CN213234972U - Geological drilling aluminum alloy drill pipe - Google Patents
Geological drilling aluminum alloy drill pipe Download PDFInfo
- Publication number
- CN213234972U CN213234972U CN202022231070.1U CN202022231070U CN213234972U CN 213234972 U CN213234972 U CN 213234972U CN 202022231070 U CN202022231070 U CN 202022231070U CN 213234972 U CN213234972 U CN 213234972U
- Authority
- CN
- China
- Prior art keywords
- rod
- fixedly connected
- sides
- threaded rod
- aluminum alloy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 31
- 229910000838 Al alloy Inorganic materials 0.000 title claims abstract description 19
- 238000009434 installation Methods 0.000 claims abstract description 45
- 238000005192 partition Methods 0.000 claims description 9
- 230000001737 promoting effect Effects 0.000 abstract description 3
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a geological drilling aluminum alloy drilling rod, including the drilling rod body, the bottom fixedly connected with install bin of drilling rod body, the bottom of install bin is provided with the drill bit body, the first threaded rod of top fixedly connected with of drill bit body, the top of first threaded rod is run through to the inner chamber of install bin and is equipped with the set casing, the top of set casing and the inner wall fixed connection of install bin, the equal fixedly connected with installation piece in both sides at drill bit body top. The utility model discloses a set up first threaded rod, set casing, installation piece, draw-in groove, arm-tie, pull rod, push pedal, fixture block, spring, knob, rotary rod, first bevel gear, baffle, second bevel gear, second threaded rod, telescopic link, fly leaf and locating piece, solved current geological drilling aluminum alloy drill rod drill bit installation and dismantle trouble problem long consuming time, this geological drilling aluminum alloy drill rod possesses the advantage that the drill bit makes things convenient for the dismouting, is worth promoting.
Description
Technical Field
The utility model relates to a geological drilling technical field specifically is a geological drilling aluminum alloy drilling rod.
Background
Geological drilling refers to a geological project which utilizes certain drilling mechanical equipment and processes to obtain core rocks below the earth surface and makes reliable evaluation on geological and mineral resource parameters, and the geological project is a drilling work for finding out underground geological conditions.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a geological drilling aluminum alloy drilling rod possesses the advantage that the drill bit makes things convenient for the dismouting, has solved the problem of current geological drilling aluminum alloy drilling rod drill bit installation and dismantlement troublesome length consuming time.
In order to achieve the above object, the utility model provides a following technical scheme: an aluminum alloy drill rod for geological drilling comprises a drill rod body, wherein the bottom of the drill rod body is fixedly connected with an installation box, the bottom of the installation box is provided with a drill bit body, the top of the drill bit body is fixedly connected with a first threaded rod, the top of the first threaded rod penetrates through the inner cavity of the installation box and is sleeved with a fixed shell, the top of the fixed shell is fixedly connected with the inner wall of the installation box, the two sides of the top of the drill bit body are both fixedly connected with installation blocks, the top of the installation block penetrates through the inner cavity of the installation box, the opposite sides of the two installation blocks are provided with clamping grooves, the bottoms of the two sides of the installation box are both provided with pull plates, the opposite sides of the two pull plates are both fixedly connected with pull rods, the side of the pull rod, far away from the pull plates, penetrates through the inner cavity of the installation box and is fixedly connected with, the opposite sides of the two clamping blocks extend to the inner cavity of the clamping groove, the bottoms of the opposite sides of the two push plates are fixedly connected with springs, the tops of the two sides of the installation box are respectively provided with a knob, the opposite sides of the two knobs are respectively fixedly connected with a rotary rod, one side of the rotary rod, far away from the knobs, penetrates through the inner cavity of the installation box and is movably connected with a fixed shell, the surface of the rotary rod is sleeved with a first bevel gear, the two sides of the fixed shell are respectively and fixedly connected with a partition plate, one side of the partition plate, far away from the fixed shell, is fixedly connected with the inner wall of the installation box, the top of the partition plate is provided with a second bevel gear, the top of the second bevel gear is meshed with the first bevel gear, the bottom of the second bevel gear is fixedly connected with a, the bottom of fly leaf fixedly connected with locating piece, the bottom and the pull rod contact of locating piece.
Preferably, the bottom of install bin is seted up with first threaded rod and the first opening that the installation piece cooperation was used, the spring is kept away from one side of push pedal and the inner wall fixed connection of install bin.
Preferably, the bottom of the two sides of the installation box is provided with a second opening matched with the pull rod for use, and the surface of the first threaded rod is in threaded connection with the fixed shell.
Preferably, the connection part of one side of the rotating rod, which is far away from the knob, and the fixed shell is movably connected through a bearing, and the surface of the second threaded rod is in threaded connection with the telescopic rod.
Preferably, the equal fixedly connected with stopper in top of telescopic link both sides, the spacing groove that uses with the stopper cooperation is all seted up with the both sides of set casing to the both sides of install bin inner chamber.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up first threaded rod, set casing, installation piece, draw-in groove, arm-tie, pull rod, push pedal, fixture block, spring, knob, rotary rod, first bevel gear, baffle, second bevel gear, second threaded rod, telescopic link, fly leaf and locating piece, solved current geological drilling aluminum alloy drill rod drill bit installation and dismantle trouble problem long consuming time, this geological drilling aluminum alloy drill rod possesses the advantage that the drill bit makes things convenient for the dismouting, is worth promoting.
2. The utility model discloses a set up first threaded rod, can with the fixed bit body of set casing cooperation, through setting up the draw-in groove, can cooperate the fixed mounting piece with the fixture block, through setting up the arm-tie, the user position that can person of facilitating the use adjust pull rod and push pedal, through setting up the knob, can person of facilitating the use rotate the rotary rod, through setting up second bevel gear, can drive the second threaded rod with first bevel gear cooperation and rotate, through setting up the telescopic link, can adjust the position of use of fly leaf with the cooperation of second threaded rod, through setting up the locating piece, can support the pull rod, prevent that the pull rod from taking place to remove.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a front view of the structure of the present invention;
fig. 3 is a partially enlarged view of a in fig. 1 according to the present invention.
In the figure: 1. a drill rod body; 2. installing a box; 3. a drill bit body; 4. a first threaded rod; 5. a stationary case; 6. mounting blocks; 7. a card slot; 8. pulling a plate; 9. a pull rod; 10. pushing the plate; 11. a clamping block; 12. a spring; 13. a knob; 14. rotating the rod; 15. a first bevel gear; 16. a partition plate; 17. a second bevel gear; 18. a second threaded rod; 19. a telescopic rod; 20. a movable plate; 21. positioning blocks; 22. a limiting block; 23. a limiting groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to be referred must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, a geological drilling aluminum alloy drill rod comprises a drill rod body 1, a mounting box 2 is fixedly connected to the bottom of the drill rod body 1, a drill bit body 3 is arranged at the bottom of the mounting box 2, a first threaded rod 4 is fixedly connected to the top of the drill bit body 3, the top of the first threaded rod 4 penetrates through the inner cavity of the mounting box 2 and is sleeved with a fixing shell 5, the top of the fixing shell 5 is fixedly connected with the inner wall of the mounting box 2, mounting blocks 6 are fixedly connected to both sides of the top of the drill bit body 3, the top of the mounting blocks 6 penetrates through the inner cavity of the mounting box 2, clamping grooves 7 are respectively formed in the inner cavities of the two mounting blocks 6 at opposite sides, pull plates 8 are respectively arranged at the bottoms of both sides of the mounting box 2, pull rods 9 are fixedly connected to both sides of the two pull plates 8, and a push plate 10 is fixedly connected to the inner cavity of the mounting box, the opposite sides of the two push plates 10 are fixedly connected with clamping blocks 11, the opposite sides of the two clamping blocks 11 extend to the inner cavity of the clamping groove 7, the bottoms of the opposite sides of the two push plates 10 are fixedly connected with springs 12, the tops of the two sides of the installation box 2 are provided with knobs 13, the opposite sides of the two knobs 13 are fixedly connected with rotary rods 14, one sides, far away from the knobs 13, of the rotary rods 14 penetrate through the inner cavity of the installation box 2 and are movably connected with the fixed shell 5, the surfaces of the rotary rods 14 are sleeved with first bevel gears 15, the two sides of the fixed shell 5 are fixedly connected with partition plates 16, one sides, far away from the fixed shell 5, of the partition plates 16 are fixedly connected with the inner wall of the installation box 2, the tops of the partition plates 16 are provided with second bevel gears 17, the tops of the second bevel gears 17 are meshed with the first bevel gears 15, the bottoms of the second, the bottom of the telescopic rod 19 is fixedly connected with a movable plate 20, the bottom of the movable plate 20 is fixedly connected with a positioning block 21, the bottom of the positioning block 21 is contacted with the pull rod 9, the bottom of the installation box 2 is provided with a first opening matched with the first threaded rod 4 and the installation block 6 for use, one side of the spring 12 away from the push plate 10 is fixedly connected with the inner wall of the installation box 2, the bottoms of two sides of the installation box 2 are respectively provided with a second opening matched with the pull rod 9 for use, the surface of the first threaded rod 4 is in threaded connection with the fixed shell 5, the side of the rotary rod 14 away from the knob 13 is movably connected with the joint of the fixed shell 5 through a bearing, the surface of the second threaded rod 18 is in threaded connection with the telescopic rod 19, the tops of two sides of the telescopic rod 19 are respectively and fixedly connected with a limiting block 22, two sides of the inner cavity of the installation box, can cooperate fixed drill bit body 3 with set casing 5, through setting up draw-in groove 7, can cooperate fixed mounting piece 6 with fixture block 11, through setting up arm-tie 8, can the person of facilitating the use adjust the position in use of pull rod 9 and push pedal 10, through setting up knob 13, can the person of facilitating the use rotate rotary rod 14, through setting up second bevel gear 17, can drive second threaded rod 18 with first bevel gear 15 cooperation and rotate, through setting up telescopic link 19, can cooperate the position in use of adjusting fly leaf 20 with second threaded rod 18, through setting up locating piece 21, can support pull rod 9, prevent that pull rod 9 from removing, through setting up first threaded rod 4, set casing 5, mounting piece 6, draw-in groove 7, arm-tie 8, pull rod 9, push pedal 10, fixture block 11, spring 12, knob 13, rotary rod 14, first bevel gear 15, baffle 16, second bevel gear 17, second threaded rod 18, Telescopic link 19, fly leaf 20 and locating piece 21 have solved the installation of current geological drilling aluminum alloy drill rod drill bit and have dismantled the trouble problem of consuming time long, and this geological drilling aluminum alloy drill rod possesses the advantage that the drill bit makes things convenient for the dismouting, is worth promoting.
When the drill bit body 3 needs to be disassembled, the knob 13 is rotated, the knob 13 is matched with the rotating rod 14 to drive the first bevel gear 15 to rotate, the first bevel gear 15 is matched with the second bevel gear 17 to drive the second threaded rod 18 to rotate, the second threaded rod 18 is matched with the telescopic rod 19 to drive the movable plate 20 to move, the movable plate 20 moves to drive the positioning block 21 not to contact with the pull rod 9, the pull plate 8 is pulled, the pull plate 8 is matched with the pull rod 9 to drive the push plate 10 to extrude the spring 12, meanwhile, the push plate 10 moves to drive the clamping block 11 to be separated from the inner cavity of the clamping groove 7, the drill bit body 3 is rotated, the drill bit body 3 rotates to drive the first threaded rod 4 to rotate, the first threaded rod 4 does not connect with the fixed shell 5, the drill bit body 3 can be removed, when the drill bit body 3 needs to be assembled, the first threaded rod 4 is put into the installation box 2 and rotates the drill bit, meanwhile, the mounting block 6 enters an inner cavity of the mounting box 2, the pulling plate 8 is loosened, the spring 12 resets to drive the pushing plate 10 to move, the pushing plate 10 moves to drive the clamping block 11 to enter the inner cavity of the clamping groove 7, then the knob 13 is rotated, the knob 13 is matched with the rotating rod 14 to drive the first bevel gear 15 to rotate, the first bevel gear 15 is matched with the second bevel gear 17 to drive the second threaded rod 18 to rotate, the second threaded rod 18 is matched with the telescopic rod 19 to drive the movable plate 20 to move, the movable plate 20 moves to drive the positioning block 21 to be in contact with the pulling rod 9, and the pulling.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a geological drilling aluminum alloy drilling rod, includes drilling rod body (1), its characterized in that: the drill rod comprises a drill rod body (1), wherein the bottom of the drill rod body (1) is fixedly connected with an installation box (2), the bottom of the installation box (2) is provided with a drill bit body (3), the top of the drill bit body (3) is fixedly connected with a first threaded rod (4), the top of the first threaded rod (4) penetrates through the inner cavity of the installation box (2) and is sleeved with a fixed shell (5), the top of the fixed shell (5) is fixedly connected with the inner wall of the installation box (2), the two sides of the top of the drill bit body (3) are both fixedly connected with installation blocks (6), the top of each installation block (6) penetrates through the inner cavity of the installation box (2), the two opposite sides of each installation block (6) and the inner cavity of the installation box (2) are both provided with a clamping groove (7), the bottoms of the two sides of the installation box (2) are both provided with pull plates (8), and the opposite sides of the, one side of the pull rod (9) far away from the pull plate (8) penetrates through an inner cavity of the installation box (2) and is fixedly connected with push plates (10), one opposite side of the two push plates (10) is fixedly connected with clamping blocks (11), one opposite side of the two clamping blocks (11) extends to an inner cavity of the clamping grooves (7), the bottom of one opposite side of the two push plates (10) is fixedly connected with springs (12), the tops of two sides of the installation box (2) are respectively provided with a knob (13), one opposite side of the two knobs (13) is fixedly connected with a rotary rod (14), one side of the rotary rod (14) far away from the knobs (13) penetrates through the inner cavity of the installation box (2) and is movably connected with the fixed shell (5), a first bevel gear (15) is sleeved on the surface of the rotary rod (14), two sides of the fixed shell (5) are respectively and fixedly connected with a partition plate (16), one side of the partition plate (16) far away from the fixed shell (5), the top of baffle (16) is provided with second bevel gear (17), the top and the meshing of first bevel gear (15) of second bevel gear (17), the bottom fixedly connected with second threaded rod (18) of second bevel gear (17), the bottom of second threaded rod (18) is run through baffle (16) and is equipped with telescopic link (19), the bottom fixedly connected with fly leaf (20) of telescopic link (19), the bottom fixedly connected with locating piece (21) of fly leaf (20), the bottom and the pull rod (9) contact of locating piece (21).
2. The aluminum alloy drill pipe for geological drilling as recited in claim 1, wherein: the bottom of install bin (2) is seted up with first threaded rod (4) and first opening that installation piece (6) cooperation was used, the inner wall fixed connection of push pedal (10) and install bin (2) is kept away from in spring (12) one side.
3. The aluminum alloy drill pipe for geological drilling as recited in claim 1, wherein: the bottom of install bin (2) both sides all is seted up the second opening that uses with pull rod (9) cooperation, the surface and the set casing (5) threaded connection of first threaded rod (4).
4. The aluminum alloy drill pipe for geological drilling as recited in claim 1, wherein: one side of the rotary rod (14) far away from the knob (13) is movably connected with the joint of the fixed shell (5) through a bearing, and the surface of the second threaded rod (18) is in threaded connection with the telescopic rod (19).
5. The aluminum alloy drill pipe for geological drilling as recited in claim 1, wherein: the equal fixedly connected with stopper (22) in top of telescopic link (19) both sides, spacing groove (23) that use with stopper (22) cooperation are all seted up to the both sides of install bin (2) inner chamber and the both sides of set casing (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022231070.1U CN213234972U (en) | 2020-10-06 | 2020-10-06 | Geological drilling aluminum alloy drill pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022231070.1U CN213234972U (en) | 2020-10-06 | 2020-10-06 | Geological drilling aluminum alloy drill pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213234972U true CN213234972U (en) | 2021-05-18 |
Family
ID=75878872
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022231070.1U Expired - Fee Related CN213234972U (en) | 2020-10-06 | 2020-10-06 | Geological drilling aluminum alloy drill pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213234972U (en) |
-
2020
- 2020-10-06 CN CN202022231070.1U patent/CN213234972U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111894005B (en) | Earthwork foundation ditch bearing structure | |
CN214277492U (en) | Soil sampling device is used in geotechnical engineering reconnaissance design | |
CN213234972U (en) | Geological drilling aluminum alloy drill pipe | |
CN211260256U (en) | Air quality early warning device for building monitoring | |
CN115541297A (en) | Exploration equipment for mineral engineering | |
CN216050850U (en) | Oil recovery geology sample measuring device | |
CN216559818U (en) | Hydrogeology investigation sample sampling device | |
CN215448566U (en) | Adjustable sampling device is used in electric power geology reconnaissance | |
CN213714783U (en) | High-efficient sampling device of ecological environment monitoring | |
CN210958128U (en) | High power density booster | |
CN211452947U (en) | Sampling device for geological structure investigation | |
CN210266358U (en) | Prevent shrinkage cavity thick wall PE pipe | |
CN211240768U (en) | Digging and holing device for planting of Ma Jia pomelos | |
CN211085836U (en) | Sewage collection system for pollution control | |
CN221528632U (en) | Soil environment monitoring device | |
CN113418737A (en) | Convenient sampling device for hydrogeological exploration and sampling method thereof | |
CN214787269U (en) | Steady pipe fixer of gas drainage hole sealing pipe | |
CN219864963U (en) | Novel perforating bullet for perforating large-displacement well | |
CN218629062U (en) | Graphite ore down-the-hole bores section sampler | |
CN213087139U (en) | Light steel assembled curtain of environmental protection | |
CN216634916U (en) | Wallboard line box perforating device in ALC | |
CN211539809U (en) | Tapping device for processing aluminum alloy doors and windows | |
CN219319783U (en) | Saline-alkali soil deep sampler | |
CN203835064U (en) | Automatic lock of machine cabinet and machine cabinet | |
CN217155893U (en) | Sampling device special for geological exploration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210518 |