CN213298009U - Support platform for integral loading of underground hydraulic support - Google Patents

Support platform for integral loading of underground hydraulic support Download PDF

Info

Publication number
CN213298009U
CN213298009U CN202022357461.8U CN202022357461U CN213298009U CN 213298009 U CN213298009 U CN 213298009U CN 202022357461 U CN202022357461 U CN 202022357461U CN 213298009 U CN213298009 U CN 213298009U
Authority
CN
China
Prior art keywords
section
platform
plate
support
iii
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022357461.8U
Other languages
Chinese (zh)
Inventor
苏保强
孟飞
张强
刘舜尧
侯杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022357461.8U priority Critical patent/CN213298009U/en
Application granted granted Critical
Publication of CN213298009U publication Critical patent/CN213298009U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a support platform that is used for whole loading of hydraulic support in pit, including first section platform, can reduce the cost of moving, increased mine efficiency, the platform uses in a flexible way, and steady dress is convenient, and labour saving and time saving can realize moving fast and steadily adorn, and the platform surface is smooth, has stopped wire rope's phenomenon of rupture when pulling the support, has improved factor of safety greatly. The first section platform one end passes through bolt fixed connection with first section combination board, and first section combination board passes through bolt fixed connection with second section platform one end, and the second section platform other end passes through bolt fixed connection with second section combination board, and second section combination board passes through bolt fixed connection with third section platform one end, and first section platform, second section platform and third section platform top surface both sides limit all pass through bolt fixed connection railing, and first section platform, second section platform and third section platform side bottom department all pass through bolt fixed connection fixed plate.

Description

Support platform for integral loading of underground hydraulic support
Technical Field
The utility model relates to a support platform, the more specifically support platform that is used for whole loading of hydraulic support in pit that says so.
Background
The auxiliary transportation of the underground disk area of the mine is the traditional winch traction rail transportation, and in the moving and stable loading process of fully mechanized mining work, the withdrawing and stable loading of the hydraulic support also needs winch traction. When the support is turned over, the integral loading and transporting process can save a plurality of process procedures compared with the process of disassembly and transportation and then assembly, and the moving efficiency of the working face can be greatly improved.
Because the whole support is heavy, the whole support cannot be loaded in a hoisting mode, and the support is assembled and disassembled in a mode of pouring a concrete support assembling and disassembling platform at a proper position of a working surface in the prior art. The support is hauled from ground (flatbed) to flatbed (ground) through the concrete loading platform by winch traction. However, the construction and maintenance time of the cast concrete loading and unloading platform is long, the process is complicated, the platform cannot be reused after being used, and the cost is high; and the friction coefficient between the surface of the concrete platform and the support is large, the traction force required by the support is large, and the support is easy to cause unexpected situations such as steel wire rope fracture when moving.
Aiming at the defects of the concrete loading and unloading platform in the using process, the support platform for the integral loading of the underground hydraulic support is designed and manufactured through repeated research.
Disclosure of Invention
The utility model discloses the main technical problem who solves is: the utility model provides a support platform for whole loading of hydraulic support in pit, reduced the cost of moving, increased mine efficiency, the platform uses in a flexible way, and it is convenient to steadily adorn, labour saving and time saving can realize moving fast and steadily adorning, and the platform surface is smooth, has stopped wire rope's fracture phenomenon when pulling the support, has improved factor of safety greatly.
The utility model provides a technical scheme that its technical problem adopted is: the utility model provides a support platform that is used for whole loading of hydraulic support in pit, includes first section platform, its characterized in that: first section platform one end passes through bolt fixed connection with first section binding plate, first section binding plate has two, pass through bolt fixed connection between two first section binding plates, first section binding plate passes through bolt fixed connection with second section platform one end, the second section platform other end passes through bolt fixed connection with second section binding plate, second section binding plate has two, pass through bolt fixed connection between two second section binding plates, second section binding plate passes through bolt fixed connection with third section platform one end, first section platform, second section platform and third section platform top surface both sides limit all pass through bolt fixed connection railing, first section platform, second section platform and third section platform side bottom department all pass through bolt fixed connection fixed plate.
Preferably, the first stage platform consists of a first bottom plate, a first top plate, a first vertical support column, a first transverse support column and a first side plate, and the first bottom plate and the first top plate are connected with four first vertical support columns and four first transverse support columns through bolts.
Preferably, the second-section platform consists of a second bottom plate, a second top plate, a second vertical support column, a second transverse support column and a second side plate, and eight groups of second vertical support columns and four groups of second transverse support columns are connected between the second bottom plate and the second top plate through bolts.
Preferably, the third-stage platform consists of a third bottom plate, a third top plate, a third vertical support column, a third transverse support column, a third side plate and an end plate, wherein eight groups of third vertical support columns and four groups of third transverse support columns are connected between the third bottom plate and the third top plate through bolts.
Preferably, the top surfaces of the first section of platform and the second section of platform are inclined planes with the same inclination.
Preferably, the top surface of the platform of the third section is a horizontal surface.
Preferably, the first section platform, the first section combination plate, the second section platform, the second section combination plate, the third section platform, the fixed connection handrail and the fixed plate are all made of steel materials.
The utility model relates to a support platform for whole loading of hydraulic support in pit's advantage is: the moving cost can be reduced, the mine efficiency is increased, the platform is flexible to use, convenient to stably mount, time-saving and labor-saving, rapid moving and stable mounting can be realized, the surface of the platform is smooth, the fracture phenomenon of a steel wire rope when the support is pulled is avoided, and the safety coefficient is greatly improved.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural diagram of a first stage platform 1;
FIG. 3 is a schematic structural view of the first segment of the bonding board 2;
FIG. 4 is a schematic structural view of the second stage of the stage 3;
FIG. 5 is a schematic structural view of the second segment of the bonding plate 4;
FIG. 6 is a schematic structural view of a third stage 5;
fig. 7 is a schematic structural view of the balustrade 6.
In the figure: a first stage platform 1; a first bottom plate 1-1; a first top plate 1-2; 1-3 of a vertical support column I; 1-4 of a horizontal support column I; 1-5 of a side plate I; a first segment of bonding board 2; a first connecting hole 2-1; a first fixing hole 2-2; a first combining hole 2-3; a second stage platform 3; a second bottom plate 3-1; a second top plate 3-2; 3-3 parts of a second vertical support column; 3-4 parts of a horizontal support column II; 3-5 parts of a second side plate; a second section of the bonding plate 4; a second connecting hole 4-1; a second fixing hole 4-2; a second bonding hole 4-3; a third stage platform 5; a bottom plate III 5-1; a top plate III 5-2; 5-3 of a vertical support column III; 5-4 parts of a horizontal support column III; 5-5 parts of a side plate III; 5-6 of end plate; a handrail 6; a threaded hole 6-1; and a fixing plate 7.
Detailed Description
In fig. 1-7, the present invention relates to a support platform, and more particularly to a support platform for integral loading of a hydraulic support in a well, comprising: the first section platform 1 can reduce the cost of moving, increases mine efficiency, and the platform is used in a flexible way, and is convenient to stably mount, time-saving and labor-saving, can realize quick moving and stable mounting, and the surface of the platform is smooth, thereby avoiding the fracture phenomenon of a steel wire rope when the support is pulled, and greatly improving safety factor.
In order to solve the technical problem, one end of a first section platform 1 is fixedly connected with a first section combination plate 2 through bolts, the number of the first section combination plates 2 is two, the two first section combination plates 2 are fixedly connected through bolts, the first section combination plate 2 is fixedly connected with one end of a second section platform 3 through bolts, the other end of the second section platform 3 is fixedly connected with a second section combination plate 4 through bolts, the number of the second section combination plates 4 is two, the two second section combination plates 4 are fixedly connected through bolts, the second section combination plate 4 is fixedly connected with one end of a third section platform 5 through bolts, the two side edges of the top surfaces of the first section platform 1, the second section platform 3 and the third section platform 5 are fixedly connected with railings 6 through bolts, and the side surfaces of the first section platform 1, the second section platform 3 and the third section platform 5 are fixedly connected with fixing plates 7 through bolts;
the bottom plate I1-1, the top plate I1-2 and the side plate I1-5 are all made of 20mm steel plates, the bottom end of a vertical support column I1-3 is fixedly connected to the bottom plate I1-1 through a bolt, the top end of the vertical support column I1-3 is fixedly connected to the top plate I1-2 through a bolt, one end of a transverse support column I1-4 is fixedly connected with the vertical support column I1-3 through a bolt, the other end of the transverse support column I1-4 is fixedly connected to the bottom plate I1-1 through a bolt, and the side plate I (1-5) is fixedly connected to two sides of the bottom plate I1-1 and the top plate I1-2 through bolts, so that the top plate I1-2 is inclined and can;
the first connecting holes 2-1 on the first section of the combination plate 2 are four, the four first connecting holes 2-1 fixedly connect the two first section of the combination plate 2 through bolts, the first fixing holes 2-2 on the first section of the combination plate 2 are four, the four first fixing holes 2-2 fixedly connect the first section of the combination plate 2 to the first vertical supporting columns 1-3 or the second vertical supporting columns 3-3 through bolts, the first combining holes 2-3 on the first section of the combination plate 2 are three, and the three first combining holes 2-3 increase the fixing degree between the two first section of the combination plate 2 through adaptive stable nails;
the bottom plate II 3-1, the top plate II 3-2 and the side plate II 3-5 are all made of 20mm steel plates, the bottom ends of the vertical support columns II 3-3 are fixedly connected to the bottom plate II 3-1 through bolts, the top ends of the vertical support columns II 3-3 are fixedly connected with the horizontal support columns II 3-4 through bolts, the horizontal support columns II 3-4 are fixedly connected below the top plate II 3-2 through bolts, twelve groups of vertical support columns II 3-3 are provided, four groups of vertical support columns II 3-3 are respectively positioned at the front end, the middle end and the rear end of the bottom plate II 3-1, the heights of the horizontal support columns II 3-4 at the front end, the middle end and the rear end of the bottom plate II 3-1 are sequentially increased, and the top plate II 3-2 is inclined and can support heavy objects;
ten connecting holes two 4-1 are arranged on the second section of combination board 4, the ten connecting holes two 4-1 are used for fixedly connecting the two second section of combination boards 4 through bolts, four fixing holes two 4-2 are arranged on the second section of combination board 4, the four fixing holes two 4-2 are used for fixedly connecting the second section of combination board 4 to the vertical support column two 3-3 or the horizontal support column three 5-4 through bolts, three combining holes two 4-3 are arranged on the second section of combination board 4, and the three combining holes two 4-3 are used for increasing the fixing degree between the two second section of combination boards 4 through adaptive stable nails;
the bottom plate III 5-1, the top plate III 5-2, the side plate III 5-5 and the end plate 5-6 are all made of 20mm steel plates, the bottom ends of the vertical support columns III 5-3 are fixedly connected to the bottom plate III 5-1 through bolts, the top ends of the vertical support columns III 5-3 are fixedly connected with the horizontal support columns III 5-4 through bolts, the horizontal support columns III 5-4 are fixedly connected below the top plate III 5-2 through bolts, twelve groups of vertical support columns III 5-3 are provided, four groups of vertical support columns III 5-3 are respectively positioned at the front end, the middle end and the rear end of the bottom plate III 5-1, the heights of the vertical support columns III 5-3 at the front end, the middle end and the rear end of the bottom plate III 5-1 are the same, and the top plate III 5-2 is horizontal and can support heavy objects;
the bottom end of the railing 6 is provided with a threaded hole 6-1, and the threaded hole 6-1 is used for fixing the railing 6 on the first top plate 1-2, the second top plate 3-2 and the third top plate 5-2 through bolts so as to prevent the support from shifting when moving on the platform;
the fixing plate 7 is provided with a through hole for fixing the first section platform 1, the second section platform 3 and the third section platform 5 on the ground.
The utility model discloses when using:
the utility model discloses when using, earlier with each part installation of supporting platform complete, then remove supporting platform to support department, adjusted the position, fix whole platform through the through-hole on the fixed plate 7 and get off, pull the support through the winch at last and transport to flatbed (ground) from ground (flatbed) through supporting platform.
Of course, the above description is not intended to limit the present invention, and the present invention is not limited to the above examples, and the changes, modifications, additions or replacements made by those skilled in the art within the scope of the present invention also belong to the protection scope of the present invention.

Claims (7)

1. The utility model provides a support platform that is used for whole loading of hydraulic support in pit, includes first section platform (1), its characterized in that: one end of the first section of platform (1) is fixedly connected with the first section of combined plate (2) through a bolt, the number of the first section of combined plate (2) is two, the two first section of combined plate (2) are fixedly connected through a bolt, the first section of combined plate (2) is fixedly connected with one end of the second section of platform (3), the other end of the second section of platform (3) is fixedly connected with the second section of combined plate (4) through a bolt, the number of the second section of combined plate (4) is two, the two second section of combined plate (4) are fixedly connected through a bolt, the second section of combined plate (4) is fixedly connected with one end of the third section of platform (5) through a bolt, the two sides of the top surfaces of the first section of platform (1), the second section of platform (3) and the third section of platform (5) are fixedly connected with a railing (6) through a, the bottom ends of the side surfaces of the second section platform (3) and the third section platform (5) are fixedly connected with a fixed plate (7) through bolts.
2. The support platform for integral loading of a downhole hydraulic support according to claim 1, wherein: the first-section platform (1) is composed of a first bottom plate (1-1), a first top plate (1-2), first vertical supporting columns (1-3), first transverse supporting columns (1-4) and first side plates (1-5), and four groups of first vertical supporting columns (1-3) and four groups of first transverse supporting columns (1-4) are connected between the first bottom plate (1-1) and the first top plate (1-2) through bolts.
3. The support platform for integral loading of a downhole hydraulic support according to claim 1, wherein: the second-section platform (3) is composed of a second bottom plate (3-1), a second top plate (3-2), second vertical supporting columns (3-3), second transverse supporting columns (3-4) and second side plates (3-5), and the second bottom plate (3-1) and the second top plate (3-2) are connected with the second twelve groups of vertical supporting columns (3-3) and the second four groups of transverse supporting columns (3-4) through bolts.
4. The support platform for integral loading of a downhole hydraulic support according to claim 1, wherein: the third-stage platform (5) is composed of a bottom plate III (5-1), a top plate III (5-2), vertical support columns III (5-3), transverse support columns III (5-4), side plates III (5-5) and end plates (5-6), wherein twelve groups of vertical support columns III (5-3) and four groups of transverse support columns III (5-4) are connected between the bottom plate III (5-1) and the top plate III (5-2) through bolts.
5. The support platform for integral loading of a downhole hydraulic support according to claim 1, wherein: the top surfaces of the first section of platform (1) and the second section of platform (3) are inclined planes with the same inclination.
6. The support platform for integral loading of a downhole hydraulic support according to claim 1, wherein: the top surface of the third stage platform (5) is a horizontal plane.
7. The support platform for integral loading of a downhole hydraulic support according to claim 1, wherein: the first section platform (1), the first section combination plate (2), the second section platform (3), the second section combination plate (4), the third section platform (5), the fixed connection railing (6) and the fixing plate (7) are all made of steel materials.
CN202022357461.8U 2020-10-21 2020-10-21 Support platform for integral loading of underground hydraulic support Active CN213298009U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022357461.8U CN213298009U (en) 2020-10-21 2020-10-21 Support platform for integral loading of underground hydraulic support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022357461.8U CN213298009U (en) 2020-10-21 2020-10-21 Support platform for integral loading of underground hydraulic support

Publications (1)

Publication Number Publication Date
CN213298009U true CN213298009U (en) 2021-05-28

Family

ID=76014917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022357461.8U Active CN213298009U (en) 2020-10-21 2020-10-21 Support platform for integral loading of underground hydraulic support

Country Status (1)

Country Link
CN (1) CN213298009U (en)

Similar Documents

Publication Publication Date Title
US11028651B2 (en) Drilling rig
CN201458596U (en) Crane with self-dismounting device
CN102491186A (en) Tower crane
CN110901851A (en) Ship large-scale equipment broadside installation device
CN213298009U (en) Support platform for integral loading of underground hydraulic support
CN110877704A (en) Shipboard installation method of large ship equipment
CN206680101U (en) A kind of simple and convenient guardrail model sheetinstallat chassis
CN110160817B (en) Boosting weight system for electric hoist test and use method thereof
CN1800555A (en) Large span suspended cable structure and its construction method
CN213059778U (en) Crane for civil engineering
CN215055466U (en) Discharging platform for high-rise building
CN210683047U (en) Loading and unloading vehicle device suitable for large-scale component
CN110790123A (en) Hoisting structure and hoisting method for deck room
CN2386034Y (en) Multi-stage elevating platforms
CN211254996U (en) Limited space translation sliding and lifting device
CN214577069U (en) Steel mould trolley portal
CN211004358U (en) Special equipment for disassembling and installing hydraulic support
CN205953276U (en) Assembled multisection lift
CN217264253U (en) Hoisting bolt for hoisting prefabricated part
CN219118814U (en) Installation frock of roofing secondary beam
CN215803324U (en) Floor shock-absorbing anti-cracking material carrying platform
CN220810162U (en) Integral carrying device for heavy goods shelf
CN218261673U (en) Prefabricated component handling installation device
CN220264973U (en) Partition plate installation lifting device
CN218893430U (en) Fork truck davit

Legal Events

Date Code Title Description
GR01 Patent grant