CN213237587U - Flue duct - Google Patents

Flue duct Download PDF

Info

Publication number
CN213237587U
CN213237587U CN202022252375.0U CN202022252375U CN213237587U CN 213237587 U CN213237587 U CN 213237587U CN 202022252375 U CN202022252375 U CN 202022252375U CN 213237587 U CN213237587 U CN 213237587U
Authority
CN
China
Prior art keywords
flue
baffle
air
tube bundle
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022252375.0U
Other languages
Chinese (zh)
Inventor
袁振峰
包满都呼
张海军
王学强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Yitai Chemical Co ltd
Original Assignee
Inner Mongolia Yitai Chemical Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Yitai Chemical Co ltd filed Critical Inner Mongolia Yitai Chemical Co ltd
Priority to CN202022252375.0U priority Critical patent/CN213237587U/en
Application granted granted Critical
Publication of CN213237587U publication Critical patent/CN213237587U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Landscapes

  • Chimneys And Flues (AREA)

Abstract

The utility model discloses a flue, an air preheater is arranged in the flue, and a tube bundle of the air preheater is parallel to the flowing direction of primary air and secondary air and is vertical to the flowing direction of flue gas; the inner wall of the flue at the inlet side of the primary air and the secondary air is provided with a first baffle plate, and the first baffle plate is positioned above the tube bundle and covers the inlet section of the primary air and the secondary air. The existence of the first baffle plate can change the flow direction of the flue gas so as to prevent the flue gas from passing through an area easy to deposit dust, thereby reducing the formation of the dust; meanwhile, vortex generated by flowing of the flue gas can play a role in cleaning the existing accumulated dust below the first baffle. Therefore, the utility model provides a flue has improved the flue, can avoid the emergence of air heater deposition phenomenon, has solved the difficult problem in this field at present stage.

Description

Flue duct
Technical Field
The utility model relates to an air heater tube bank deposition technical field, more specifically says, relates to a flue.
Background
The method is characterized in that ash deposition happens occasionally on tube bundles of an air preheater of the circulating fluidized bed boiler, and due to the influence of the arrangement form of the air preheater, the ash deposition phenomenon is easy to happen between the tube bundles at the inlet sections of a primary air preheater and a secondary air preheater; particularly, when the air temperature is lower in winter, the smoke at the inlet sections of the primary air and the secondary air is lower than the dew point temperature, so that serious dust accumulation is easily caused; moreover, the low temperature regions on both sides of the air preheater near the tail flue also cause severe dust accumulation. Please refer to fig. 4-6. The dust deposition of the air preheater not only influences the normal operation of the boiler, but also increases the overhauling difficulty and the overhauling cost of workers.
Therefore, how to improve the flue to avoid the occurrence of the ash accumulation phenomenon of the air preheater is a difficult problem to be solved urgently in the field at the present stage.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at providing a flue has improved the flue, can avoid the emergence of air heater deposition phenomenon, has solved the difficult problem in this field at present stage.
A flue is internally provided with an air preheater, and a tube bundle of the air preheater is parallel to the flowing direction of primary air and secondary air and is vertical to the flowing direction of flue gas;
the inner walls of the flue at the inlet sides of the primary air and the secondary air are provided with first baffles, and the first baffles are positioned above the tube bundles and cover the inlet sections of the primary air and the secondary air.
Preferably, the first baffle is inclined from the inner wall of the flue to the direction close to the tube bundle.
Preferably, in the flue, the included angle between the first baffle and the tube bundle is 45 °.
Preferably, the flue is equipped with the second baffle at the inner wall of tube bank both sides.
Preferably, in the flue, the two second baffles are both located above the tube bundle and cover between the tube bundle and the inner wall of the flue.
Preferably, the second baffle is perpendicular to the inner wall of the flue.
Preferably, in the flue, the first baffle is a steel plate with the thickness ranging from 2mm to 4 mm.
Preferably, in the flue, the second baffle is a steel plate with the thickness ranging from 2mm to 4 mm.
Preferably, the first baffle plate and the inner wall of the flue are welded.
Preferably, the second baffle is welded with the inner wall of the flue.
The utility model provides a flue, an air preheater is arranged in the flue, and a pipe bundle of the air preheater is parallel to the flowing direction of primary air and secondary air and is vertical to the flowing direction of flue gas; the inner wall of the flue at the inlet side of the primary air and the secondary air is provided with a first baffle plate, and the first baffle plate is positioned above the tube bundle and covers the inlet section of the primary air and the secondary air. The existence of the first baffle plate can change the flow direction of the flue gas so as to prevent the flue gas from passing through an area easy to deposit dust, thereby reducing the formation of the dust; meanwhile, vortex generated by flowing of the flue gas can play a role in cleaning the existing accumulated dust below the first baffle. Therefore, the utility model provides a flue has improved the flue, can avoid the emergence of air heater deposition phenomenon, has solved the difficult problem in this field at present stage.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic view of a flue according to an embodiment of the present invention;
FIG. 2 is a cross-sectional view of A-A of FIG. 1 according to an embodiment of the present invention;
FIG. 3 is a cross-sectional view of B-B of FIG. 1 according to an embodiment of the present invention;
FIG. 4 is a schematic diagram of the soot deposition in the flue in the background art of the present invention;
FIG. 5 is a cross-sectional view taken along line A-A of FIG. 4 in the background of the invention;
fig. 6 is a cross-sectional view of B-B in fig. 5 according to the background art of the present invention.
In fig. 1-6:
a tube bundle-1; a first baffle-2; a second baffle-3.
Detailed Description
The core of the specific embodiment lies in providing the flue, improving the flue, avoiding the occurrence of the dust accumulation phenomenon of the air preheater and solving the problem in the field at the present stage.
Hereinafter, embodiments will be described with reference to the drawings. The embodiments described below do not limit the scope of the invention described in the claims. Further, the entire contents of the configurations shown in the following embodiments are not limited to those necessary as a solution of the invention described in the claims.
In the flue provided by the embodiment, an air preheater is arranged in the flue, and a tube bundle 1 of the air preheater is parallel to the flowing direction of primary air and secondary air and is vertical to the flowing direction of flue gas; the inner wall of the flue at the inlet side of the primary air and the secondary air is provided with a first baffle 2, and the first baffle 2 is positioned above the tube bundle 1 and covers the inlet section of the primary air and the secondary air.
The existence of the first baffle 2 can change the flow direction of the flue gas so as to prevent the flue gas from passing through an area easy to deposit dust, thereby reducing the formation of the dust; meanwhile, vortex generated by flowing of the flue gas can play a role in cleaning the existing accumulated dust below the first baffle 2. Therefore, the utility model provides a flue has improved the flue, can avoid the emergence of air heater deposition phenomenon, has solved the difficult problem in this field at present stage. Please refer to fig. 1-6.
In the flue provided by the present embodiment, the first baffle 2 may be disposed in an inclined shape, for example, the first baffle 2 is inclined from the inner wall of the flue to the direction close to the tube bundle 1; the inclined arrangement mode of the first baffle 2 can further change the flow direction of the flue gas, and simultaneously reduce the resistance of the flow of the flue gas, thereby avoiding the formation of dust deposition.
In the flue provided by the embodiment, the included angle between the first baffle 2 and the tube bundle 1 can be 45 degrees, or other angles capable of playing the same role. See fig. 1-3 for details.
In the flue provided by the embodiment, the inner walls of the flue at the two sides of the tube bundle 1 can be provided with second baffles 3, please refer to fig. 1-3; the two second baffles 3 are both positioned above the tube bundle 1 and cover between the tube bundle 1 and the inner wall of the flue. The setting of second baffle 3 can block the buffering to the mobile formation of flue gas, and then avoids the direct and flue wall contact of flue gas to make the flue gas avoid the low temperature district of afterbody flue, and then play the effect of avoiding the deposition.
In the flue provided by the embodiment, in order to better enable the second baffle 3 to play a role in blocking and buffering the flue gas, the second baffle 3 may be set to be perpendicular to the inner wall of the flue, please refer to fig. 2.
In the flue provided by the embodiment, the first baffle 2 and the second baffle 3 can both adopt thin steel plates, so that the service life of the structure can be prolonged, the use of materials can be reduced, and the burden on the flue is avoided.
For example, the first baffle plate 2 and the second baffle plate 3 may be steel plates having a thickness in the range of 2mm to 4 mm; of course, the thicknesses of the first baffle plate 2 and the second baffle plate 3 can also be selected according to actual needs, so as to achieve better effects.
In the flue provided by the specific embodiment, the first baffle 2 and the inner wall of the flue can be in a welding, clamping or connecting mode capable of playing the same role; in order to facilitate the arrangement of the first baffle 2, a steel plate can be selected and welded to be connected with the inner wall of the flue.
Similarly, the second baffle 3 and the inner wall of the flue can be in a welding, clamping or connecting mode capable of playing the same role; in order to facilitate the arrangement of the second baffle 3, a steel plate can be selected and welded to be connected with the inner wall of the flue.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (10)

1. A flue is characterized in that an air preheater is arranged in the flue, and a tube bundle (1) of the air preheater is parallel to the flowing direction of primary air and secondary air and is vertical to the flowing direction of flue gas;
the inner wall of the flue at the inlet side of the primary air and the secondary air is provided with a first baffle (2), and the first baffle (2) is positioned above the tube bundle (1) and covers the inlet section of the primary air and the secondary air.
2. A flue according to claim 1 wherein the first baffle (2) is inclined from the inner wall of the flue to a direction close to the tube bundle (1).
3. A flue according to claim 2 wherein the angle between the first baffle (2) and the tube bundle (1) is 45 °.
4. A flue according to claim 1 wherein the inner wall of the flue on both sides of the tube bundle (1) is provided with second baffles (3).
5. A flue according to claim 4 wherein both of the second baffles (3) are located above the tube bundle (1) and overlie the tube bundle (1) and an inner wall of the flue.
6. A flue according to claim 5 wherein the second baffle (3) is perpendicular to the inner wall of the flue.
7. The flue according to claim 1, wherein the first baffle (2) is a steel plate having a thickness in the range of 2mm to 4 mm.
8. The flue according to claim 4, wherein the second shutter (3) is a steel plate having a thickness ranging from 2mm to 4 mm.
9. A flue according to claim 7 wherein the first baffle (2) is welded to the inner wall of the flue.
10. A flue according to claim 8 wherein the second baffle (3) is welded to the inner wall of the flue.
CN202022252375.0U 2020-10-10 2020-10-10 Flue duct Active CN213237587U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022252375.0U CN213237587U (en) 2020-10-10 2020-10-10 Flue duct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022252375.0U CN213237587U (en) 2020-10-10 2020-10-10 Flue duct

Publications (1)

Publication Number Publication Date
CN213237587U true CN213237587U (en) 2021-05-18

Family

ID=75880057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022252375.0U Active CN213237587U (en) 2020-10-10 2020-10-10 Flue duct

Country Status (1)

Country Link
CN (1) CN213237587U (en)

Similar Documents

Publication Publication Date Title
JPH04179818A (en) Exhaust gas fine particles purifing device
CN107860022B (en) Variable flue section tubular air preheater
CN213237587U (en) Flue duct
JP2003279293A (en) Exhaust heat exchanger
CN202885607U (en) H-shaped finned tube energy saver used for industrial and civil boilers
CN209155528U (en) A kind of catalyst deashing device for cement SCR denitration
CN102439364B (en) Thermal power boiler
JP4031393B2 (en) EGR cooler
KR100473083B1 (en) heat exchanger of condensing boiler
KR101956542B1 (en) ventilating supporting Heat transfer plate basket of desulfurization system
CN101344260A (en) Steam generator arrangement
CN103742900B (en) A kind of Anti-abrasion water wall tube panel
CN204404203U (en) A kind of boiler ultra low-ash back-end ductwork system
CN208418783U (en) A kind of air deflector for gas cooler
CN210441711U (en) All-welded plate type gas-gas heat exchanger
CN210448375U (en) Dust removal device of coal economizer
CN110043916B (en) Boiler flue and denitration system
CN208139307U (en) A kind of soot blowing blast cap with flat connecting tube
CN215311293U (en) Flue flow guiding device for active coke desulfurization and denitrification system
CN202092105U (en) Sealing mechanism for sealing rear wall exhaust tube and suspension tube water-cooling wall penetrated by smoke deflecting corner water-cooling wall
CN209385845U (en) A kind of exhaust piping docking facilities
CN201680749U (en) Heat exchanger used for methane wall-mounted furnaces
CN207214093U (en) A kind of direct-fired coal-fired hot-blast stove smoke evacuation cover locking device
CN205208587U (en) Flue guiding device
CN209909945U (en) Chimney of heating furnace