CN213171098U - Novel cement pipeline lifting device - Google Patents

Novel cement pipeline lifting device Download PDF

Info

Publication number
CN213171098U
CN213171098U CN202021717303.2U CN202021717303U CN213171098U CN 213171098 U CN213171098 U CN 213171098U CN 202021717303 U CN202021717303 U CN 202021717303U CN 213171098 U CN213171098 U CN 213171098U
Authority
CN
China
Prior art keywords
hoisting
ring
shaped
opening
opening sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021717303.2U
Other languages
Chinese (zh)
Inventor
许阳
庄启村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Qianzheng New Material Technology Co ltd
Original Assignee
Shandong Qianzheng New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Qianzheng New Material Technology Co ltd filed Critical Shandong Qianzheng New Material Technology Co ltd
Priority to CN202021717303.2U priority Critical patent/CN213171098U/en
Application granted granted Critical
Publication of CN213171098U publication Critical patent/CN213171098U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

A novel cement pipeline hoisting device. The product comprises a left hanging opening sleeve, a middle hanging opening sleeve and a right hanging opening sleeve, wherein the left hanging opening sleeve is connected with a left front 8-shaped hanging ring and a left rear 8-shaped hanging ring, the left hanging opening sleeve is connected with a left U-shaped clamping piece, the opening end of the left U-shaped clamping piece clamps a left scale and is fixed by a bolt, the other ring of the left front 8-shaped hanging ring is connected with a left front sling, the left front sling is connected with the left front hanging ring, the other ring of the left rear 8-shaped hanging ring is connected with a left rear sling, and the left rear sling is connected with the left rear hanging ring; the right hanging opening sleeve is connected with the right front 8-shaped hanging ring and the right rear 8-shaped hanging ring, the right hanging opening sleeve is connected with the right U-shaped clamping piece, the opening end of the right U-shaped clamping piece clamps the right scale and is fixed by a bolt, the other ring of the right front 8-shaped hanging ring is connected with the right front sling, the right front sling is connected with the right front hanging ring, the other ring of the right rear 8-shaped hanging ring is connected with the right rear sling, and the right rear sling is connected with the right rear hanging ring. The utility model is used for the cement pipeline handling.

