CN105583948A - End plate transferring mechanism for pipe pile production line - Google Patents
End plate transferring mechanism for pipe pile production line Download PDFInfo
- Publication number
- CN105583948A CN105583948A CN201610111224.9A CN201610111224A CN105583948A CN 105583948 A CN105583948 A CN 105583948A CN 201610111224 A CN201610111224 A CN 201610111224A CN 105583948 A CN105583948 A CN 105583948A
- Authority
- CN
- China
- Prior art keywords
- end plate
- chain
- production line
- transmission shaft
- shaft assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B21/00—Methods or machines specially adapted for the production of tubular articles
- B28B21/56—Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
- B28B21/60—Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts prestressed reinforcements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G17/00—Conveyors having an endless traction element, e.g. a chain, transmitting movement to a continuous or substantially-continuous load-carrying surface or to a series of individual load-carriers; Endless-chain conveyors in which the chains form the load-carrying surface
- B65G17/12—Conveyors having an endless traction element, e.g. a chain, transmitting movement to a continuous or substantially-continuous load-carrying surface or to a series of individual load-carriers; Endless-chain conveyors in which the chains form the load-carrying surface comprising a series of individual load-carriers fixed, or normally fixed, relative to traction element
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明属于建筑技术领域,涉及一种用于管桩生产线的端板传送机构。包括链条输送机,所述的链条输送机包括呈环形的输送链,所述的输送链上固定有若干用于放置端板的端板固定架,当端板放入到端板固定架中时,端板的边缘与端板固定架抵靠接触从而使端板在输送链上位置固定。本发明适用于自动化生产线,整个过程稳定可靠,工作效率高。
The invention belongs to the technical field of construction and relates to an end plate conveying mechanism used in a pipe pile production line. Including a chain conveyor, the chain conveyor includes a circular conveyor chain, the conveyor chain is fixed with a number of end plate holders for placing the end plates, when the end plates are put into the end plate holders , the edge of the end plate is in contact with the end plate fixing frame so that the position of the end plate on the conveyor chain is fixed. The invention is suitable for automatic production lines, the whole process is stable and reliable, and the working efficiency is high.
Description
技术领域technical field
本发明属于建筑技术领域,涉及一种用于管桩生产线的端板传送机构。The invention belongs to the technical field of construction and relates to an end plate conveying mechanism used in a pipe pile production line.
背景技术Background technique
现有的预制桩或管桩在生产工艺如下:The production process of existing prefabricated piles or pipe piles is as follows:
1.混凝土原材料的计量、搅拌。根据设计好的配合比,将砂、石、水泥、水、外加剂和掺合料等经精确计量,用混凝土强制式搅拌机制成3cm~5cm的低坍落度的新拌混凝土,设计要求混凝土强度等级不低于C60或C80。1. Measuring and mixing of concrete raw materials. According to the designed mix ratio, sand, stone, cement, water, admixtures and admixtures are accurately measured, and a concrete forced mixer is used to make fresh concrete with a low slump of 3cm to 5cm. The design requires concrete The strength grade is not lower than C60 or C80.
2.离心方桩端板制作。与管桩端板制作基本一致,但方桩的端板外形是方形的,且预应力主筋的沉孔沿端板四边、角均匀分布。端板安装前,四周需焊接厚度为1.5mm~2mm的薄钢板制作成的方形桩套箍。2. Fabrication of centrifugal square pile end plate. The production of the end plate of the pipe pile is basically the same, but the shape of the end plate of the square pile is square, and the counterbores of the prestressed main reinforcement are evenly distributed along the four sides and corners of the end plate. Before the end plate is installed, square pile hoops made of thin steel plates with a thickness of 1.5mm to 2mm need to be welded around.
3.骨架制作。预应力主筋采用低松驰型的预应力混凝土用钢棒,需要精确定长、切断、镦头;螺旋筋采用椎4mm~6mm的低碳冷拔钢丝;根据离心方桩结构配筋设计要求,方形钢筋骨架采用专用的方桩骨架自动焊接机加工。3. Skeleton production. The prestressed main reinforcement adopts low-relaxation prestressed concrete steel rods, which need to be precisely lengthened, cut, and heading; the spiral reinforcement adopts low-carbon cold-drawn steel wires with a vertebra of 4mm to 6mm; according to the design requirements of centrifugal square pile structure reinforcement, The square steel frame is processed by a special square pile frame automatic welding machine.
4.安装钢筋骨架。将制作好的钢筋骨架、方形端板已焊套箍放置于离心方桩的钢模具内,并与预应力钢筋锚固板、张拉板、张拉杆等连接。4. Install the steel skeleton. Place the prepared steel bar skeleton and welded hoop of the square end plate in the steel mold of the centrifugal square pile, and connect them with the prestressed steel anchor plate, tension plate, tension rod, etc.
5.混凝土布料。按每根离心方桩的用量要求,将新拌混凝土沿模具均匀填满下半模,在张拉一端尽可能多布一些混凝土。5. Concrete cloth. According to the dosage requirements of each centrifugal square pile, fill the lower half of the mold with fresh concrete evenly along the mold, and place as much concrete as possible on the stretched end.
6.合模。将离心方桩上半钢模吊至下半钢模上方,并用螺栓将上下两半钢模固定,以确保模具在高速离心作业过程中不松动和混凝土不跑浆。6. Mold closing. Lift the upper half of the steel mold of the centrifugal square pile above the lower half of the steel mold, and fix the upper and lower half of the steel mold with bolts to ensure that the mold does not loosen and the concrete does not run out of slurry during high-speed centrifugal operation.
7.预应力张拉。采用千斤顶式的张拉机对合模后的离心方桩钢筋骨架进行整体张拉,张拉至钢筋强度的70%后,用大螺母将张拉杆固定在钢模具上。7. Prestressed tension. A jack-type tensioning machine is used to overall tension the steel frame of the centrifugal square pile after mold closing. After the tension reaches 70% of the strength of the steel bar, the tension rod is fixed on the steel mold with a large nut.
8.离心工艺。将上述张拉锚固后的带模离心方桩吊至离心机上方,按初速、中速、中高速、高速的离心速度逐级加速,离心时间一般为10min~18min。通过离心密实成型工艺,使新拌混凝土沿离心方桩的模具四周均匀密实,同时,管桩形成一圆形内腔。离心结束后,将张拉端抬高,倾倒离心过程中产生的废浆水。8. Centrifugal process. The above-mentioned tensioned and anchored centrifugal square pile with mold is hoisted above the centrifuge, and accelerated step by step according to the centrifugal speed of initial speed, medium speed, medium high speed and high speed, and the centrifugation time is generally 10 minutes to 18 minutes. Through the centrifugal compacting forming process, the fresh concrete is evenly compacted along the mold periphery of the centrifugal square pile, and at the same time, the pipe pile forms a circular inner cavity. After centrifugation, raise the tension end and dump the waste slurry water generated during centrifugation.
9.初级蒸气养护。将离心成型后的带模离心方桩吊至常压蒸气养护池坑内,静停1h~2h,缓慢升温至90℃~100℃,常压下养护4h~8h,使混凝土强度达到40MPa以上。9. Primary steam curing. Hang the molded centrifugal square pile after centrifugation into the atmospheric pressure steam curing pit, stop for 1h~2h, slowly raise the temperature to 90℃~100℃, and cure under normal pressure for 4h~8h, so that the concrete strength can reach more than 40MPa.
10.脱模。将初级蒸气养护后的带模离心方桩吊至专用脱模台位上,用风动扳手卸去张拉螺栓及合模螺栓,给桩体施加预应力,然后吊走上半模,翻动下半模,卸去预应力张拉大螺杆。清理上下半模、锚固板、张拉杆,并涂刷脱模剂。对于混凝土设计强度等级为C60的离心方桩,将脱模后的离心方桩直接吊运至成品堆场码堆,自然养护,达到出厂强度后即可出厂。10. Demoulding. Lift the molded centrifugal square pile after primary steam curing to the special demoulding platform, remove the tension bolts and mold clamping bolts with a pneumatic wrench, apply prestress to the pile body, then lift the upper half mold, turn it down Half mold, unload the prestressed tensioning large screw. Clean up the upper and lower mold halves, anchor plates, tension rods, and apply release agent. For centrifugal square piles with a concrete design strength grade of C60, the demoulded centrifugal square piles are directly hoisted to the finished product yard for natural curing, and can be shipped after reaching the factory strength.
11.高压蒸养。设计混凝土强度等级为C80以上的离心方桩,需将脱模后的离心方桩再进入高压釜进行高温蒸气养护,最高温度为180℃~200℃,饱和蒸气压力为1.0MPa,养护时间8h~12h,使混凝土强度达到80MPa以上。经高压养护后的管桩可以直接出厂供桩。11. High pressure steaming. For centrifugal square piles whose design concrete strength grade is above C80, the demoulded centrifugal square piles need to be put into the autoclave for high-temperature steam curing. The maximum temperature is 180℃~200℃, the saturated steam pressure is 1.0MPa, and the curing time is 8h~ 12h, make the concrete strength reach more than 80MPa. The pipe piles after high pressure curing can be directly delivered to the factory for piles.
其中,脱模过程中,现有技术是用风动扳手卸去张拉螺栓,然后卸下张拉用的端板,端板重量较大,需要用专用的车堆放在一处,清洗后再送入到安装钢筋骨架的工序处,也即端板要来回运输,从而极大的浪费了生产时间,生产效率不高,也不适合自动化生产的需求。Among them, in the demoulding process, the existing technology is to use a pneumatic wrench to remove the tensioning bolts, and then remove the end plates used for tensioning. When entering the process of installing the steel skeleton, that is, the end plates have to be transported back and forth, which greatly wastes production time, the production efficiency is not high, and it is not suitable for the needs of automated production.
发明内容Contents of the invention
本发明的目的是针对上述问题,提供一种工作效率高的用于管桩生产线的端板传送机构。The object of the present invention is to solve the above problems and provide an end plate conveying mechanism for a pipe pile production line with high working efficiency.
为达到上述目的,本发明采用了下列技术方案:一种用于管桩生产线的端板传送机构,包括链条输送机,所述的链条输送机包括呈环形的输送链,所述的输送链上固定有若干用于放置端板的端板固定架,当端板放入到端板固定架中时,端板的边缘与端板固定架抵靠接触从而使端板在输送链上位置固定。In order to achieve the above object, the present invention adopts the following technical solutions: an end plate transmission mechanism for pipe pile production line, including a chain conveyor, and the chain conveyor includes a circular conveyor chain, on which A number of end plate fixing frames are fixed for placing the end plates. When the end plates are put into the end plate fixing frames, the edges of the end plates are in contact with the end plate fixing frames so that the position of the end plates on the conveyor chain is fixed.
在上述的用于管桩生产线的端板传送机构中,所述的若干端板固定架间隔均匀且可拆卸的固定在输送链上,所述的链条输送机包括分别位于链条输送机两端的主动传送轴组件和被动传送轴组件,输送链与主动传送轴组件和被动传送轴组件啮合,所述的主动传送轴组件连接主轴驱动机构。In the above-mentioned end plate conveying mechanism for the pipe pile production line, the number of end plate fixing frames are evenly spaced and detachably fixed on the conveyor chain, and the chain conveyor includes active conveyors located at both ends of the chain conveyor. The transmission shaft assembly and the passive transmission shaft assembly, the conveyor chain meshes with the active transmission shaft assembly and the passive transmission shaft assembly, and the active transmission shaft assembly is connected to the main shaft drive mechanism.
在上述的用于管桩生产线的端板传送机构中,所述的主动传送轴组件包括与主轴驱动机构连接的主动轴及与主动轴固定连接的主动链轮,所述的被动传送轴组件包括被动轴及与被动轴固定连接的被动链轮,所述的输送链与主动链轮和被动链轮啮合。In the above-mentioned end plate transmission mechanism used in the pipe pile production line, the driving transmission shaft assembly includes a driving shaft connected to the main shaft driving mechanism and a driving sprocket fixedly connected to the driving shaft, and the passive transmission shaft assembly includes The driven shaft and the driven sprocket fixedly connected with the driven shaft, and the conveying chain meshes with the driving sprocket and the driven sprocket.
在上述的用于管桩生产线的端板传送机构中,所述的端板固定架包括两块分别固定在输送链上且相对置的限位挡板,两块限位挡板之间用连接件固定连接,每两个端板固定架为一组,每组端板固定架间隔均匀。In the above-mentioned end plate transmission mechanism used in the pipe pile production line, the end plate fixing frame includes two limit baffles respectively fixed on the conveying chain and opposite to each other, and the two limit baffles are connected by a The parts are fixedly connected, and every two end plate fixing frames form a group, and the interval between each group of end plate fixing frames is even.
在上述的用于管桩生产线的端板传送机构中,端板固定架上的两块限位挡板之间的距离与端板的厚度相配适,当端板插入到两个端板固定架中间时,端板呈竖直状固定在两个端板固定架之间且端板的两个表面分别与相邻的限位挡板抵靠接触。In the above-mentioned end plate conveying mechanism for the pipe pile production line, the distance between the two limit baffles on the end plate fixing frame is suitable for the thickness of the end plate, when the end plate is inserted into the two end plate fixing frames In the middle, the end plate is vertically fixed between the two end plate fixing frames and the two surfaces of the end plate are in contact with the adjacent limit baffles respectively.
在上述的用于管桩生产线的端板传送机构中,所述的输送链有两条且所处的平面相互平行,端板固定架固定在两条输送链中间,端板固定架上的两块限位挡板分别固定在一条输送链上,且两块限位挡板的底部通过连接销与两条输送链固定连接。In the above-mentioned end plate conveying mechanism for the pipe pile production line, there are two conveying chains and the planes are parallel to each other, the end plate fixing frame is fixed in the middle of the two conveying chains, and the two end plate fixing frames The block limiting baffles are respectively fixed on a conveying chain, and the bottoms of the two limiting baffles are fixedly connected with the two conveying chains through connecting pins.
在上述的用于管桩生产线的端板传送机构中,所述的主动传送轴组件和被动传送轴组件之间设有用于当输送链下垂时能对输送链形成支撑的链条支撑组件。In the above-mentioned end plate conveying mechanism for pipe pile production line, a chain support assembly for supporting the conveying chain when the conveying chain is drooping is arranged between the active conveying shaft assembly and the passive conveying shaft assembly.
在上述的用于管桩生产线的端板传送机构中,所述的链条支撑组件包括两个在竖直方向上呈上下设置的支撑件,支撑件在竖直方向上的位置与输送链相对应,且两个支撑件在水平方向上相互平行。In the above-mentioned end plate conveying mechanism used in the pipe pile production line, the chain support assembly includes two support members vertically arranged up and down, and the position of the support members in the vertical direction corresponds to the conveying chain , and the two supports are parallel to each other in the horizontal direction.
在上述的用于管桩生产线的端板传送机构中,所述的主轴驱动机构包括驱动器,所述的驱动器用传输带机构连接主动传送轴组件。In the above-mentioned end plate conveying mechanism for a pipe pile production line, the main shaft driving mechanism includes a driver, and the driver is connected to the driving transmission shaft assembly by a conveyor belt mechanism.
在上述的用于管桩生产线的端板传送机构中,所述的传输带机构包括皮带轮组件或链轮组件,所述的驱动器包括电机或液压马达。In the above-mentioned end plate conveying mechanism for a pipe pile production line, the conveying belt mechanism includes a pulley assembly or a sprocket assembly, and the driver includes an electric motor or a hydraulic motor.
与现有的技术相比,本发明的优点在于:端板从管模上卸下后可直接放入到链条输送机上固定位置并进行输送,节省了人力和堆放、运输的工序,从而提高工作效率,由于端板采用链条连续输送,工作过程安全可靠。Compared with the existing technology, the present invention has the advantage that after the end plate is unloaded from the pipe mold, it can be directly put into a fixed position on the chain conveyor and transported, which saves manpower and stacking and transportation procedures, thereby improving work efficiency. High efficiency, because the end plate is continuously conveyed by chain, the working process is safe and reliable.
附图说明Description of drawings
图1是本发明提供的结构示意图;Fig. 1 is a structural representation provided by the present invention;
图2是图1另一个方向的示意图;Fig. 2 is a schematic diagram of another direction of Fig. 1;
图3是图1另一个方向的示意图。Fig. 3 is a schematic diagram of another direction of Fig. 1 .
图中:链条输送机1、输送链2、端板固定架3、主动传送轴组件4、被动传送轴组件5、主轴驱动机构6、主动轴7、主动链轮8、被动轴9、被动链轮10、限位挡板11、连接件12、连接销13、链条支撑组件14、支撑件15、驱动器16、传输带机构17、端板100、机座101。In the figure: chain conveyor 1, conveyor chain 2, end plate fixing frame 3, active transmission shaft assembly 4, passive transmission shaft assembly 5, main shaft drive mechanism 6, driving shaft 7, driving sprocket 8, passive shaft 9, passive chain Wheel 10 , limit baffle 11 , connecting piece 12 , connecting pin 13 , chain support assembly 14 , supporting piece 15 , driver 16 , conveyor belt mechanism 17 , end plate 100 , machine base 101 .
具体实施方式detailed description
下面结合附图和具体实施方式对本发明做进一步详细的说明。The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
如图1所示,一种用于管桩生产线的端板传送机构,包括链条输送机1,所述的链条输送机1包括呈环形的输送链2,所述的输送链2上固定有若干用于放置端板100的端板固定架3,当端板100放入到端板固定架3中时,端板100的边缘与端板固定架3抵靠接触从而使端板在输送链2上位置固定。As shown in Figure 1, an end plate conveying mechanism for a pipe pile production line includes a chain conveyor 1, and the chain conveyor 1 includes an annular conveying chain 2, and the conveying chain 2 is fixed with several The end plate fixing frame 3 for placing the end plate 100, when the end plate 100 is put into the end plate fixing frame 3, the edge of the end plate 100 is in contact with the end plate fixing frame 3 so that the end plate is in the conveyor chain 2 The upper position is fixed.
优选方案,若干端板固定架3间隔均匀且可拆卸的固定在输送链2上,所述的链条输送机1包括分别位于链条输送机1两端的主动传送轴组件4和被动传送轴组件5,再结合图2所示,输送链2与主动传送轴组件4和被动传送轴组件5啮合,所述的主动传送轴组件4连接主轴驱动机构6。In a preferred solution, several end plate fixing frames 3 are evenly spaced and detachably fixed on the conveyor chain 2, and the chain conveyor 1 includes a driving transmission shaft assembly 4 and a passive transmission shaft assembly 5 respectively located at both ends of the chain conveyor 1, Referring again to FIG. 2 , the conveyor chain 2 is engaged with the driving transmission shaft assembly 4 and the passive transmission shaft assembly 5 , and the driving transmission shaft assembly 4 is connected to the main shaft driving mechanism 6 .
主动传送轴组件4包括与主轴驱动机构6连接的主动轴7及与主动轴7固定连接的主动链轮8,所述的被动传送轴组件5包括被动轴9及与被动轴9固定连接的被动链轮10,所述的输送链2与主动链轮8和被动链轮10啮合。本领域技术人员应当理解,主动轴7与被动轴9与机座101转动连接。The active transmission shaft assembly 4 includes a drive shaft 7 connected to the main shaft drive mechanism 6 and a drive sprocket 8 fixedly connected with the drive shaft 7, and the passive transmission shaft assembly 5 includes a driven shaft 9 and a passive shaft fixedly connected with the driven shaft 9. The sprocket 10, the conveyor chain 2 meshes with the driving sprocket 8 and the driven sprocket 10. Those skilled in the art should understand that the driving shaft 7 is rotatably connected to the driven shaft 9 and the base 101 .
如图3所示,端板固定架3包括两块分别固定在输送链2上且相对置的限位挡板11,两块限位挡板11之间用连接件12固定连接,连接件12可以是铆钉、插销、销轴等,每两个端板固定架3为一组,每组端板固定架3间隔均匀。限位挡板11的形状不做限定,优选为矩形。As shown in Figure 3, the end plate fixing frame 3 includes two limit baffles 11 respectively fixed on the conveyor chain 2 and facing each other, and the two limit baffles 11 are fixedly connected by a connecting piece 12, and the connecting piece 12 Can be rivets, bolts, bearing pins, etc., every two end plate fixing frames 3 form a group, and each group of end plate fixing frames 3 are evenly spaced. The shape of the limiting baffle 11 is not limited, and is preferably rectangular.
具体的说,端板固定架3上的两块限位挡板11之间的距离与端板100的厚度相配适,当端板插入到两个端板固定架3中间时,端板呈竖直状固定在两个端板固定架3之间且端板的两个表面分别与相邻的限位挡板11抵靠接触,即端板100与每个端板固定架3相对置的两块限位挡板11间隙配合。Specifically, the distance between the two limit baffles 11 on the end plate fixing frame 3 is suitable for the thickness of the end plate 100. When the end plate is inserted into the middle of the two end plate fixing frames 3, the end plate is vertical. The straight shape is fixed between the two end plate fixing frames 3 and the two surfaces of the end plates are in contact with the adjacent limit baffles 11 respectively, that is, the two ends of the end plate 100 and each end plate fixing frame 3 are opposite to each other. Block limit baffle 11 clearance fit.
输送链2有两条且所处的平面相互平行,端板固定架3固定在两条输送链2中间,端板固定架3上的两块限位挡板11分别固定在一条输送链2上,且两块限位挡板11的底部通过连接销13与两条输送链2固定连接。There are two conveyor chains 2 and the planes are parallel to each other. The end plate fixing frame 3 is fixed in the middle of the two conveyor chains 2. The two limit baffles 11 on the end plate fixing frame 3 are respectively fixed on a conveyor chain 2. , and the bottoms of the two limit baffles 11 are fixedly connected with the two conveying chains 2 through connecting pins 13 .
主动传送轴组件4和被动传送轴组件5之间设有用于当输送链2下垂时能对输送链2形成支撑的链条支撑组件14。本领域技术人员应当理解,当输送链2承受端板100的负荷时,输送链2会发生下垂,如果没有支撑,可能导致输送链2运作部顺畅,链条支撑组件14可以采用轨道式,即将导轨设在输送链2下方,对输送链2形成支撑。A chain support assembly 14 is provided between the active transmission shaft assembly 4 and the passive transmission shaft assembly 5 for supporting the conveyor chain 2 when the conveyor chain 2 is drooping. Those skilled in the art should understand that when the conveyor chain 2 bears the load of the end plate 100, the conveyor chain 2 will sag. If there is no support, the operation of the conveyor chain 2 may be smooth. It is arranged below the conveyor chain 2 to form a support for the conveyor chain 2 .
在本实施例中,链条支撑组件14包括两个在竖直方向上呈上下设置的支撑件15,支撑件15在竖直方向上的位置与输送链2相对应,当输送链2下垂时能直接压设在支撑架15上,两个支撑件15在水平方向上相互平行。支撑件15可以是工字钢,呈位置固定状态,可以与链条输送机1固定连接或与地面基础固定连接。In this embodiment, the chain support assembly 14 includes two support members 15 arranged up and down in the vertical direction, and the position of the support members 15 in the vertical direction corresponds to the conveying chain 2. They are directly pressed on the support frame 15, and the two support members 15 are parallel to each other in the horizontal direction. The supporting member 15 can be an I-beam, in a fixed position, and can be fixedly connected with the chain conveyor 1 or fixedly connected with the ground foundation.
如图1所示,主轴驱动机构6包括驱动器16,所述的驱动器16用传输带机构17连接主动传送轴组件4。传输带机构17包括皮带轮组件或链轮组件,所述的驱动器16包括电机或液压马达。As shown in FIG. 1 , the spindle driving mechanism 6 includes a driver 16 , and the driver 16 is connected to the driving transmission shaft assembly 4 with a transmission belt mechanism 17 . The transmission belt mechanism 17 includes a pulley assembly or a sprocket assembly, and the driver 16 includes an electric motor or a hydraulic motor.
本发明实施例中所述的被动传送轴组件安装有张紧装置当链条使用过程及安装过程中张紧力不够时可以通过张紧装置进行张紧链条。The passive transmission shaft assembly described in the embodiment of the present invention is equipped with a tensioning device, and the chain can be tensioned by the tensioning device when the tension force is insufficient during the use and installation of the chain.
本发明的工作过程是:当端板100从制桩用的管模上拆下时,端板呈竖直状,可以直接插入到端板固定架3中,节省了端板100堆放,运输的过程。启动驱动器16,驱动器16通过传输带机构17带动主动轴7转动,从而带动主动链轮8转动,继而带动输送链2转动,端板固定架3随输送链2同步转动,端板100从输送链2的一头输送到另一头,如果在输送链2的另一头上设置钢筋笼放置架,则可直接将端板100从输送链2上取下放入与钢筋笼配合,减少了来回运输的的人力和时间,工作过程的安全性也大大提高,大大的提高了工作效率。The working process of the present invention is: when the end plate 100 is removed from the pipe form used for pile making, the end plate is vertical and can be directly inserted into the end plate fixing frame 3, saving the stacking of the end plate 100 and the cost of transportation process. Start the driver 16, the driver 16 drives the driving shaft 7 to rotate through the transmission belt mechanism 17, thereby driving the driving sprocket 8 to rotate, and then drives the conveyor chain 2 to rotate, the end plate fixing frame 3 rotates synchronously with the conveyor chain 2, and the end plate 100 is driven from the conveyor chain 2 is transported from one end to the other, if a reinforcement cage placement frame is set on the other end of the conveyor chain 2, the end plate 100 can be directly removed from the conveyor chain 2 and put into cooperation with the reinforcement cage, which reduces the time spent on back and forth transportation. Manpower and time, the safety of the work process is also greatly improved, and the work efficiency is greatly improved.
本文中所描述的具体实施例仅仅是对本发明精神作举例说明。本发明所属技术领域的技术人员可以对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,但并不会偏离本发明的精神或者超越所附权利要求书所定义的范围。The specific embodiments described herein are merely illustrative of the spirit of the invention. Those skilled in the art to which the present invention belongs can make various modifications or supplements to the described specific embodiments or adopt similar methods to replace them, but they will not deviate from the spirit of the present invention or go beyond the definition of the appended claims range.
尽管本文较多地使用了链条输送机1、输送链2、端板固定架3、主动传送轴组件4、被动传送轴组件5、主轴驱动机构6、主动轴7、主动链轮8、被动轴9、被动链轮10、限位挡板11、连接件12、连接销13、链条支撑组件14、支撑件15、驱动器16、传输带机构17、端板100、机座101、等术语,但并不排除使用其它术语的可能性。使用这些术语仅仅是为了更方便地描述和解释本发明的本质;把它们解释成任何一种附加的限制都是与本发明精神相违背的。Although the chain conveyor 1, the conveyor chain 2, the end plate fixing frame 3, the driving transmission shaft assembly 4, the passive transmission shaft assembly 5, the main shaft driving mechanism 6, the driving shaft 7, the driving sprocket 8, and the passive shaft are widely used in this paper 9. Terms such as driven sprocket 10, limit baffle 11, connector 12, connecting pin 13, chain support assembly 14, support 15, driver 16, conveyor belt mechanism 17, end plate 100, machine base 101, etc., but The possibility of using other terms is not excluded. These terms are used only for the purpose of describing and explaining the essence of the present invention more conveniently; interpreting them as any kind of additional limitation is against the spirit of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610111224.9A CN105583948B (en) | 2016-02-29 | 2016-02-29 | End plate transport mechanism for tubular pole production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610111224.9A CN105583948B (en) | 2016-02-29 | 2016-02-29 | End plate transport mechanism for tubular pole production line |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105583948A true CN105583948A (en) | 2016-05-18 |
CN105583948B CN105583948B (en) | 2018-11-16 |
Family
ID=55924026
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610111224.9A Active CN105583948B (en) | 2016-02-29 | 2016-02-29 | End plate transport mechanism for tubular pole production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105583948B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106738293A (en) * | 2017-04-01 | 2017-05-31 | 菏泽市实悦复合材料有限公司 | A kind of intelligent positioning of organic material plate and automatic limit device |
CN107117439A (en) * | 2017-06-16 | 2017-09-01 | 苏州优王电子科技有限公司 | Cyclic conveying device |
CN110498205A (en) * | 2019-08-09 | 2019-11-26 | 广东三和管桩股份有限公司 | A kind of tubular pole carrier chain and control system, method, electronic equipment, storage medium |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2235955Y (en) * | 1994-09-12 | 1996-09-25 | 机械工业部第四设计研究院 | Rotary conveying mechanism for cylindrical work piece |
EP2096053A1 (en) * | 2008-02-26 | 2009-09-02 | Clemessy | One chained pallet accumulation conveyor |
GB2482029A (en) * | 2010-07-16 | 2012-01-18 | Martin Dolan | A precision indexing conveyor |
CN102442521A (en) * | 2011-09-20 | 2012-05-09 | 国鼎(南通)管桩有限公司 | Concrete pipe pile die opening and closing chain conveyor |
CN202245074U (en) * | 2011-09-20 | 2012-05-30 | 国鼎(南通)管桩有限公司 | Chain type concrete pipe pile mould conveyor |
CN202912366U (en) * | 2012-07-02 | 2013-05-01 | 苏彬 | Off-line distribution mechanism of flying saucer target production line |
CN202953412U (en) * | 2012-03-01 | 2013-05-29 | 太仓市鑫海纸业有限公司 | Paper pipe transmitting device used for paper pipe curved head machine |
WO2013079166A1 (en) * | 2011-12-01 | 2013-06-06 | Tünkers Iberica S.L. | Accumulating conveyor |
CN203199544U (en) * | 2013-03-25 | 2013-09-18 | 浙江恒久特种链条有限公司 | Precise bar conveying chain |
CN203728048U (en) * | 2014-03-04 | 2014-07-23 | 蒙城天缘太阳能产业有限公司 | Water tank conveying device of solar water heater |
CN203997760U (en) * | 2014-06-16 | 2014-12-10 | 番禺珠江钢管(珠海)有限公司 | A kind of steel pipe chain conveyor |
CN204137734U (en) * | 2014-08-15 | 2015-02-04 | 无锡众望四维科技有限公司 | Lock core conveying mechanism |
CN205497776U (en) * | 2016-02-29 | 2016-08-24 | 周兆弟 | A end plate transport mechanism for pipe pile production line |
-
2016
- 2016-02-29 CN CN201610111224.9A patent/CN105583948B/en active Active
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2235955Y (en) * | 1994-09-12 | 1996-09-25 | 机械工业部第四设计研究院 | Rotary conveying mechanism for cylindrical work piece |
EP2096053A1 (en) * | 2008-02-26 | 2009-09-02 | Clemessy | One chained pallet accumulation conveyor |
GB2482029A (en) * | 2010-07-16 | 2012-01-18 | Martin Dolan | A precision indexing conveyor |
CN102442521A (en) * | 2011-09-20 | 2012-05-09 | 国鼎(南通)管桩有限公司 | Concrete pipe pile die opening and closing chain conveyor |
CN202245074U (en) * | 2011-09-20 | 2012-05-30 | 国鼎(南通)管桩有限公司 | Chain type concrete pipe pile mould conveyor |
WO2013079166A1 (en) * | 2011-12-01 | 2013-06-06 | Tünkers Iberica S.L. | Accumulating conveyor |
CN202953412U (en) * | 2012-03-01 | 2013-05-29 | 太仓市鑫海纸业有限公司 | Paper pipe transmitting device used for paper pipe curved head machine |
CN202912366U (en) * | 2012-07-02 | 2013-05-01 | 苏彬 | Off-line distribution mechanism of flying saucer target production line |
CN203199544U (en) * | 2013-03-25 | 2013-09-18 | 浙江恒久特种链条有限公司 | Precise bar conveying chain |
CN203728048U (en) * | 2014-03-04 | 2014-07-23 | 蒙城天缘太阳能产业有限公司 | Water tank conveying device of solar water heater |
CN203997760U (en) * | 2014-06-16 | 2014-12-10 | 番禺珠江钢管(珠海)有限公司 | A kind of steel pipe chain conveyor |
CN204137734U (en) * | 2014-08-15 | 2015-02-04 | 无锡众望四维科技有限公司 | Lock core conveying mechanism |
CN205497776U (en) * | 2016-02-29 | 2016-08-24 | 周兆弟 | A end plate transport mechanism for pipe pile production line |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106738293A (en) * | 2017-04-01 | 2017-05-31 | 菏泽市实悦复合材料有限公司 | A kind of intelligent positioning of organic material plate and automatic limit device |
CN107117439A (en) * | 2017-06-16 | 2017-09-01 | 苏州优王电子科技有限公司 | Cyclic conveying device |
CN107117439B (en) * | 2017-06-16 | 2022-10-11 | 苏州优王电子科技有限公司 | Circulation transmission device |
CN110498205A (en) * | 2019-08-09 | 2019-11-26 | 广东三和管桩股份有限公司 | A kind of tubular pole carrier chain and control system, method, electronic equipment, storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN105583948B (en) | 2018-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105668178B (en) | Integral type steel reinforcement cage pipeline for pile pile production line | |
CN105600335B (en) | Rebar cage storage and conveying device for pipe pile production line | |
CN105583947B (en) | It is continuous to compile cage pile pile production line | |
CN102275219B (en) | Automatic production line for tubular piles | |
CN106827216B (en) | Brick making and brick discharging system for baking-free bricks | |
CN105583948B (en) | End plate transport mechanism for tubular pole production line | |
CN105599128B (en) | Full-automatic pile tube production line | |
CN113183308B (en) | Concrete pipe pile production method convenient for demolding | |
CN105666681A (en) | Pipe die large nut dismounting machine for automatic pipe pile production line | |
CN108908680B (en) | Gypsum block forming device and operation method thereof | |
CN105666685A (en) | Machine for dismounting small nuts of fixed end plate by pipe mold | |
CN205500144U (en) | A integral type steel reinforcement cage transfer chain for pipe pile production line | |
CN105563636B (en) | Steel reinforcement cage prestressing force drawing mechanism | |
CN102248601B (en) | Method for producing precast concrete piles by transverse running water | |
CN111618992B (en) | A concrete pile production system | |
CN105564897B (en) | Volume cage reinforcing bar storage shelf and volume cage steel bar conveying device for pile pile production line | |
CN217970091U (en) | Packing device for autoclaved aerated concrete plates | |
CN205497776U (en) | A end plate transport mechanism for pipe pile production line | |
CN108789809B (en) | Centrifugal concrete pile production line | |
CN105619590B (en) | Steel reinforcement cage jacking apparatus for pile pile production line | |
CN216465291U (en) | A device for pouring concrete prefabricated parts | |
CN205397327U (en) | A steel reinforcement cage is deposited, conveyor for pipe pile production line | |
EP3419434B1 (en) | Concrete delivery subsystem for automated concrete fabrication system | |
CN209832088U (en) | Combined curing kiln for concrete product production line | |
CN211440528U (en) | Ground overturning platform structure for aerated concrete building block |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201229 Address after: 313013 workshop 1 of Huzhou Wantuo metal products Co., Ltd., rujiadian Road, Lianshi Town, Nanxun District, Huzhou City, Zhejiang Province Patentee after: Zhejiang Zhaodi Technology Co.,Ltd. Address before: 315800 Pugang 18, Xiaogang street, Beilun District, Ningbo, Zhejiang Patentee before: Zhou Zhaodi |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: End plate conveying mechanism for pipe pile production line Effective date of registration: 20211227 Granted publication date: 20181116 Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Huzhou Lianshi Xiaowei franchise sub branch Pledgor: Zhejiang Zhaodi Technology Co.,Ltd. Registration number: Y2021330002677 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220617 Granted publication date: 20181116 Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Huzhou Lianshi Xiaowei franchise sub branch Pledgor: Zhejiang Zhaodi Technology Co.,Ltd. Registration number: Y2021330002677 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: End plate conveying mechanism for pipe pile production line Effective date of registration: 20230707 Granted publication date: 20181116 Pledgee: Nanxun Rural Commercial Bank of Zhejiang, Limited by Share Ltd. Pledgor: Zhejiang Zhaodi Technology Co.,Ltd. Registration number: Y2023330001414 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20181116 Pledgee: Nanxun Rural Commercial Bank of Zhejiang, Limited by Share Ltd. Pledgor: Zhejiang Zhaodi Technology Co.,Ltd. Registration number: Y2023330001414 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20160518 Assignee: Zhejiang Hejian building materials Co.,Ltd. Assignor: Zhejiang Zhaodi Technology Co.,Ltd. Contract record no.: X2024980033208 Denomination of invention: End plate conveying mechanism for pipe pile production line Granted publication date: 20181116 License type: Common License Record date: 20241209 |