CN213260379U - Aerated brick production and processing is with cutting prepositioning device - Google Patents

Aerated brick production and processing is with cutting prepositioning device Download PDF

Info

Publication number
CN213260379U
CN213260379U CN202021870838.3U CN202021870838U CN213260379U CN 213260379 U CN213260379 U CN 213260379U CN 202021870838 U CN202021870838 U CN 202021870838U CN 213260379 U CN213260379 U CN 213260379U
Authority
CN
China
Prior art keywords
plate
cutting
aerated
limiting assembly
limiting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021870838.3U
Other languages
Chinese (zh)
Inventor
官建敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangyang Great Wall Star Building Materials Co ltd
Original Assignee
Xiangyang Great Wall Star Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiangyang Great Wall Star Building Materials Co ltd filed Critical Xiangyang Great Wall Star Building Materials Co ltd
Priority to CN202021870838.3U priority Critical patent/CN213260379U/en
Application granted granted Critical
Publication of CN213260379U publication Critical patent/CN213260379U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The application discloses aerated brick production and processing is with cutting prepositioning device, this aerated brick production and processing includes with cutting prepositioning device: the conveying base comprises a bottom plate, a first side plate and a second side plate, wherein the first side plate and the second side plate are connected with the bottom plate, the first side plate and the second side plate are enclosed to form a conveying groove, conveyed aerated bricks are conveyed in the conveying groove, and a limiting groove is formed in one side surface, facing the conveying groove, of the bottom plate; the limiting assembly is connected with the bottom plate in a sliding mode, the sliding direction of the limiting assembly is perpendicular to the moving direction of the aerated bricks to be conveyed, and the limiting assembly is used for pushing the aerated bricks to be conveyed to move towards the limiting groove; the cutting assembly is arranged at the downstream of the limiting assembly and used for cutting the aerated bricks conveyed by the aerated bricks. Through above-mentioned mode, this application can provide the processingquality of air entrainment brick.

Description

Aerated brick production and processing is with cutting prepositioning device
Technical Field
The application relates to the technical field of aerated brick production and processing, in particular to a cutting pre-positioning device for aerated brick production and processing.
Background
The aerated brick is widely applied to the field of buildings, is developed more and more quickly, and has the advantages of light weight, good heat insulation effect, strong shock resistance, good processability and the like.
The aerated brick needs to be limited in the movement direction in the aerated brick transportation process in the production process, so that the aerated brick can reach a preset cutting position, the size of the aerated brick cut by the cutting device can meet the set size requirement, but most of the existing limiting devices are not adjustable, and when the aerated brick abuts against the limiting device, the aerated brick easily forms rigid impact on the side end of the aerated brick, so that the processing quality of the aerated brick is influenced.
SUMMERY OF THE UTILITY MODEL
The main technical problem who solves of this application provides an aerated brick production and processing is with cutting prepositioning device, can improve the production quality of aerated brick.
In order to solve the technical problem, the application adopts a technical scheme that: the utility model provides an aerated brick production and processing is with cutting prepositioning device, includes: the conveying base comprises a bottom plate, a first side plate and a second side plate, wherein the first side plate and the second side plate are connected with the bottom plate, the first side plate and the second side plate are enclosed to form a conveying groove, conveyed aerated bricks are conveyed in the conveying groove, and a limiting groove is formed in one side surface, facing the conveying groove, of the bottom plate;
the limiting assembly is connected with the bottom plate in a sliding mode, the sliding direction of the limiting assembly is perpendicular to the moving direction of the aerated bricks to be conveyed, and the limiting assembly is used for pushing the aerated bricks to be conveyed to move towards the limiting groove;
and the cutting assembly is arranged at the downstream of the limiting assembly and used for cutting the aerated bricks conveyed by the aerated bricks.
Furthermore, the limiting assembly comprises a first limiting assembly and a second limiting assembly, and the first limiting assembly and the second limiting assembly are respectively arranged on two opposite sides of the limiting groove.
Further, the first limiting assembly comprises a first sliding plate, a first elastic member connected with the first sliding plate and a second sliding plate connected with the first elastic member;
the second limiting assembly comprises a third sliding plate, a second elastic piece connected with the third sliding plate and a fourth sliding plate connected with the second elastic piece.
The first baffle plate and the second baffle plate are connected with the bottom plate, the first baffle plate is abutted against the first sliding plate and the second sliding plate, and the second baffle plate is abutted against the third sliding plate and the fourth sliding plate.
Further, the first elastic piece and the second elastic piece are both springs.
Further, the cutting assembly comprises a frame body, a first cutter and a second cutter, wherein the first cutter and the second cutter are connected with the frame body, and an included angle between the first cutter and the second cutter is formed.
Further, the frame body comprises a first upright, a connecting plate connected with the first upright and a second upright which is connected with the connecting plate and is arranged corresponding to the first upright;
the first cutter is respectively connected with the first upright post and the second upright post, and the second cutter is connected with the connecting plate and extends towards the bottom plate.
The beneficial effect of this application is: be different from prior art's condition, this application provides an air entrainment brick production and processing is with cutting pre-positioning device, this air entrainment brick production and processing includes the spacing subassembly with bottom plate sliding connection, and then can promote spacing subassembly through external force and slide, so set up, the air entrainment brick just can not form the rigidity with spacing subassembly when carrying and strike, alright in order and then guarantee that the side of air entrainment brick can not receive wearing and tearing and influence processingquality, and then improve machining efficiency.
Drawings
FIG. 1 is a schematic structural view of an embodiment of a cutting and pre-positioning device for aerated brick production and processing according to the application;
FIG. 2 is an enlarged schematic view of the structure shown at A in FIG. 1;
fig. 3 is a top view of fig. 1.
The reference numerals are as follows:
10. a conveying base; 110. a base plate; 1110. a limiting groove; 120. a first side plate; 130. a second side plate; 140. a conveying trough; 150. a first baffle plate; 160. a second baffle;
20. a limiting component; 210. a first limit component; 2110. a first sliding plate; 2120. a first elastic member; 2130. a second sliding plate; 220. a second limiting component; 2210. a third sliding plate; 2220. a second elastic member; 2230. a fourth sliding plate;
30. a cutting assembly; 310. a frame body; 3110. a first upright post; 3120. a connecting plate; 3130. a second upright post; 320. a first cutter; 330. and a second cutter.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, an embodiment of the present application provides a cutting and pre-positioning device for aerated brick production and processing, and the cutting and pre-positioning device for aerated brick production and processing includes: the conveying base 10 comprises a bottom plate 110, a first side plate 120 and a second side plate 130 which are connected with the bottom plate 110, the first side plate 120 and the second side plate 130 enclose a conveying groove 140, conveyed aerated bricks are conveyed in the conveying groove 140, and a limiting groove 1110 is formed in one side surface, facing the conveying groove 140, of the bottom plate 110; the limiting assembly 20 is connected with the bottom plate 110 in a sliding mode, the sliding direction of the limiting assembly is perpendicular to the moving direction of the aerated bricks to be conveyed, and the limiting assembly 20 is used for pushing the aerated bricks to be conveyed to move towards the limiting groove 1110; the cutting assembly 30 is arranged at the downstream of the limiting assembly 20 and used for cutting the aerated bricks conveyed by the aerated bricks. It should be noted that, be different from prior art's condition, this application provides an aerated brick production and processing is with cutting pre-positioning device, this aerated brick production and processing is with cutting pre-positioning device include with bottom plate 110 sliding connection's spacing subassembly 20, and then can promote spacing subassembly 20 through external force and slide, so set up, the aerated brick just can not form the rigidity with spacing subassembly 20 when carrying and strike, alright and then guarantee that the side of aerated brick can not receive wearing and tearing and influence processingquality, and then improve machining efficiency.
The position-limiting assembly 20 includes a first position-limiting assembly 210 and a second position-limiting assembly 220, and the first position-limiting assembly 210 and the second position-limiting assembly 220 are respectively disposed on two opposite sides of the position-limiting groove 1110. Therefore, the positions of the two sides of the aerated brick can be adjusted.
In an embodiment of the present application, the first limiting assembly 210 includes a first sliding plate 2110, a first elastic member 2120 connected to the first sliding plate 2110, and a second sliding plate 2130 connected to the first elastic member 2120; the second limiting assembly 220 includes a third sliding plate 2210, a second elastic member 2220 connected to the third sliding plate 2210, and a fourth sliding plate 2230 connected to the second elastic member 2220. The first slide plate 2110 and the third slide plate 2210 may be fixedly installed, and the second slide plate 2130 and the fourth slide plate 2230 may elastically reciprocate.
Specifically, the first and second baffle plates 150 and 160 are further included, the first and second baffle plates 150 and 160 are connected to the base plate 110, the first baffle plate 150 abuts against the first and second sliding plates 2110 and 2130, and the second baffle plate 160 abuts against the third and fourth sliding plates 2210 and 2230.
In an embodiment of the present application, the first elastic element 2120 and the second elastic element 2220 are both springs. In other embodiments, the elastic member may be a rubber elastic member, and the like, which is not limited herein.
The cutting assembly 30 includes a frame 310, and a first cutter 320 and a second cutter 330 connected to the frame 310, wherein the first cutter 320 and the second cutter 330 are arranged at an included angle. In an embodiment of the present application, the first cutter 320 is disposed perpendicular to the second cutter 330.
The frame body 310 includes a first upright 3110, a connecting plate 3120 connected with the first upright 3110, and a second upright 3130 connected with the connecting plate 3120 and disposed corresponding to the first upright 3110; the first cutting knife 320 is connected to the first upright 3110 and the second upright 3130, and the second cutting knife 330 is connected to the connecting plate 3120 and extends toward the bottom plate 110.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all the equivalent structures or equivalent processes that are used in the specification and the attached drawings or directly or indirectly applied to other related technical fields are included in the patent protection scope of the present invention.

Claims (7)

1. The utility model provides an aerated brick production and processing is with cutting prepositioning device which characterized in that includes:
the conveying base comprises a bottom plate, a first side plate and a second side plate, wherein the first side plate and the second side plate are connected with the bottom plate, the first side plate and the second side plate are enclosed to form a conveying groove, conveyed aerated bricks are conveyed in the conveying groove, and a limiting groove is formed in one side surface, facing the conveying groove, of the bottom plate;
the limiting assembly is connected with the bottom plate in a sliding mode, the sliding direction of the limiting assembly is perpendicular to the moving direction of the aerated bricks to be conveyed, and the limiting assembly is used for pushing the aerated bricks to be conveyed to move towards the limiting groove;
and the cutting assembly is arranged at the downstream of the limiting assembly and used for cutting the aerated bricks conveyed by the aerated bricks.
2. The cutting and pre-positioning device for aerated brick production and processing according to claim 1, wherein the limiting assembly comprises a first limiting assembly and a second limiting assembly, and the first limiting assembly and the second limiting assembly are respectively arranged on two opposite sides of the limiting groove.
3. The cutting and pre-positioning device for aerated brick production and processing according to claim 2, wherein the first limiting component comprises a first sliding plate, a first elastic member connected with the first sliding plate, and a second sliding plate connected with the first elastic member;
the second limiting assembly comprises a third sliding plate, a second elastic piece connected with the third sliding plate and a fourth sliding plate connected with the second elastic piece.
4. The cutting and pre-positioning device for aerated brick production and processing according to claim 3, further comprising a first baffle plate and a second baffle plate, wherein the first baffle plate and the second baffle plate are connected with the bottom plate, the first baffle plate abuts against the first sliding plate and the second sliding plate, and the second baffle plate abuts against the third sliding plate and the fourth sliding plate.
5. The cutting and pre-positioning device for aerated brick production and processing according to claim 4, wherein the first elastic member and the second elastic member are both springs.
6. The cutting and pre-positioning device for aerated brick production and processing according to claim 1, wherein the cutting assembly comprises a frame body, and a first cutter and a second cutter which are connected with the frame body, and the first cutter and the second cutter are arranged at an included angle.
7. The cutting and pre-positioning device for aerated brick production and processing according to claim 6, wherein the frame body comprises a first upright, a connecting plate connected with the first upright, and a second upright which is connected with the connecting plate and is arranged corresponding to the first upright;
the first cutter is respectively connected with the first upright post and the second upright post, and the second cutter is connected with the connecting plate and extends towards the bottom plate.
CN202021870838.3U 2020-08-31 2020-08-31 Aerated brick production and processing is with cutting prepositioning device Active CN213260379U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021870838.3U CN213260379U (en) 2020-08-31 2020-08-31 Aerated brick production and processing is with cutting prepositioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021870838.3U CN213260379U (en) 2020-08-31 2020-08-31 Aerated brick production and processing is with cutting prepositioning device

Publications (1)

Publication Number Publication Date
CN213260379U true CN213260379U (en) 2021-05-25

Family

ID=75979344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021870838.3U Active CN213260379U (en) 2020-08-31 2020-08-31 Aerated brick production and processing is with cutting prepositioning device

Country Status (1)

Country Link
CN (1) CN213260379U (en)

Similar Documents

Publication Publication Date Title
CN204249001U (en) A kind of accurate safety woodworking sizing saw machine
CN213260379U (en) Aerated brick production and processing is with cutting prepositioning device
EP1154501A3 (en) Method for manufacturing electrode plate for battery
CN211555621U (en) Lightning protection type transformer
CN208788686U (en) Plate shearing machine is used in the production of PET sheet material
CN110538918A (en) Novel terminal material area is cuted mark tool
CN210190003U (en) Narrow limit is left cotton exhaust apparatus of white bubble
CN202534820U (en) Antenna connection device
CN211491293U (en) Bending type alignment laminating suction device
CN207465288U (en) A kind of cut paper module
CN219987479U (en) Installation component for glass
CN212096726U (en) Multifunctional cutting frame for wood sawing
CN206145263U (en) PVC tubular brace frame
CN220973869U (en) Front windshield structure and vehicle
CN213915630U (en) Food can flanging die with high stamping precision
CN218557398U (en) Multifunctional plate cutting frame
CN206083556U (en) Punching device for car bumper
CN219521635U (en) Cutting auxiliary device of angle grinder
CN217018815U (en) Device is tailor to blade
CN215187602U (en) High-power IGBT module fixed knot constructs
CN213485249U (en) PCB board punch press protection device
CN215544273U (en) Pump body mould
CN204772606U (en) Safe edging cutter
CN215969181U (en) Efficient backing knife die for cutting procedure in plastic suction forming process
CN210308230U (en) Woodworking plate cutting positioning frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Cutting pre positioning device for production and processing of aerated bricks

Effective date of registration: 20230413

Granted publication date: 20210525

Pledgee: Bank of China Limited Xiangyang Branch

Pledgor: Xiangyang the Great Wall Star Building Materials Co.,Ltd.

Registration number: Y2023980037871

PE01 Entry into force of the registration of the contract for pledge of patent right