CN213162837U - Automatic pier nose device of tubular pile reinforcing bar - Google Patents

Automatic pier nose device of tubular pile reinforcing bar Download PDF

Info

Publication number
CN213162837U
CN213162837U CN202021113844.4U CN202021113844U CN213162837U CN 213162837 U CN213162837 U CN 213162837U CN 202021113844 U CN202021113844 U CN 202021113844U CN 213162837 U CN213162837 U CN 213162837U
Authority
CN
China
Prior art keywords
operating platform
tubular pile
automatic
reinforcing bar
operating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021113844.4U
Other languages
Chinese (zh)
Inventor
张建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinxin Concrete Pile Co ltd
Original Assignee
Zhejiang Jinxin Concrete Pile Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinxin Concrete Pile Co ltd filed Critical Zhejiang Jinxin Concrete Pile Co ltd
Priority to CN202021113844.4U priority Critical patent/CN213162837U/en
Application granted granted Critical
Publication of CN213162837U publication Critical patent/CN213162837U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides an automatic pier head device of tubular pile reinforcing steel bars, which is provided with an operating platform with a hollow inner part, a conveyer belt is arranged on the operating platform, rotating shafts at two ends of the conveyer belt are positioned at two ends of the operating platform, and a rotating shaft at one side is connected with a motor arranged in the operating platform through a transmission device; the operating table other end installation one cuts the sword, cuts the sword and connects actuating mechanism, and operating table one side sets up 2-8 locking mechanism, and nearly cutting sword one side and being equipped with a pier nose metal sheet, establishes the oil pump in the operating table along an organic whole connection under the pier nose metal sheet, and this device has realized the automatic processing of the double-end mound of concrete pipe stake reinforcing bar, has reduced operating personnel's intensity of labour, has improved the security of production, has improved the production efficiency of reinforcing bar double-end mound processing, has satisfied the needs of production.

Description

Automatic pier nose device of tubular pile reinforcing bar
[ technical field ] A method for producing a semiconductor device
The utility model relates to a tubular pile processing subassembly, concretely relates to automatic pier nose device of tubular pile reinforcing bar.
[ background of the invention ]
With the development of reform and open and economic construction, the pretensioned prestressed concrete pipe piles are beginning to be applied to railway systems in large quantities and are expanded to the fields of industry and civil construction, municipal administration, metallurgy, harbors, highways and the like. In Yangtze river delta and Zhujiang delta areas, due to the fact that geological conditions are suitable for the use characteristics of the pipe piles, the demand of the pipe piles is increased rapidly, and therefore a new industry is formed rapidly. The structure of the prestressed concrete pipe pile comprises a plurality of deformed steel bars and steel wires spirally wound on the deformed steel bars, and the deformed steel bars are connected with each deformed steel bar in a welding mode to play a hoop wrapping role in the deformed steel bars. The two ends of the deformed steel bar are upset, the two ends of the upset are fixed through end plates to form tension, then concrete is poured, and the finished product is prepared through centrifugal forming in a die and high-temperature steam curing. In the finished product of the concrete pipe pile, the deformed steel bar is in a tensile stress state under the support of the solidified concrete, and when the product bears the weight, the compressive stress and the tensile stress in the deformed steel bar are balanced.
Therefore, upsetting at two ends of the deformed steel bar is an important process in the production of the prestressed concrete pipe pile, and the processing amount is large. In the prior art, manual operation is generally adopted, steel bars are cut, and two ends of the steel bars are respectively upset, so that the labor intensity is high, the production efficiency is low, the safety is poor, and the production requirement of the concrete pipe pile is difficult to meet.
[ Utility model ] content
In order to overcome the not enough of current technique, the utility model relates to an automatic pier nose device of tubular pile reinforcing bar realizes the automatic pier nose processing of concrete tubular pile reinforcing bar.
The utility model adopts the technical proposal that: an automatic pier head device for tubular pile reinforcing steel bars is provided with an operating platform with a hollow interior, a conveyer belt is arranged on the operating platform, rotating shafts at two ends of the conveyer belt are positioned at two ends of the operating platform, and a rotating shaft at one side is connected with a motor arranged in the operating platform through a transmission device; the other end of the operating platform is provided with a cutting knife which is connected with a driving mechanism, 2-8 locking mechanisms are arranged on one side of the operating platform, a pier head metal plate is arranged on one side close to the cutting knife, and an oil pump arranged in the operating platform is arranged in the lower edge of the pier head metal plate in an integrated connection mode.
Preferably, the locking mechanism is a multi-stage turnover mechanical arm, and the top end of the locking mechanism is embedded into a lock hole on the other side of the operating platform.
Preferably, the driving mechanism of the cutting knife is a lifting oil pump.
The utility model has the advantages that: the automatic processing of the double-end upsetting of the concrete pipe pile reinforcing steel bars is realized, the labor intensity of operators is reduced, the production safety is improved, the production efficiency of the double-end upsetting of the reinforcing steel bars is improved, and the production requirement is met.
For a better understanding of the features and technical content of the present invention, reference should be made to the embodiments of the present invention, which are illustrated for reference and description purposes only, and are not intended to limit the present invention.
[ description of the drawings ]
FIG. 1 is a schematic structural view of the present invention;
in the figure, the device comprises a working table 1, a conveying belt 2, a locking device 3, a cutting knife 4, a pier head metal plate 5, an oil pump 6, an oil pump 7 and a motor.
[ detailed description ] embodiments
The following examples further illustrate the invention:
embodiment 1, an automatic pier head device for tubular pile reinforcing steel bars is provided with an operating platform with a hollow inner part, a conveyer belt is arranged on the operating platform, rotating shafts at two ends of the conveyer belt are positioned at two ends of the operating platform, and a rotating shaft at one side is connected with a motor arranged in the operating platform through a transmission device; the other end of the operating platform is provided with a cutting knife which is connected with a driving mechanism, 2-8 locking mechanisms are arranged on one side of the operating platform, a pier head metal plate is arranged on one side close to the cutting knife, and an oil pump arranged in the operating platform is arranged in the lower edge of the pier head metal plate in an integrated connection mode.
Embodiment 2, an automatic pier head device for tubular pile reinforcing steel bars is provided with an operating platform with a hollow inner part, a conveyer belt is arranged on the operating platform, rotating shafts at two ends of the conveyer belt are positioned at two ends of the operating platform, and a rotating shaft at one side is connected with a motor arranged in the operating platform through a transmission device; the other end of the operating platform is provided with a cutting knife which is connected with a driving mechanism, 2-8 locking mechanisms are arranged on one side of the operating platform, each locking mechanism is a mechanical arm which is folded in multiple sections, the top end of each locking mechanism is embedded into a lock hole on the other side of the operating platform, a pier head metal plate is arranged on one side close to the cutting knife, and an oil pump arranged in the operating platform is arranged in the lower edge of the pier head metal plate in an integrated connection mode.
Embodiment 3, an automatic pier head device for tubular pile reinforcing steel bars is provided with an operating platform with a hollow inner part, a conveyer belt is arranged on the operating platform, rotating shafts at two ends of the conveyer belt are positioned at two ends of the operating platform, and a rotating shaft at one side is connected with a motor arranged in the operating platform through a transmission device; the other end of the operating platform is provided with a cutting knife which is connected with a driving mechanism, the driving mechanism of the cutting knife is a lifting oil pump, 2-8 locking mechanisms are arranged on one side of the operating platform, a pier head metal plate is arranged on one side close to the cutting knife, and the oil pump arranged in the operating platform is arranged in the lower edge of the pier head metal plate in an integrated connection mode.
The device realizes the automatic processing of the double-end upsetting of the concrete pipe pile reinforcing steel bars, reduces the labor intensity of operators, improves the production safety, improves the production efficiency of the double-end upsetting of the reinforcing steel bars, and meets the production requirement.
However, the present invention is not limited to the above embodiments, and various modifications and applications made according to the above embodiments and the accompanying drawings are within the scope of the present invention.

Claims (3)

1. An automatic pier head device for tubular pile reinforcing steel bars is characterized in that an operating platform with a hollow inner part is arranged, a conveying belt is arranged on the operating platform, rotating shafts at two ends of the conveying belt are positioned at two ends of the operating platform, and a rotating shaft at one side is connected with a motor arranged in the operating platform through a transmission device; the other end of the operating platform is provided with a cutting knife which is connected with a driving mechanism, 2-8 locking mechanisms are arranged on one side of the operating platform, a pier head metal plate is arranged on one side close to the cutting knife, and an oil pump arranged in the operating platform is arranged in the lower edge of the pier head metal plate in an integrated connection mode.
2. The automatic pier head device of claim 1, wherein the locking mechanism is a multi-section foldable mechanical arm, and the top end of the mechanical arm is embedded into a lock hole on the other side of the operating platform.
3. The automatic pier nose device of tubular pile reinforcing bar of claim 1, wherein the driving mechanism of the cutting knife is a lift oil pump.
CN202021113844.4U 2020-06-16 2020-06-16 Automatic pier nose device of tubular pile reinforcing bar Active CN213162837U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021113844.4U CN213162837U (en) 2020-06-16 2020-06-16 Automatic pier nose device of tubular pile reinforcing bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021113844.4U CN213162837U (en) 2020-06-16 2020-06-16 Automatic pier nose device of tubular pile reinforcing bar

Publications (1)

Publication Number Publication Date
CN213162837U true CN213162837U (en) 2021-05-11

Family

ID=75788234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021113844.4U Active CN213162837U (en) 2020-06-16 2020-06-16 Automatic pier nose device of tubular pile reinforcing bar

Country Status (1)

Country Link
CN (1) CN213162837U (en)

Similar Documents

Publication Publication Date Title
CN102828510B (en) H type soldier pile and preparation method thereof
CN102070071B (en) Steel reinforcement cage hoisting method
CN101302758B (en) Method for processing prestress square pile
CN101481935B (en) Prestressed reinforcement concrete double T plate, tire shuttering thereof and production method
CN213162837U (en) Automatic pier nose device of tubular pile reinforcing bar
CN210262715U (en) Bridge engineering is with prefabricated assembled anticollision barrier
CN206425358U (en) A kind of cold extrusion flute profile mould applied to winding drum output wheel frame plate
CN209502845U (en) A kind of rolling cage machine
CN110883937A (en) Movable non-pretensioning bidirectional prestress production line
CN109653536A (en) A kind of large volume arc concrete steel lattice supporting framework and its construction method
CN105583948A (en) End plate transferring mechanism for pipe pile production line
CN209686924U (en) A kind of large volume arc concrete steel lattice supporting framework
CN107973222A (en) For installing the Bridge Erector and its construction method of hydraulic steel gate
CN1292135C (en) Hoop with butt-welding joint and its making method and equipment
CN107268452A (en) Mobile formwork bed die work car and excessively hole construction method
CN207468050U (en) For installing the Bridge Erector of hydraulic steel gate
CN102493333A (en) U-shaped tubular prefabrication and assembling column-bearing platform structure and assembling and positioning technology thereof
CN214725218U (en) Portable whole reinforcement binding platform of high-speed railway precast box girder
CN202378167U (en) Easy-to-demould mould for concrete square pile
CN114687577A (en) Double-steel-concrete combined conversion strengthening truss
CN206509452U (en) Modern assembled architecture engineering steel reinforcement cage circular stirrups coiling cylinder
CN217166233U (en) Square stirrup shaping device of precast pile
CN214989698U (en) Prefabricated tubular pile hoist device
CN210684760U (en) End plate-free prestressed concrete pile connecting structure
CN218911923U (en) Prefabricated pouring disassembly-free bottom die steel bar truss floor support plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant