CN213143949U - Steel construction antidetonation support for house construction - Google Patents
Steel construction antidetonation support for house construction Download PDFInfo
- Publication number
- CN213143949U CN213143949U CN202021397807.0U CN202021397807U CN213143949U CN 213143949 U CN213143949 U CN 213143949U CN 202021397807 U CN202021397807 U CN 202021397807U CN 213143949 U CN213143949 U CN 213143949U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- cavity
- construction
- support
- bottom plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000010276 construction Methods 0.000 title claims abstract description 44
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 39
- 239000010959 steel Substances 0.000 title claims abstract description 39
- 238000009435 building construction Methods 0.000 claims abstract description 7
- 230000000694 effects Effects 0.000 abstract description 14
- 230000003139 buffering effect Effects 0.000 abstract description 9
- 230000007246 mechanism Effects 0.000 abstract description 4
- 230000000670 limiting effect Effects 0.000 description 5
- 238000000034 method Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model discloses a steel construction antidetonation support for building construction, comprising a base plate, the top of bottom plate is provided with the sleeve, the top of bottom plate and surround the sleeve and evenly be provided with the hydraulic ram, the top of hydraulic ram is provided with the mounting groove, the cavity has been seted up on telescopic top, the bottom of cavity is provided with the spacing ring, the spacing ring inboard is provided with the main spring, the top circumference outside of main spring and the inboard that is located the cavity are provided with the stem, a plurality of bracing pieces have evenly been put to the surface of stem, and the bracing piece runs through the sleeve and extends to the sleeve outside, the bracing piece just is located the outside one end of sleeve and is. Has the advantages that: compact structure reasonable in design has good antidetonation effect, can play fine buffering protection effect to the steel construction, adopts the mechanism design that heavy load spring and hydraulic ram combined together simultaneously, in antidetonation, also can bear heavy load, has increased the structural strength of house steel construction.
Description
Technical Field
The utility model relates to a steel structure support technical field particularly, relates to a steel structure antidetonation support for house construction.
Background
Steel structures are structures composed of steel materials and are one of the main building structure types. The structure mainly comprises beam steel, steel columns, steel trusses and other members made of section steel, steel plates and the like. Because of its light dead weight, and construction is simple and convenient, widely apply to fields such as large-scale factory building, venue, superelevation layer. In the house construction at present, along with the requirement of lightweight, construction cycle is short, light steel structure's house is increasing day by day, can use steel construction antidetonation support in actual construction to strengthen the antidetonation effect of house, increase the security, the structure is complicated between the current antidetonation leads to structural strength not big, high in manufacturing cost, construction cycle is long, and antidetonation buffering effect is not obvious, and the ability of bearing heavy load is not strong in the in-service use.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
To the problem in the correlation technique, the utility model provides a steel construction antidetonation support for house construction to overcome the above-mentioned technical problem that current correlation technique exists.
Therefore, the utility model discloses a specific technical scheme as follows:
the utility model provides a steel construction antidetonation support for house construction, comprising a base plate, the top of bottom plate is provided with the sleeve, the top of bottom plate and surround the sleeve and evenly be provided with the hydraulic ram, the top of hydraulic ram is provided with the mounting groove, the cavity has been seted up on telescopic top, the bottom of cavity is provided with the spacing ring, the spacing ring inboard is provided with the main spring, the top circumference outside of main spring and the inboard that is located the cavity are provided with the stem, a plurality of bracing pieces have evenly been put to the surface of stem, and the bracing piece runs through the sleeve and extends to the sleeve outside, the bracing piece just is located the outside one.
Further, in order to make the bracing piece can pass the U-shaped through-hole and be connected with the mounting groove, and then make the stem connect into a whole with the hydraulic ram, strengthen this antidetonation support's antidetonation effect, the sleeve is the quadrangular structure, and has all seted up the U-shaped through-hole on the chamber wall of cavity.
Further, in order to make the spacing ring and the shoulder hole cooperate, the moving range of restriction stem, the stem is the quadrangular structure, and the shoulder hole has been seted up on the top of stem, all sets up threaded hole on the lateral wall of stem, and the top diameter of shoulder hole is greater than the external diameter of spacing ring, and the bottom diameter of shoulder hole is less than the external diameter of spacing ring, and is greater than the external diameter of main spring.
Further, in order to enable the external thread to be matched with the threaded hole, the support rod and the core column can be connected into a whole, the support rod comprises a stud which is in threaded connection with the threaded hole, an external thread is arranged on the outer circle of one end of the stud, a terminal surface is horizontally arranged at the bottom of the end, away from the external thread, of the stud, and a connecting column is arranged in the center of the terminal surface.
Further, for the convenience of this antidetonation support mounting, shorten house construction's construction cycle, improve the efficiency of construction, the fixed orifices has all been seted up to the both sides that just are located the hydraulic ram on the bottom plate, has evenly seted up a plurality of screw holes on the connecting plate.
The utility model has the advantages that:
(1) the utility model discloses compact structure reasonable in design has good antidetonation effect, can play fine buffering protection effect to the steel construction, adopts the mechanism design that heavy load spring and hydraulic ram combined together simultaneously, in shock-resistant, also can bear heavy load, has increased the structural strength of house steel construction.
(2) The limiting ring is matched with the stepped hole, so that the moving range of the core column is limited, the limiting effect is achieved, and the structural strength of the anti-seismic support is improved while the good anti-seismic buffering effect is achieved.
(3) The bottom plate is matched with the connecting plate, so that the anti-seismic support is convenient to install, the construction period of building construction is shortened, and the construction efficiency is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of a steel structure earthquake-resistant support for building construction according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a core column of a steel structure earthquake-proof support for building construction according to an embodiment of the present invention;
fig. 3 is according to the utility model discloses a structural schematic of steel construction antidetonation support's for building construction bracing piece.
Fig. 4 is an exploded view of fig. 1.
In the figure:
1. a base plate; 2. a sleeve; 3. a hydraulic jack; 4. mounting grooves; 5. a cavity; 6. a limiting ring; 7. a main spring; 8. a stem; 9. a support bar; 901. a stud; 902. an external thread; 903. an end face; 904. connecting columns; 10. a connecting plate; 11. a U-shaped through hole; 12. a stepped hole; 13. a threaded hole; 14. a fixing hole; 15. and (4) screw holes.
Detailed Description
For further explanation of the embodiments, the drawings are provided as part of the disclosure and serve primarily to illustrate the embodiments and, together with the description, to explain the principles of operation of the embodiments, and to provide further explanation of the invention and advantages thereof, it will be understood by those skilled in the art that various other embodiments and advantages of the invention are possible, and that elements in the drawings are not to scale and that like reference numerals are generally used to designate like elements.
According to the utility model discloses an embodiment provides a steel construction antidetonation support for building construction.
The invention will now be further described with reference to the accompanying drawings and specific embodiments, as shown in figures 1-4, the steel structure anti-seismic support for house construction according to the embodiment of the utility model comprises a bottom plate 1, a sleeve 2 is arranged on the top end of the bottom plate 1, a hydraulic ram 3 is evenly arranged on the top end of the bottom plate 1 and surrounding the sleeve 2, a mounting groove 4 is arranged on the top end of the hydraulic ram 3, a cavity 5 is arranged on the top end of the sleeve 2, a spacing ring 6 is arranged on the bottom of the cavity 5, a main spring 7 is arranged on the inner side of the spacing ring 6, a core column 8 is arranged on the outer side of the circumference of the top of the main spring 7 and on the inner side of the cavity 5, a, and the bracing piece 9 runs through sleeve 2 and extends to the sleeve 2 outside, and bracing piece 9 just is located the outside one end of sleeve 2 and is connected with mounting groove 4, and the top of stem 8 is provided with connecting plate 10.
By means of the above scheme to make compact structure, have good antidetonation effect, can play fine buffering protection effect to the steel construction, adopt the mechanism design that heavy load spring and hydraulic ram combined together simultaneously, when antidetonation, also can bear heavy load, increased the structural strength of house steel construction.
In one embodiment, the sleeve 2 is of a quadrangular structure, and the wall of the cavity 5 is provided with the U-shaped through hole 11, so that the support rod 9 can penetrate through the U-shaped through hole 11 to be connected with the installation groove, the core column 8 and the hydraulic ram are connected into a whole, the anti-seismic effect of the anti-seismic support is enhanced, and meanwhile, the U-shaped through hole 11 plays a limiting role in the support rod 9.
In one embodiment, stem 8 is the quadrangular prism structure, and shoulder hole 12 has been seted up on the top of stem 8, all seted up threaded hole 13 on the lateral wall of stem 8, the top diameter of shoulder hole 12 is greater than the external diameter of spacing ring 6, the bottom diameter of shoulder hole 12 is less than the external diameter of spacing ring 6, and is greater than the external diameter of main spring 7 to make spacing ring 6 and shoulder hole 12 cooperate, limited stem 8's range of motion, guarantee that this antidetonation support improves antidetonation support structural strength when having good antidetonation buffering effect.
In one embodiment, the support rod 9 includes a stud 901 in threaded connection with the threaded hole 13, an external thread 902 is arranged on an outer circle of one end of the stud 901, an end surface 903 is horizontally arranged at the bottom of one end of the stud 901 away from the external thread 902, and a connection column 904 is arranged at the center of the end surface 903, so that the external thread 902 is matched with the threaded hole 13, and the support rod 9 and the stem 8 can be connected into a whole.
In one embodiment, the fixing holes 14 are formed in the two sides of the hydraulic jack 3 on the bottom plate 1, and the screw holes 15 are uniformly formed in the connecting plate 10, so that the anti-seismic support is convenient to install, the construction period of house construction is shortened, the construction efficiency is improved, and in addition, when the anti-seismic support is applied, the connecting plate 10 can be connected with a steel structure through screws or can be welded with the steel structure.
For the convenience of understanding the technical solution of the present invention, the following detailed description is made on the working principle or the operation mode of the present invention in the practical process.
When in actual application, bottom plate 1 is overall structure with sleeve 2, stem 8 is overall structure with connecting plate 10, at first fix bottom plate 1 on the installation base face, then with spacing ring 6 fixed mounting in the bottom intermediate position of cavity 5, then install main spring 7 in spacing ring 6, then install stem 8 in cavity 5, make the top of main spring 7 be located shoulder hole 12, then pass U-shaped through-hole 11 with bracing piece 9 and be connected with screw hole 13, and make terminal surface 903 level towards bottom plate 1, then carry out fixed connection with spliced pole 904 and mounting groove 4, be connected connecting plate 10 and the steel construction in house, the weight of steel construction acts on connecting plate 10, play the effect of antidetonation buffering under the effect of main spring 7 and hydraulic ram 3.
To sum up, with the help of the above technical scheme of the utility model, cooperate with shoulder hole 12 through setting up spacing ring 6, restricted stem 8's displacement range, played spacing effect, guarantee that this antidetonation support improves antidetonation support structural strength when having good antidetonation buffering effect. Through setting up bottom plate 1 and connecting plate 10 and cooperating to made things convenient for this antidetonation support mounting, shortened house construction's construction cycle, improved the efficiency of construction. Therefore, the structure is compact, the anti-seismic effect is good, the good buffering protection effect can be achieved for the steel structure, meanwhile, the heavy load spring and the hydraulic ram are combined, the anti-seismic mechanism can bear heavy load, and the structural strength of the house steel structure is improved.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "disposed," "connected," "fixed," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (6)
1. The utility model provides a steel construction antidetonation support for house construction, a serial communication port, including bottom plate (1), the top of bottom plate (1) is provided with sleeve (2), the top of bottom plate (1) just encircles sleeve (2) evenly are provided with hydraulic ram (3), the top of hydraulic ram (3) is provided with mounting groove (4), cavity (5) have been seted up on the top of sleeve (2), the bottom of cavity (5) is provided with spacing ring (6), spacing ring (6) inboard is provided with main spring (7), the top circumference outside of main spring (7) just is located the inboard of cavity (5) is provided with stem (8), a plurality of bracing pieces (9) have evenly been put to the surface of stem (8), just bracing piece (9) run through sleeve (2) extend to sleeve (2) are outside, bracing piece (9) just are located sleeve (2) outside one end with mounting groove (4) link to each other And a connecting plate (10) is arranged at the top end of the core column (8).
