Novel engineering construction furred ceiling structure is built in room Download PDF

Info

Publication number
CN213296843U
CN213296843U CN202021692863.7U CN202021692863U CN213296843U CN 213296843 U CN213296843 U CN 213296843U CN 202021692863 U CN202021692863 U CN 202021692863U CN 213296843 U CN213296843 U CN 213296843U
Authority
CN
China
Prior art keywords
fossil fragments
ceiling structure
keel
engineering construction
stull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021692863.7U
Other languages
Chinese (zh)
Inventor
兰飞
刘银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pengcheng Construction Group Co ltd
Original Assignee
Pengcheng Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pengcheng Construction Group Co ltd filed Critical Pengcheng Construction Group Co ltd
Priority to CN202021692863.7U priority Critical patent/CN213296843U/en
Application granted granted Critical
Publication of CN213296843U publication Critical patent/CN213296843U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The application relates to a novel ceiling structure for building engineering construction, which belongs to the field of building engineering and comprises a hanging piece, a keel arranged at the lower end of the hanging piece and a cross-brace keel arranged below the keel, wherein a limiting assembly is arranged between the keel and the cross-brace keel; spacing subassembly is including the last installation pipe that the fossil fragments were located to the cover and the lower installation pipe of stull fossil fragments is located to the cover, goes up installation pipe and installs pipe mutually perpendicular and integrated into one piece down. Compared with the prior art, this application has the effect of being convenient for adjust furred ceiling structure.

Description

Novel engineering construction furred ceiling structure is built in room
Technical Field
The application relates to the field of building engineering, especially, relate to a novel engineering construction furred ceiling structure is built in room.
Background
The suspended ceiling is a part of building construction engineering construction, refers to decoration of top decoration of a house living environment, and is simply referred to decoration of a ceiling, and is one of important parts of interior decoration. The suspended ceiling has the functions of heat preservation, heat insulation, sound insulation and sound absorption, and is also a hidden layer for projects such as electric, ventilation air-conditioning, communication and fire prevention, alarm pipeline equipment and the like.
Chinese patent application with current publication number CN209163138U discloses a novel ceiling structure for building engineering construction, which mainly comprises a hanging piece, a keel, a front frame, a rear frame and a cross-brace keel, wherein the cross-brace keel is transversely arranged on the top end of the keel, and two ends of the cross-brace keel are fixedly connected with the front frame and the rear frame. When the connecting structure is used, all parts in the structure are stably connected, and the problems of sagging and falling can be effectively avoided.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: however, once installation error occurs due to misoperation of an installer, the suspended ceiling needs to be disassembled and reinstalled, and the problem that the suspended ceiling structure is inconvenient to adjust exists.
SUMMERY OF THE UTILITY MODEL
In order to facilitate adjusting the furred ceiling structure, this application provides a novel engineering construction furred ceiling structure is built in room.
The application provides a pair of novel engineering construction furred ceiling structure is built in room adopts following technical scheme:
the utility model provides a novel ceiling structure is under construction in building engineering, includes and hangs piece, sets up at the fossil fragments of hanging a lower extreme and sets up the stull fossil fragments in the fossil fragments below, be provided with spacing subassembly between fossil fragments and the stull fossil fragments, the fossil fragments slip cap is located one side that spacing subassembly is close to fossil fragments, the stull fossil fragments slip cap is located one side that spacing subassembly is close to the stull fossil fragments, be provided with the first mounting that is used for fixed fossil fragments and stull fossil fragments on the spacing subassembly.
By adopting the technical scheme, when the ceiling structure is installed incorrectly, the ceiling structure does not need to be disassembled, the structure of the ceiling can be adjusted by adjusting the position of the limiting assembly on the keel, and the keel and the cross-brace keel are sequentially fixed by the first fixing piece so as to adjust the ceiling structure; and in this in-process, because spacing subassembly is located to fossil fragments and stull fossil fragments cover, therefore fossil fragments and stull fossil fragments are difficult for inclining.
Preferably, spacing subassembly is including the last installation pipe that the fossil fragments were located to the cover and the lower installation pipe of stull fossil fragments is located to the cover, go up installation pipe and installation pipe mutually perpendicular and integrated into one piece down.
Through adopting above-mentioned technical scheme, through last installation pipe with install down pipe integrated into one piece and come fossil fragments and stull fossil fragments to link together to can avoid installer mistake to touch fossil fragments or stull fossil fragments and make fossil fragments and stull fossil fragments dislocation to a certain extent.
Preferably, all seted up the storage tank on the inside wall of going up installation pipe and lower installation pipe, be provided with the spring bean spring in the storage tank, on install the pipe and all seted up on the pipe down with spring bean spring complex draw-in groove.
Through adopting above-mentioned technical scheme, when emboliaing installation pipe and emboliaing installation pipe down with the stull fossil fragments with the fossil fragments, the draw-in groove can be imbedded to the spring of jumping the beans, further spacing messenger's fossil fragments and stull fossil fragments are not easy to incline to fossil fragments and stull fossil fragments.
Preferably, hang the piece and include rings, bracing piece and connecting rod, the connecting rod slides and sets up on the bracing piece, the one end and the rings fixed connection of bracing piece are kept away from to the connecting rod, fossil fragments are located to rings sliding sleeve, be provided with the second mounting that is used for fixed connection pole between bracing piece and the connecting rod.
Through adopting above-mentioned technical scheme, hang the piece and be used for installing furred ceiling structure on the floor roof, rings can establish fossil fragments cover in the rings to realize hanging the connection of piece, fossil fragments and stull fossil fragments, and bracing piece and connecting rod sliding fit can carry out the regulation on the furred ceiling structure height through the length of adjusting hanging the piece, are further convenient for adjust furred ceiling structure.
Preferably, the second fixing part comprises a sleeve, the end part, far away from the hanging ring, of the connecting rod is sleeved in the sleeve and is in threaded fit with the sleeve, and the lower end part of the supporting rod is sleeved in the sleeve and is in threaded fit with the sleeve.
By adopting the technical scheme, the relative distance between the connecting rod and the supporting rod can be adjusted by rotating the sleeve, and the connecting rod is fixed at any position, so that the correction level of the suspended ceiling is convenient to realize; simultaneously, because threaded connection has good joint strength, can be in the same place bracing piece and firm the connecting rod linking together.
Preferably, rings include screw rod, left snap ring and with left snap ring articulated right snap ring, the one end of articulated shaft and the one end of keeping away from the articulated shaft of right snap ring are kept away from to left snap ring passes through screw rod fixed connection.
Through adopting above-mentioned technical scheme, unscrew the screw rod and slightly separate left snap ring and right snap ring for the fossil fragments can embolia the cover intra-annular, and it can realize the fixed between fossil fragments and the rings to screw up the screw rod again, easy operation, the realization of being convenient for.
Preferably, the first fixing piece comprises a bolt, and the limiting assembly is fixedly connected with the keel and the cross-brace keel through the bolt.
Through adopting above-mentioned technical scheme, threaded connection has good joint strength, can link together fossil fragments, stull fossil fragments and spacing subassembly firmly, and difficult production is not hard up, can avoid ceiling structure not hard up or drop to a certain extent.
Preferably, the caliber of the upper installation pipe is larger than the diameter of the keel, and the caliber of the lower installation pipe is larger than the diameter of the cross-brace keel.
Through adopting above-mentioned technical scheme, can easily embolia the installation pipe with fossil fragments, also can easily embolia installation pipe down with the stull fossil fragments simultaneously, be convenient for realize being connected between fossil fragments, stull fossil fragments and the spacing subassembly.
Preferably, the T-shaped sliding groove is formed in the lower mounting pipe along the length direction of the lower mounting pipe, the cross-sectional area of the cross-brace keel is I-shaped, and the cross-brace keel is in sliding fit with the T-shaped sliding groove.
Through adopting above-mentioned technical scheme, the below of stull fossil fragments is level and smooth, makes things convenient for follow-up construction operation.
Preferably, the length direction of the cross brace keel on the cross brace keel is provided with a dovetail groove, the part of the lower installation pipe embedded in the cross brace keel is a dovetail part, and the dovetail groove is in sliding fit with the dovetail part.
Through adopting above-mentioned technical scheme, dovetail and forked tail portion block further carry on spacingly to the stull fossil fragments, can strengthen the support intensity of stull fossil fragments simultaneously.
In summary, the present application includes at least one of the following beneficial technical effects:
1. according to the ceiling structure, due to the combined action of the upper mounting pipe, the lower mounting pipe and the bolt, when the ceiling structure is mounted incorrectly, the ceiling structure is not required to be dismounted, the position of the limiting assembly on the keel can be adjusted to adjust the ceiling structure, and the keel and the cross-brace keel are sequentially fixed through the first fixing piece, so that the ceiling structure can be adjusted;
2. this application can adjust the relative distance between bracing piece and the connecting rod and adjust the length of hanging the piece through rings, bracing piece, connecting rod and telescopic combined action to realize the regulation in the furred ceiling structure height, further be convenient for adjust the furred ceiling structure.
Drawings
Fig. 1 is a schematic structural diagram of a novel ceiling structure for building engineering construction according to an embodiment of the application.
Fig. 2 is an enlarged view of a portion a in fig. 1.
Fig. 3 is a schematic structural diagram of a limiting assembly according to an embodiment of the present application.
Figure 4 is a first cross-sectional view of a stop assembly of an embodiment of the present application.
Figure 5 is a second cross-sectional view of a stop assembly of an embodiment of the present application.
Fig. 6 is a schematic structural view of a hanger according to an embodiment of the present application.
Description of reference numerals: 1. a hanger; 11. a hoisting ring; 111. a left snap ring; 112. a right snap ring; 113. a screw; 12. a support bar; 13. a connecting rod; 14. a sleeve; 2. a keel; 3. a cross-brace keel; 31. a dovetail groove; 4. a limiting component; 41. installing a pipe; 42. a lower mounting tube; 421. a T-shaped chute; 422. a swallowtail; 5. a bolt; 6. a containing groove; 7. a card slot; 8. a bean jumping spring; 81. a spring; 82. a marble.
Detailed Description
The present application is described in further detail below with reference to figures 1-6.
The embodiment of the application discloses novel engineering construction furred ceiling structure is built in room. Referring to fig. 1, a novel ceiling structure for building engineering construction comprises a hanging part 1, a keel 2 arranged at the lower end of the hanging part 1 and a cross-brace keel 3 arranged below the keel 2. In order to facilitate the adjustment of the ceiling structure, a limiting component 4 is arranged between the keel 2 and the cross-brace keel 3, the keel 2 is sleeved on one side of the limiting component 4 close to the keel 2, the cross-brace keel 3 is sleeved on one side of the limiting component 4 close to the cross-brace keel 3, a first fixing piece used for fixing the keel 2 and the cross-brace keel 3 is arranged on the limiting component 4, and the keel 2 and the cross-brace keel 3 are inserted into the limiting component 4. Meanwhile, the limiting component 4 plays a limiting role, so that the keel 2 and the cross-brace keel 3 are not easy to incline. Wherein, first mounting includes bolt 5, and bolt 5 is firm on spacing subassembly 4 with fossil fragments 2 and stull fossil fragments 3.
