CN213226748U - Device for implanting aerated concrete into steel bar mesh cage - Google Patents
Device for implanting aerated concrete into steel bar mesh cage Download PDFInfo
- Publication number
- CN213226748U CN213226748U CN202020707379.0U CN202020707379U CN213226748U CN 213226748 U CN213226748 U CN 213226748U CN 202020707379 U CN202020707379 U CN 202020707379U CN 213226748 U CN213226748 U CN 213226748U
- Authority
- CN
- China
- Prior art keywords
- sprocket
- aerated concrete
- driving motor
- brackets
- rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
The utility model discloses a device for implanting aerated concrete into a reinforcement cage, which relates to the technical field of aerated concrete production equipment and comprises two brackets, two moving assemblies and a drill rod inserting assembly; the two brackets are fixed at intervals in the transverse direction, and each bracket comprises two pillars which are arranged at intervals in the longitudinal direction and connected with each other; the two moving assemblies are respectively and symmetrically arranged on the two brackets and are used for simultaneously driving the plug-in drill rod assembly to move up and down along the vertical direction or/and horizontally move along the longitudinal direction; and the inserting drill rod assembly comprises a plurality of inserting drill rods used for hanging the steel bar net cage. The utility model discloses a device of aerated concrete is implanted to reinforcing bar cylinder mould, it can make reinforcing bar cylinder mould implant aerated concrete fast, practices thrift manufacturing cost.
Description
Technical Field
The utility model relates to an aerated concrete production equips technical field, concretely relates to aerated concrete's device is implanted to reinforcing bar cylinder mould.
Background
The aerated concrete slab is a novel light porous green environment-friendly building material which takes cement, lime, silica sand and the like as main raw materials and is added with different quantities of anti-corrosion treated reinforcing mesh cage sheets according to the structural requirements. The aerated concrete slab with porous crystals is produced through high-temperature high-pressure steam curing and reaction, has lower density than common cement materials, and has excellent performance of fire resistance, fire prevention, sound insulation, heat preservation and the like which are unparalleled.
When the aerated concrete is implanted into the steel bar net cage for positioning, the positioning is generally carried out manually, which wastes time and labor and has higher production cost. How to rapidly implant the steel bar mesh cage into the aerated concrete for positioning becomes a technical problem to be solved.
SUMMERY OF THE UTILITY MODEL
To the defect that exists among the prior art, the utility model aims to provide a device of aerated concrete is implanted to reinforcing bar cylinder mould, it can make reinforcing bar cylinder mould implant aerated concrete fast, practices thrift manufacturing cost.
In order to achieve the above purpose, the utility model adopts the technical proposal that: an apparatus for embedding aerated concrete into a reinforcement cage, comprising: the two supports, the two moving assemblies and the inserting drill rod assembly;
the two brackets are fixed at intervals in the transverse direction, and each bracket comprises two pillars which are arranged at intervals in the longitudinal direction and connected with each other;
the two moving assemblies are respectively and symmetrically arranged on the two brackets and are used for simultaneously driving the plug-in drill rod assembly to move up and down along the vertical direction or/and horizontally move along the longitudinal direction;
and the inserting drill rod assembly comprises a plurality of inserting drill rods used for hanging the steel bar net cage.
On the basis of the technical scheme, each moving assembly comprises two vertical sliding rails and a longitudinal rail, the two vertical sliding rails are respectively arranged on the two corresponding supports of the support, and the longitudinal rail is matched with the two vertical sliding rails and moves up and down along the vertical sliding rails.
On the basis of the technical scheme, every remove the subassembly and all still including setting up respectively every go up sprocket and a lower sprocket on two pillars of support, two go up the sprocket and pass through a pivot and connect, the last sprocket and the lower sprocket of same pillar pass through first chain and connect, just first chain with correspond vertical rail fixed connection, every remove the subassembly and all still include a driving motor, a driving motor establishes correspondingly on the support, a driving motor is used for the drive the pivot rotates in order to drive go up the sprocket and rotate.
On the basis of the technical scheme, every connect through the longeron between two pillars of support, be equipped with a mounting panel on the longeron, a driving motor is fixed in on the mounting panel, a driving motor output is equipped with the driving gear, be equipped with in the pivot with driving gear engaged driven gear.
On the basis of the technical scheme, every the both ends of indulging the rail inlay respectively and are equipped with a third sprocket, two the third sprocket passes through the second chain and connects, be equipped with the slide on the second chain, it still is equipped with second driving motor to indulge on the rail, second driving motor is used for the drive the third sprocket rotates in order to drive the slide is followed it moves to indulge the rail horizontal migration.
