189318.2U CN213301298U (en) | 2020-09-29 | 2020-09-29 | Monitoring system for prefabricated stand column |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213301298U true CN213301298U (en) | 2021-05-28 |
Family
ID=76010753
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022189318.2U Active CN213301298U (en) | 2020-09-29 | 2020-09-29 | Monitoring system for prefabricated stand column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213301298U (en) |
-
2020
- 2020-09-29 CN CN202022189318.2U patent/CN213301298U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109130961B (en) | Special return rail system positive line sectional design method | |
CN108645312A (en) | A kind of bridge displacement detection device | |
CN213301298U (en) | Monitoring system for prefabricated stand column | |
CN204919243U (en) | Railway overhead line safety real -time supervision device | |
CN213740379U (en) | Monitoring system for prefabricated track slab | |
CN209805980U (en) | Track traffic comprehensive monitoring equipment | |
CN215572684U (en) | Device for measuring distance between railroad engineering sleepers | |
CN108551151A (en) | Big closed High-Voltage Cable Branching Case apart | |
CN210283916U (en) | Electric installation is got to railcar | |
CN104149661A (en) | End connection mechanism for embedded power supply system | |
CN205280778U (en) | Draw wire sleeve under telescopic | |
CN210123290U (en) | Rail transit monitoring system | |
CN208198161U (en) | High-voltage dual-circuit track power supply connector device | |
CN201230182Y (en) | Wind electricity conductive apparatus | |
CN217358602U (en) | Vehicle operation safety monitoring integrated management system | |
CN201604535U (en) | Expansion joint of rigid contact system | |
CN108657217A (en) | A kind of transit equipment with the vehicle being guided along single traffic lane | |
CN203911329U (en) | Overhead outgoing line gas-insulated switchgear | |
CN204947935U (en) | Piezoelectric shock energy exchanger | |
CN209525080U (en) | A kind of mechanical type three-dimensional parking garage car swings detection device | |
CN216480652U (en) | Intelligent street lamp for remotely and wirelessly monitoring traffic environment | |
CN204947938U (en) | Railway operation remote monitoring impact endurance test shock piezoelectric transduction mass-energy interchanger | |
CN217320113U (en) | A contact net suspension hoist cable frame for under steel mesh structure roofing | |
CN214224279U (en) | Automatic culvert ponding monitoring device | |
CN213413796U (en) | Alarm device suitable for railway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |