CN213220888U - Amusement facility with spherical structure - Google Patents

Amusement facility with spherical structure Download PDF

Info

Publication number
CN213220888U
CN213220888U CN202021159596.7U CN202021159596U CN213220888U CN 213220888 U CN213220888 U CN 213220888U CN 202021159596 U CN202021159596 U CN 202021159596U CN 213220888 U CN213220888 U CN 213220888U
Authority
CN
China
Prior art keywords
building
sling
spherical structure
net
slide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021159596.7U
Other languages
Chinese (zh)
Inventor
李方悦
吕文博
胡爽
彭丽锦
张武
刘清华
李青楠
钱丹颖
王一群
郭霖
王宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Aoya Design Inc
Original Assignee
Shenzhen Aoya Design Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Aoya Design Inc filed Critical Shenzhen Aoya Design Inc
Priority to CN202021159596.7U priority Critical patent/CN213220888U/en
Application granted granted Critical
Publication of CN213220888U publication Critical patent/CN213220888U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an amusement facility with a spherical structure, which comprises a first building, wherein the first building is arranged in a spherical shape; the first sand pit and the first building are arranged at intervals; and the sliding cable component comprises a sling and a tackle, the first end of the sling is connected with the first building, the second end of the sling extends to the first sand pit, the first end of the sling is higher than the second end of the sling, and the tackle can slide from the first end to the second end on the sling. According to the amusement facility with the spherical structure, the pulley can slide along the sling under the action of gravity, and the child slides to the first sand pit from the first building by means of the pulley, so that the courtesy and mental training are exercised.

Description

Amusement facility with spherical structure
Technical Field
The utility model relates to the technical field of entertainment equipment, in particular to an amusement facility with a spherical structure.
Background
The children's paradise is a place which can satisfy the amusement of children, various theme games and amusement equipment are usually matched and sleeved in the place, the children's paradise is usually arranged in theme parks, schools, children's activity centers and the like, and the children's paradise can also be arranged in some creative industry parks and comprehensive commercial districts.
Some children's paradises will set up the strop project to exercise children's courtesy and mental wisdom. However, children are in a developmental stage, have limited strain capacity, and are prone to accidents.
SUMMERY OF THE UTILITY MODEL
Based on this, it is necessary to provide an amusement facility with a spherical structure; the amusement facility with the spherical structure can improve the safety of children playing the strop line project and reduce the accident rate.
The technical scheme is as follows:
one embodiment provides an amusement ride with a ball formation, comprising:
the first building is arranged in a spherical shape;
the first sand pit and the first building are arranged at intervals; and
the sliding cable assembly comprises a sling and a tackle, the first end of the sling is connected with the first building, the second end of the sling extends to the first sand pit, the first end of the sling is higher than the second end of the sling, and the tackle can slide from the first end to the second end on the sling.
According to the amusement facility with the spherical structure, the pulley can slide along the sling under the action of gravity, and the child slides to the first sand pit from the first building by virtue of the pulley, so that the courtesy and mental training are exercised; in addition, the appearance of first building is the globular setting, strengthens the interest of amusement facilities.
The technical solution is further explained below:
in one embodiment, the strop assembly further comprises a fixed post disposed within the first bunker, the second end of the strop being secured to the fixed post.
In one embodiment, the first building is provided with a first entrance, the first building is provided with a first ladder stand, and the first ladder stand extends into the first building through the first entrance.
In one embodiment, a shielding shed is further arranged above the first sand pit, and an opening is formed in one side, facing the sling, of the shielding shed.
In one embodiment, the amusement facility with the spherical structure further comprises a second building, the second building is arranged at a distance from the first building, and a first channel is arranged between the second building and the first building and is used for communicating the first building and the second building.
In one embodiment, the first passage is a net climbing passage, one end of the first passage is communicated with the interior of the first building, and the other end of the first passage is communicated with the interior of the second building;
the first channels are at least two, and the adjacent first channels are connected between the first building and the second building at intervals.
In one embodiment, a first climbing net is further arranged in the first building, and a channel of the first climbing net is spirally arranged; or/and a second climbing net is also arranged in the second building, and a channel of the second climbing net is spirally arranged;
a first lying net is further arranged in the first building and is horizontally arranged; the first lying net is provided with at least two nets which are arranged at intervals up and down; a first guardrail is further arranged in the first building and arranged around the periphery of the first lying net;
or/and a second lying net is also arranged in the second building, and the second lying net is horizontally arranged; the second lying nets are provided with at least two second lying nets which are arranged at intervals up and down; and a second guardrail is further arranged in the second building and surrounds the periphery of the second lying net.
In one embodiment, a swinging ball is arranged in the first building or a swinging ball is arranged in the second building;
a first sponge pool is arranged in the first building, and a plurality of first sponge balls or first sponge blocks are arranged in the first sponge pool;
or a second sponge pool is arranged in the second building, and a plurality of second sponge balls or second sponge blocks are arranged in the second sponge pool.
In one embodiment, the amusement ride with the spherical structure further comprises a second sand pit, the first building is further provided with a first slide way, one end of the first slide way is positioned in the first building, and the other end of the first slide way extends to the second sand pit; the first slide way extends in an arc shape;
the amusement facility with the spherical structure further comprises a third sand pit, the second building is further provided with a second slide way, one end of the second slide way is located in the second building, and the other end of the second slide way extends to the third sand pit; the second slide is arc extension setting.
In one embodiment, a third building is further arranged between the first building and the second building, two ends of the first channel are respectively communicated with the first building and the second building so as to enable the first building and the second building to be communicated, a second channel is further arranged between the second building and the third building, two ends of the second channel are respectively communicated with the second building and the third building so as to enable the second building and the third building to be communicated;
the second building is arranged spherically; or/and the shape of the third building is spherically arranged.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification.
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
FIG. 1 is a schematic view showing the overall structure of an amusement ride with a spherical structure according to an embodiment;
FIG. 2 is a schematic view of a first bunker and shelter of the embodiment of FIG. 1;
FIG. 3 is a schematic illustration of a first building, a second building, a third building, etc. in the embodiment of FIG. 1;
fig. 4 is a schematic sectional view of a first building, a second building, a third building, etc. in a top view in the embodiment of fig. 1.
Reference is made to the accompanying drawings in which:
110. a first building; 111. a first ladder stand; 120. a second building; 130. a third building; 140. a fourth building; 150. a fifth building; 160. a sixth building; 210. a first bunker; 220. a shielding shed; 310. A sling; 320. fixing a column; 410. a first channel; 420. a second channel.
Detailed Description
The embodiments of the present invention will be described in detail below with reference to the accompanying drawings:
in order to make the above objects, features and advantages of the present invention more comprehensible, embodiments of the present invention are described in detail below with reference to the accompanying drawings. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein, as those skilled in the art will be able to make similar modifications without departing from the spirit and scope of the present invention.
Referring to fig. 1 and 2, one embodiment provides an amusement ride with a bulbous structure, including a first building 110, a first pit 210, and a slickline assembly.
The first building 110 may be a ball shape such as a litchi shape, and the litchi shape may be painted red and white to provide flesh and peel, so that a spatial concept of a three-dimensional object is shown to children on one hand, and a color concept is also shown on the other hand, thereby enhancing interestingness.
There is a distance between the first building 110 and the first bunker 210, which may be 15 to 60 meters, the height of the first building 110 may be 3 to 5 meters, and the first bunker 210 is on the ground, thus facilitating deployment of the slickline assembly.
The strop assembly can experience a stimulating sensation as a traditional play item, more can exercise one's thoughts and mental well being, and is generally less likely to be experienced by children due to safety issues.
Through the setting of first jumping pit 210, first jumping pit 210 arranges in the one side that descends to can play the buffering to the effort that falls in-process and produce, promote safety.
In one embodiment, referring to fig. 1 and 2, the first bunker 210 is spaced apart from the first building 110.
The first sand pit 210 is filled with crushed sand to buffer the impact force during descent. And the children naturally like playing the sand, so the sand not only plays a buffering role, but also can play in the sandpit after falling.
In one embodiment, the sliding cable assembly comprises a lifting cable 310 and a tackle, wherein a first end of the lifting cable 310 is connected to the first building 110, a second end of the lifting cable 310 extends to the first pit 210, the first end of the lifting cable 310 is higher than the second end of the lifting cable 310, and the tackle can slide on the lifting cable 310 from the first end to the second end.
It should be noted that: the concept of the rope 310 and tackle here differs from the concept of a conventional scenic rope 310 tackle or sightseeing vehicle. The sling 310 in the traditional scenic spot is suitable for adults to play because the people are in the development stage, the body bearing capacity is poor, and the mental quality, the courtesy mind and the strain capacity are poor, so the sling is not suitable for children to play. In the embodiment, the distance between the first building 110 and the first sandpit 210 may be 15 meters to 60 meters, so as to adapt to the playing characteristics of children.
Because children can experience the amazing sensation in the process of playing, on the other hand, because need some operations of oneself, also need children to overcome the feared psychology of oneself moreover, consequently, also tempered children's thoughts and mental wisdom.
According to the amusement facility with the spherical structure, the pulley can slide along the sling 310 under the action of gravity, and the child can slide to the first sand pit 210 from the first building 110 by virtue of the pulley, so that the courtesy and mind can be exercised, and the first sand pit 210 can play a role in buffering, so that the situation that the child can collide with the ground violently to cause an accident due to confusion, tension or strain difference when arriving at a terminal point can be avoided, and the playing safety is improved.
In one embodiment, referring to fig. 2, the sliding rope assembly further includes a fixing post 320, the fixing post 320 is disposed in the first bunker 210, and the second end of the sling 310 is fixed to the fixing post 320.
Both the first and second ends of the sling 310 should be securely mounted to ensure the safety of use of the sling 310. The first end of the sling 310 is in a higher position, i.e.: the first end of the sling 310 is fixed to the first structure 110 at a higher level than the first bunker 210.
The second end of the sling 310 is mounted through a fixing post 320 provided in the first pit 210, the carrier can slide on the sling 310, a child grips the carrier, and the carrier slides on the sling 310 due to gravity and the like, and slides from the first building 110 at a higher position to the first pit 210 at a lower position.
The fixing post 320 is used to mount the second end of the sling 310. Optionally, the fixed post 320 includes a base secured within the first bunker 210, a post secured above the base, and a locking mechanism secured to the post.
When the sling 310 is installed, the second end of the sling 310 is firmly fixed to the column through the locking mechanism, so that the technical effect that the second end of the sling 310 extends into the first sand pit 210 is achieved.
It should be noted that: the second end of the sling 310 should be installed on the fixed post 320 at a position higher than the ground, and will not be described in detail.
In one embodiment, referring to fig. 4, the first building 110 is provided with a first entrance, the first building 110 is provided with a first ladder 111, and the first ladder 111 extends into the first building 110 through the first entrance.
The first entrance provides access to the interior of the first building 110 from the outside of the child, while the first ladder 111 provides access means by which the child's ability to crawl can be exercised to enhance mobility.
Optionally, the first ladder 111 is a net. Reticular structure has interest on the one hand, and on the other hand can make children grab the net and creep at the in-process of crawling, promotes the manipulative ability.
In addition, in order to consider the safety problem, set up the guardrail respectively in first cat ladder 111's both sides, the guardrail can play the guard action to children, avoids children to fall down the cat ladder at the in-process of crawling in accident.
In one embodiment, referring to fig. 2, a shelter 220 is further disposed above the first pit 210, and an opening is disposed on a side of the shelter 220 facing the sling 310.
The shelter 220 may be used to shelter from wind and rain on the one hand, and to shelter from sunlight on the other hand. In south China, the weather is hot, the ultraviolet radiation is strong, and if the lamp is directly exposed outdoors, the lamp may cause sunburn to children. Accordingly, the blocking booth 220 is provided. The shielding shed 220 shown in fig. 2 only shows the installation framework of the shielding shed 220, and a corresponding shed can be further arranged on the framework, which is not described again.
In addition, the shelter 220 can also be used as a temporary rain shelter or a rest place, thereby meeting various requirements of tourists.
In one embodiment, referring to fig. 1, 3 and 4, the amusement ride with spherical structure further comprises a second building 120, the second building 120 is spaced apart from the first building 110, a first channel 410 is further provided between the second building 120 and the first building 110, and the first channel 410 is used for communicating the first building 110 and the second building 120.
In one embodiment, the first passageway 410 is a crawling passageway, one end of the first passageway 410 is in communication with the interior of the first building 110, and the other end of the first passageway 410 is in communication with the interior of the second building 120.
The first passageway 410 communicates between the first building 110 and the second building 120 to enable a child to shuttle between the first building 110 and the second building 120.
In one embodiment, there are at least two first passages 410, and adjacent first passages 410 are connected between the first building 110 and the second building 120 at intervals.
The first pathway 410 is provided in at least two such that a child may select different first pathways 410 to and from the first building 110 and the second building 120 to experience play items within different buildings.
In this embodiment, one of the first passageways 410 is a passageway from the first building 110 to the second building 120, and the other of the first passageways 410 is a passageway from the second building 120 to the first building 110, so as to avoid collision of incoming and outgoing children in the passageways.
In one embodiment, a first climbing net is further arranged in the first building 110, and a channel of the first climbing net is arranged in a spiral shape.
In one embodiment, a second climbing net is further disposed in the second building 120, and a channel of the second climbing net is spirally arranged.
In one embodiment, a first climbing net is arranged in the first building 110, and a channel of the first climbing net is arranged in a spiral shape; meanwhile, a second climbing net is further arranged in the second building 120, and a channel of the second climbing net is spirally arranged.
In one embodiment, a first net is further installed in the first building 110, and the first net is horizontally arranged.
Further, the first lying net is provided with at least two nets which are arranged at intervals up and down.
Further, a first guardrail is disposed in the first building 110, and the first guardrail is disposed around the periphery of the first lying net.
In one embodiment, a second net is further installed in the second building 120, and the second net is horizontally installed.
Further, the second lying net is provided with at least two nets which are arranged at intervals up and down.
Further, a second guardrail is disposed in the second building 120, and the second guardrail is disposed around the outer circumference of the second lying net.
In one embodiment, a swinging ball is provided in the first building 110.
In one embodiment, a swinging ball is provided in the second building 120.
The swinging ball is used for enabling children to experience the feeling of holding the ball and swinging.
It should be noted that the swinging ball should be provided with a pull rope, the upper end of the pull rope is fixed, and the lower end of the pull rope is fixed with the swinging ball.
Further, at least two teeter balls in the first building 110 or the second building 120 are provided to provide more items that a child can play with the teeter balls at the same time.
Of course, the spacing between different teeter balls should be taken into account when specifically arranging to avoid collision between different children during play.
In one embodiment, a first sponge pool is provided in the first building 110, and a plurality of first sponge balls or first sponge blocks are provided in the first sponge pool.
In one embodiment, a second sponge pool is provided in the second building 120, and a plurality of second sponge balls or second sponge blocks are provided in the second sponge pool.
It should be noted that:
first sponge pond and second sponge pond all indicate the pond, fill first sponge ball (or first sponge piece) and second sponge ball (or second sponge piece) respectively in the pond, for traditional amusement project, no longer give unnecessary details.
In one embodiment, the amusement ride with the spherical structure further comprises a second pit, the first building 110 is further provided with a first slide, one end of the first slide is located in the first building 110, and the other end of the first slide extends to the second pit.
In one embodiment, the first slideway extends in an arc shape.
The first slide that the arc extended the setting not only can play the cushioning effect to the in-process production effort that slides, but also can improve children to the understanding in space, opens children's mental intelligence.
Further, the first slide is arranged in a C shape.
In one embodiment, the amusement ride with the spherical structure further comprises a third pit, the second building 120 is further provided with a second slide, one end of the second slide is located inside the second building 120, and the other end of the second slide extends to the third pit.
In one embodiment, the second slideway extends in an arc shape.
Further, the second slide is arranged in a C shape.
In one embodiment, referring to fig. 1, 3 and 4, a third building 130 is further disposed between the first building 110 and the second building 120, two ends of the first channel 410 are respectively communicated with the first building 110 and the second building 120 to enable the first building 110 to be communicated with the second building 120, a second channel 420 is further disposed between the second building 120 and the third building 130, and two ends of the second channel 420 are respectively communicated with the second building 120 and the third building 130 to enable the second building 120 to be communicated with the third building 130.
The first building 110, the second building 120 and the third building 130 are arranged to accommodate more children for playing, and the plurality of buildings form a building group to form a large playground, so that the children can experience multiple playing items at one time.
In one embodiment, referring to fig. 1, 3 and 4, the amusement ride with the bulbous structure further comprises a fourth building 140, a fifth building 150 and a sixth building 160, with passageways being provided between the different buildings to allow communication between the different buildings so that children can shuttle between the different buildings and experience different attractions.
Specifically, the first building 110, the second building 120, the third building 130, the fourth building 140, the fifth building 150, and the sixth building 160 are set as different attraction sites, respectively.
In one embodiment, the second building 120 is spherically shaped.
In one embodiment, the third building 130 is spherically shaped.
In the specific arrangement, referring to fig. 1, 3 and 4, the first building 110, the second building 120, the third building 130, the fourth building 140, the fifth building 150 and the sixth building 160 are all disposed in a ball shape like a litchi shape, and the first building 110, the second building 120, the third building 130, the fourth building 140, the fifth building 150 and the sixth building 160 may be set to different sizes.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like, indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
In the present application, unless expressly stated or limited otherwise, the first feature may be directly on or directly under the second feature or indirectly via intermediate members. Also, a first feature "on," "over," and "above" a second feature may be directly or diagonally above the second feature, or may simply indicate that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature may be directly under or obliquely under the first feature, or may simply mean that the first feature is at a lesser elevation than the second feature.
It will be understood that when an element is referred to as being "secured to" or "disposed on" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "upper," "lower," "left," "right," and the like as used herein are for illustrative purposes only and do not denote a unique embodiment.
The technical features of the embodiments described above may be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the embodiments described above are not described, but should be considered as being within the scope of the present specification as long as there is no contradiction between the combinations of the technical features.
The above-mentioned embodiments only represent some embodiments of the present invention, and the description thereof is specific and detailed, but not to be construed as limiting the scope of the present invention. It should be noted that, for those skilled in the art, without departing from the spirit of the present invention, several variations and modifications can be made, which are within the scope of the present invention. Therefore, the protection scope of the present invention should be subject to the appended claims.

Claims (10)

1. An amusement ride with a spherical structure, comprising:
the first building is arranged in a spherical shape;
the first sand pit and the first building are arranged at intervals; and
the sliding cable assembly comprises a sling and a tackle, the first end of the sling is connected with the first building, the second end of the sling extends to the first sand pit, the first end of the sling is higher than the second end of the sling, and the tackle can slide from the first end to the second end on the sling.
2. The amusement ride with spherical construction of claim 1, wherein the sliding cable assembly further comprises a fixed post disposed within the first bunker, the second end of the cable being secured to the fixed post.
3. The amusement ride with the spherical structure according to claim 1, wherein the first building is provided with a first entrance, and wherein the first building is provided with a first ladder extending into the first building through the first entrance.
4. The amusement ride with the spherical structure according to claim 1, wherein a shelter is further provided above the first sand pit, and an opening is provided on a side of the shelter facing the sling.
5. The amusement ride with spherical structure according to any one of claims 1 to 4, further comprising a second building spaced apart from the first building, wherein a first passage is provided between the second building and the first building for communicating the first building with the second building.
6. The amusement ride with the spherical structure according to claim 5, wherein the first passage is a wire-climbing passage, one end of the first passage communicates with the interior of the first building, and the other end of the first passage communicates with the interior of the second building;
the first channels are at least two, and the adjacent first channels are connected between the first building and the second building at intervals.
7. The amusement ride with the spherical structure as claimed in claim 5, wherein a first climbing net is further arranged in the first building, and a channel of the first climbing net is spirally arranged; or/and a second climbing net is also arranged in the second building, and a channel of the second climbing net is spirally arranged;
a first lying net is further arranged in the first building and is horizontally arranged; the first lying net is provided with at least two nets which are arranged at intervals up and down; a first guardrail is further arranged in the first building and arranged around the periphery of the first lying net;
or/and a second lying net is also arranged in the second building, and the second lying net is horizontally arranged; the second lying nets are provided with at least two second lying nets which are arranged at intervals up and down; and a second guardrail is further arranged in the second building and surrounds the periphery of the second lying net.
8. The amusement ride with the spherical structure according to claim 5, wherein a rocking ball is provided in the first building or a rocking ball is provided in the second building;
a first sponge pool is arranged in the first building, and a plurality of first sponge balls or first sponge blocks are arranged in the first sponge pool;
or a second sponge pool is arranged in the second building, and a plurality of second sponge balls or second sponge blocks are arranged in the second sponge pool.
9. The amusement ride with spherical structure of claim 5, further comprising a second bunker, wherein the first building is further provided with a first slide, one end of the first slide being located within the first building, and the other end of the first slide extending to the second bunker; the first slide way extends in an arc shape;
the amusement facility with the spherical structure further comprises a third sand pit, the second building is further provided with a second slide way, one end of the second slide way is located in the second building, and the other end of the second slide way extends to the third sand pit; the second slide is arc extension setting.
10. The amusement ride with the spherical structure as claimed in claim 5, wherein a third building is further provided between the first building and the second building, both ends of the first passage are respectively communicated with the first building and the second building to communicate the first building with the second building, a second passage is further provided between the second building and the third building, both ends of the second passage are respectively communicated with the second building and the third building to communicate the second building with the third building;
the second building is arranged spherically; or/and the shape of the third building is spherically arranged.
CN202021159596.7U 2020-06-19 2020-06-19 Amusement facility with spherical structure Active CN213220888U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021159596.7U CN213220888U (en) 2020-06-19 2020-06-19 Amusement facility with spherical structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021159596.7U CN213220888U (en) 2020-06-19 2020-06-19 Amusement facility with spherical structure

Publications (1)

Publication Number Publication Date
CN213220888U true CN213220888U (en) 2021-05-18

Family

ID=75885430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021159596.7U Active CN213220888U (en) 2020-06-19 2020-06-19 Amusement facility with spherical structure

Country Status (1)

Country Link
CN (1) CN213220888U (en)

Similar Documents

Publication Publication Date Title
KR101393650B1 (en) A complex amusement facilities
CN213220888U (en) Amusement facility with spherical structure
CN202410135U (en) Children's slide toy
CN213667888U (en) Multilayer structure amusement facility
CN211328131U (en) Double-tower recreation facility
CN111298451B (en) Outdoor climbing playing facility for improving applicable crowds
CN215781459U (en) Combined slide for rescue theme
US8647213B2 (en) Apparatus for a playground bouldering slide
CN207506905U (en) A kind of climbing bridge with rope
CN218685991U (en) Ride-through and challenge type combined amusement device
KR20100124229A (en) The product method of complex mesh recreation device
CN212166504U (en) Composite entertainment facility
KR101226994B1 (en) Complex mesh recreation device
CN207506907U (en) A kind of climbing bridge that net is climbed with basin shape
CN220294110U (en) Slide with climbing net
CN210251173U (en) Inclined plane string bag walking amusement multipurpose suspension bridge
CN213667890U (en) Combined structure with integrated door and recreation facility
CN207506906U (en) A kind of climbing bridge that net is laterally climbed with inclined-plane
CN216222901U (en) Robot amusement facility
CN211215391U (en) Octopus theme's facility of travelling
CN207506908U (en) A kind of climbing bridge that net is climbed with spill
CN207506909U (en) It is a kind of to carry the climbing bridge for hanging stake and hanging ring
CN212166509U (en) Spherical recreation facility of excrement
CN220203552U (en) Cultural relic lighthouse
CN211752146U (en) Recreation facility

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant