CN207506909U - It is a kind of to carry the climbing bridge for hanging stake and hanging ring - Google Patents

It is a kind of to carry the climbing bridge for hanging stake and hanging ring Download PDF

Info

Publication number
CN207506909U
CN207506909U CN201721523194.9U CN201721523194U CN207506909U CN 207506909 U CN207506909 U CN 207506909U CN 201721523194 U CN201721523194 U CN 201721523194U CN 207506909 U CN207506909 U CN 207506909U
Authority
CN
China
Prior art keywords
bridge
bar
climbing
net
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721523194.9U
Other languages
Chinese (zh)
Inventor
刘三祥
陈兆宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Virgin Culture And Education Ltd Co In Wuhan Hundred Million
Original Assignee
Virgin Culture And Education Ltd Co In Wuhan Hundred Million
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Virgin Culture And Education Ltd Co In Wuhan Hundred Million filed Critical Virgin Culture And Education Ltd Co In Wuhan Hundred Million
Priority to CN201721523194.9U priority Critical patent/CN207506909U/en
Application granted granted Critical
Publication of CN207506909U publication Critical patent/CN207506909U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The technical program is related to amusement facility field, it is particularly a kind of with the climbing bridge for hanging stake and hanging ring, including at least bridge railings and the plain net being set between bridge railings and spill net, bridge railings is located at the both sides of climbing bridge, climbing bridge passes through the they sup-port that is arranged on bridge railings, bridge railings includes horizon bar, tilting bar and fold-line-shaped bar, the bridge railings of bridge side is climbed according to the first tilting bar, first level bar, first fold-line-shaped bar and the second tilting bar are linked in sequence, the bridge railings of bridge opposite side is climbed according to third tilting bar, second horizon bar, second fold-line-shaped bar and the 4th tilting bar are linked in sequence, plain net or spill side off the net, which are equipped with, hangs stake or hanging ring.User can creep on the climbing bridge with the climbing bridge for hanging stake and hanging ring, temper limb force and body harmony, user can temper limb force and body harmony by using the method for hanging stake and hanging ring movement, and climbing bridge simultaneously participates in convenient for more children.

Description

It is a kind of to carry the climbing bridge for hanging stake and hanging ring
Technical field
The technical program is related to amusement facility field, particularly a kind of with the climbing bridge for hanging stake and hanging ring.
Background technology
Climbing class amusement facility is deep in recent years to be liked by children, can not only cultivate interest of the children to sports, and energy Temper the balanced capacity and muscle power of children.Large-scale climbing class amusement facility is convenient for house in order to which children are concentrated on fixed area at present Length is looked after, and is mainly fabricated to enclosed, and closed amusement facility is typically provided fixed entrance, such as Chinese invention patent A kind of closed amusement facility formed by outer net encirclement proposed in " one kind, which is travelled, climbs net " (CN2015101817495), Usually build higher of closed amusement facility in megastore is simultaneously stopped with iron wire and safety belt is tied up with children To ensure safety, the sense of participation of this enclosed climbing class amusement facility and not as good as open good, tying up safety belt can also limit The scope of activities of children processed, so open climbing class amusement facility is more suitable for the more children such as community and kindergarten at any time Entertain the place of group participation.However existing open amusement facility is mainly slide, swing, seesaw etc., it is in the form of a single Can not meet the needs of children.
Invention content
The purpose of the present invention is to provide a kind of open and various informative climbing class amusement facilities.
In order to achieve the goal above, the technical scheme is that a kind of with the climbing bridge of stake and hanging ring is hung, at least wrap The plain net and spill net for including bridge railings and being set between bridge railings, bridge railings are located at the both sides of climbing bridge, and climbing bridge is by setting The they sup-port on bridge railings is put, bridge railings includes horizon bar, tilting bar and fold-line-shaped bar, and the both ends height of tilting bar is not Same and both ends are respectively equipped with circular arc shaped curvature, and the bending direction in the tilting bar bending two ends portion is on the contrary, turning for fold-line-shaped bar Folding part position circular arc chamfering;The bridge railings of bridge side is climbed according to the first tilting bar, first level bar, the first fold-line-shaped bar and second Tilting bar is linked in sequence, climb bridge opposite side bridge railings according to third tilting bar, the second horizon bar, the second fold-line-shaped bar and 4th tilting bar is linked in sequence, and plain net, first level bar and the second level are equipped between the first tilting bar and third tilting bar Be equipped with spill net between bar, the first fold-line-shaped bar and the second fold-line-shaped bar form climbing bridge turning site, the first fold-line-shaped bar and Plain net or spill net are equipped between second fold-line-shaped bar, plain net is equipped between the second tilting bar and the 4th tilting bar, positioned at first Spill side off the net between horizon bar and the second horizon bar, which is equipped with, hangs stake or hanging ring, positioned at the first fold-line-shaped bar and the second fold-line-shaped Plain net or spill side off the net between bar, which is equipped with, hangs stake or hanging ring.
Moreover, plain net between the first tilting bar and third tilting bar is equipped with skin skidding or climbing rope, positioned at the Plain net between two tilting bars and the 4th tilting bar is equipped with skin skidding or climbing rope.
It hangs stake rope including what is connect with plain net or spill net moreover, hanging stake, be set in the handle and foot pedal that hang on stake rope; It is connected between hanging ring and plain net or spill net by hanging ring rope.
Moreover, bridge railings is connected with jungle gym, jungle gym includes the vertical supporting rod being connect with bridge railings and is propping up vertically The gangboard set on strut in serpentine or rectangle.
Moreover, plain net and spill net are equipped with connecting portion, the connecting portion and plain net of plain net and spill net and spill net Grid be equipped with reinforcing member, reinforcing member surface circular arc chamfering.
Moreover, the both ends of bridge railings are equipped with connecting portion, the connecting portion of bridge railings is equipped with ring flange, outside ring flange Equipped with hemispherical fastener.
Moreover, being equipped with the safe fastener of arc above bridge railings, the safe fastener of arc includes card slot part and extension, card Slot part is matched with horizon bar, tilting bar and fold-line-shaped bar size, and the outside of extension to climbing bridge extends.
Moreover, one end of the climbing bridge is connected with tail net.
Moreover, the bottom with the climbing bridge for hanging stake and hanging ring is equipped with cushion.
Moreover, supporting rod includes straight-bar and J-shaped bar.
In use, user can creep on the climbing bridge for hanging stake and hanging ring, limb force and body association are tempered Tonality, user can temper limb force and body harmony by using the method for hanging stake and hanging ring movement, and climbing bridge is convenient for More children simultaneously participate in.
The advantageous effect of the technical program is:1st, the technical program with hanging the climbing bridge of stake and hanging ring in opening Formula is more suitable for the place that the more children such as community and kindergarten entertain group participation at any time, without limitation on the movable model of children It encloses;2nd, climbing bridge climbs web form with a variety of, can be suitable for various landform, can be put in vacant lot can also be placed on enclosure wall side; 3rd, the plain net between two tilting bars is equipped with skin skidding or climbing rope, and user can slide from skin skidding, can be with It is climbed upward or downward by climbing rope;4th, climbing bridge is equipped with turning site, tempers steering skill of the user on climbing bridge; 5th, climbing bridge, which is equipped with, hangs stake and hanging ring, and user can temper limb force and body by using the method for hanging stake and hanging ring movement Harmony;6th, it is integrally formed when fold-line-shaped bar makes, the mode of than more tilting bar splicings is more secured;7th, grid spacing is 120mm-140mm so that the legs and feet of children can be to pass through, but more than waist cannot pass through, to ensure the safety of children;8th, bridge It is bonded to each other between railing with ring flange and uses screw locking, connection is more stable and firm;9th, arc is equipped with above bridge railings to pacify Full fastener avoids children from high falling.
Description of the drawings
Fig. 1 is the schematic diagram with the climbing bridge embodiment for hanging stake and hanging ring;
Fig. 2 be mounted with the safe fastener of arc climb net schematic diagram;
Fig. 3 is the schematic diagram of the safe fastener of arc;
Reference sign:1st, the second horizon bar;2nd, third tilting bar;3rd, jungle gym;4th, gangboard;5th, the second fold-line-shaped Bar;6th, supporting rod;7th, plain net;8th, spill net;9th, the first tilting bar;10th, first level bar;11st, the first fold-line-shaped bar;12nd, Two tilting bars;13rd, skin skidding;14th, climbing rope;15th, stake is hung;16th, handle;17th, foot pedal;18th, hanging ring;19th, arc safety card Part;20th, the 4th tilting bar.
Specific embodiment
The technical program is illustrated below in conjunction with drawings and examples.
A kind of embodiment with the climbing bridge for hanging stake and hanging ring is as shown in Figure 1, whole with the climbing bridge for hanging stake and hanging ring Body is in open, forms closed region not over outer net or fence, including at least bridge railings and is set between bridge railings Climb net, climb net include plain net 7 and spill net 8, bridge railings be located at climbing bridge both sides, climbing bridge by being arranged on bridge railings Supporting rod 6 support, bridge railings includes horizon bar, tilting bar and fold-line-shaped bar, and the both ends height of tilting bar is different and both ends point Not She You circular arc shaped curvature, the bending direction in the tilting bar bending two ends portion on the contrary, the circular arc shaped curvature of tilting bar with The bar cramp angle of tilting bar middle section is all higher than 90 degree;The turning point position circular arc chamfering of fold-line-shaped bar.Climb the bridge railing of bridge side Bar is linked in sequence according to the first tilting bar 9, first level bar 10, the first fold-line-shaped bar 11 and the second tilting bar 12, climbs bridge The bridge railings of opposite side connects according to the sequence of third tilting bar 2, the second horizon bar 1, the second fold-line-shaped bar 5 and the 4th tilting bar 20 It connects, plain net is equipped between the first tilting bar and third tilting bar, spill net is equipped between first level bar and the second horizon bar, it is recessed Concave shape concavity area, the first fold-line-shaped bar and the second fold-line-shaped bar form climbing bridge turning site, the first folding to shape net downwards Plain net or spill net are equipped between linear bar and the second fold-line-shaped bar, plain net is equipped between the second tilting bar and the 4th tilting bar, Spill side off the net between first level bar and the second horizon bar is equipped with and hangs stake or hanging ring, positioned at the first fold-line-shaped bar and the Plain net or spill side off the net between two fold-line-shaped bars, which are equipped with, hangs stake or hanging ring.
In the present embodiment, the spill side off the net between first level bar and the second horizon bar, which is equipped with, hangs stake 15, hangs stake It hangs stake rope including what is connect with spill net, be set in the handle 16 and foot pedal 17 that hang on stake rope, user can be by hanging stake The mode of upper movement tempers limb force and body harmony;Spill between the first fold-line-shaped bar and the second fold-line-shaped bar Side off the net is equipped with hanging ring 18, is connected between hanging ring and spill net by hanging ring rope, the length of hanging ring rope can identical also long short delivery Mistake, user can do the arm exercises such as chin-up and forward movement using hanging ring, wherein the second fold-line-shaped bar is than the first broken line Shape bar is long, and the second fold-line-shaped bar, which can be integrally formed, to be spliced by much shorter fold-line-shaped bars;First tilting bar Plain net between third tilting bar is equipped with skin skidding 13, and the plain net between the second tilting bar and the 4th tilting bar is equipped with and climbs Rope climbing 14, user can slide from skin skidding, can upward or downward be climbed by climbing rope, temper limb force, make User can climb bridge from lower end climbing;The spill area of spill net can more temper the body harmony of user, also can be for User rests;The turning site of climbing bridge can temper steering skill of the user on climbing bridge;Bridge railings is connected with climbing Frame 3, jungle gym include the vertical supporting rod being connect with bridge railings and the ladder set on vertical supporting rod in serpentine or rectangle Plate 4, convenient for climbing bridge in climbing.
One end of climbing bridge is connected with tail net, and the grid spacing of tail net is smaller and positioned at the end of climbing bridge, works as user It can play the role of damping when climbing down climbing bridge.
Plain net and spill net are equipped with connecting portion, the connecting portion and plain net of plain net and spill net and the grid of spill net Reinforcing member is equipped with, reinforcing member surface circular arc chamfering avoids user from being scraped off, and reinforcing member uses aluminum alloy materials, firm resistance to With.Rope used in plain net and spill net is extra large cable rope, and using nylon material, 6 strands of steel wires of interior package of restricting, grid spacing is 120mm- 140mm so that the legs and feet of children can be to pass through, but more than waist cannot pass through, to ensure the safety of children.
The both ends of bridge railings are equipped with connecting portion, and the connecting portion of bridge railings is equipped with ring flange, usage between bridge railings Blue disk is bonded to each other and uses screw locking, external to be fastened again with two hemispherical aluminium alloy fasteners.
Because there is the possibility for climbing out of net from eminence and falling in children, it is therefore desirable to carry out safeguard measure.For height Bridge railings higher than 80cm, bridge railings top is equipped with the safe fastener 19 of arc, as shown in figure 3, the safe fastener of arc includes card slot Part and extension, card slot part are matched with horizon bar, tilting bar and fold-line-shaped bar size, and extension is outer to climbing bridge Side extends, and the safe fastener of arc can be stuck on bridge railings, Fig. 2 be mounted with the safe fastener of arc climb net schematic diagram, wherein It is the plain net between the first tilting bar and third tilting bar to climb net.The safe fastener surface of arc is smooth, and children can not utilize The smooth surface of the safe fastener of arc by means of power climb, such children aloft when would not from climbing bridge both sides fall.
Cushion is equipped with the climbing pars basilaris pontis for hanging stake and hanging ring, cushion can play the role of buffering.
Supporting rod includes straight-bar and J-shaped bar, and straight-bar is used when bridge railings is nearer from the ground as supporting rod, bridge railings from Ground farther out (highly higher than 80cm) when use J-shaped bar as supporting rod.

Claims (10)

1. it is a kind of with the climbing bridge for hanging stake and hanging ring, including at least bridge railings and the plain net being set between bridge railings and spill Net, it is characterised in that:Bridge railings is located at the both sides of climbing bridge, and climbing bridge passes through the they sup-port being arranged on bridge railings, bridge Railing includes horizon bar, tilting bar and fold-line-shaped bar, and the both ends height of tilting bar is different and both ends are respectively equipped with arc-shaped bending Portion, the bending direction in the tilting bar bending two ends portion is on the contrary, the turning point position circular arc chamfering of fold-line-shaped bar;Climb bridge side Bridge railings is linked in sequence according to the first tilting bar, first level bar, the first fold-line-shaped bar and the second tilting bar, and climbing bridge is another The bridge railings of side is linked in sequence according to third tilting bar, the second horizon bar, the second fold-line-shaped bar and the 4th tilting bar, and first inclines Plain net is equipped between brace and third tilting bar, spill net, the first fold-line-shaped are equipped between first level bar and the second horizon bar Bar and the second fold-line-shaped bar form climbing bridge turning site, and plain net or recessed is equipped between the first fold-line-shaped bar and the second fold-line-shaped bar Shape net is equipped with plain net, the spill between first level bar and the second horizon bar between the second tilting bar and the 4th tilting bar Side off the net is equipped with and hangs stake or hanging ring, and the plain net or spill side off the net between the first fold-line-shaped bar and the second fold-line-shaped bar are equipped with Hang stake or hanging ring.
It is 2. according to claim 1 with the climbing bridge for hanging stake and hanging ring, it is characterised in that:Positioned at the first tilting bar and Plain net between three tilting bars is equipped with skin skidding or climbing is restricted, on the plain net between the second tilting bar and the 4th tilting bar Equipped with skin skidding or climbing rope.
It is 3. according to claim 1 with the climbing bridge for hanging stake and hanging ring, it is characterised in that:Stake is hung to include and plain net or recessed The connection of shape net hangs stake rope, is set in the handle and foot pedal hung on stake rope;Pass through hanging ring between hanging ring and plain net or spill net Rope connection.
It is 4. according to claim 1 with the climbing bridge for hanging stake and hanging ring, it is characterised in that:Bridge railings is connected with climbing Frame, jungle gym include the vertical supporting rod being connect with bridge railings and the ladder set on vertical supporting rod in serpentine or rectangle Plate.
It is 5. according to claim 1 with the climbing bridge for hanging stake and hanging ring, it is characterised in that:Plain net and spill net, which are equipped with, to be connected Socket part position, the connecting portion and plain net of plain net and spill net and the grid of spill net are equipped with reinforcing member, reinforcing member surface circle Arc chamfering.
It is 6. according to claim 1 with the climbing bridge for hanging stake and hanging ring, it is characterised in that:The both ends of bridge railings are equipped with Connecting portion, the connecting portion of bridge railings are equipped with ring flange, hemispherical fastener are equipped with outside ring flange.
It is 7. according to claim 1 with the climbing bridge for hanging stake and hanging ring, it is characterised in that:Arc is equipped with above bridge railings Safe fastener, the safe fastener of arc include card slot part and extension, card slot part and horizon bar, tilting bar and fold-line-shaped bar Size matches, and the outside of extension to climbing bridge extends.
It is 8. according to claim 1 with the climbing bridge for hanging stake and hanging ring, it is characterised in that:One end of the climbing bridge connects It is connected to tail net.
It is 9. according to claim 1 with the climbing bridge for hanging stake and hanging ring, it is characterised in that:With hanging climbing for stake and hanging ring The bottom for climbing bridge is equipped with cushion.
It is 10. according to claim 1 with the climbing bridge for hanging stake and hanging ring, it is characterised in that:Supporting rod includes straight-bar and J Font bar.
CN201721523194.9U 2017-11-15 2017-11-15 It is a kind of to carry the climbing bridge for hanging stake and hanging ring Active CN207506909U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721523194.9U CN207506909U (en) 2017-11-15 2017-11-15 It is a kind of to carry the climbing bridge for hanging stake and hanging ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721523194.9U CN207506909U (en) 2017-11-15 2017-11-15 It is a kind of to carry the climbing bridge for hanging stake and hanging ring

Publications (1)

Publication Number Publication Date
CN207506909U true CN207506909U (en) 2018-06-19

Family

ID=62539150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721523194.9U Active CN207506909U (en) 2017-11-15 2017-11-15 It is a kind of to carry the climbing bridge for hanging stake and hanging ring

Country Status (1)

Country Link
CN (1) CN207506909U (en)

Similar Documents

Publication Publication Date Title
US3572698A (en) Playground shelter
EP3115085B1 (en) Fitness system, fitness assembly arrangement and functional fitness elements
US10702729B2 (en) Multi-level play equipment
US6511383B1 (en) Multi-bay bungee-cord acrobatic suspension & trampoline structure
CN207506909U (en) It is a kind of to carry the climbing bridge for hanging stake and hanging ring
CN202185106U (en) Indoor body-building frame
CN201719735U (en) Multifunctional horizontal bar
CN207462658U (en) A kind of climbing bridge with jungle gym
CN107930005B (en) Open travel of one kind climbs bridge
CN207506908U (en) A kind of climbing bridge that net is climbed with spill
CN207506905U (en) A kind of climbing bridge with rope
CN207506904U (en) A kind of climbing bridge that net is climbed with U-shaped
CN207462657U (en) A kind of climbing bridge
CN207506903U (en) One kind, which is travelled, climbs bridge
CN207462534U (en) One kind, which is played, climbs bridge
CN207506907U (en) A kind of climbing bridge that net is climbed with basin shape
CN207506901U (en) A kind of amusement climbing bridge
CN107875565B (en) Open travel of one kind climbs ring
CN207506906U (en) A kind of climbing bridge that net is laterally climbed with inclined-plane
CN207506902U (en) A kind of climbing ring
CN207462535U (en) A kind of climbing bridge that net is climbed with waveform
CN209967664U (en) String bag bridge
CN207822363U (en) A kind of children's climbing training frame
CN208660321U (en) A kind of highly-safe amusement slide for children
KR200429261Y1 (en) sport apparatus of ethnic customs for a rope play

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant