CN201990377U - Crane sling for large scale equipment in electric power system - Google Patents
Crane sling for large scale equipment in electric power system Download PDFInfo
- Publication number
- CN201990377U CN201990377U CN2011201092816U CN201120109281U CN201990377U CN 201990377 U CN201990377 U CN 201990377U CN 2011201092816 U CN2011201092816 U CN 2011201092816U CN 201120109281 U CN201120109281 U CN 201120109281U CN 201990377 U CN201990377 U CN 201990377U
- Authority
- CN
- China
- Prior art keywords
- steel wire
- lifting
- steel rope
- round
- link chain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a crane sling for large scale equipment in an electric power system, which comprises lifting rings, three circular ring chains, steel wire ropes and lifting hooks, wherein the circular ring chains are sleeved and hung on the lifting rings and connected with the lifting hooks through the steel wire ropes; annular buckles are arranged at the two ends of each steel wire rope; one end of each steel wire rope is connected with the circular ring chains through the annular buckles; the other ends of the steel wire ropes are connected with the lifting hooks through the annular buckles; each circular ring chain is connected with one lifting hook through one steel wire rope; and after the circular ring chains are sleeved and hung on the lifting rings, the lifting rings are welded to be a closed structure. When the crane sling is in use, the steel wire ropes and the lifting hooks at the lower ends of the steel wire ropes can be flexibly moved according to different appearances and weights of the equipment to be hoisted, so that the potential safety hazards are eliminated, and convenience in use and good effects is achieved.
Description
One, technical field:
The utility model relates to a kind of electrician's lifting gear, particularly relates to a kind of electric system main equipment hoisting hook rigging that is used for the lifting of power department main equipment.
Two, background technology:
In the lifting work of electric system main equipment, rigging and suspender are fundamental sum lifting gears commonly used, are used for bundling, carry and shake rising weight and main equipment.Wherein, steel rope is being undertaken very important effect, often steel rope and suspension ring, shackle etc. is coupled together in the hoisting and hanging operation, makes various hoist cables, to adapt to the lifting of various device.These common Current Collector Sleaves are in hoisting process, particularly at the lifting of large lifting equipment, it is too many and through processing again, the easy equipment landing of hoisting process causes potential safety hazard with not ing to be inserted in the opening that leaves behind the round-link chain on the suspension ring of this class Current Collector Sleave, operation inconvenience, and easy damage equipment.
Three, utility model content:
Technical problem to be solved in the utility model is: overcome the deficiencies in the prior art, a kind of electric system main equipment hoisting hook rigging that does not have potential safety hazard is provided.
The utility model is that the technical scheme that the technical solution problem is taked is:
A kind of electric system main equipment hoisting hook rigging comprises suspension ring, round-link chain, steel rope and suspension hook, and described round-link chain cover hangs on the suspension ring, and round-link chain is connected with suspension hook by steel rope.
Described steel rope two ends are provided with the annulus button, and steel rope one end links to each other with round-link chain by the annulus button, and the steel rope other end links to each other with suspension hook by the annulus button.
Described round-link chain is three, and each round-link chain all links to each other with a suspension hook by a steel rope.
After described round-link chain cover hung on the suspension ring, suspension ring were welded into enclosed construction.
Good effect of the present utility model is as follows:
1, electric system main equipment hoisting hook rigging of the present utility model, after the round-link chain cover hung on the suspension ring, suspension ring were welded into enclosed construction, have eliminated potential safety hazard, had guaranteed the safety performance of lifting process.During use, can move the suspension hook of steel rope and steel rope lower end flexibly according to the difference of weight-lifting equipment profile, weight, easy to use effective.
2, electric system main equipment hoisting hook rigging of the present utility model, simple in structure, cost is lower.
Four, description of drawings:
Fig. 1 is a structural representation of the present utility model.
Five, the specific embodiment:
Below in conjunction with accompanying drawing the utility model is described further:
Referring to accompanying drawing, a kind of electric system main equipment hoisting hook rigging comprises suspension ring 1, round-link chain 2, steel rope 4 and suspension hook 6, and described round-link chain 2 covers hang on the suspension ring 1, and round-link chain 2 is connected with suspension hook 6 by steel rope 4; Described steel rope 4 two ends are provided with the annulus button, and steel rope 4 one ends link to each other with round-link chain 2 by annulus button 3, and steel rope 4 other ends link to each other with suspension hook 6 by annulus button 5; Described round-link chain 2 is three, and each round-link chain 2 all links to each other with a suspension hook 6 by a steel rope 4; After described round-link chain 2 covers hung on the suspension ring 1, suspension ring 1 were welded into enclosed construction.
The electric system main equipment hoisting hook rigging of this utility model, round-link chain 2 covers hang on the suspension ring 1, and three round-link chains 2 all are connected with a steel rope 4 and a suspension hook 6, and steel rope 4 two ends are respectively arranged with annulus button 3 and annulus button 5.During use, can move the suspension hook 6 of steel rope 4 and steel rope lower end flexibly according to the difference of weight-lifting equipment profile, weight, easy to operate effective.
Claims (4)
1. electric system main equipment hoisting hook rigging, comprise suspension ring (1), round-link chain (2), steel rope (4) and suspension hook (6), it is characterized in that: described round-link chain (2) cover hangs on the suspension ring (1), and round-link chain (2) is connected with suspension hook (6) by steel rope (4).
2. electric system main equipment hoisting hook rigging according to claim 1, it is characterized in that: described steel rope (4) two ends are provided with the annulus button, steel rope (4) one ends link to each other with round-link chain (2) by annulus button (3), and steel rope (4) other end links to each other with suspension hook (6) by annulus button (5).
3. electric system main equipment hoisting hook rigging according to claim 1 and 2, it is characterized in that: described round-link chain (2) is three, each round-link chain (2) all links to each other with a suspension hook (6) by a steel rope (4).
4. electric system main equipment hoisting hook rigging according to claim 3 is characterized in that: after described round-link chain (2) cover hung on the suspension ring (1), suspension ring (1) were welded into enclosed construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201092816U CN201990377U (en) | 2011-04-14 | 2011-04-14 | Crane sling for large scale equipment in electric power system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201092816U CN201990377U (en) | 2011-04-14 | 2011-04-14 | Crane sling for large scale equipment in electric power system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201990377U true CN201990377U (en) | 2011-09-28 |
Family
ID=44666871
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201092816U Expired - Fee Related CN201990377U (en) | 2011-04-14 | 2011-04-14 | Crane sling for large scale equipment in electric power system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201990377U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107867624A (en) * | 2017-12-12 | 2018-04-03 | 铜陵有色金属集团铜冠建筑安装股份有限公司 | A kind of shaped steel driving suspender |
-
2011
- 2011-04-14 CN CN2011201092816U patent/CN201990377U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107867624A (en) * | 2017-12-12 | 2018-04-03 | 铜陵有色金属集团铜冠建筑安装股份有限公司 | A kind of shaped steel driving suspender |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101659369A (en) | Triangle-type hanger | |
CN203699647U (en) | Special lifting appliance for lifting large plates | |
CN201517016U (en) | Special sling for a centrifugal concrete pile long die | |
CN202785383U (en) | Cantilever hoisting device | |
CN202107425U (en) | Oil drum sling | |
CN201515169U (en) | Angle iron cable trolley | |
CN201990377U (en) | Crane sling for large scale equipment in electric power system | |
CN201722053U (en) | Hoisting mechanism used for upright column hoisting | |
CN203513086U (en) | Special lifting appliance for long-bundle-shaped material | |
CN202542743U (en) | Auxiliary reeving mechanism for mounting tower crane | |
CN202917897U (en) | Cable hoisting horizontal pulley | |
CN202625622U (en) | Lifting appliance for loading and unloading concrete electric pole | |
CN202465029U (en) | Cable hoisting tool | |
CN210084804U (en) | Double-hook double-motor hoisting equipment with manual loop chain | |
CN202670992U (en) | Rod hoisting device | |
CN204342263U (en) | A kind of lifting power conversion suspender | |
CN203033659U (en) | Simple hoisting tool for I-shaped part | |
CN202038804U (en) | Special binding tackle for modifying agricultural power grid | |
CN202038806U (en) | Scale type lifting ring and lifting hook rigging special for electrical equipment installation | |
CN203319505U (en) | Plastic bucket lifting appliance | |
CN203284098U (en) | Disassembled and assembled part self-lifting device for tower crane | |
CN202529725U (en) | Novel crane | |
CN201545596U (en) | Sling with multiple connecting rings | |
CN203006726U (en) | Light lifting device for transformer substation | |
CN201961958U (en) | Triangular lifting sling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110928 Termination date: 20120414 |