Description

Novel cement pipeline lifting device
Technical Field
The utility model relates to a novel cement pipeline hangs fortune device.
Background
The length of cement pipeline is than longer, inconvenient finding the balance point when carrying out hoist and mount, if can't find accurate balance point, the slope can appear in the hoist and mount process, has dangerous hidden danger, and how the handling cement pipeline that can be safe is the problem that needs to solve.
Disclosure of Invention
The utility model aims at providing a handling cement pipeline that can be safe, the novel cement pipeline of excellent in use effect is hoisted device.
The above purpose is realized by the following technical scheme:
a novel cement pipeline hoisting device comprises a left hoisting opening sleeve, a middle hoisting opening sleeve and a right hoisting opening sleeve, wherein the left hoisting opening sleeve is connected with a left front 8-shaped hoisting ring and a left rear 8-shaped hoisting ring, one ring of the left front 8-shaped hoisting ring passes through the left hoisting opening sleeve, one ring of the left rear 8-shaped hoisting ring passes through the left hoisting opening sleeve, the left hoisting opening sleeve is connected with a left U-shaped clamping piece, the open end of the left U-shaped clamping piece clamps a left scale and is fixed by a bolt, the other ring of the left front 8-shaped hoisting ring is connected with a left front hoisting ring, the left front hoisting ring is connected with a left front hoisting ring, the other ring of the left rear 8-shaped hoisting ring is connected with a left rear hoisting ring, and the left rear is connected with a left rear hoisting ring; hang the opening cover on the right side and connect right front 8 font rings and right back 8 font rings, a ring of right front 8 font rings pass the right side hang the opening cover, a ring of right back 8 font rings pass the right side hang the opening cover, the right side hang the opening cover and connect right U-shaped folder, the open end centre gripping right scale of right U-shaped folder, and with bolt fastening, another ring of right front 8 font rings connect right front hoist cable, right front hoist cable connect right front hoist ring, another ring of right back 8 font rings connect right back hoist cable, right back hoist cable connect right back hoist cable.
The novel cement pipeline hoisting device is characterized in that the middle hoisting opening sleeve is connected with one ring of the 8-shaped middle hoisting ring, the other ring of the 8-shaped middle hoisting ring is connected with the middle hoisting ring, the left front hoisting ring, the left rear hoisting ring, the middle hoisting ring, the right front hoisting ring and the right rear hoisting ring are combined together to be connected with a lifting hook, and the lifting hook is connected with a crane.
A novel cement pipeline hoisting device, the left open end both sides of hanging the opening cover all connect left splint, the middle open end both sides of hanging the opening cover all connect well splint, the right open end both sides of hanging the opening cover all connect right splint, left splint open and to have communicating round hole, well splint open and to have communicating round hole, right splint open and to have communicating round hole, round hole connecting bolt fixed.
The novel cement pipeline hoisting device is characterized in that the left scale is rolled up to be connected with the left elastic sleeve for fixation, and the right scale is rolled up to be connected with the right elastic sleeve for fixation.
Advantageous effects
1. The utility model discloses a left side is hung opening cover apart from the left side of cement pipeline, is hung opening cover apart from the right side equidistance of cement pipeline on the right side, and a left side is hung opening cover and is hung between the opening cover, well hanging opening cover and hanging opening cover on the right side between the distance equals, makes a left side hang opening cover, well hanging opening cover, right hanging opening cover can enough evenly distribute on the cement pipeline, and the point of application of force is even when the cement pipeline is hung, handling process safety.
2. The utility model discloses a left side front sling, left back hoist cable, right front sling, right back hoist cable, well hoist cable's distribution is even, and the pulling force of applying is balanced, and application of force point is even during handling cement pipeline, handling process safety.
3. The utility model discloses a rings merge together and catch with the lifting hook in rings, rings before the right side before left front, left back, concentrate on a little with the power of left front hoist cable, left back hoist cable, right front hoist cable, right back hoist cable, well hoist cable, and the atress is concentrated when hoisting, and the process of hoisting safety.
4. The utility model discloses a left side scale is rolled up and is fixed with left elasticity cover, right scale is rolled up and is fixed with right elasticity cover, ensures that left scale and right scale do not hinder handling cement pipeline.
Drawings
Fig. 1 is a schematic structural diagram of the product.
Fig. 2 is a rear view of fig. 1.
FIG. 3 is a top view of the cement pipeline, the left hanging opening sleeve, the middle hanging opening sleeve and the right hanging opening sleeve.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Example 1
The utility model provides a novel cement pipeline lifting device, its constitution includes: a left hanging opening sleeve 1, a middle hanging opening sleeve 2 and a right hanging opening sleeve 3, the left hanging opening sleeve is connected with a left front 8-shaped hanging ring 4 and a left rear 8-shaped hanging ring 5, one ring of the left front 8-shaped hanging ring passes through the left hanging opening sleeve in a tight fit manner, one ring of the left rear 8-shaped hanging ring passes through the left hanging opening sleeve in a tight fit manner, the left hanging opening sleeve is connected with the left U-shaped clamping piece 6, the open end of the left U-shaped clamp clamps the left scale 7 and is fixed by a bolt, the left scale can measure the distance between the left hanging opening sleeve and the left side of the cement pipeline accurately, the other ring of the left front 8-shaped hanging ring is connected with a left front sling 8, the left front sling is connected with a left front hanging ring 9, the other ring of the left rear 8-shaped hanging ring is connected with a left rear sling 10, and the left rear sling is connected with a left rear hanging ring 11; hang the opening cover on the right side and connect right front 8 font rings 12 and right back 8 font rings 13, a ring tight fit of right front 8 font rings pass the right side hang the opening cover, a ring tight fit of right back 8 font rings pass the right side hang the opening cover, the right side hang the opening cover and connect right U-shaped folder 14, the open end centre gripping right scale 15 of right U-shaped folder, and with bolt fastening, the right scale can measure the distance, the accuracy on right side hang opening cover and cement pipeline right side, another ring of right front 8 font rings connect right front hoist cable 16, right front hoist cable connect right front hoist ring 17, another ring of right back 8 font connect right back hoist cable 18, right back link connect right back hoist ring 19.
The left front sling, the left rear sling, the middle sling, the right front sling and the right rear sling apply balanced tension to the cement pipeline, and the hoisting and hoisting processes are safe.
The middle lifting opening sleeve is connected with one ring of a 8-shaped middle lifting ring 30, the other ring of the 8-shaped middle lifting ring is connected with a middle lifting rope 20, the middle lifting rope is connected with a middle lifting ring 21, the left front lifting ring, the left rear lifting ring, the middle lifting ring, the right front lifting ring and the right rear lifting ring are combined together to be connected with a lifting hook 22, and the lifting hook is connected with a crane 23.
The two sides of the opening end of the left hanging opening sleeve are both connected with a left clamping plate 24, the two sides of the opening end of the middle hanging opening sleeve are both connected with a middle clamping plate 25, the two sides of the opening end of the right hanging opening sleeve are both connected with a right clamping plate 26, the left clamping plate is provided with a communicated circular hole 27, the middle clamping plate is provided with a communicated circular hole, the right clamping plate is provided with a communicated circular hole, and the circular holes are connected and fixed through bolts. The left hanging opening sleeve, the middle hanging opening sleeve and the right hanging opening sleeve can be tightly fixed on the cement pipeline, and the hoisting and hoisting processes are safe.
The left scale is rolled up and connected with the left elastic sleeve 28 for fixation, and the right scale is rolled up and connected with the right elastic sleeve 29 for fixation.
The working principle is as follows:
opening the left scale, sleeving the left hanging opening sleeve on the left side of the cement pipeline, sleeving the middle hanging opening sleeve in the middle of the cement pipeline, opening the right scale, sleeving the right hanging opening sleeve on the right side of the cement pipeline, closing and fixing the left hanging opening sleeve, the middle hanging opening sleeve and the right hanging opening sleeve, combining the left front hanging ring, the left rear hanging ring, the middle hanging ring, the right front hanging ring and the right rear hanging ring together, hooking by using a hanging hook, and hanging by using a crane.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention should be covered by the present invention.

Claims (4)

1. A novel cement pipeline hoisting device comprises a left hoisting opening sleeve, a middle hoisting opening sleeve and a right hoisting opening sleeve, and is characterized in that the left hoisting opening sleeve is connected with a left front 8-shaped hoisting ring and a left rear 8-shaped hoisting ring, one ring of the left front 8-shaped hoisting ring passes through the left hoisting opening sleeve, one ring of the left rear 8-shaped hoisting ring passes through the left hoisting opening sleeve, the left hoisting opening sleeve is connected with a left U-shaped clamping piece, the open end of the left U-shaped clamping piece clamps a left scale and is fixed by a bolt, the other ring of the left front 8-shaped hoisting ring is connected with a left front hoisting cable, the left front hoisting cable is connected with the left front hoisting ring, the other ring of the left rear 8-shaped hoisting ring is connected with a left rear hoisting cable, and the left rear hoisting cable is connected with the left rear hoisting ring; hang the opening cover on the right side and connect right front 8 font rings and right back 8 font rings, a ring of right front 8 font rings pass the right side hang the opening cover, a ring of right back 8 font rings pass the right side hang the opening cover, the right side hang the opening cover and connect right U-shaped folder, the open end centre gripping right scale of right U-shaped folder, and with bolt fastening, another ring of right front 8 font rings connect right front hoist cable, right front hoist cable connect right front hoist ring, another ring of right back 8 font rings connect right back hoist cable, right back hoist cable connect right back hoist cable.
2. The novel cement pipeline hoisting device as claimed in claim 1, wherein the middle hoisting opening sleeve is connected with one ring of a 8-shaped middle hoisting ring, the other ring of the 8-shaped middle hoisting ring is connected with a middle hoisting rope, the middle hoisting rope is connected with the middle hoisting ring, the left front hoisting ring, the left rear hoisting ring, the middle hoisting ring, the right front hoisting ring and the right rear hoisting ring are combined together to be connected with a lifting hook, and the lifting hook is connected with a crane.
3. The novel cement pipeline hoisting device is characterized in that two sides of the opening end of the left hoisting opening sleeve are connected with left clamping plates, two sides of the opening end of the middle hoisting opening sleeve are connected with middle clamping plates, two sides of the opening end of the right hoisting opening sleeve are connected with right clamping plates, the left clamping plates are provided with communicated circular holes, the middle clamping plates are provided with communicated circular holes, the right clamping plates are provided with communicated circular holes, and the circular holes are connected and fixed through bolts.
4. The novel cement pipeline hoisting device as claimed in claim 1, wherein the left scale is rolled up and connected with the left elastic sleeve for fixation, and the right scale is rolled up and connected with the right elastic sleeve for fixation.
CN202021717303.2U 2020-08-17 2020-08-17 Novel cement pipeline lifting device Active CN213171098U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021717303.2U CN213171098U (en) 2020-08-17 2020-08-17 Novel cement pipeline lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021717303.2U CN213171098U (en) 2020-08-17 2020-08-17 Novel cement pipeline lifting device

Publications (1)

Publication Number Publication Date
CN213171098U true CN213171098U (en) 2021-05-11

Family

ID=75766932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021717303.2U Active CN213171098U (en) 2020-08-17 2020-08-17 Novel cement pipeline lifting device

Country Status (1)

Country Link
CN (1) CN213171098U (en)

Similar Documents

Publication Publication Date Title
CN213171098U (en) Novel cement pipeline lifting device
CN201890717U (en) Special hanger for H-shaped steel
CN203699647U (en) Special lifting appliance for lifting large plates
CN203781627U (en) Component lifting device
CN205916895U (en) But chain hoist that multiple spot hung
CN205442405U (en) Anchor clamps play to put in a position
CN202265308U (en) Combined hoisting device for pipeline steel plate hoisting
CN205773027U (en) A kind of convenient chain block hung
CN202808173U (en) Lifting device special for lateral columns
CN205419628U (en) Steel wire rope clasp prevents release
CN203513086U (en) Special lifting appliance for long-bundle-shaped material
CN106044548A (en) Specially-manufactured lifting device applied to pipeline lifting
CN208964396U (en) A kind of suspender of aluminium alloy pole
CN104108646B (en) A kind of handling apparatus
CN203998573U (en) A kind of overhead hoist
CN208916602U (en) Cement electric pole boom hoisting
CN209242475U (en) A kind of suspender
CN210041237U (en) Bus duct gallows convenient to installation
CN207918248U (en) A kind of manufacture of agricultural machinery suspender
CN214828459U (en) Steel wire rope installation adjustment retaining device
CN210438268U (en) Balance hoist subassembly with adjustable multiple spot for nuclear power equipment
CN211687917U (en) Novel forestry sapling lifts by crane device
CN213834224U (en) Special hoisting equipment for hoisting roller sleeve
CN201932808U (en) Lifting appliance
CN201990377U (en) Crane sling for large scale equipment in electric power system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant