CN213185034U - Building site switch board convenient to installation - Google Patents
Building site switch board convenient to installation Download PDFInfo
- Publication number
- CN213185034U CN213185034U CN202021329199.XU CN202021329199U CN213185034U CN 213185034 U CN213185034 U CN 213185034U CN 202021329199 U CN202021329199 U CN 202021329199U CN 213185034 U CN213185034 U CN 213185034U
- Authority
- CN
- China
- Prior art keywords
- switch board
- distribution cabinet
- power distribution
- rear surface
- rubber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Patch Boards (AREA)
Abstract
The utility model belongs to the building field, concretely relates to building site switch board convenient to installation, including the switch board, the louvre has been seted up to switch board lateral wall both sides, switch board rear surface intermediate position department is equipped with fixed establishment, the switch board lateral wall is equipped with protection machanism, fixed establishment includes dogtooth, connecting band, adapter sleeve, spacing tooth, connecting rod and spring; through the connecting band, the setting of rubber pad and spring, make the difficult removal that takes place the position of switch board, need not to carry out the installation of a plurality of bolts, more save time, be favorable to staff work efficiency's improvement, through the rubber sack, the setting of roof and guard plate, make the inside temperature reduction of switch board, and can the temperature that the separation external environment transmitted to the switch board, alleviate the influence to switch board internal plant life, and can not cause power resource's consumption, roof and side board can separate the erosion of external environment factor to the switch board.
Description
Technical Field
The utility model relates to a building field, concretely relates to building site switch board convenient to installation.
Background
The power distribution cabinet is a general name of a motor control center. The power distribution cabinet is used in the occasions with dispersed loads and less loops; the motor control center is used for occasions with concentrated loads and more loops. They distribute the power of a certain circuit of the upper-level distribution equipment to the nearby loads. This level of equipment should provide protection, monitoring and control of the load.
The prior art has the following problems:
1. the switch board of building site adopts the bolt to install fixedly more, need consume more time when installation and dismantlement and carry out twisting of a plurality of bolts and move, makes the installation rate of switch board slow down, and when external space is less narrow, the staff of being not convenient for carries out twisting of bolt and moves, causes inconvenience for the staff.
2. The exposed placing of switch board that building site used is in external environment, and it is great to make the switch board receive the erosion of external environment factor, influences the life of switch board, and the higher life that easily shortens switch board internal plant of ambient temperature, and utilizes external equipment to dispel the heat the power resource that the easy expense is more.
For solving the problem, the utility model provides a building site switch board convenient to installation in this application.
SUMMERY OF THE UTILITY MODEL
Objects of the invention
For solving the technical problem who exists among the background art, the utility model provides a building site switch board convenient to installation has the characteristics of being convenient for fixed, protection and heat dissipation.
(II) technical scheme
For solving the technical problem, the utility model provides a building site switch board convenient to installation, which comprises a power distribution cabinet, the louvre has been seted up to switch board lateral wall both sides, switch board rear surface intermediate position department is equipped with fixed establishment, the switch board lateral wall is equipped with protection machanism, fixed establishment includes dogtooth, connecting band, adapter sleeve, spacing tooth, connecting rod and spring, switch board rear surface one side is connected with the connecting band, the connecting band rear surface is connected with the dogtooth, switch board rear surface opposite side is connected with the adapter sleeve, the inside rear surface intermediate position department of adapter sleeve is connected with the spring, the spring front end is connected with spacing tooth, spacing tooth rear surface intermediate position department is close to the spring inboard is connected with the connecting rod.
Preferably, the number of the convex teeth is multiple, and the multiple convex teeth are uniformly distributed on the rear surface of the connecting band.
Preferably, the front surface of the connecting belt is connected with a rubber pad.
Preferably, the protection mechanism comprises a rubber bag, and the outer side wall of the power distribution cabinet is connected with the rubber bag.
Preferably, the protection mechanism further comprises a top plate and protection plates, the upper surface of the power distribution cabinet is close to the upper surface of the rubber bag, the top plate is connected to the upper surface of the rubber bag, and the protection plates are connected to two ends of the top plate.
Preferably, the protection mechanism further comprises a side plate and a guide plate, the outer side wall of the power distribution cabinet is close to one side of the rubber bag, the side plate is connected to the lower end of the side plate, and the guide plate is connected to the lower end of the side plate.
Preferably, the number of the rubber bags is multiple, and the multiple rubber bags are uniformly distributed on the outer side wall of the power distribution cabinet.
The above technical scheme of the utility model has following profitable technological effect:
1. through the connecting band, the setting of rubber pad and spring, make switch board for the building site when installing, the staff accessible is placed the switch board and is being treated the installation place, insert the connecting band inside the adapter sleeve and stimulate, make the connecting band after the pulling press from both sides tight in contact with the installation pole, the rubber pad increases the frictional force between connecting band and the installation pole, make the difficult removal that takes place the position of switch board, need not to carry out the installation of a plurality of bolts, more save time is favorable to staff work efficiency's improvement.
2. Through the rubber sack, the setting of roof and guard plate, make switch board for the building site after the installation, the liquid of connecting the inside splendid attire of rubber sack in the switch board outside can absorb the heat when the inside temperature of switch board is higher, make the inside temperature of switch board reduce, and can separate the temperature that external environment transmitted to the switch board, alleviate the influence to switch board internal plant life, and can not cause power resource's consumption, roof and side board can separate the erosion of external environment factor to the switch board, the life of extension switch board.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the fixing mechanism of the present invention;
fig. 3 is a schematic view of the internal structure of the connecting sleeve of the present invention;
fig. 4 is a schematic structural diagram of the protection mechanism of the present invention.
Reference numerals:
1. a power distribution cabinet; 2. heat dissipation holes; 3. a fixing mechanism; 31. a convex tooth; 32. a connecting belt; 33. a rubber pad; 34. connecting sleeves; 35. limiting teeth; 36. a connecting rod; 37. a spring; 4. a protection mechanism; 41. a rubber bag; 42. a top plate; 43. a protection plate; 44. a side plate; 45. a guide plate.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in detail with reference to the accompanying drawings. It should be understood that the description is intended to be illustrative only and is not intended to limit the scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
As shown in fig. 1-4, the utility model provides a building site switch board convenient to installation, including switch board 1, louvre 2 has been seted up to 1 lateral wall both sides of switch board, 1 rear surface intermediate position department of switch board is equipped with fixed establishment 3, 1 lateral wall of switch board is equipped with protection machanism 4, fixed establishment 3 includes dogtooth 31, connecting band 32, adapter sleeve 34, spacing tooth 35, connecting rod 36 and spring 37, 1 rear surface one side of switch board is connected with connecting band 32, connecting band 32 rear surface is connected with dogtooth 31, 1 rear surface opposite side of switch board is connected with adapter sleeve 34, the inside rear surface intermediate position department of adapter sleeve 34 is connected with spring 37, spring 37 front end is connected with spacing tooth 35, spacing tooth 35 rear surface intermediate position department is close to the inboard connecting rod 36 that is connected with.
In this embodiment, install fixedly for solving building site's switch board 1 adopts the bolt more, need consume more time when installation and dismantlement and carry out twisting of a plurality of bolts and move, make switch board 1's installation rate slow down, and when external space is narrower, the staff of being not convenient for carries out twisting of bolt and moves, leads to the fact inconvenient problem for the staff.
As shown in fig. 2-3, when the power distribution cabinet for the building site is installed, the worker can place the power distribution cabinet 1 at a place to be installed, insert the connecting belt 32 into the connecting sleeve 34 and pull the connecting belt, so that the connecting belt 32 is tightly and tightly contacted with the installation rod after being pulled, the rubber pad 33 increases the friction force between the connecting belt 32 and the installation rod, the power distribution cabinet 1 is not easy to move, a plurality of bolts do not need to be installed, the time is saved, and the improvement of the working efficiency of the worker is facilitated.
After the connecting band 32 is pulled, the convex teeth 31 on the rear surface of the connecting band 32 and the limiting teeth 35 inside the connecting sleeve 34 are limited with each other, and the limiting teeth 35 press the connecting band 32 under the action of the springs 37, so that the connecting band 32 is not loosened, and the limiting teeth 35 are not easy to shift under the action of the connecting rod 36.
In this embodiment, in order to solve the exposed placing in external environment of switch board 1 that the building site used, it is great to make switch board 1 receive the erosion of external environment factor, influences switch board 1's life, and the higher life who easily shortens switch board 1 internal plant of ambient temperature, and utilizes external equipment to dispel the heat the problem of the more power resource of easy expense.
As shown in fig. 4, switch board 1 for the building site is after the installation, the liquid of connecting the inside splendid attire of rubber sack 41 in the switch board 1 outside can absorb the heat when switch board 1 inside temperature is higher, make the inside temperature of switch board 1 reduce, and can the separation external environment transmit to the temperature of switch board 1, alleviate the influence to switch board 1 internal plant life, and can not cause power resource's consumption, roof 42 and side board 44 can separate the erosion of external environment factor to switch board 1, extension switch board 1's life.
It should be noted that, the quantity of rubber sack 41 is a plurality of, a plurality of rubber sacs 41 evenly distributed on switch board 1 lateral wall, and separate certain clearance between the rubber sack 41, the heat dissipation of the inside liquid of rubber sack 41 of being convenient for, and when external effort acted force acted on switch board 1, rubber sack 41 can carry out the buffering of effort, prevent that switch board 1 from causing the destruction, guard plate 43 and guide board 45 are the angle of inclination design, make external rainwater receive the difficult switch board 1 inside that gets into of separation.
In the present embodiment, in order to make the position of the connection band 32 limited by the mutual restriction between the convex teeth 31 and the limit teeth 35, it is further preferable that the number of the convex teeth 31 is plural, and the plural convex teeth 31 are uniformly distributed on the rear surface of the connection band 32.
In order to increase the friction between the connection belt 32 and the fixing device, it is further preferable that a rubber pad 33 is attached to the front surface of the connection belt 32.
In order to reduce the influence of the external temperature on the internal equipment of the power distribution cabinet 1 by the liquid in the rubber bag 41, the protection mechanism 4 further comprises the rubber bag 41, and the rubber bag 41 is connected to the outer side wall of the power distribution cabinet 1.
In order to protect the rubber bag 41 from damage, the protection mechanism 4 further comprises a top plate 42 and a protection plate 43, the top plate 42 is connected to the upper surface of the power distribution cabinet 1, which is close to the rubber bag 41, and the protection plates 43 are connected to two ends of the top plate 42.
In order to protect the rubber bag 41, the protection mechanism 4 further comprises a side plate 44 and a guide plate 45, the side plate 44 is connected to one side of the outer side wall of the power distribution cabinet 1, which is close to the rubber bag 41, and the guide plate 45 is connected to the lower end of the side plate 44.
In order to reduce the influence of the external temperature on the internal devices of the power distribution cabinet 1 by the liquid inside the rubber bags 41, the number of the rubber bags 41 is further multiple, and the multiple rubber bags 41 are uniformly distributed on the outer side wall of the power distribution cabinet 1.
The utility model discloses a theory of operation and use flow: when the power distribution cabinet for the construction site is installed, a worker can place the power distribution cabinet 1 at a place to be installed, insert the connecting belt 32 into the connecting sleeve 34 and pull the connecting belt 32 to tightly contact with the installation rod after pulling, the rubber pad 33 increases the friction force between the connecting belt 32 and the installation rod, so that the power distribution cabinet 1 is not easy to move, installation of a plurality of bolts is not needed, time is saved, improvement of working efficiency of the worker is facilitated, after the power distribution cabinet 1 for the construction site is installed, liquid contained in the rubber bag 41 connected to the outer side of the power distribution cabinet 1 can absorb heat when the temperature in the power distribution cabinet 1 is higher, the temperature in the power distribution cabinet 1 is reduced, the temperature transmitted to the power distribution cabinet 1 from the external environment can be blocked, the influence on the service life of equipment in the power distribution cabinet 1 is reduced, and power resources are not consumed, roof 42 and side board 44 can separate the erosion of external environment factor to switch board 1, prolongs switch board 1's life.
It is to be understood that the above-described embodiments of the present invention are merely illustrative of or explaining the principles of the invention and are not to be construed as limiting the invention. Therefore, any modification, equivalent replacement, improvement and the like made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. Further, it is intended that the appended claims cover all such variations and modifications as fall within the scope and boundaries of the appended claims or the equivalents of such scope and boundaries.
Claims (7)
1. The utility model provides a building site switch board convenient to installation, includes switch board (1), louvre (2) have been seted up to switch board (1) lateral wall both sides, its characterized in that, switch board (1) rear surface intermediate position department is equipped with fixed establishment (3), switch board (1) lateral wall is equipped with protection machanism (4), fixed establishment (3) include dogtooth (31), connecting band (32), adapter sleeve (34), spacing tooth (35), connecting rod (36) and spring (37), switch board (1) rear surface one side is connected with connecting band (32), the connecting band (32) rear surface is connected with dogtooth (31), switch board (1) rear surface opposite side is connected with adapter sleeve (34), adapter sleeve (34) inside rear surface intermediate position department is connected with spring (37), spring (37) front end is connected with spacing tooth (35), the middle position of the rear surface of the limiting tooth (35) is close to the inner side of the spring (37) and is connected with a connecting rod (36).
2. Construction site distribution cabinet convenient to install according to claim 1, characterized in that the number of teeth (31) is multiple and multiple teeth (31) are evenly distributed on the rear surface of the connecting band (32).
3. Construction site distribution cabinet convenient to install according to claim 1, characterized in that a rubber pad (33) is attached to the front surface of the connection belt (32).
4. Construction site power distribution cabinet convenient to install according to claim 1, characterized in that the protection mechanism (4) comprises a rubber bag (41), and the rubber bag (41) is connected to the outer side wall of the power distribution cabinet (1).
5. The construction site power distribution cabinet convenient to install according to claim 4, wherein the protection mechanism (4) further comprises a top plate (42) and a protection plate (43), the top plate (42) is connected to the upper surface of the power distribution cabinet (1) close to the upper surface of the rubber bag (41), and the protection plate (43) is connected to two ends of the top plate (42).
6. The construction site power distribution cabinet convenient to install according to claim 4, wherein the protection mechanism (4) further comprises a side edge plate (44) and a guide plate (45), the side edge plate (44) is connected to one side, close to the rubber bag (41), of the outer side wall of the power distribution cabinet (1), and the guide plate (45) is connected to the lower end of the side edge plate (44).
7. Construction site power distribution cabinet convenient to install according to claim 4, characterized in that the number of said rubber bladders (41) is multiple and the multiple rubber bladders (41) are evenly distributed on the outer side wall of the power distribution cabinet (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021329199.XU CN213185034U (en) | 2020-07-08 | 2020-07-08 | Building site switch board convenient to installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021329199.XU CN213185034U (en) | 2020-07-08 | 2020-07-08 | Building site switch board convenient to installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213185034U true CN213185034U (en) | 2021-05-11 |
Family
ID=75793217
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021329199.XU Expired - Fee Related CN213185034U (en) | 2020-07-08 | 2020-07-08 | Building site switch board convenient to installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213185034U (en) |
-
2020
- 2020-07-08 CN CN202021329199.XU patent/CN213185034U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213185034U (en) | Building site switch board convenient to installation | |
CN204850497U (en) | Promote no lower hem material platform | |
CN219351171U (en) | High temperature resistant crane span structure with protective structure | |
CN202063631U (en) | Double-crane lifting freely-unhooking device | |
CN208516764U (en) | A kind of protection hanging basket for photovoltaic module distribution, lifting | |
CN103615013A (en) | Repairable flexible passive protection system product | |
CN212659884U (en) | Reactive electric compensation cabinet | |
CN203866862U (en) | Hooking device of inspection well protective screen | |
CN203120602U (en) | Combined-type glue frame | |
CN214534152U (en) | Pawl mechanism | |
CN108277888B (en) | Novel flexible anti-seismic connecting piece | |
CN205092531U (en) | Dust -protection type U type chute | |
CN208015341U (en) | A kind of fixing device of heritage buildings lightning protection device | |
CN206783093U (en) | A kind of reflux pump pump housing hangs drawing device | |
CN202193559U (en) | Anti-dropping device of jacking device of gantry crane | |
CN211872842U (en) | Water conservancy waterwall with stabilising arrangement | |
CN219833649U (en) | Weak current engineering bridge structure | |
CN217721708U (en) | Electromechanical device collision avoidance device | |
CN218436871U (en) | A safety protection structure for water conservancy construction | |
CN218177139U (en) | Hydraulic engineering overhauls cat ladder | |
CN212866045U (en) | Iron plate fixing frame | |
CN213391528U (en) | Safety protection net convenient to installation | |
CN204111162U (en) | Vertical hanger rope rope support | |
CN216850284U (en) | 5G communication antenna | |
CN216215522U (en) | High strength communication support for communication engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210511 |
|
CF01 | Termination of patent right due to non-payment of annual fee |