CN213230951U - Electric power construction is with receiving line finishing device - Google Patents
Electric power construction is with receiving line finishing device Download PDFInfo
- Publication number
- CN213230951U CN213230951U CN202022326584.5U CN202022326584U CN213230951U CN 213230951 U CN213230951 U CN 213230951U CN 202022326584 U CN202022326584 U CN 202022326584U CN 213230951 U CN213230951 U CN 213230951U
- Authority
- CN
- China
- Prior art keywords
- controller
- bottom plate
- finishing device
- gear
- power construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model discloses a take-up finishing device for electric power construction, which comprises a bottom plate, wherein two sides of the bottom plate are respectively provided with a support rod, and a winding mechanism is fixedly arranged above the two support rods; the bottom plate is provided with a sliding chute which is positioned between the two supporting rods; a second rotating wheel is arranged below the sliding groove, and the width of the rotating wheel is greater than that of the sliding groove; a controller is arranged above the sliding groove, two groups of first rotating wheels are arranged below the controller, and a control module and a motor for driving the first rotating wheels to rotate are arranged in the controller; the controller top is provided with the mounting, the mounting top is provided with the buckle. The utility model adopts the above structure receive line finishing device, can make the electric wire winding more even, and then increase electric wire storage device's electric wire and hold length.
Description
Technical Field
The utility model belongs to the technical field of the electric wire arrangement and specifically relates to a receive line finishing device for electric power construction is related to.
Background
After the electric power construction is completed, the wire is generally sorted and stored by using a wire take-up device. At present, the electric wire is stored by driving a rotating shaft to rotate through a motor. Accomodate the in-process, can accomodate evenly for guaranteeing the electric wire, need artifically to adjust electric wire winding position. This way, not only is the workload for the operator high, but also time is wasted.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a receive line finishing device for electric power construction solves the inhomogeneous problem of electric wire winding.
In order to achieve the purpose, the utility model provides a take-up finishing device for electric power construction, which comprises a bottom plate, wherein two sides of the bottom plate are respectively provided with a supporting rod, and a winding mechanism is fixedly arranged above the two supporting rods; the bottom plate is provided with a sliding chute which is positioned between the two supporting rods; a second rotating wheel is arranged below the sliding groove, and the width of the second rotating wheel is greater than that of the sliding groove; a controller is arranged above the sliding groove, two groups of first rotating wheels are arranged below the controller, and a control module and a motor for driving the first rotating wheels to rotate are arranged in the controller; the controller top is provided with the mounting, the mounting top is provided with and drives the electric wire and remove the buckle.
Preferably, the winding mechanism comprises a sleeve, the sleeve is fixedly arranged on the supporting rod, and the sleeve is fixedly connected with a connecting plate; the connecting plate is provided with a through hole, a rotating shaft penetrates through the through hole, and the rotating shaft is rotatably connected with the through hole; the support rod is characterized in that a first gear is fixedly arranged on one side of the rotating shaft, the first gear is meshed with a second gear, the second gear is fixedly installed on an output shaft of a driving motor, the driving motor is installed on a fixing plate, and the fixing plate is fixedly installed on the support rod on one side of the first gear.
Preferably, the rotating shaft is provided with two limiting plates, and the width between the limiting plates is equal to the length of the sliding chute.
Preferably, the buckle is a connecting ring with an openable middle.
Preferably, a pulley is installed below the bottom plate, and a pushing handle is fixedly installed on one side of the bottom plate.
The utility model adopts the above structure receive line finishing device adjusts the electric wire winding through the buckle and rotates epaxial position, makes the electric wire winding more even, and then increases the electric wire of rotation axis and holds length.
Drawings
Fig. 1 is a front view of an embodiment of a winding finishing device for electric power construction of the present invention;
fig. 2 is the utility model relates to a top view of electric power construction is with receiving line finishing device embodiment.
Reference numerals
1. A sleeve; 2. a support bar; 3. a base plate; 4. a pulley; 5. a limiting plate; 6. a rotating shaft; 7. a first gear; 8. buckling; 9. a first runner; 10. a controller; 11. a second runner; 12. a second gear; 13. a fixing plate; 14. a drive motor; 15. a pushing handle; 16. a connecting plate; 17. a chute.
Detailed Description
The technical solution of the present invention is further described in detail by the accompanying drawings and examples.
As shown in fig. 1-2, the winding finishing device for electric power construction comprises a bottom plate 3, two support rods 2 are respectively arranged on two sides of the bottom plate 3, and winding mechanisms are fixedly arranged above the two support rods 2.
The winding mechanism comprises a sleeve 1, and the sleeve 1 is fixedly arranged on the support rod 2 through a jackscrew. The mounting height of the sleeves 1 on both sides of the support rod 2 should be kept consistent. The sleeve 1 is fixedly connected with connecting plates 16, the connecting plates 16 are provided with through holes, the rotating shaft 6 penetrates through the through holes of the two connecting plates 16, and the rotating shaft 6 is rotatably connected with the through holes. A first gear 7 is fixedly arranged on one side of the rotating shaft 6, and the first gear 7 is meshed with a second gear 12. The second gear 12 is fixedly mounted on an output shaft of the driving motor 14, and the driving motor 14 is mounted on the fixing plate 13. The fixed plate 13 is fixedly installed on the support bar 2 at one side of the first gear 7. The driving motor 14 indirectly drives the first gear 7 to rotate by driving the second gear 12 to rotate, thereby rotating the rotating shaft 6 and winding the electric wire on the rotating shaft 6.
The bottom plate 3 is provided with a sliding groove 17, and the sliding groove 17 is positioned between the two support rods 2. A second runner 11 is arranged below the sliding chute 17, and the width of the second runner 11 is larger than that of the sliding chute 17. A controller 10 is arranged above the sliding groove 17, two groups of first rotating wheels 9 are arranged below the controller 10, and a control module and a motor for driving the first rotating wheels 9 to rotate are arranged inside the controller 10. The control module is used for controlling the forward rotation or the reverse rotation of the motor in the controller and the working time of the motor. A fixing part is arranged above the controller 10, and a buckle 8 for driving the electric wire to move is arranged above the fixing part. The buckle 8 can be an existing connecting ring or a safety ring. When the electric wire connector is used, the buckle 8 is opened, and the electric wire is placed into the buckle 8. A motor in the controller rotates forwards to drive the buckle 8 to move forwards, so that the electric wire is driven to move forwards; the motor rotates reversely to drive the buckle 8 to move backwards, and then the electric wire is driven to move backwards. The position of the electric wire wound on the rotating shaft 6 is ensured to be different by adjusting the position of the electric wire entering the winding device, so that the electric wire wound on the rotating shaft 6 is more uniform.
In order to ensure that the electric wire is not contacted with the supporting rod 2, two limiting plates 5 are arranged on the rotating shaft 6, and the width between the limiting plates 5 is equal to the length of the sliding groove.
In order to facilitate the movement of the winding finishing device, a pulley 4 is arranged below the bottom plate 3, and a pushing handle 15 is fixedly arranged on one side of the bottom plate 3.
To sum up, the utility model adopts the above structure receive line finishing device adjusts the position that the electric wire got into rotation axis 6 through buckle 8, makes the electric wire winding more even, and then increases the electric wire of rotation axis 6 and hold length.
The above are specific embodiments of the present invention, but the scope of protection of the present invention should not be limited thereto. Any changes or substitutions which can be easily conceived by those skilled in the art within the technical scope of the present invention are covered by the protection scope of the present invention, and therefore, the protection scope of the present invention is subject to the protection scope defined by the claims.
Claims (4)
1. The utility model provides an electric power construction is with receiving line finishing device which characterized in that: the winding device comprises a bottom plate, wherein two supporting rods are arranged on two sides of the bottom plate respectively, and winding mechanisms are fixedly arranged above the two supporting rods; the bottom plate is provided with a sliding chute which is positioned between the two supporting rods; a second rotating wheel is arranged below the sliding groove, and the width of the second rotating wheel is greater than that of the sliding groove; a controller is arranged above the sliding groove, two groups of first rotating wheels are arranged below the controller, and a control module and a motor for driving the first rotating wheels to rotate are arranged in the controller; the controller top is provided with the mounting, the mounting top is provided with the buckle that drives the electric wire and remove.
2. The wire take-up finishing device for power construction as claimed in claim 1, characterized in that: the winding mechanism comprises a sleeve, the sleeve is fixedly arranged on the supporting rod, and the sleeve is fixedly connected with a connecting plate; the connecting plate is provided with a through hole, a rotating shaft penetrates through the through hole, and the rotating shaft is rotatably connected with the through hole; the support rod is characterized in that a first gear is fixedly arranged on one side of the rotating shaft, the first gear is meshed with a second gear, the second gear is fixedly installed on an output shaft of a driving motor, the driving motor is installed on a fixing plate, and the fixing plate is fixedly installed on the support rod on one side of the first gear.
3. The wire take-up finishing device for power construction as claimed in claim 2, wherein: the rotating shaft is provided with two limiting plates, and the width between the limiting plates is equal to the length of the sliding chute.
4. The wire take-up finishing device for power construction as claimed in claim 1, characterized in that: the pulley is installed to the bottom plate below, bottom plate one side fixed mounting has the pushing hands.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022326584.5U CN213230951U (en) | 2020-10-19 | 2020-10-19 | Electric power construction is with receiving line finishing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022326584.5U CN213230951U (en) | 2020-10-19 | 2020-10-19 | Electric power construction is with receiving line finishing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213230951U true CN213230951U (en) | 2021-05-18 |
Family
ID=75879271
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022326584.5U Active CN213230951U (en) | 2020-10-19 | 2020-10-19 | Electric power construction is with receiving line finishing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213230951U (en) |
-
2020
- 2020-10-19 CN CN202022326584.5U patent/CN213230951U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109626261B (en) | A lift platform for maintaining new energy automobile | |
CN210533579U (en) | Motor shaft temperature detection device for new energy automobile motor production | |
CN213230951U (en) | Electric power construction is with receiving line finishing device | |
CN201538612U (en) | Movable machine for winding carbon fiber composite conductor core | |
CN109775460A (en) | Full-automatic cable winding machine | |
CN211136352U (en) | Anchor clamps are used in auto-parts processing | |
CN214879144U (en) | Auxiliary device for electric power engineering construction | |
CN112217268A (en) | Roof solar panel with extending structure | |
CN217024800U (en) | Horizontal winding machine | |
CN211254833U (en) | Cable reel fixing and supporting device | |
CN210453858U (en) | Portable labor-saving unwinding trolley for tire cord cutting machine | |
CN211225833U (en) | Cable draw gear for electric power construction | |
CN219489423U (en) | Loading, unloading, transporting and hoisting equipment | |
CN218619394U (en) | Plastic packaging film coiling mechanism | |
CN216737409U (en) | Lifting device for water conservancy and hydropower construction | |
CN215877722U (en) | Supporting mechanism for double-helix mixer | |
CN216966823U (en) | Winch welding set for coal mine | |
CN217884750U (en) | Automatic feeding device of portable livestock | |
CN216033821U (en) | A buffer memory charging mechanism for multiple battery package of adaptation | |
CN204156419U (en) | A kind of Electromechanical Control high-tension bus-bar top layer cleaning plant | |
CN213326068U (en) | Cable take-up stand | |
CN219546352U (en) | Winding mechanism for preventing cable from loosening | |
CN220580445U (en) | Trowelling machine | |
CN210064731U (en) | Winder with winding displacement function | |
CN217125937U (en) | Integral high-strength telescopic machine frame structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |