CN213197400U - Workstation is used in engineering approximate calculation - Google Patents

Workstation is used in engineering approximate calculation Download PDF

Info

Publication number
CN213197400U
CN213197400U CN202021842048.4U CN202021842048U CN213197400U CN 213197400 U CN213197400 U CN 213197400U CN 202021842048 U CN202021842048 U CN 202021842048U CN 213197400 U CN213197400 U CN 213197400U
Authority
CN
China
Prior art keywords
table body
engineering
workstation
magnetic stripe
riser
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021842048.4U
Other languages
Chinese (zh)
Inventor
高航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021842048.4U priority Critical patent/CN213197400U/en
Application granted granted Critical
Publication of CN213197400U publication Critical patent/CN213197400U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses an engineering is workstation for approximate calculation, including stage body, magnetism panel and magnetic stripe two, be provided with the riser on the stage body lateral wall, be connected with between the riser the magnetism panel, be provided with spacing the propping on the riser lateral wall, spacing middle part sliding connection that props has fastening bolt, magnetism panel top is provided with magnetic stripe one, magnetic stripe one side is provided with magnetic stripe two, the riser with the stage body passes through the screw connection, the magnetism panel with the riser rotates to be connected. Has the advantages that: the utility model discloses a set up riser, magnetism panel, magnetic stripe one, magnetic stripe two, spacing and prop and fastening bolt, not only can expand fixedly to the drawing, avoid the drawing to expand the difficulty and cause the engineering approximate calculation inconvenient, but also can rotate the regulation to the drawing, avoid the drawing to see the clear engineering approximate calculation inefficiency that causes, improved the efficiency of workstation work for the engineering approximate calculation.

Description

Workstation is used in engineering approximate calculation
Technical Field
The utility model relates to a workstation technical field, concretely relates to workstation is used in engineering approximate calculation.
Background
The project budget estimate refers to a technical and economic file for pre-calculating and determining the total project cost of a construction project according to the specific content of design files at different design stages, related quota, index and fee-taking standard in the process of project construction.
At present, most of existing workbenches for engineering approximation use simple structures, engineering drawings are large, the drawings are easy to expand difficultly to cause inconvenience of the engineering approximation, meanwhile, due to the fact that the engineering drawings cannot be rotated and adjusted, the drawings are easy to be unclear to cause low efficiency of the engineering approximation, the working efficiency of the workbenches for engineering approximation is reduced, secondly, the existing workbenches for engineering approximation use mostly use fixed structures, and due to the lack of lifting parts, filling of the workbenches is slow to cause low usability of the workbenches, and the using requirements of the workbenches for engineering approximation cannot be met.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to overcome the defects of the prior art, the workbench for the engineering approximation is provided, and the problems that the existing workbench for the engineering approximation is inconvenient in engineering approximation due to the fact that engineering drawings are large and are easy to unfold difficultly, and meanwhile, due to the fact that the workbench cannot be adjusted in a rotating mode, the engineering approximation efficiency is low due to the fact that the drawings are easy to see not clearly, and the working efficiency of the workbench for the engineering approximation is reduced are solved.
(II) technical scheme
The utility model discloses a following technical scheme realizes: the utility model provides an engineering is workstation for approximate calculation, including stage body, magnetism panel and magnetic stripe two, be provided with the riser on the stage body lateral wall, be connected with between the riser the magnetism panel, be provided with spacing the propping on the riser lateral wall, spacing middle part sliding connection that props has fastening bolt, magnetism panel top is provided with magnetic stripe one, magnetic stripe one side is provided with magnetic stripe two, the riser with the stage body passes through the screw connection, the magnetism panel with the riser rotates to be connected, spacing prop with the riser passes through the screw connection, fastening bolt with the magnetism panel passes through the screw connection, magnetic stripe one with magnetism panel magnetism is connected, magnetic stripe two with magnetism panel magnetism is connected.
Furthermore, a sliding seat is arranged on the other side wall of the table body, and a working lamp is arranged above the sliding seat.
Through adopting above-mentioned technical scheme, the slide can make the flexible removal of work light.
Furthermore, a glass plate is arranged in the middle of the table body, a high-definition lamp is arranged below the glass plate, an operation panel is arranged on one side of the glass plate, an electric push rod is arranged below the table body, a base is arranged below the electric push rod, and a storage battery is arranged inside the base.
Through adopting above-mentioned technical scheme, the base can make the workstation steadily support.
Furthermore, the slide seat is connected with the table body in a sliding mode, and the work lamp is connected with the slide seat through screws.
Through adopting above-mentioned technical scheme, the work light can throw light on to the workstation.
Furthermore, the glass plate is connected with the table body through a clamping groove, and the high-definition lamp is connected with the table body through a screw.
Through adopting above-mentioned technical scheme, the high definition lamp sees through the glass board can be to the more clear of drawing detail department photograph, and what messenger's engineering budget estimate was done is more accurate.
Furthermore, the operation panel is connected with the table body through a screw, and the electric push rod is connected with the table body through a screw.
Through adopting above-mentioned technical scheme, electric putter can go up and down to the workstation.
Further, the base is connected with the electric push rod through a screw, and the storage battery is connected with the base through a screw.
Through adopting above-mentioned technical scheme, the battery can provide the electric energy to the workstation.
(III) advantageous effects
Compared with the prior art, the utility model, following beneficial effect has:
1. the utility model discloses a set up riser, magnetism panel, magnetic stripe one, magnetic stripe two, spacing brace and fastening bolt, not only can expand fixedly to the drawing, avoid the drawing to expand the difficulty and cause the engineering approximate calculation inconvenient, but also can rotate the regulation to the drawing, avoid the drawing to expand the difficulty and cause the engineering approximate calculation inconvenient, avoid the drawing to rotate the regulation, avoid the drawing to see the unclear and cause the engineering approximate calculation inefficiency, improved the efficiency of the workstation work for the engineering approximate calculation;
2. for solving current engineering for calculating the approximate workstation all adopts fixed knot to construct, owing to lack the lift part, make engineering approximate calculate fill in than the fruit and cause the workstation performance low slowly easily, can not satisfy the problem of workstation user demand for engineering approximate calculate, the utility model discloses a set up base, battery and electric push rod, can carry out lift adjustment to the workstation, avoid engineering approximate calculate fill in than the fruit and cause the workstation performance low slowly, satisfy the demand that the workstation used for engineering approximate calculate.
Drawings
Fig. 1 is a schematic structural diagram of a workbench for engineering approximate calculation according to the present invention;
FIG. 2 is a schematic view showing a connection relationship between a high-definition lamp and a stage body in a stage for engineering approximate calculation according to the present invention;
FIG. 3 is an internal view of a base in a workbench for engineering approximate calculation
1. A table body; 2. a vertical plate; 3. a magnetic display board; 4. a limit support; 5. fastening a bolt; 6. a first magnetic strip; 7. a second magnetic strip; 8. a slide base; 9. a working lamp; 10. a glass plate; 11. a high-definition lamp; 12. an operation panel; 13. an electric push rod; 14. a base; 15. and (4) a storage battery.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As shown in fig. 1-3, the workbench for engineering approximate calculation in this embodiment includes a table body 1, a magnetic display board 3 and a second magnetic stripe 7, a vertical board 2 is disposed on a side wall of the table body 1, the magnetic display board 3 is connected between the vertical boards 2, a limit support 4 is disposed on a side wall of the vertical board 2, a fastening bolt 5 is slidably connected to a middle portion of the limit support 4, a first magnetic stripe 6 is disposed above the magnetic display board 3, a second magnetic stripe 7 is disposed on one side of the first magnetic stripe 6, a sliding base 8 is disposed on the other side wall of the table body 1, a working lamp 9 is disposed above the sliding base 8, the working lamp 9 can be flexibly moved by the sliding base 8, a glass plate 10 is disposed in the middle portion of the table body 1, a high definition lamp 11 is disposed below the glass plate 10, an operation panel 12 is disposed on one side of the glass plate 10, an electric push rod 13 is disposed below the table body, the base 14 can make the workstation steadily support, slide 8 and stage 1 sliding connection, and the working light 9 passes through bolted connection with slide 8, and the working light 9 can throw light on to the workstation, and glass board 10 passes through the draw-in groove with stage 1 to be connected, and high definition lamp 11 passes through bolted connection with stage 1, and high definition lamp 11 sees through glass board 10 can be to the clearer that drawing detail department shines, makes the more accurate that the engineering budget is generally done.
As shown in fig. 1-3, in this embodiment, riser 2 passes through the screw connection with stage 1, magnetism panel 3 rotates with riser 2 to be connected, spacing 4 that prop passes through the screw connection with riser 2, fastening bolt 5 passes through the screw connection with magnetism panel 3, magnetic stripe one 6 is connected with magnetism panel 3 magnetism, magnetic stripe two 7 is connected with magnetism panel 3 magnetism, not only can expand fixedly to the drawing, it is inconvenient to avoid the drawing to expand the difficulty and cause the engineering approximate calculation, and can also rotate the regulation to the drawing, it is low to avoid the drawing to see the clear engineering approximate calculation efficiency that causes, the efficiency of workstation work for the engineering approximate calculation has been improved.
As shown in fig. 1 and 3, in the present embodiment, the operation panel 12 is connected to the table body 1 by screws, the electric push rod 13 is connected to the table body 1 by screws, the base 14 is connected to the electric push rod 13 by screws, and the battery 15 is connected to the base 14 by screws.
The specific implementation process of this embodiment is as follows: remove the workstation to appointed place, tile the engineering drawing on magnetism panel 3, expand fixedly through magnetic stripe 6 and two 7 with the drawing and compress tightly, for the clarity that makes things convenient for the drawing to see, rotate magnetism panel 3 through spacing 4 that prop, adjust the drawing, and die magnetism panel 3 lock through fastening bolt 5, slide 8, start working lamp 9 through operating panel 12 and throw light on to the drawing, conveniently carry out the engineering budget estimate, the construction node of a bit of complicacy in the drawing, see through glass board 10 through high definition lamp 11, look over the drawing, it is more accurate to make the engineering budget estimate do, during the engineering budget, need the on-the-spot calculation to fill in a bit, start electric push rod 13 and carry out the lift adjustment to the workstation, conveniently operate and use, this engineering is workstation convenient to use for the approximate, the efficiency that the workstation was used for the engineering approximate has been improved.
The above-described embodiments are merely illustrative of the preferred embodiments of the present invention and are not intended to limit the spirit and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made by the technical solution of the present invention by those skilled in the art should fall into the protection scope of the present invention, and the technical contents claimed by the present invention have been fully recorded in the claims.

Claims (7)

1. A workbench for project approximate calculation is characterized in that: comprises a table body (1), a magnetic display board (3) and a magnetic strip II (7), wherein a vertical plate (2) is arranged on one side wall of the table body (1), the magnetic display board (3) is connected between the vertical plates (2), a limit support (4) is arranged on one side wall of the vertical plate (2), a fastening bolt (5) is slidably connected to the middle part of the limit support (4), a magnetic strip I (6) is arranged above the magnetic display board (3), the magnetic strip II (7) is arranged on one side of the magnetic strip I (6), the vertical plate (2) is connected with the table body (1) through a screw, the magnetic display board (3) is rotatably connected with the vertical plate (2), the limit support (4) is connected with the vertical plate (2) through a screw, the fastening bolt (5) is connected with the magnetic display board (3) through a screw, the magnetic strip I (6) is magnetically connected with the magnetic display board (3), the second magnetic strip (7) is magnetically connected with the magnetic display board (3).
2. The work bench for project estimation according to claim 1, characterized in that: a sliding seat (8) is arranged on the other side wall of the table body (1), and a working lamp (9) is arranged above the sliding seat (8).
3. The work bench for project estimation according to claim 2, characterized in that: the table body is characterized in that a glass plate (10) is arranged in the middle of the table body (1), a high-definition lamp (11) is arranged below the glass plate (10), an operation panel (12) is arranged on one side of the glass plate (10), an electric push rod (13) is arranged below the table body (1), a base (14) is arranged below the electric push rod (13), and a storage battery (15) is arranged inside the base (14).
4. The work bench for project estimation according to claim 2, characterized in that: the sliding seat (8) is connected with the table body (1) in a sliding mode, and the working lamp (9) is connected with the sliding seat (8) through screws.
5. A workstation for project approximation according to claim 3, wherein: the glass plate (10) is connected with the table body (1) through a clamping groove, and the high-definition lamp (11) is connected with the table body (1) through a screw.
6. A workstation for project approximation according to claim 3, wherein: the operation panel (12) is connected with the table body (1) through screws, and the electric push rod (13) is connected with the table body (1) through screws.
7. A workstation for project approximation according to claim 3, wherein: the base (14) is connected with the electric push rod (13) through screws, and the storage battery (15) is connected with the base (14) through screws.
CN202021842048.4U 2020-08-28 2020-08-28 Workstation is used in engineering approximate calculation Active CN213197400U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021842048.4U CN213197400U (en) 2020-08-28 2020-08-28 Workstation is used in engineering approximate calculation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021842048.4U CN213197400U (en) 2020-08-28 2020-08-28 Workstation is used in engineering approximate calculation

Publications (1)

Publication Number Publication Date
CN213197400U true CN213197400U (en) 2021-05-14

Family

ID=75842163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021842048.4U Active CN213197400U (en) 2020-08-28 2020-08-28 Workstation is used in engineering approximate calculation

Country Status (1)

Country Link
CN (1) CN213197400U (en)

Similar Documents

Publication Publication Date Title
CN210621146U (en) Adjustable operation station table for sewing machine
CN213197400U (en) Workstation is used in engineering approximate calculation
CN212681068U (en) Physical experiment table
CN214609615U (en) Improved storage shelf
CN214678132U (en) Finance and tax management is with storage frame
CN212144011U (en) Door and window aluminum alloy levels device
CN212794901U (en) Portable toolbox is used to engineering budget estimate
CN214963382U (en) Digital media design platform based on computer technology
CN207152266U (en) A kind of construction costs dedicated
CN220587755U (en) Drawing bench with cleaning function
CN214964214U (en) Portable show shelf structure for architectural design
CN213562427U (en) Workbench with electric movable sliding table
CN215798242U (en) Retractable removes lift platform
CN215417455U (en) Power grid planning display board for power engineering design
CN211078198U (en) Hydraulic grab bucket device convenient to operate
CN212193105U (en) Storage device for mapping engineering
CN218576154U (en) Movable lifting workbench
CN212537237U (en) Big data all-in-one is with placing platform
CN214156863U (en) Show shelf mount pad of paper containing box for drawing of ring skill design
CN220807232U (en) Extensible workbench
CN210339532U (en) Lead wire carrying clamping jaw
CN220141135U (en) Adjustable high-altitude multi-layer goods shelf
CN215970910U (en) Art design picture inserting device
CN218883593U (en) Adjustable server support
CN216632353U (en) Processing of medical consumptive material packing box is with machine of breaching a mouthful

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant