CN213238909U - Engineering survey pay-off - Google Patents
Engineering survey pay-off Download PDFInfo
- Publication number
- CN213238909U CN213238909U CN202021943332.0U CN202021943332U CN213238909U CN 213238909 U CN213238909 U CN 213238909U CN 202021943332 U CN202021943332 U CN 202021943332U CN 213238909 U CN213238909 U CN 213238909U
- Authority
- CN
- China
- Prior art keywords
- pay
- bolted connection
- drum
- motor
- thick bamboo
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000008878 coupling Effects 0.000 claims abstract description 3
- 238000010168 coupling process Methods 0.000 claims abstract description 3
- 238000005859 coupling reaction Methods 0.000 claims abstract description 3
- 238000003466 welding Methods 0.000 claims abstract description 3
- 238000005259 measurement Methods 0.000 claims description 31
- 238000004140 cleaning Methods 0.000 claims description 8
- 235000017166 Bambusa arundinacea Nutrition 0.000 abstract description 10
- 235000017491 Bambusa tulda Nutrition 0.000 abstract description 10
- 241001330002 Bambuseae Species 0.000 abstract description 10
- 235000015334 Phyllostachys viridis Nutrition 0.000 abstract description 10
- 239000011425 bamboo Substances 0.000 abstract description 10
- 238000004804 winding Methods 0.000 abstract description 10
- 208000027418 Wounds and injury Diseases 0.000 description 5
- 238000000034 method Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 230000003749 cleanliness Effects 0.000 description 4
- 238000010276 construction Methods 0.000 description 2
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000001133 acceleration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
Images
Landscapes
- A Measuring Device Byusing Mechanical Method (AREA)
Abstract
The utility model discloses an engineering survey pay-off, including base, a pay off section of thick bamboo and motor, there is the mount base upper end through bolted connection, there is a pay off section of thick bamboo through bolted connection between the mount, a mount lateral wall has through bolted connection the motor, the pay off section of thick bamboo internal rotation is connected with the spool, there is the connecting axle spool one end through bolted connection, the connecting axle runs through a pay off section of thick bamboo with the output shaft of motor passes through the coupling joint, there is electric screw at the top through bolted connection in the pay off section of thick bamboo, sliding connection has the slider on the electric screw, the welding of slider bottom has the spacing ring. Has the advantages that: the utility model discloses a set up electronic lead screw, slider and spacing ring, can drive the neat winding of measuring wire on the spool, guarantee that measuring wire is neat around, avoid appearing alternately winding phenomenon, can fine protect measuring wire, extension measuring wire life.
Description
Technical Field
The utility model relates to a pay-off technical field, concretely relates to engineering survey pay-off.
Background
With the continuous acceleration of urban modern construction, planning design and measurement can be carried out in advance in the construction process, the main idea of paying off is to move the size of a design drawing to the ground according to the size of a diagram, and the accuracy of paying off is seen when the size of the whole project is constructed according to the size of the design drawing.
The existing pay-off device can be used for measuring when the line is used for measuring in a winding mode, the winding disorder of the line is caused, the neatness is poor, the line is easy to cross and wind, the line can be used for measuring to be damaged, the service life of the line for measuring is influenced, the line can not be cleaned in the reuse process of the existing pay-off device, the line for measuring can be dirty and disordered after the existing pay-off device is used for a long time, and even scales on the line can be worn and torn to measure, so that the measurement precision is influenced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to overcome the prior art not enough, provide an engineering survey pay-off at present, solved current pay-off when the rolling is measured and is used the line, can make the measuring to use the line winding confusion, the regularity is poor, alternately winding easily, can cause the injury to measuring with the line, influences the problem of measuring with the life of line.
(II) technical scheme
The utility model discloses a following technical scheme realizes: the utility model provides an engineering survey pay-off, including base, a pay off section of thick bamboo and motor, there is the mount base upper end through bolted connection, there is through bolted connection between the mount a pay off section of thick bamboo, a mount lateral wall has through bolted connection the motor, pay off section of thick bamboo internal rotation is connected with the spool, spool one end has the connecting axle through bolted connection, the connecting axle runs through a pay off section of thick bamboo with the output shaft of motor passes through the coupling joint, there is electronic lead screw at the top through bolted connection in the pay off section of thick bamboo, sliding connection has the slider on the electronic lead screw, the welding of slider bottom has the spacing ring.
Furthermore, a wire outlet is formed in one side wall of the pay-off drum, and the inner wall of the wire outlet is connected with a cleaning brush through a clamping groove.
Through adopting above-mentioned technical scheme, the wire releasing tube provides the line place of accomodating for measurement, the connecting axle plays the connection effect, thereby can make the motor drives the spool rotates, and then receive and releases the line for measurement, and when receiving and releasing the line, the measuring wire passes the spacing ring, through electronic lead screw drives the slider slides to can drive the neat winding of measuring line and twine on the spool, guarantee that the line for measurement twines neatly, protect the line for measurement, the cleanness that the cleaning brush can wash the line for measurement when receiving and releasing the line, guarantee the cleanliness factor of the line for measurement, avoid influencing the scale of the line for measurement, improve measurement accuracy.
Furthermore, one side of the upper end of the base is connected with a supporting table through a bolt.
Through adopting above-mentioned technical scheme, can with the brace table fixed mounting be in on the base.
Furthermore, the upper end of the support table is connected with an operation panel through a bolt.
By adopting the technical scheme, the on-off of the circuit of the device can be controlled, and the operation of the device is further controlled.
Furthermore, one side of the support platform is connected with a push handle through a bolt.
Through adopting above-mentioned technical scheme, can the thrust unit remove.
Furthermore, the bottom end of the base is connected with universal wheels through bolts.
By adopting the technical scheme, the mobility of the device can be improved.
(III) advantageous effects
Compared with the prior art, the utility model, following beneficial effect has:
1. in order to solve the problems that the existing pay-off device can lead the measuring wire to be disordered and poor in alignment when the measuring wire is wound, the measuring wire is easy to be crossly wound, the measuring wire can be damaged, and the service life of the measuring wire is influenced, the utility model discloses a set electric lead screw, a slide block and a limit ring can drive the measuring wire to be neatly wound on a scroll, ensure the measuring wire to be neatly wound, avoid the cross winding phenomenon, well protect the measuring wire and prolong the service life of the measuring wire;
2. can not clean the line for measurement in solving current pay-off unit reuse process, long-time use can make the line for measurement more dirty in disorder, can wear and tear even and measure the scale on the line for measurement, influence measurement accuracy's problem, the utility model discloses a set up the cleaning brush, can wash the line for measurement, effectively get rid of dust, rubbish etc. of adhesion on the measuring rope, guarantee the cleanliness factor of measuring the line for measurement, avoid influencing the scale of measuring the line for measurement, improve measurement accuracy.
Drawings
Fig. 1 is a schematic structural view of an engineering measurement pay-off device according to the present invention;
FIG. 2 is a right side sectional view of an engineering measurement pay-off device according to the present invention;
fig. 3 is a main sectional view of a pay-off cylinder in the engineering survey pay-off device.
The reference numerals are explained below:
1. a push handle; 2. an operation panel; 3. a support table; 4. a universal wheel; 5. a base; 6. a fixed mount; 7. a pay-off drum; 8. an outlet; 9. a cleaning brush; 10. a connecting shaft; 11. a reel; 12. an electric lead screw; 13. a slider; 14. a limiting ring; 15. an electric motor.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As shown in fig. 1-3, the engineering measurement pay-off device in this embodiment includes a base 5, a pay-off drum 7 and a motor 15, the upper end of the base 5 is connected with a fixing frame 6 through bolts, the pay-off drum 7 is connected between the fixing frames 6 through bolts, the fixing frame 6 provides stable support for the pay-off drum 7, so that the pay-off drum 7 is fixedly installed on the base 5, one side wall of the fixing frame 6 is connected with the motor 15 through bolts, a reel 11 is rotatably connected with the pay-off drum 7, one end of the reel 11 is connected with a connecting shaft 10 through bolts, the connecting shaft 10 penetrates through the pay-off drum 7 and is connected with an output shaft of the motor 15 through a coupler, the top inside the pay-off drum 7 is connected with an electric lead screw 12 through bolts, a slide block 13 is slidably connected on the electric lead screw 12, thereby can make 15 drive spool 11 rotations of motor, and then receive and release the line for measurement, when receiving and releasing the line, the measuring line passes spacing ring 14, it slides to drive slider 13 through electronic lead screw 12, thereby can drive the neat winding of measuring line on spool 11, it is neat to guarantee that the line for measurement is twined, protect the line for measurement, 7 a lateral wall shaping of paying out reel has appearance mouth 8, it is connected with cleaning brush 9 through the draw-in groove to appear 8 inner walls of mouth, cleaning brush 9 can wash the line for measurement when receiving and releasing the line, guarantee the cleanliness factor of the line for measurement, avoid influencing the scale of the line for measurement, improve measurement accuracy.
As shown in fig. 1-3, in this embodiment, a support platform 3 is connected to one side of the upper end of a base 5 through a bolt, the support platform 3 can be fixedly installed on the base 5, and an operation panel 2 is connected to the upper end of the support platform 3 through a bolt, so that the on/off of a circuit of the device can be controlled, and the operation of the device can be controlled.
As shown in fig. 1-3, in this embodiment, a pushing handle 1 is connected to one side of the supporting platform 3 through a bolt, so that the pushing device can move, and a universal wheel 4 is connected to the bottom end of the base 5 through a bolt, so that the mobility of the device can be improved.
The specific implementation process of this embodiment is as follows: when the device is used, the pushing handle 1 is pushed to a measuring position, the device is controlled to run through the operation panel 2, the motor 15 works to drive the connecting shaft 10 to rotate, the reel 11 is driven to rotate, the measuring wire starts to be released, the measuring wire extends out of the wire outlet 8, the measuring wire penetrates through the limiting ring 14 when being released, the electric lead screw 12 pushes the sliding block 13 to move transversely, so that the limiting ring 14 guides the measuring wire to move, the device can be gradually moved to pay off in the measuring process, the efficiency is high, after the measurement is finished, the motor 15 can be controlled to rotate reversely to drive the reel 11 to rotate reversely to take up, when the wire is taken up, the cleaning brush 9 can clean the measuring wire, the cleanliness of the measuring wire is ensured, the scale of the measuring wire is prevented from being influenced, the measuring precision is improved, and meanwhile, the electric lead screw can drive the sliding block 13 to move transversely, so that the measuring wire is guided to be wound on the, the phenomenon of cross winding is avoided, the measuring wire can be well protected, the service life of the measuring wire is prolonged, and the practicability is good.
The above-described embodiments are merely illustrative of the preferred embodiments of the present invention and are not intended to limit the spirit and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made by the technical solution of the present invention by those skilled in the art should fall into the protection scope of the present invention, and the technical contents claimed by the present invention have been fully recorded in the claims.
Claims (6)
1. The utility model provides an engineering survey pay-off which characterized in that: including base (5), a pay off drum (7) and motor (15), there is mount (6) base (5) upper end through bolted connection, there is through bolted connection between mount (6) pay off drum (7), there is motor (15) mount (6) a lateral wall through bolted connection, pay off drum (7) internal rotation is connected with spool (11), spool (11) one end has connecting axle (10) through bolted connection, connecting axle (10) run through pay off drum (7) with the output shaft of motor (15) passes through the coupling joint, there is electronic lead screw (12) at pay off drum (7) internal top through bolted connection, sliding connection has slider (13) on electronic lead screw (12), slider (13) bottom welding has spacing ring (14).
2. An engineering surveying pay-off as defined in claim 1, wherein: a forming opening (8) is formed in one side wall of the pay-off drum (7), and the inner wall of the opening (8) is connected with a cleaning brush (9) through a clamping groove.
3. An engineering surveying pay-off as defined in claim 1, wherein: one side of the upper end of the base (5) is connected with a supporting table (3) through a bolt.
4. An engineering measurement pay-off device as defined in claim 3, wherein: the upper end of the supporting table (3) is connected with an operation panel (2) through a bolt.
5. An engineering measurement pay-off device as defined in claim 3, wherein: one side of the support table (3) is connected with a push handle (1) through a bolt.
6. An engineering surveying pay-off as defined in claim 1, wherein: the bottom end of the base (5) is connected with a universal wheel (4) through a bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021943332.0U CN213238909U (en) | 2020-09-08 | 2020-09-08 | Engineering survey pay-off |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021943332.0U CN213238909U (en) | 2020-09-08 | 2020-09-08 | Engineering survey pay-off |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213238909U true CN213238909U (en) | 2021-05-18 |
Family
ID=75871809
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021943332.0U Expired - Fee Related CN213238909U (en) | 2020-09-08 | 2020-09-08 | Engineering survey pay-off |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213238909U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113514043A (en) * | 2021-07-12 | 2021-10-19 | 南京高等职业技术学校(江苏联合职业技术学院南京分院) | Engineering survey pay-off |
-
2020
- 2020-09-08 CN CN202021943332.0U patent/CN213238909U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113514043A (en) * | 2021-07-12 | 2021-10-19 | 南京高等职业技术学校(江苏联合职业技术学院南京分院) | Engineering survey pay-off |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111359929A (en) | Automatic take-up and cleaning device for automobile charging pile | |
CN213238909U (en) | Engineering survey pay-off | |
CN110371774A (en) | Drum is used in a kind of production of novel cable | |
CN105835072A (en) | Optical fiber winding and unwinding unit for mobile robot | |
CN214298729U (en) | Traffic facilities engineering is with cable winding and unwinding devices of municipal construction | |
CN219341326U (en) | Paying-off structure for engineering survey and drawing | |
CN212475582U (en) | Wire winding vehicle for electric power engineering | |
CN211310460U (en) | Lightning protection detects automatic take-up | |
CN217322906U (en) | Pay-off is used at construction site is built in room | |
CN212402957U (en) | Automatic counting cable taking equipment | |
CN215710592U (en) | Construction pay-off equipment capable of automatically stretching | |
CN209009838U (en) | A kind of waste and old aluminum stranded conductor recycling bobbin winder device | |
CN114112014B (en) | Work vibration meter that facilitates use | |
CN215159813U (en) | A pay-off for wire and cable | |
CN216638771U (en) | Winding drum for electric hoist | |
CN205419302U (en) | Wire guiding device | |
CN211859029U (en) | Butt-joint type automatic charging device for robot | |
CN210833758U (en) | Heavy hammer level meter for measuring ultra-light density material | |
CN113682877A (en) | Automatic paying-off counting device for photovoltaic group string cables | |
CN215885918U (en) | Cable coiling mechanism of underground pipe culvert detection robot | |
CN218114672U (en) | Wire winding and unwinding device of mobile welding machine | |
CN220304539U (en) | Pay-off convenient to engineering measurement | |
CN217750919U (en) | Steel wire rope rust removal device | |
CN216785351U (en) | Cable construction draw gear for power engineering | |
CN210973426U (en) | Communication cable winding and unwinding devices for communication engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210518 |