Referring to fig. 1 and 3, in order to avoid the dislocation of the keel 2 and the cross-brace keel 3 during the adjustment process, the limiting component 4 comprises an upper mounting pipe 41 sleeved on the keel 2 and a lower mounting pipe 42 sleeved on the cross-brace keel 3, wherein the upper mounting pipe 41 and the lower mounting pipe 42 are mutually vertical and integrally formed. In this embodiment, fossil fragments 2 and stull fossil fragments 3 set up to square post, go up installation pipe 41 and install pipe 42 down and set up to square pipe for fossil fragments 2 and last installation pipe 41, stull fossil fragments 3 and install and agree with each other between the pipe 42 down, thereby can prevent fossil fragments 2 and stull fossil fragments 3 dislocation. In order to facilitate the keel 2 to be sleeved into the upper mounting pipe 41 and the cross-brace keel 3 to be sleeved into the lower mounting pipe 42, the caliber of the upper mounting pipe 41 is larger than the diameter of the keel 2, and the caliber of the lower mounting pipe 42 is larger than the diameter of the cross-brace keel 3.
Referring to fig. 1 and 5, in order to make the lower portion of the cross-brace keel 3 flat, the cross-sectional area of the cross-brace keel 3 is i-shaped, a T-shaped sliding groove 421 is formed in the lower mounting tube 42 along the length direction of the lower mounting tube 42, and the cross-brace keel 3 is in sliding fit with the T-shaped sliding groove 421. Wherein, in order to increase the support intensity of stull fossil fragments, the dovetail 31 has been seted up along the length direction of stull fossil fragments 3 on stull fossil fragments 3, and the part that lower installation pipe 42 imbeds in stull fossil fragments 3 is dovetail 422, dovetail 31 and dovetail 42) sliding fit.
Referring to fig. 4 and 5, in order to prevent fossil fragments 2 and stull fossil fragments 3 slope to a certain extent in order to limit fossil fragments 2 and stull fossil fragments 3, mounting tube 41 has been gone up and storage tank 6 has been seted up on the lateral wall of mounting tube 42 down, be provided with jump beans spring 8 in the storage tank 6, install and offer on the pipe wall of tube 41 and mounting tube 42 down with jump beans spring 8 complex draw-in groove 7, and install the fluting on tube 41 and the mounting tube 42 down and all seted up a plurality ofly, and install the length direction interval setting of tube 41 and mounting tube 42 down along last. When making fossil fragments 2 and stull fossil fragments 3 embolia last installation pipe 41 and lower installation pipe 42, fossil fragments 2 and lower installation pipe 42 joint, install pipe 42 and stull fossil fragments 3 joint down to make fossil fragments 2 and stull fossil fragments 3 be difficult for the slope. Wherein, jumping bean spring 8 includes spring 81 and marble 82, and spring 81 sets up the diapire at storage tank 6, and marble 82 sets up the one end of keeping away from the diapire at spring 81, and the bore of storage tank 6 is less than the diameter of marble 82 for it slides in the subassembly to give stull fossil fragments 3 and fossil fragments 2.
Referring to fig. 1 and 6, the hanging member 1 includes a hanging ring 11, a supporting rod 12 and a connecting rod 13, the connecting rod 13 is slidably disposed on the supporting rod 12, an end portion of the connecting rod 13 far away from the supporting rod 12 is fixedly connected with the hanging ring 11, the hanging ring 11 is slidably sleeved with the keel 2, and a second fixing member is disposed between the supporting rod 12 and the connecting rod 13 and used for fixing the connecting rod 13 on the supporting rod 12. Thereby through the relative distance between regulation bracing piece 12 and the connecting rod 13 with the length of adjusting hanging 1 for the height of furred ceiling structure can be adjusted, is further convenient for adjust the furred ceiling structure.
Referring to fig. 6, the second fixing member includes a sleeve 14, the end of the connecting rod 13 away from the hanging ring 11 is inserted into the sleeve 14 and is in threaded engagement with the sleeve 14, and the lower end of the support rod 12 is inserted into the sleeve 14 and is in threaded engagement with the sleeve 14. The sleeve 14 connects the support rod 12 and the connecting column together, and the length of the hanger 1 can be adjusted by rotating the sleeve 14, and the connecting rod 13 can be fixed at any position due to the threaded fit between the sleeve 14 and the support rod 12.
Referring to fig. 6, in order to facilitate the fixation between the hanging ring 11 and the keel 2, the hanging ring 11 includes a screw 113, a left snap ring 111 and a right snap ring 112 hinged to the left snap ring 111, and one end of the left snap ring 111 far away from the hinge shaft and one end of the right snap ring 112 far away from the hinge shaft are fixedly connected by a bolt 5. Wherein, the articulated shaft that left snap ring 111 and right snap ring 112 are articulated is fixed to be set up on connecting rod 13.
The implementation principle of the novel ceiling structure for building engineering construction is as follows: when the suspended ceiling is installed, the hanging piece 1 is installed on a floor top plate, then the screw 113 is unscrewed to enable the keel 2 to be sleeved into the hanging ring 11, and then the screw 113 is screwed down to fix the keel 2. When the keels 2 are installed, the height of each keel 2 is measured, and if the heights of the keels 2 are obviously different, the rotating sleeve 14 adjusts the length of the hanging piece 1 to enable the heights of the keels 2 to be the same. Then, the limiting component 4 is sleeved on the keel 2 through the upper mounting pipe 41, the limiting component 4 is slid to enable the limiting component 4 to slide to a proper position, the upper mounting pipe 41 is fixed on the upper mounting pipe 41 through the bolt 5, the cross-brace keel 3 is sleeved on the lower mounting pipe 42, the cross-brace keel 3 is slid to a proper position, and fixing is completed through the bolt 5.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. The utility model provides a novel engineering construction furred ceiling structure is built in room, includes to hang piece (1), set up at fossil fragments (2) of hanging piece (1) lower extreme and stull fossil fragments (3) of setting in fossil fragments (2) below, its characterized in that: be provided with spacing subassembly (4) between fossil fragments (2) and stull fossil fragments (3), fossil fragments (2) slip cap is located one side that spacing subassembly (4) are close to fossil fragments (2), one side that spacing subassembly (4) are close to stull fossil fragments (3) is located to stull fossil fragments (3) slip cap, be provided with the first mounting that is used for fixed fossil fragments (2) and stull fossil fragments (3) on spacing subassembly (4).
2. The novel ceiling structure for building engineering construction according to claim 1, characterized in that: spacing subassembly (4) are including the last installation pipe (41) that the cover was located fossil fragments (2) and the lower installation pipe (42) of stull fossil fragments (3) are located to the cover, go up installation pipe (41) and install pipe (42) mutually perpendicular and integrated into one piece down.
3. The novel ceiling structure for building engineering construction according to claim 2, characterized in that: go up and all seted up storage tank (6) on the inside wall of installation pipe (41) and lower installation pipe (42), be provided with in storage tank (6) and jump beans spring (8), go up installation pipe (41) and install down and all seted up on pipe (42) and jump beans spring (8) complex draw-in groove (7).
4. The novel ceiling structure for building engineering construction according to claim 1, characterized in that: hang piece (1) including rings (11), bracing piece (12) and connecting rod (13), connecting rod (13) slide to set up on bracing piece (12), the one end and rings (11) fixed connection of bracing piece (12) are kept away from in connecting rod (13), fossil fragments (2) are located to rings (11) slip cap, be provided with the second mounting that is used for fixed connection pole (13) between bracing piece (12) and connecting rod (13).
5. The novel ceiling structure for building engineering construction according to claim 4, wherein: the second fixing piece comprises a sleeve (14), the end part, far away from the lifting ring (11), of the connecting rod (13) is sleeved into the sleeve (14) and is in threaded fit with the sleeve (14), and the lower end part of the supporting rod (12) is sleeved into the sleeve (14) and is in threaded fit with the sleeve (14).
6. The novel ceiling structure for building engineering construction according to claim 4, wherein: rings (11) include screw rod (113), left snap ring (111) and with left snap ring (111) articulated right snap ring (112), the one end of articulated shaft and the one end of keeping away from the articulated shaft of right snap ring (112) are kept away from to left side snap ring (111) passes through screw rod (113) fixed connection.
7. The novel ceiling structure for building engineering construction according to claim 1, characterized in that: the first fixing piece comprises a bolt (5), and the limiting assembly (4) is fixedly connected with the keel (2) and the cross-brace keel (3) through the bolt (5).
8. The novel ceiling structure for building engineering construction according to claim 2, characterized in that: the caliber of the upper mounting pipe (41) is larger than the diameter of the keel (2), and the caliber of the lower mounting pipe (42) is larger than the diameter of the cross-brace keel (3).
9. The novel ceiling structure for building engineering construction according to claim 2, characterized in that: t type spout (421) have been seted up along the length direction of installing pipe (42) down on lower installation pipe (42), the cross-sectional area of stull fossil fragments (3) is I shape form, stull fossil fragments (3) and T type spout (421) sliding fit.
10. The novel ceiling structure for building engineering construction according to claim 9, wherein: the length direction of stull fossil fragments (3) is followed and has been seted up dovetail (31) on stull fossil fragments (3), the part of installation pipe (42) embedding stull fossil fragments (3) down is dovetail (422), dovetail (31) and dovetail (422) sliding fit.
CN202021692863.7U 2020-08-14 2020-08-14 Novel engineering construction furred ceiling structure is built in room Expired - Fee Related CN213296843U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021692863.7U CN213296843U (en) 2020-08-14 2020-08-14 Novel engineering construction furred ceiling structure is built in room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021692863.7U CN213296843U (en) 2020-08-14 2020-08-14 Novel engineering construction furred ceiling structure is built in room

Publications (1)

Publication Number Publication Date
CN213296843U true CN213296843U (en) 2021-05-28

Family

ID=76024614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021692863.7U Expired - Fee Related CN213296843U (en) 2020-08-14 2020-08-14 Novel engineering construction furred ceiling structure is built in room

Country Status (1)

Country Link
CN (1) CN213296843U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114045973A (en) * 2021-11-08 2022-02-15 浙江万川装饰设计工程有限公司 Plug-in type keel ceiling structure and mounting method thereof
CN116815982A (en) * 2023-03-10 2023-09-29 广东楹固建设工程有限公司 Multi-angle keel suspended ceiling integral construction process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114045973A (en) * 2021-11-08 2022-02-15 浙江万川装饰设计工程有限公司 Plug-in type keel ceiling structure and mounting method thereof
CN116815982A (en) * 2023-03-10 2023-09-29 广东楹固建设工程有限公司 Multi-angle keel suspended ceiling integral construction process
CN116815982B (en) * 2023-03-10 2024-04-05 广东楹固建设工程有限公司 Multi-angle keel suspended ceiling integral construction process

Similar Documents

Publication Publication Date Title
CN213296843U (en) Novel engineering construction furred ceiling structure is built in room
CN204850205U (en) Furred ceiling mounting structure
CN208934228U (en) Suspended ceiling structure
CN109264601B (en) Air conditioner outdoor unit installation device and method
CN214044857U (en) Height-adjustable cable bridge
CN210316140U (en) Multifunctional adjusting component for curtain wall
CN201335239Y (en) Inclinable self-locking panel TV set rack
CN217517927U (en) Drop level furred ceiling structure
CN212641899U (en) Suspended ceiling connecting structure easy to decorate and install
CN210980132U (en) Constant temperature and humidity air conditioning unit for purification
CN109680849A (en) A kind of back hanging type curtain wall connecting node
CN201637180U (en) Installing rack of wall-mounted solar thermal collector
CN212224338U (en) Novel half hidden frame glass curtain wall structure of drag-line
CN211472990U (en) Building curtain wall mounting structure
CN214785248U (en) Aluminum grid ceiling structure
CN201635228U (en) Novel flash rack ceiling system
CN208519617U (en) A kind of LED pendent lamp that can freely adjust illuminator level
CN208473088U (en) Furred ceiling hanging rod structure
CN112081294A (en) Combined type suspender structure of assembled ceiling
CN112112348A (en) Indoor multi-functional assembled furred ceiling structure of building
CN217243711U (en) Fixing device for building interior decoration
CN206467873U (en) A kind of adjustable fixedly connected part of section bar
CN214798692U (en) Easily dismantle flexible suspension type cable testing bridge
CN218952851U (en) Convenient installation device of building engineering construction jib
CN216865672U (en) Suspended ceiling assembling structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210528