2. The steel structure anti-seismic support for house construction according to claim 1, wherein the sleeve (2) is of a quadrangular prism structure, and the wall of the cavity (5) is provided with U-shaped through holes (11).
3. The steel structure anti-seismic support for house construction according to claim 1, wherein the core column (8) is of a quadrangular prism structure, a stepped hole (12) is formed in the top end of the core column (8), and threaded holes (13) are formed in the side walls of the core column (8).
4. The steel structure earthquake-resistant support for building construction according to claim 3, wherein the diameter of the top of the stepped hole (12) is larger than the outer diameter of the limit ring (6), and the diameter of the bottom of the stepped hole (12) is smaller than the outer diameter of the limit ring (6) and larger than the outer diameter of the main spring (7).
5. The steel structure earthquake-resistant support for house construction according to claim 3, wherein the support rod (9) comprises a stud (901) in threaded connection with the threaded hole (13), an external thread (902) is arranged on the outer circle of one end of the stud (901), an end face (903) is horizontally arranged at the bottom of one end of the stud (901) far away from the external thread (902), and a connecting column (904) is arranged in the center of the end face (903).
6. The steel structure anti-seismic support for house construction according to claim 1, wherein fixing holes (14) are formed in the bottom plate (1) and located on two sides of the hydraulic jack (3), and a plurality of screw holes (15) are uniformly formed in the connecting plate (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021397807.0U CN213143949U (en) | 2020-07-16 | 2020-07-16 | Steel construction antidetonation support for house construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021397807.0U CN213143949U (en) | 2020-07-16 | 2020-07-16 | Steel construction antidetonation support for house construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213143949U true CN213143949U (en) | 2021-05-07 |
Family
ID=75732582
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021397807.0U Withdrawn - After Issue CN213143949U (en) | 2020-07-16 | 2020-07-16 | Steel construction antidetonation support for house construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213143949U (en) |
-
2020
- 2020-07-16 CN CN202021397807.0U patent/CN213143949U/en not_active Withdrawn - After Issue
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210858145U (en) | Simple building structure capable of being repeatedly used | |
CN209670195U (en) | A kind of assembling frame structure stress system | |
CN213143949U (en) | Steel construction antidetonation support for house construction | |
CN212641738U (en) | Modular multi-story high-rise fabricated steel structure frame body | |
CN111894130A (en) | Modular multi-story high-rise fabricated steel structure frame body | |
CN216766203U (en) | Assembled beam column with bracing structure | |
CN114809324A (en) | Assembled steel wood integrated configuration | |
CN213143493U (en) | Steel sheet shear force wall quick positioning connection structure in assembly type structure | |
CN212358587U (en) | Assembled concrete frame structure beam column with connected node | |
CN210067025U (en) | Elastic anti-seismic structure of energy-saving assembled steel structure house | |
CN211228873U (en) | Building steel structure connecting piece | |
CN217680835U (en) | Steel construction factory building that antidetonation was prevent wind | |
CN213062491U (en) | Civil engineering wall structure | |
CN218933506U (en) | Wall body anti-seismic mechanism is built in room | |
CN212926704U (en) | High-precision prefabricated building steel structure beam | |
CN220620553U (en) | Assembled shear wall | |
CN220117449U (en) | Steel construction factory building supporting mechanism | |
CN213709878U (en) | Truss door type steel structure | |
CN210031879U (en) | Raft foundation detachable steel bar section steel support frame | |
CN214833533U (en) | Limiting device of steel structure truss | |
CN220598722U (en) | Stable beam column connection node | |
CN220184355U (en) | Main body connecting structure of assembled steel structure building | |
CN211257331U (en) | Assembly type building bottom connecting mechanism | |
CN221346507U (en) | Steel structure iron tower base | |
CN218667880U (en) | Quick detachable steel structure support frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20210507 Effective date of abandoning: 20231006 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20210507 Effective date of abandoning: 20231006 |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |