CN213173806U - General basic of transformer substation GIS equipment buries piece - Google Patents

General basic of transformer substation GIS equipment buries piece Download PDF

Info

Publication number
CN213173806U
CN213173806U CN202021760255.5U CN202021760255U CN213173806U CN 213173806 U CN213173806 U CN 213173806U CN 202021760255 U CN202021760255 U CN 202021760255U CN 213173806 U CN213173806 U CN 213173806U
Authority
CN
China
Prior art keywords
gis equipment
plate
screw
wall
installation pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021760255.5U
Other languages
Chinese (zh)
Inventor
鄢博
王球
黄峥
郭其祥
徐文
毛阿宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Energy Explorer Energy Co ltd
Economic and Technological Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Energy Explorer Energy Co ltd
Economic and Technological Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Energy Explorer Energy Co ltd, Economic and Technological Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical Energy Explorer Energy Co ltd
Priority to CN202021760255.5U priority Critical patent/CN213173806U/en
Application granted granted Critical
Publication of CN213173806U publication Critical patent/CN213173806U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the field of communication equipment installation, in particular to a general basic embedded part for GIS equipment of a transformer substation, aiming at the problems that the prior building surface layer needs to be subjected to secondary pouring, the construction period is longer, concrete vibration and hardening can cause the position deviation of the embedded part during pouring to influence the GIS equipment installation, the secondary embedded part and the building surface layer form a whole body, and the reconstruction is very difficult, the utility model provides a scheme which comprises an installation pipe, wherein both sides of the installation pipe are fixedly provided with a U-shaped frame, a movable plate is connected in the installation pipe in a sliding way, the bottom of the movable plate is symmetrically and fixedly provided with two groups of screw rods, and the screw thread directions on the two groups of screw rods are opposite, the support plate can be moved downwards by rotating a screw rod, so that the heights of two adjacent basic embedded parts can be conveniently adjusted, the two basic embedded parts are positioned at the same height, and, therefore, the GIS equipment is installed, and the GIS equipment has good practicability.

Description

General basic of transformer substation GIS equipment buries piece
Technical Field
The utility model relates to a communication equipment installs technical field, especially relates to a general basis of transformer substation GIS equipment buries piece.
Background
Due to the objective difference of the product technical schemes of various GIS equipment suppliers in China, a unified, detailed and available GIS equipment basic embedded part standard is not formed at present, and the application effect of the GIS equipment basic embedded part in general equipment is not ideal, so that the further improvement of the general interchangeability of GIS equipment is restricted. In addition, because GIS equipment importance is high, in order to guarantee smooth installation, normal operating and use of equipment, all require higher than conventional engineering to GIS equipment foundation's wholeness, structural strength, construction error etc.. Therefore, the research is accelerated to form a uniform and standard GIS equipment foundation embedded part scheme, which is a necessary condition for continuously promoting the modular construction level of the transformer substation;
the following problems still exist when the embedded part is installed at present: building surface course needs to carry out the secondary pouring, and construction cycle is longer, and concrete vibration, hardening can lead to burying a skew in position when pouring, influence GIS equipment fixing, and the piece is buried to the secondary and building surface course forms wholly for it is very difficult to reform transform, so we propose a general basis of transformer substation GIS equipment and bury the piece, are used for solving the above-mentioned problem that proposes.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving and having building surface course among the prior art and need carry out the secondary pouring, construction cycle is longer, and concrete vibration, hardening can lead to burying a skew when pouring, influence GIS equipment fixing, and the secondary is buried a and is formed wholly with building surface course for reform transform the shortcoming of very difficulty, and the piece is buried to the general basis of transformer substation GIS equipment that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a general foundation embedded part for GIS equipment of a transformer substation comprises an installation pipe, wherein U-shaped frames are fixedly installed on both sides of the installation pipe, and the mounting tube is internally and slidably connected with a movable plate, the bottom of the movable plate is symmetrically and fixedly provided with two groups of screw rods, the screw directions of the two screw rods are opposite, each screw rod is provided with two screw rods, the bottom of the mounting pipe is symmetrically and rotatably connected with four threaded pipes, and the four screw rods respectively penetrate through the four threaded pipes and are respectively in threaded connection with the four threaded pipes, the bottom ends of the four screw rods all extend to the lower part of the mounting pipe and are fixedly provided with the same supporting plate, a plurality of anchor rods are fixedly arranged at the bottom of the supporting plate at equal intervals, a linkage plate is connected on the inner wall of the bottom of the mounting pipe in a sliding way, and the linkage plate is in transmission connection with the four threaded pipes respectively, the inner wall of the bottom of the installation pipe is rotatably connected with a lead screw, and the lead screw is in threaded connection with the linkage plate.
Preferably, fixed mounting has the fixed plate on the one side inner wall of U type frame, and equidistant fixed mounting has a plurality of bracing pieces on the fixed plate, the top and the bottom of a plurality of bracing pieces respectively with the top inner wall and the bottom inner wall fixed connection of U type frame, can strengthen the support nature of burying the piece.
Preferably, the equal fixed mounting in both sides of linkage board has the rack, and fixed cover is equipped with the gear on the screwed pipe, lies in all meshing with same rack with two gears of one side, the thread groove has been seted up to one side of linkage board, and the one end of lead screw extend to in the thread groove and with the inner wall threaded connection of thread groove, can conveniently drive four screwed pipes simultaneously and rotate.
Preferably, fixed mounting has the mounting panel on the bottom inner wall of installation pipe, and the lead screw runs through the mounting panel and rotates with the mounting panel to be connected, one side sliding connection of mounting panel has the carriage release lever, the rectangular channel has been seted up to the other end of lead screw, and sliding connection has the gag lever post in the rectangular channel, the one end of gag lever post extends to in the installation pipe and fixed mounting has the handle, and the one end and the handle of carriage release lever rotate to be connected, fixed mounting has the removal ring gear on the carriage release lever, and the lead screw runs through and removes the ring gear, fixed cover is equipped with fixed gear on the lead screw, and removes ring gear and fixed gear swing joint, can conveniently brake the lead screw.
Preferably, one side fixed mounting of mounting panel has the go-between, and the carriage release lever run through the go-between and with the inner wall sliding connection of go-between, the cover is equipped with compression spring on the carriage release lever, and compression spring's both ends respectively with carriage release lever and go-between fixed connection, can conveniently carry out elasticity spacing to removing the ring gear.
The utility model discloses in, the general basis of transformer substation GIS equipment buries piece:
according to the technical scheme, firstly, two basic embedded parts are respectively placed in pre-arranged pre-embedded grooves, then a moving rod can be driven to move by pulling a handle, so that a moving rack and a fixed rack can be disengaged, then the handle can be rotated to drive a screw rod to rotate, at the moment, a linkage plate and the screw rod are in threaded connection, so that the linkage plate can move, when the linkage plate moves, four gears can be simultaneously driven to rotate by the two racks, and therefore, under the action of a threaded pipe, four screws can be driven to simultaneously move downwards, and a supporting plate can move downwards;
when two adjacent mounting pipes are moved to the same height, the handle can be released at the moment, the compression spring in a stressed state can pull the moving rod to move reversely, the moving toothed ring can be driven to move until the moving toothed ring is meshed with the fixed gear, the screw rod can be braked, and the two adjacent mounting pipes can be further positioned at a stable height;
the utility model discloses a rotate the lead screw and can make the backup pad remove downwards to this height that can conveniently adjust two adjacent basis and bury the piece, make two basis bury the piece and be in same height, make things convenient for the later stage to connect the installation, so installing GIS equipment, have good practicality.
Drawings
Fig. 1 is a front view of a structure of a general foundation embedded part for a substation GIS device provided by the present invention;
fig. 2 is a structural plan view of the general foundation embedded part for the substation GIS equipment provided by the utility model;
fig. 3 is the utility model provides a part A of the structure schematic diagram in fig. 2 of general basis of transformer substation GIS equipment buries piece.
In the figure: the device comprises a mounting tube 1, a U-shaped frame 2, a fixing plate 3, a supporting rod 4, a moving plate 5, a screw 6, a supporting plate 7, an anchor rod 8, a threaded tube 9, a gear 10, a linkage plate 11, a rack 12, a threaded groove 13, a screw rod 14, a fixed gear 15, a mounting plate 16, a connecting ring 17, a moving rod 18, a moving toothed ring 19, a compression spring 20 and a limiting rod 21.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a general basic buried component for a transformer substation GIS device comprises an installation pipe 1, wherein two sides of the installation pipe 1 are fixedly provided with a U-shaped frame 2, a movable plate 5 is connected in the installation pipe 1 in a sliding manner, the bottom of the movable plate 5 is symmetrically and fixedly provided with two groups of screw rods 6, the directions of screw threads on the two groups of screw rods 6 are opposite, each group of screw rods 6 is provided with two, the bottom of the installation pipe 1 is symmetrically and rotatably connected with four threaded pipes 9, the four screw rods 6 respectively penetrate through the four threaded pipes 9 and are respectively in threaded connection with the four threaded pipes 9, the bottom ends of the four screw rods 6 extend to the lower part of the installation pipe 1 and are fixedly provided with a same support plate 7, the bottom of the support plate 7 is fixedly provided with a plurality of anchor rods 8 at equal intervals, a linkage plate 11 is slidably connected on the inner wall of the bottom of the installation pipe 1, the, the screw rod 14 is in threaded connection with the linkage plate 11.
Wherein, the utility model discloses a rotation lead screw 14 can make backup pad 7 remove downwards to this height that can conveniently adjust two adjacent basis and bury the piece, make two basis bury the piece and be in same height, make things convenient for the later stage to connect the installation, so installing GIS equipment, have good practicality.
The utility model discloses in, fixed mounting has fixed plate 3 on one side inner wall of U type frame 2, and equidistant fixed mounting has a plurality of bracing pieces 4 on fixed plate 3, the top and the bottom of a plurality of bracing pieces 4 respectively with the top inner wall and the bottom inner wall fixed connection of U type frame 2, can strengthen the support nature of burying the piece.
The utility model discloses in, the equal fixed mounting in both sides of linkage board 11 has rack 12, and fixed cover is equipped with gear 10 on the screwed pipe 9, lies in and all meshes with same rack 12 with two gear 10 of one side, and thread groove 13 has been seted up to one side of linkage board 11, and the one end of lead screw 14 extend to in the thread groove 13 and with the inner wall threaded connection of thread groove 13, can conveniently drive four screwed pipes 9 simultaneously and rotate.
The utility model discloses in, fixed mounting has mounting panel 16 on the bottom inner wall of installation pipe 1, and lead screw 14 runs through mounting panel 16 and rotates with mounting panel 16 to be connected, one side sliding connection of mounting panel 16 has carriage release lever 18, the rectangular channel has been seted up to the other end of lead screw 14, and sliding connection has gag lever post 21 in the rectangular channel, the one end of gag lever post 21 extends to in the installation pipe 1 and fixed mounting has the handle, the one end and the handle of carriage release lever 18 rotate to be connected, fixed mounting has removal ring gear 19 on the carriage release lever 18, and lead screw 14 runs through and removes ring gear 19, the fixed cover is equipped with fixed gear 15 on the lead screw 14, and remove ring gear 19 and 15 swing joint of fixed gear, can conveniently brake lead screw 14.
The utility model discloses in, one side fixed mounting of mounting panel 16 has go-between 17, and the carriage release lever 18 run through go-between 17 and with the inner wall sliding connection of go-between 17, the cover is equipped with compression spring 20 on the carriage release lever 18, and compression spring 20's both ends respectively with carriage release lever 18 and go-between 17 fixed connection, can conveniently carry out elasticity spacing to removing ring gear 19.
In the utility model, the technical scheme can facilitate the connection of two basic embedded parts through the arranged U-shaped frame, and can provide good support property under the action of a plurality of support rods 4, when the basic embedded parts are installed, firstly, the two basic embedded parts are respectively placed in pre-arranged pre-embedded grooves, then, the movable rod 18 can be driven to move by pulling the handle, so that the movable rack 19 and the fixed rack 15 are disengaged, then, the rotatable handle drives the screw rod 14 to rotate, at the moment, the linkage plate 11 and the screw rod 14 are in threaded connection, so that the movement can be carried out, when the linkage plate 11 moves, the four gears 10 can be simultaneously driven to rotate by the two racks 12, thereby, the four screws 6 can be driven to simultaneously move downwards through the action of the threaded pipe 9, so that the support plate 7 can move downwards, when removing adjacent two installation pipe 1 to same height, the handle can be released this moment, and compression spring 20 under the stress just can stimulate the carriage release 18 and remove in the opposite direction, can drive and remove ring gear 19 and remove, until removing ring gear 19 and fixed gear 15 and meshing, can reach and brake lead screw 14, further can be so that adjacent two installation pipe 1 are in stable height, make things convenient for the later stage to connect the installation, so when installing GIS equipment, have good practicality.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a general basic buried component of transformer substation GIS equipment, includes installation pipe (1), its characterized in that, the equal fixed mounting in both sides of installation pipe (1) has U type frame (2), and sliding connection has movable plate (5) in installation pipe (1), the bottom symmetry fixed mounting of movable plate (5) has two sets of screw rods (6), and the screw thread opposite direction on two sets of screw rods (6), every set screw rod (6) sets up to two, the bottom symmetry of installation pipe (1) is rotated and is connected with four screwed pipe (9), and four screw rods (6) run through four screwed pipe (9) respectively and respectively with four screwed pipe (9) threaded connection, the bottom of four screw rods (6) all extends to the below of installation pipe (1) and fixed mounting has same backup pad (7), the equidistant fixed mounting in the bottom of backup pad (7) has a plurality of stock (8), the connecting structure is characterized in that a linkage plate (11) is connected to the inner wall of the bottom of the installation pipe (1) in a sliding mode, the linkage plate (11) is in transmission connection with four threaded pipes (9) respectively, a lead screw (14) is connected to the inner wall of the bottom of the installation pipe (1) in a rotating mode, and the lead screw (14) is in threaded connection with the linkage plate (11).
2. The universal foundation embedded part for the GIS equipment of the transformer substation as claimed in claim 1, wherein a fixing plate (3) is fixedly installed on the inner wall of one side of the U-shaped frame (2), a plurality of supporting rods (4) are fixedly installed on the fixing plate (3) at equal intervals, and the top ends and the bottom ends of the supporting rods (4) are respectively and fixedly connected with the inner wall of the top and the inner wall of the bottom of the U-shaped frame (2).
3. The universal foundation embedded part for the GIS equipment of the transformer substation as claimed in claim 1, wherein racks (12) are fixedly mounted on both sides of the linkage plate (11), gears (10) are fixedly sleeved on the threaded pipes (9), the two gears (10) located on the same side are both meshed with the same rack (12), a threaded groove (13) is formed in one side of the linkage plate (11), and one end of the screw rod (14) extends into the threaded groove (13) and is in threaded connection with the inner wall of the threaded groove (13).
4. The universal foundation buried piece for substation GIS equipment of claim 1, the inner wall of the bottom of the mounting pipe (1) is fixedly provided with a mounting plate (16), and the screw rod (14) penetrates through the mounting plate (16) and is rotationally connected with the mounting plate (16), one side of the mounting plate (16) is connected with a moving rod (18) in a sliding way, the other end of the screw rod (14) is provided with a rectangular groove, and a limiting rod (21) is connected in the rectangular groove in a sliding manner, one end of the limiting rod (21) extends into the mounting pipe (1) and is fixedly provided with a handle, one end of a moving rod (18) is rotatably connected with the handle, a moving toothed ring (19) is fixedly arranged on the moving rod (18), and the screw rod (14) penetrates through the movable gear ring (19), the fixed gear (15) is fixedly sleeved on the screw rod (14), and the movable gear ring (19) is movably meshed with the fixed gear (15).
5. The universal foundation embedded part for the GIS equipment of the transformer substation as claimed in claim 4, wherein the connecting ring (17) is fixedly installed on one side of the installation plate (16), the moving rod (18) penetrates through the connecting ring (17) and is slidably connected with the inner wall of the connecting ring (17), the moving rod (18) is sleeved with a compression spring (20), and two ends of the compression spring (20) are respectively fixedly connected with the moving rod (18) and the connecting ring (17).
CN202021760255.5U 2020-08-21 2020-08-21 General basic of transformer substation GIS equipment buries piece Expired - Fee Related CN213173806U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021760255.5U CN213173806U (en) 2020-08-21 2020-08-21 General basic of transformer substation GIS equipment buries piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021760255.5U CN213173806U (en) 2020-08-21 2020-08-21 General basic of transformer substation GIS equipment buries piece

Publications (1)

Publication Number Publication Date
CN213173806U true CN213173806U (en) 2021-05-11

Family

ID=75766388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021760255.5U Expired - Fee Related CN213173806U (en) 2020-08-21 2020-08-21 General basic of transformer substation GIS equipment buries piece

Country Status (1)

Country Link
CN (1) CN213173806U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113502844A (en) * 2021-06-11 2021-10-15 国网山东省电力公司海阳市供电公司 Transformer installation basis and transformer substation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113502844A (en) * 2021-06-11 2021-10-15 国网山东省电力公司海阳市供电公司 Transformer installation basis and transformer substation

Similar Documents

Publication Publication Date Title
CN109972891B (en) Prefabricated steel structure-based fabricated steel plate net concrete-encased shear wall structure
CN211550736U (en) Building heating and ventilation pipeline fixing device
CN213173806U (en) General basic of transformer substation GIS equipment buries piece
CN214424029U (en) Outer supporting structure for fixing pouring wall formwork
CN111820634A (en) Concatenation formula alloy cupboard
CN214247358U (en) Strutting arrangement for subway construction
CN207980278U (en) A kind of arm physical strength training device
CN214839648U (en) Electromechanical device mounting structure
CN112701499B (en) Emergency guarantee communication power supply clamping device
CN213211864U (en) Install transformer case fast
CN115064942A (en) Splicing type ring main unit convenient to maintain and using method thereof
CN214089715U (en) Adjustable lifting scaffold is with climbing frame guide rail
CN215036954U (en) Pipeline embedded structure for water conservancy and hydropower construction
CN214402887U (en) Strutting arrangement for building engineering
CN211007038U (en) Steel structure net rack
CN206016199U (en) A kind of adjustable trowel
CN213760116U (en) Dialysis tube fixing device for nephrology department
CN216949479U (en) Hanging die anchoring part for building
CN218149142U (en) Steel construction curtain bearing structure
CN215949004U (en) Equipment for pulling column from joist
CN218843845U (en) Anti-deformation device for construction of concrete filled steel tubular column
CN218631568U (en) Installation fixing equipment of transformer rectifier
CN220337630U (en) Pipeline bracket
CN216112618U (en) Pipeline connecting device for indoor disinfection device
CN211201240U (en) Building structure's reinforcement connecting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210511

CF01 Termination of patent right due to non-payment of annual fee