CN213141132U - PC prefabricated plate lifts by crane frock - Google Patents
PC prefabricated plate lifts by crane frock Download PDFInfo
- Publication number
- CN213141132U CN213141132U CN202021809503.0U CN202021809503U CN213141132U CN 213141132 U CN213141132 U CN 213141132U CN 202021809503 U CN202021809503 U CN 202021809503U CN 213141132 U CN213141132 U CN 213141132U
- Authority
- CN
- China
- Prior art keywords
- shaped steel
- plug
- steel
- grafting main
- main part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a PC prefabricated plate lifts by crane frock, including H shaped steel gallows and supporting hoist thereof, H shaped steel gallows includes two parallel arrangement's H shaped steel and a plurality of connection shaped steel between them. The hoist includes two pairs of grafting main parts and two wire rope, the grafting main part includes two landing legs and the connecting piece between two landing legs of centre gripping H shaped steel web, each grafting main part inserts the both ends of H shaped steel with the mode that two landing legs pressed from both sides the H shaped steel web respectively, connect wire rope between the connecting piece of two grafting main parts of same end, lift by crane the object and arrange back on the H shaped steel gallows in, it hooks rings on wire rope or the wire rope and lifts by crane equipment, each grafting main part is two-way atress during lifting by crane, guarantee that the hoist atress is even, and the front end bottom surface of two landing legs of grafting main part is the hypotenuse of adduction, form the face contact when making it hang between the pterygoid lamina with H shaped steel, increase frictional force, thereby avoid the in-process grafting main part to follow.
Description
Technical Field
The utility model belongs to the PC component field specifically is a PC prefabricated plate frock of lifting by crane.
Background
The PC components of the prefabricated building comprise wall boards, floor slabs and structural columns, which are respectively prefabricated in a factory and then transported to a construction site for assembly, and are combined with local cast-in-place to form the building.
Because the PC wall board and the floor slab both have larger sizes, after the PC wall board and the floor slab are prefabricated on a die table, in order to avoid the deformation or the damage of the plate body in the hoisting process, a hoisting frame made of H-shaped steel is usually adopted, four insertion plates are respectively inserted into notches between wing plates and web plates of the H-shaped steel at two ends of the hoisting frame, and then the hoisting is carried out through connecting wire ropes of holes on the insertion plates. However, the following disadvantages exist in this way: because the flashboard is used as a single piece, and the hanging bracket and the flashboard are made of metal materials, the risk that the flashboard slips from the groove can occur in the hoisting process, and once the slip occurs, the prefabricated board can be damaged and safety accidents can also occur.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a can safe handling PC component with supporting hoist of H shaped steel gallows.
The utility model provides a frock is played to this kind of PC prefabricated plate, including H shaped steel gallows and supporting hoist, H shaped steel gallows includes two parallel arrangement's H shaped steel and a plurality of connection shaped steel between them. The lifting appliance comprises two pairs of plug-in main bodies and two steel wire ropes, the plug-in main bodies comprise two support legs for clamping H-shaped steel webs and connecting pieces between the two support legs, the plug-in main bodies are respectively inserted into two ends of the H-shaped steel in a mode that the two support legs clamp the H-shaped steel webs, the steel wire ropes are connected between the connecting pieces of the two plug-in main bodies at the same end, and after a hoisting object is arranged on an H-shaped steel hanging bracket, hoisting equipment hooks a hoisting ring on the steel wire.
In an embodiment of the above technical scheme, two legs of the plug-in main body are made of rectangular steel plates, a rectangular groove is formed in the middle of the lower side of the length direction of the two legs, the length direction side edge of an entity at one end of the rectangular groove is an adduction bevel edge, a round hole is formed in the entity at the other end of the entity, and the bevel edge end serves as the inner end of the plug-in main body.
In an embodiment of the above technical scheme, the connecting member is a circular steel tube, and two ends of the connecting member are respectively welded in the circular holes on the two legs of the plug main body.
In an embodiment of the above technical solution, when the steel wire rope is connected to the plug main body, the steel wire rope passes through an inner hole of the connecting member.
In one embodiment of the above technical solution, a soft rubber pad is bonded to the oblique edge of the lower side of the leg.
The utility model discloses the web of gallows H shaped steel is held through two landing legs to the grafting main part of hoist, and each grafting main part is two-way atress when making the prefabricated plate body lift by crane, guarantees that the hoist atress is even, and the hypotenuse of adduction is in the front end bottom surface of two landing legs of grafting main part in addition, when making lift by crane and H shaped steel between the pterygoid lamina form the face contact, increase frictional force to avoid the handling in-process grafting main part from H shaped steel department landing, improve the security of handling in-process.
Drawings
Fig. 1 is a schematic front view of an embodiment of the present invention.
Fig. 2 is a schematic top view of fig. 1 (cable and lifting lug not shown).
Fig. 3 is a schematic side view of fig. 1 (cable and lifting lug not shown).
Fig. 4 is an enlarged schematic view of a portion a in fig. 1.
Fig. 5 is an enlarged schematic view of a portion B in fig. 3.
Detailed Description
As shown in FIG. 1, the PC precast slab plays a role of tooling, and comprises an H-shaped steel hanger 1 and a lifting appliance 2.
As can be seen in conjunction with fig. 1 to 3:
the H-shaped steel hanger 1 comprises two H-shaped steels 11 arranged in parallel and a plurality of connecting section steels 12 between the two H-shaped steels. The connecting section steel 12 of this embodiment is also H-shaped steel of the same type.
As can be seen in conjunction with fig. 1 to 5:
the lifting appliance 2 comprises two pairs of inserting main bodies 21, two steel wire ropes 22 and lifting rings.
The plug-in main body 21 comprises two legs 211 for clamping an H-shaped steel web and connecting pieces 212 between the two legs, each plug-in main body 21 is respectively inserted into two ends of the H-shaped steel 11 in a mode that the two legs clamp the H-shaped steel web, a steel wire rope 22 is connected between the connecting pieces of the two plug-in main bodies 21 at the same end, and the hanging ring is fixed at the middle position of the two steel wire ropes 22.
Two landing legs 211 of grafting main part 21 all adopt the preparation of rectangle steel sheet, and there is the rectangle recess in the middle part of its length direction downside, and the length direction lateral edge of rectangle recess one end entity has seted up the round hole for the hypotenuse of adduction, other end entity, and the hypotenuse end is as the inner of grafting main part 21.
The connecting member 212 is a circular steel tube, and two ends of the connecting member are welded in the circular holes of the two legs 211 respectively.
The cable 22 passes through the inner hole of the connector 212 when connected to the plug body 21.
A soft rubber pad (not shown) is bonded to the lower side of the leg 211 at the oblique edge.
After the PC prefabricated plate body is conveyed to the H-shaped steel hanging bracket, the plug-in main bodies of the hanging device are respectively inserted into two ends of two H-shaped steels, and the hoisting equipment is hoisted through the hoisting rings.
Because the web of gallows H shaped steel is held to the grafting main part of hoist through two landing legs, each grafting main part is two-way atress when making the prefabricated plate body lift by crane, guarantees that the hoist atress is even, and the front end bottom surface of two landing legs of grafting main part is the hypotenuse of adduction moreover, and hypotenuse department sets up soft rubber pad, forms the face contact when making to lift by crane between the pterygoid lamina with H shaped steel, increase frictional force to avoid the handling in-process grafting main part to follow the landing of H shaped steel, improve the security of handling in-process.
Claims (5)
1. The utility model provides a PC prefabricated plate lifts by crane frock, includes H shaped steel gallows and supporting hoist thereof, and the H shaped steel gallows includes two parallel arrangement's H shaped steel and a plurality of connection shaped steel between them, its characterized in that: the lifting appliance comprises two pairs of plug-in main bodies and two steel wire ropes, the plug-in main bodies comprise two support legs for clamping H-shaped steel webs and connecting pieces between the two support legs, the plug-in main bodies are respectively inserted into two ends of the H-shaped steel in a mode that the two support legs clamp the H-shaped steel webs, the steel wire ropes are connected between the connecting pieces of the two plug-in main bodies at the same end, and after a hoisting object is arranged on an H-shaped steel hanging bracket, hoisting equipment hooks a hoisting ring on the steel wire.
2. The PC precast slab lifting tool of claim 1, wherein: the two legs of the plug-in main body are made of rectangular steel plates, a rectangular groove is formed in the middle of the lower side of the length direction of the rectangular steel plates, the length direction side edge of the entity at one end of the rectangular groove is an adduction bevel edge, a round hole is formed in the entity at the other end of the entity, and the bevel edge end serves as the inner end of the plug-in main body.
3. The PC precast slab lifting tool of claim 2, which is characterized in that: the connecting piece is a round steel pipe, and two ends of the connecting piece are respectively welded in the round holes in the two legs of the plug-in main body.
4. The PC precast slab lifting tool of claim 3, wherein: when the steel wire rope is connected with the plug-in main body, the steel wire rope penetrates through an inner hole of the connecting piece.
5. The PC precast slab lifting tool of claim 2, which is characterized in that: and a soft rubber pad is bonded at the bevel edge of the lower side of the supporting leg.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021809503.0U CN213141132U (en) | 2020-08-26 | 2020-08-26 | PC prefabricated plate lifts by crane frock |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021809503.0U CN213141132U (en) | 2020-08-26 | 2020-08-26 | PC prefabricated plate lifts by crane frock |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213141132U true CN213141132U (en) | 2021-05-07 |
Family
ID=75741089
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021809503.0U Active CN213141132U (en) | 2020-08-26 | 2020-08-26 | PC prefabricated plate lifts by crane frock |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213141132U (en) |
-
2020
- 2020-08-26 CN CN202021809503.0U patent/CN213141132U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213141132U (en) | PC prefabricated plate lifts by crane frock | |
CN202279623U (en) | Hoisting tool of bent concrete precast slab | |
CN204752012U (en) | Wall -hanging miniature hoist | |
CN217555572U (en) | Combined type hoisting device for I-shaped steel beam | |
CN203269337U (en) | Clamp for high-altitude construction of long sleeve | |
CN215558413U (en) | Lifting sling for rectangular culvert sections | |
CN212581356U (en) | Prefabricated part hoisting structure | |
CN212581331U (en) | Shaft bus duct hoisting mechanism | |
CN211419349U (en) | Combined lifting appliance for lifting I-steel | |
CN211037773U (en) | Hanging basket suspension device | |
CN210366632U (en) | Equipment transfer platform convenient for centralized transfer | |
CN210594927U (en) | Bolt structure for hoisting | |
CN204022267U (en) | Steel trestle tool special for hoisting | |
CN209778047U (en) | Lifting device for overturning template of dam | |
CN203715136U (en) | Tool for hoisting lifting hole cover plate in nuclear power plant | |
CN210117163U (en) | Lifting appliance with function of side-turning prefabricated part | |
CN202575684U (en) | Prefabricated-slab hoisting tool | |
CN205616430U (en) | Railway T beam mold board dismouting hoist and hang and move device | |
CN202414964U (en) | Travelling crane hoisting auxiliary device | |
CN211110632U (en) | Safety protection device capable of hoisting aerated bricks | |
CN205892490U (en) | A special lifting device for concrete pipe pile hoist and mount | |
CN110668301A (en) | Precast concrete slab hoisting method and hoisting auxiliary | |
CN104925644B (en) | Cathode conductive assembly overturning, inverting and hoisting construction method | |
CN217921004U (en) | Quick hoist and mount system of superimposed sheet | |
CN217126692U (en) | Device for hoisting overhanging I-shaped steel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |