CN213265247U - Install ladder vestibule fixing device additional - Google Patents
Install ladder vestibule fixing device additional Download PDFInfo
- Publication number
- CN213265247U CN213265247U CN202022341482.0U CN202022341482U CN213265247U CN 213265247 U CN213265247 U CN 213265247U CN 202022341482 U CN202022341482 U CN 202022341482U CN 213265247 U CN213265247 U CN 213265247U
- Authority
- CN
- China
- Prior art keywords
- vestibule
- fixedly connected
- corridor
- frame
- ladder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 25
- 239000010959 steel Substances 0.000 claims description 25
- 238000009434 installation Methods 0.000 claims description 14
- 238000005728 strengthening Methods 0.000 claims description 14
- 230000001105 regulatory effect Effects 0.000 abstract description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 2
- 101100334009 Caenorhabditis elegans rib-2 gene Proteins 0.000 description 4
- 238000010276 construction Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002650 habitual effect Effects 0.000 description 1
- 238000010030 laminating Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses an install ladder vestibule fixing device additional relates to and installs ladder technical field additional. This install ladder vestibule fixing device additional, including vestibule frame, steelframe and connection wall, the vestibule frame is provided with a plurality ofly with connection wall altogether, and a plurality of vestibule frames all are located the left side of steelframe. This install ladder vestibule fixing device additional, the left side through passing through bolt fastening with first mount pad at the connection wall and the steelframe at top is close to the top, then place one of them vestibule frame on two first mount pads, then pass through the right side surface of bolt fastening at the connection wall of bottom respectively with the second mount pad, then fix the regulating block respectively on the steelframe, and every regulating block respectively with every second mount pad on same horizontal plane, then place remaining vestibule frame respectively between the top of second mount pad and regulating block on same water flat line, with this degree of difficulty that makes level and fix a position in reducing the site operation, save time.
Description
Technical Field
The utility model relates to an install ladder technical field additional, specifically be an install ladder vestibule fixing device additional.
Background
The elevator is a permanent transportation device which serves a plurality of specific floors in a building, the elevator car of the elevator runs on at least two rows of rigid rails which are vertical to the horizontal plane or have an inclination angle smaller than 15 degrees with a vertical line, the elevator is also of a step type, step plates are arranged on a track to continuously run, the elevator is commonly called an escalator or a moving sidewalk, and a fixed lifting device serves the specified floors, the vertical lifting elevator is provided with an elevator car which runs between at least two rows of rigid guide rails which are vertical or have an inclination angle smaller than 15 degrees, the size and the structural form of the elevator car are convenient for passengers to access or load and unload goods, the elevator is taken as a general name of a vertical transportation device in the building regardless of the driving mode in a habitual way, the elevator is additionally arranged in old districts to bring convenience for lives to residents, but when a corridor with an ordinary additionally arranged elevator is fixed, the danger of high-altitude operation exists, so, the field installation time is longer to the ruggedness of current vestibule is not strong enough, leads to the vestibule to warp easily, shortens its life.
SUMMERY OF THE UTILITY MODEL
The utility model provides an install ladder vestibule fixing device additional can reduce the degree of difficulty of making level and location in the site operation with this, save time, makes precision and quality obtain guaranteeing, can increase the life of vestibule.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: an additionally-installed ladder corridor fixing device comprises corridor frames, steel frames and connecting wall surfaces, wherein the corridor frames and the connecting wall surfaces are arranged in a plurality, the corridor frames are all positioned on the left side of the steel frames, the connecting wall surfaces are respectively positioned on the left sides of the corridor frames, a corridor steel plate is fixedly connected between the inner walls of the corridor frames, a plurality of fixing grooves are formed in the bottom of the corridor steel plate, the top of the corridor steel plate is fixedly connected with a first mounting seat through bolts near the top of the right outer surface of the connecting wall surface and the left outer surface of the steel frame, a plurality of second mounting seats are fixedly connected with the right outer surface of the connecting wall surfaces through bolts, a plurality of adjusting blocks are fixedly connected with the left outer surface of the steel frame through bolts in the vertical direction, one corridor frame is placed between the tops of the two first mounting seats, the other plurality of second mounting seats are respectively placed between the second mounting seats and the tops of the adjusting blocks, a plurality of two first regulation holes have all been seted up to the front surface of regulating block.
In order to make the bolt can be fixed between vestibule frame and the first mount pad through the fixed orifices, as the utility model relates to an install ladder vestibule fixing device additional preferred, two the fixed orifices, two have all been seted up at the top of first mount pad the top of fixed orifices and the bottom laminating of top vestibule frame.
Fix the second mount pad on connecting the wall in order to make the bolt pass through the screw hole, do the utility model relates to an install ladder vestibule fixing device additional preferably, a plurality of the top of second mount pad is close to the left side and all sets up threaded hole, and is a plurality of the bottom of screw hole is laminated with a plurality of tops of being connected the wall respectively.
In order to make the vestibule frame conveniently adjust at the top of second mount pad, conduct the utility model relates to an install ladder vestibule fixing device additional preferred, a plurality of the second regulation hole has all been seted up near the right side in the top of second mount pad.
In order to make the vestibule firmer, as the utility model relates to an install ladder vestibule fixing device additional preferred, wherein the right side two the first vestibule stull of fixedly connected with between the inner wall of fixed slot, the left side two fixedly connected with second vestibule stull between the inner wall of fixed slot.
In order to further strengthen the tightness of vestibule, as the utility model relates to an install ladder vestibule fixing device additional preferred, two first vestibule strengthening rib of fixedly connected with, the right side between one side surface center department that is close to each other of first vestibule stull fixedly connected with second vestibule strengthening rib between the white surface in one side that is close to each other of second vestibule stull.
The utility model provides an install ladder vestibule fixing device additional. The method has the following beneficial effects:
(1) this install ladder vestibule fixing device additional, the left side through passing through bolt fastening with first mount pad at the connection wall at top and steelframe is close to the top, then place one of them vestibule frame on two first mount pads, then pass through the right side surface of bolt fastening at the connection wall of bottom respectively with the second mount pad, then fix the regulating block respectively on the steelframe, and every regulating block respectively with every second mount pad on same horizontal plane, then place remaining vestibule frame respectively between the top of second mount pad and regulating block on same water flat line, with this degree of difficulty that reduces in-the-spot construction and make level and fix a position, save time, then put vestibule hoist and mount to the mount pad, with the bolt fastening tentatively, can slowly link to the adjustment suitable position and weld again, guarantee precision and quality.
(2) This install ladder vestibule fixing device additional, can strengthen the horizontal tightness of vestibule through first vestibule stull and second vestibule stull, can make the vestibule firmer and non-deformable through first vestibule strengthening rib and second vestibule strengthening rib, make the life of vestibule increase greatly.
Drawings
Fig. 1 is a front view of the present invention;
FIG. 2 is an enlarged view of the portion A of FIG. 1;
fig. 3 is an enlarged view of a portion B in fig. 1 according to the present invention;
fig. 4 is a top view of the vestibule frame of the present invention;
fig. 5 is a side sectional view of the corridor steel plate of the present invention;
fig. 6 is a top view of the first mounting base of the present invention;
fig. 7 is a top view of the second mounting base of the present invention.
In the figure: 1. a corridor frame; 2. a first corridor reinforcing rib; 3. a first gallery cross brace; 4. a second corridor reinforcing rib; 5. a second corridor cross brace; 6. corridor steel plates; 7. fixing grooves; 8. a steel frame; 9. a first mounting seat; 10. connecting the wall surface; 11. an adjusting block; 12. a first adjustment aperture; 13. a threaded hole; 14. a second mounting seat; 15. a fixing hole; 16. a second adjustment aperture.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary and intended to be used for explaining the present invention, and should not be construed as limiting the present invention.
Referring to fig. 1-7, the present invention provides a technical solution: an additionally-installed ladder corridor fixing device comprises corridor borders 1, steel frames 8 and connecting wall surfaces 10, wherein a plurality of corridor borders 1 and connecting wall surfaces 10 are arranged, the corridor borders 1 are all positioned on the left side of the steel frames 8, the connecting wall surfaces 10 are respectively positioned on the left sides of the corridor borders 1, corridor steel plates 6 are fixedly connected between the inner walls of the corridor borders 8, a plurality of fixing grooves 7 are formed in the bottoms of the corridor steel plates 6, the outer surfaces of the right sides of the top connecting wall surfaces 10 and the outer surfaces of the left sides of the steel frames 8, which are close to the tops, are fixedly connected with first installation seats 9 through bolts, the outer surfaces of the right sides of the connecting wall surfaces 10 are fixedly connected with second installation seats 14 through bolts, the outer surfaces of the left sides of the steel frames 1 are fixedly connected with a plurality of adjusting blocks 11 through bolts in the vertical direction, one corridor border 1 is placed between the tops of the two first installation seats 9, in addition, a plurality of second installation seats 14 are respectively arranged between the second installation seats 14 and the tops of the adjusting blocks 11, and two first adjusting holes 12 are formed in the front surfaces of the adjusting blocks 11.
In this embodiment: can make steelframe 8 be connected with connection wall 10 through vestibule frame 1, can fix first vestibule stull 3 through vestibule steel sheet 6, fixed slot 7 has also been seted up along vertical direction in vestibule steel sheet 6's bottom center department, the fixed slot 7 of vertical direction is used for fixing first vestibule strengthening rib 2 and second vestibule strengthening rib 4, first mount pad 9 is the L type, can be with vestibule frame 1 and the 10 fixed connection of connection wall at top, second mount pad 14 is the Z style of calligraphy, can be with remaining vestibule frame 1 with be connected wall 10 fixed connection, the interval of connecting between wall 10 and the steelframe 8 is greater than vestibule frame 1's length, can make vestibule frame 1's right side and steelframe 8 fixed connection through regulating block 11, can make vestibule frame 1 fix the position on the second mount pad through first regulation hole 12 and adjust.
Specifically, fixed orifices 15 have all been seted up at the top of two first mount pads 9, and the top of two fixed orifices 15 is laminated with the bottom of top vestibule frame 1.
In this embodiment: the first mounting seat 9 and the corridor side frame 1 can be fixedly connected through the fixing holes 15 through bolts.
Specifically, threaded holes 13 are formed in the tops of the second mounting seats 14 close to the left side, and the bottoms of the threaded holes 13 are attached to the tops of the connecting wall surfaces 10 respectively.
In this embodiment: the second mounting seat 14 can be fixed on the connecting wall surface 10 through the threaded hole 13.
Specifically, the top of the second mounting seats 14 close to the right side is provided with a second adjusting hole 16.
In this embodiment: the fixing position of the vestibule side frame 1 and the second mounting seat 14 can be adjusted through the second adjusting hole 16.
Specifically, wherein fixedly connected with first vestibule stull 3 between the inner wall of two fixed slots 7 on the right side, fixedly connected with second vestibule stull 5 between the inner wall of two fixed slots 7 on the left side.
In this embodiment: can strengthen the holistic tightness of vestibule through first vestibule stull 3 and second vestibule stull 5, make the vestibule can be more stable.
Specifically, fixedly connected with first vestibule strengthening rib 2 between the one side surface center department that is close to each other of two first vestibule studding 3, fixedly connected with second vestibule strengthening rib 4 between the one side outer white surface that is close to each other of right side first vestibule studding 3 and left side second vestibule studding 5.
In this embodiment: can further strengthen the sturdiness of vestibule through first vestibule strengthening rib 2 and second vestibule strengthening rib 4, make the life of vestibule increase.
When the corridor is used, when the corridor is required to be fixedly connected with the connecting wall surface 10 and the steel frame 1, the first installation seats 9 are respectively fixed on the left sides of the connecting wall surface 10 at the top and the steel frame 1 by bolts to be close to the top, then one corridor frame 1 is placed on the two first installation seats 9, then the second installation seats 14 are respectively fixed on the outer surface of the right side of the connecting wall surface 10 at the bottom by bolts, then the adjusting blocks 11 are respectively fixed on the steel frame 1, each adjusting block 11 and each second installation seat 14 are respectively positioned on the same horizontal plane, then the rest corridor frames 1 are respectively placed between the second installation seats 14 on the same horizontal line and the tops of the adjusting blocks 11, so that the difficulty of leveling and positioning in site construction is reduced, the time is saved, then the corridor is hung on the installation seats, is primarily fastened by bolts, can be slowly adjusted to be connected to a proper position and then is welded, guarantee precision and quality to can strengthen the horizontal tightness of vestibule through first vestibule stull 3 and second vestibule stull 5, can make the vestibule firmer and non-deformable more through first vestibule strengthening rib 2 and second vestibule strengthening rib 4, make the life of vestibule increase greatly.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides an install ladder vestibule fixing device additional, includes vestibule frame (1), steelframe (8) and connection wall (10), vestibule frame (1) and connection wall (10) are provided with a plurality ofly altogether, and are a plurality of vestibule frame (1) all is located the left side of steelframe (8), and is a plurality of it is a plurality of to connect wall (10) to be located the left side of a plurality of vestibule frames (1) respectively, its characterized in that: corridor steel plates (6) are fixedly connected among the inner walls of the corridor borders (1), a plurality of fixing grooves (7) are formed in the bottom of the corridor steel plate (6), the outer surface of the right side of the connecting wall surface (10) at the top and the outer surface of the left side of the steel frame (8) close to the top are fixedly connected with a first mounting seat (9) through bolts, in addition, the outer surfaces of the right sides of the plurality of connecting wall surfaces (10) are fixedly connected with second mounting seats (14) through bolts, a plurality of adjusting blocks (11) are fixedly connected to the outer surface of the left side of the steel frame (8) along the vertical direction through bolts, one of the vestibule borders (1) is placed between the tops of the two first mounting seats (9), in addition, the second installation seats (14) are respectively arranged between the second installation seats (14) and the tops of the adjusting blocks (11), and two first adjusting holes (12) are formed in the front surfaces of the adjusting blocks (11).
2. A retrofit ladder corridor fixture as set forth in claim 1, in which: two fixed orifices (15), two have all been seted up at the top of first mount pad (9) the top of fixed orifices (15) is laminated with the bottom of top vestibule frame (1).
3. A retrofit ladder corridor fixture as set forth in claim 1, in which: a plurality of threaded hole (13) are all seted up near the left side at the top of second mount pad (14), and are a plurality of the bottom of threaded hole (13) is laminated with the top of a plurality of connection wall surfaces (10) respectively.
4. A retrofit ladder corridor fixture as set forth in claim 1, in which: and second adjusting holes (16) are formed in the tops of the second mounting seats (14) close to the right side.
5. A retrofit ladder corridor fixture as set forth in claim 1, in which: wherein the right side is two fixedly connected with first vestibule stull (3) between the inner wall of fixed slot (7), the left side is two fixedly connected with second vestibule stull (5) between the inner wall of fixed slot (7).
6. The retrofit ladder corridor fixture of claim 5, wherein: two fixedly connected with first vestibule strengthening rib (2), right side between the one side surface center department that is close to each other of first vestibule stull (3) and left side fixedly connected with second vestibule strengthening rib (4) between the white surface in one side that is close to each other of second vestibule stull (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022341482.0U CN213265247U (en) | 2020-10-20 | 2020-10-20 | Install ladder vestibule fixing device additional |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022341482.0U CN213265247U (en) | 2020-10-20 | 2020-10-20 | Install ladder vestibule fixing device additional |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213265247U true CN213265247U (en) | 2021-05-25 |
Family
ID=75950326
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022341482.0U Expired - Fee Related CN213265247U (en) | 2020-10-20 | 2020-10-20 | Install ladder vestibule fixing device additional |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213265247U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113969654A (en) * | 2021-11-04 | 2022-01-25 | 哈尔滨迪康电梯制造有限公司 | Redundant connection structure of shelter bridge based on wall body protection |
-
2020
- 2020-10-20 CN CN202022341482.0U patent/CN213265247U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113969654A (en) * | 2021-11-04 | 2022-01-25 | 哈尔滨迪康电梯制造有限公司 | Redundant connection structure of shelter bridge based on wall body protection |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213265247U (en) | Install ladder vestibule fixing device additional | |
CN202098951U (en) | Outdoor added elevator with hoistway in steel structure | |
CN210854870U (en) | Right-angle elevator without machine room | |
CN207759864U (en) | A kind of building hoist offset wall-attached supporting seat device | |
CN209396737U (en) | It is a kind of for installing the vestibule horizontal plane regulating device of elevator hoistway with steel structure additional | |
CN210854887U (en) | Car structure of right-angle elevator without machine room | |
CN214031324U (en) | Elevator guide rail bracket | |
CN109502457A (en) | Elevator traction base and the lift appliance for using the elevator traction base | |
CN217600140U (en) | Be suitable for extensive elevator guide rail support | |
CN213569070U (en) | High forward position board of security | |
CN212198066U (en) | Reinforced convenient-to-maintain elevator toe guard | |
CN220787739U (en) | Support assembly for car guide rail enabling car to be arranged at angle with hoistway | |
CN219194121U (en) | High strength sedan-chair top guardrail | |
CN207903708U (en) | Elevator car frame | |
CN213265244U (en) | Installation device of modularization well frame of elevator | |
CN218595840U (en) | Car bottom structure | |
CN114476899B (en) | Derrick type elevator | |
CN219156227U (en) | Goods lift guide rail support fixed knot constructs | |
CN211594682U (en) | Elevator car main and auxiliary rail shared crosspiece | |
CN212769240U (en) | Be applied to elevator steel construction well and link subside device of existing building corridor bridge | |
CN211548727U (en) | Heightening support frame for wall-attached seat of construction elevator | |
CN216196680U (en) | Lattice type hanging seat base plate structure suitable for intelligent light equipment integration platform | |
CN219194432U (en) | Elevator mounting platform | |
CN214399422U (en) | Mounting structure of platform elevator well partition panel | |
CN218968589U (en) | Simple and easy staircase tip bearing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210525 |