On the basis of the technical scheme, the plug drill component further comprises a plurality of mounting frames, two ends of each mounting frame are respectively connected with the sliding plate, and the mounting frames are provided with a plurality of positioning holes for inserting the plug drill.
On the basis of the technical scheme, the positioning holes are formed by correspondingly distributing a pair of long round holes on two sides of the round hole.
On the basis of the technical scheme, the two ends of the mounting rack are provided with the positioning bolts.
Compared with the prior art, the utility model has the advantages of:
the utility model provides a device of aerated concrete is implanted to reinforcing bar cylinder mould sets up two removal subassemblies, and its difference symmetry is located two on the support, two remove the subassembly simultaneous drive insert the borer subassembly and reciprocate or along vertical horizontal migration along the vertical direction, and the reinforcing bar cylinder mould is hung and is established on inserting the borer subassembly, makes the reinforcing bar cylinder mould implant aerated concrete fast, practices thrift manufacturing cost.
Drawings
Fig. 1 is a schematic structural view of a device for implanting aerated concrete into a reinforcement cage in an embodiment of the present invention;
FIG. 2 is a view taken along line A of FIG. 1;
fig. 3 is a top view of the mounting frame in the embodiment of the present invention;
in the figure: 1. a support; 11. a pillar; 12. a stringer; 13. mounting a plate; 2. a moving assembly; 21. a vertical slide rail; 22. a longitudinal rail; 23. an upper sprocket; 24. a lower sprocket; 25. a rotating shaft; 251. a driven gear; 26. a first chain; 27. a first drive motor; 271. a driving gear; 221. a third sprocket; 222. a second chain; 223. a slide plate; 224. a second drive motor; 3. a plug pin assembly; 31. inserting a drill rod; 32. a mounting frame; 321. positioning holes; 33. and (6) positioning the bolt.
Detailed Description
The embodiments of the present invention will be described in further detail below with reference to the accompanying drawings.
Referring to fig. 1, an embodiment of the present invention provides a device for implanting aerated concrete into a steel mesh cage, including: the device comprises two brackets 1, two moving assemblies 2 and a plug pin assembly 3;
two brackets 1 are fixed at intervals in the transverse direction, and each bracket comprises two pillars 11 which are arranged at intervals in the longitudinal direction and connected with each other. The two moving assemblies 2 are respectively and symmetrically arranged on the two supports and are used for driving the drill rod inserting assembly to move up and down along the vertical direction and horizontally move along the longitudinal direction. The inserting rod assembly 3 comprises a plurality of inserting rods 31 for hanging a steel bar net cage.
Specifically, referring to fig. 1 and 2, each of the moving assemblies 2 includes two vertical slide rails 21 and a longitudinal rail 22, the two vertical slide rails 21 are respectively disposed on the two corresponding pillars 11 of the support 1, and the longitudinal rail 22 is engaged with the two vertical slide rails 21 and moves up and down along the vertical slide rails 21.
Further, every remove subassembly 2 all still including setting up respectively every go up sprocket 23 and a lower sprocket 24 on two pillars 11 of support 1, two go up sprocket 23 and a pivot 25 is connected, and the last sprocket 23 and the lower sprocket 24 of same pillar 11 are connected through first chain 26, just first chain 26 with correspond vertical rail 22 fixed connection, every remove subassembly 2 all still includes a driving motor 27, a driving motor 27 establish corresponding on the support 1, a driving motor 27 is used for the drive pivot 25 rotates in order to drive go up sprocket 23 rotates.
Furthermore, two columns 11 of each support 1 are connected by a longitudinal beam 12, a mounting plate 13 is disposed on the longitudinal beam 12, the first driving motor 27 is fixed on the mounting plate 13, a driving gear 271 is disposed at an output end of the first driving motor 27, and a driven gear 251 engaged with the driving gear 271 is disposed on the rotating shaft 25.
Every the both ends of indulging rail 22 are inlayed respectively and are equipped with a third sprocket 221, two third sprocket 221 passes through second chain 222 and connects, be equipped with slide 223 on the second chain 222, still be equipped with second driving motor 224 on the indulging rail 22, second driving motor 224 is used for the drive third sprocket 221 rotates in order to drive slide 223 is followed indulging rail 22 horizontal migration. Specifically, the output shaft of the second driving motor 224 is connected to the third sprocket 221.
Referring to fig. 2 and 3, the plug pin assembly 3 further includes a plurality of mounting brackets 32, two ends of each mounting bracket 32 are respectively connected to the sliding plates 223, and the mounting brackets 32 are provided with a plurality of positioning holes 321 for inserting the plug pins 31. The positioning hole 321 is formed by a pair of oblong holes arranged on two sides of the circular hole. And positioning bolts 33 are arranged at two ends of the mounting frame 32.
The embodiment of the utility model provides an in the device of aerated concrete is implanted to steel reinforcement cylinder mould, the working method as follows:
the first step is as follows: fixing the steel bar net cage on the inserting rod 31 of the inserting rod component 3;
the second step is that: pushing a mould frame filled with aerated concrete slurry to the lower part of the device;
the third step: the second driving motor 224 drives the third chain wheel 221 to rotate, the second chain 222, the sliding plate 223 and the inserting drill rod assembly 3 move horizontally, and the steel reinforcement net cage is moved horizontally to be right above a mould frame filled with aerated concrete slurry;
the third step: the first driving motor 27 drives the upper chain wheel 23 and the lower chain wheel 24 to rotate, and the first chain 26 vertically moves to drive the reinforcement cage to vertically descend to a proper height so as to implant the reinforcement cage into aerated concrete slurry in the mold frame;
the fourth step: after the aerated concrete slurry forms a blank, the inserted drill rod is shifted (at the moment, the inserted drill rod is separated from the steel reinforcement cylinder mould), the first driving motor 27 and the second driving motor 224 rotate to enable the inserted drill rod component 3 to reset, and the next steel reinforcement cylinder mould implantation construction is waited to be carried out.
Compared with the prior art, the embodiment of the utility model provides a device of aerated concrete is implanted to steel reinforcement cylinder mould sets up two and removes the subassembly, and its difference symmetry is located two on the support, two remove the subassembly simultaneous drive insert the borer subassembly and reciprocate or/and along vertical horizontal migration along the vertical direction, and steel reinforcement cylinder mould hangs and establishes on inserting the borer subassembly, makes steel reinforcement cylinder mould implant aerated concrete fast, practices thrift manufacturing cost.
The present invention is not limited to the above preferred embodiments, and any person can obtain other products in various forms without departing from the scope of the present invention, but any change in shape or structure is within the scope of protection.
Claims (8)
1. The utility model provides a device of aerated concrete is implanted to steel reinforcement cylinder mould which characterized in that includes: the device comprises two brackets (1), two moving assemblies (2) and a plug-in pin assembly (3);
the two brackets (1) are fixed at intervals in the transverse direction, and each bracket (1) comprises two struts (11) which are arranged at intervals in the longitudinal direction and connected with each other;
the two moving assemblies (2) are respectively and symmetrically arranged on the two brackets (1), and the two moving assemblies (2) are used for simultaneously driving the plug pin assembly (3) to move up and down along the vertical direction or/and horizontally move along the longitudinal direction;
the inserting drill rod assembly (3) comprises a plurality of inserting drill rods (31) used for hanging a steel bar net cage.
2. The apparatus of claim 1, wherein the means for implanting aerated concrete into the reinforcement cage comprises:
each moving assembly (2) comprises two vertical sliding rails (21) and a longitudinal rail (22), the two vertical sliding rails (21) are arranged on the two corresponding support columns (11) of the support (1) respectively, and the longitudinal rail (22) is matched with the two vertical sliding rails (21) and moves up and down along the vertical sliding rails (21).
3. The apparatus of claim 2, wherein:
every remove subassembly (2) all still including setting up respectively every go up sprocket (23) and one lower sprocket (24) on two pillars (11) of support (1), two go up sprocket (23) and connect through a pivot (25), and last sprocket (23) and lower sprocket (24) of same pillar (11) are connected through first chain (26), just first chain (26) and corresponding indulge rail (22) fixed connection, every remove subassembly (2) and all still include first driving motor (27), establish corresponding first driving motor (27) on support (1), first driving motor (27) are used for the drive pivot (25) rotate in order to drive go up sprocket (23) and rotate.
4. The apparatus of claim 3, wherein:
every connect through longeron (12) between two pillars (11) of support (1), be equipped with a mounting panel (13) on longeron (12), first driving motor (27) are fixed in on mounting panel (13), first driving motor (27) output is equipped with driving gear (271), be equipped with on pivot (25) with driven gear (251) of driving gear (271) meshing.
5. The apparatus of claim 2, wherein:
every the both ends of indulging rail (22) are inlayed respectively and are equipped with a third sprocket (221), two third sprocket (221) is connected through second chain (222), be equipped with slide (223) on second chain (222), still be equipped with second driving motor (224) on indulging rail (22), second driving motor (224) are used for the drive third sprocket (221) rotate in order to drive slide (223) are followed indulge rail (22) horizontal migration.
6. The apparatus of claim 5, wherein:
the plug-in drill rod component (3) further comprises a plurality of mounting frames (32), two ends of each mounting frame (32) are respectively connected with the sliding plate (223), and the mounting frames (32) are provided with a plurality of positioning holes (321) used for inserting the plug-in drill rods (31).
7. The apparatus of claim 6, wherein: the positioning holes (321) are formed by a pair of long round holes which are correspondingly distributed on two sides of the round hole.
8. The apparatus of claim 6, wherein: and positioning bolts (33) are arranged at two ends of the mounting frame (32).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020707379.0U CN213226748U (en) | 2020-04-30 | 2020-04-30 | Device for implanting aerated concrete into steel bar mesh cage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020707379.0U CN213226748U (en) | 2020-04-30 | 2020-04-30 | Device for implanting aerated concrete into steel bar mesh cage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213226748U true CN213226748U (en) | 2021-05-18 |
Family
ID=75867173
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020707379.0U Active CN213226748U (en) | 2020-04-30 | 2020-04-30 | Device for implanting aerated concrete into steel bar mesh cage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213226748U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114643641A (en) * | 2021-12-28 | 2022-06-21 | 杭州电子科技大学 | Reinforcing mesh piece and fixing device for aerated concrete plate |
-
2020
- 2020-04-30 CN CN202020707379.0U patent/CN213226748U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114643641A (en) * | 2021-12-28 | 2022-06-21 | 杭州电子科技大学 | Reinforcing mesh piece and fixing device for aerated concrete plate |
CN114643641B (en) * | 2021-12-28 | 2024-04-05 | 杭州电子科技大学 | Reinforcing steel bar net sheet and fixing device for aerated concrete plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112454643B (en) | Modularized disassembly-free wall form automatic production system | |
CN213226748U (en) | Device for implanting aerated concrete into steel bar mesh cage | |
CN108556129B (en) | Automatic casting vehicle for cement precast block | |
CN111922586A (en) | Three-dimensional welding die and three-dimensional fixed-position welding method for reinforcement cage | |
CN104723459B (en) | A kind of concrete prefabricated sheet material production line is assembled with mould and provision for disengagement | |
CN113622543B (en) | Assembly type building | |
CN106639328B (en) | Concrete beam steel reinforcement framework construction device and construction method | |
CN117505739A (en) | Box girder steel bar assembling jig frame and assembling method | |
CN110434980B (en) | Forming vertical mold equipment for producing L-shaped and T-shaped prefabricated edge components and working method | |
CN1020120C (en) | Mould-raising technology for poured-in-place wall without climibing rack and its mould | |
CN217079960U (en) | Green construction fence | |
CN212526659U (en) | Three-dimensional welding mould of steel reinforcement cage | |
CN112060295B (en) | Prefabricated plate stair processing usefulness mould with height-adjustable | |
CN105216095B (en) | A kind of concrete prefabricated building block multimode cavity forming machine | |
CN110962218B (en) | Mould is used in production of light partition plate | |
CN113021933A (en) | Resin-based composite material and processing technology and application thereof | |
CN210975861U (en) | Prefabricated bed-jig of deep basal pit structure roof beam framework of steel reinforcement | |
CN108839215B (en) | Pore-forming auxiliary device for concrete prefabricated part production and working method thereof | |
CN205875388U (en) | Jacking support body | |
CN105690857B (en) | A kind of automatic cold storage plate hydraulic die and control method | |
CN219604173U (en) | Movable construction platform of bridge pier column | |
CN220049873U (en) | Panel reinforcing bar screen positioning production line | |
CN204687062U (en) | A kind of concrete prefabricated sheet material production line mould assembling and provision for disengagement | |
CN115284437B (en) | Prefabricated bridge deck steel mould supporting device and pouring process thereof | |
CN113047551B (en) | Modular assembly type shear-fork-shaped steel structure outer wall stair and assembly method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |