CN211419349U - Combined lifting appliance for lifting I-steel - Google Patents
Combined lifting appliance for lifting I-steel Download PDFInfo
- Publication number
- CN211419349U CN211419349U CN201922419229.XU CN201922419229U CN211419349U CN 211419349 U CN211419349 U CN 211419349U CN 201922419229 U CN201922419229 U CN 201922419229U CN 211419349 U CN211419349 U CN 211419349U
- Authority
- CN
- China
- Prior art keywords
- steel
- hook
- lifting
- safety
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 15
- 239000010959 steel Substances 0.000 title claims abstract description 15
- 238000010276 construction Methods 0.000 abstract description 10
- 238000000034 method Methods 0.000 description 8
- 230000000694 effects Effects 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 238000000844 transformation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及吊装施工技术领域,具体涉及一种工字钢吊装用组合吊具。The utility model relates to the technical field of hoisting construction, in particular to a combined hanger for hoisting I-beams.
背景技术Background technique
工字钢是当前楼房、桥梁及隧道等建筑施工中大批量使用的钢材,在施工过程中常常需要吊装工字钢至施工点,便于施工人员对工字钢进行焊接拼装,从而构成建筑骨架支撑,然而根据施工要求不同,所采用的工字钢型号尺寸亦不相同,故吊装挂钩受工字钢的尺寸局限性要求较大,并且现有技术中的工字钢吊具多为夹具挂钩,其夹装在工字钢延伸方向的两侧,通过吊机连接夹具挂钩实现工字钢的吊装,然而该种吊装方式存在较大安全风险,吊装过程中工字钢极易因风阻等外力因素与夹具挂钩发生相对滑动,即使为保持平衡设置多个夹具挂钩,使工字钢吊装过程中保持水平状态,但该吊装方式仍未能解决工字钢向其延伸方向滑动的问题。I-beam is a steel used in large quantities in the construction of buildings, bridges and tunnels. During the construction process, it is often necessary to hoist the I-beam to the construction point, which is convenient for the construction personnel to weld and assemble the I-beam, thus forming the building skeleton support. However, according to different construction requirements, the size of the I-beam used is also different, so the hoisting hook is subject to the size limitations of the I-beam, and the I-beam hangers in the prior art are mostly clamp hooks. The I-beam is clamped on both sides of the extension direction of the I-beam, and the I-beam is hoisted by connecting the hook of the hoist to the I-beam. However, this hoisting method has great safety risks, and the I-beam is easily affected by wind resistance and other external factors during the hoisting process. There is relative sliding with the fixture hook. Even if multiple fixture hooks are set to maintain balance and keep the I-beam in a horizontal state during the hoisting process, this hoisting method still cannot solve the problem of the I-beam sliding in its extension direction.
通过公开专利检索,发现以下对比文件:Through a public patent search, the following comparative documents were found:
一种多用途工字钢吊具(CN209618677U)公开了一种多用途工字钢吊具,属于钢轨吊具设备技术领域。技术方案是:包含吊梁、吊臂、夹紧螺栓和吊孔,吊梁的中间设有吊孔,两个吊臂分别垂直固定在吊梁(1)的两端,两个吊臂上分别设有一个相对布置的夹紧螺栓(3),夹紧螺栓与吊臂螺纹连接。该实用新型的有益效果是:能够在不更换吊具的情况下,对多种型号的工字钢进行吊运;大大降低工人的劳动强度,减少工字钢滑轨等事故的发生,消除安全隐患。且结构简单,使用方便,可靠性强。A multipurpose I-beam spreader (CN209618677U) discloses a multipurpose I-beam spreader, which belongs to the technical field of rail spreader equipment. The technical scheme is: it includes a hanging beam, a hanging arm, a clamping bolt and a hanging hole, a hanging hole is arranged in the middle of the hanging beam, the two hanging arms are respectively vertically fixed on both ends of the hanging beam (1), and the two hanging arms are respectively A clamping bolt (3) arranged oppositely is provided, and the clamping bolt is threadedly connected with the boom. The beneficial effects of the utility model are that: various types of I-beams can be hoisted and transported without replacing the spreader; the labor intensity of workers is greatly reduced, the occurrence of accidents such as I-beam slide rails is reduced, and safety is eliminated. hidden danger. The utility model has the advantages of simple structure, convenient use and strong reliability.
一种工字钢吊具(CN108609483A)公开了一种工字钢吊具,包括第一吊钩和第二吊钩,第一吊钩与第二吊钩之间活动连接,第一吊钩的侧壁上设置有插销,第二吊钩的内部设置有与插销相配合的插槽。通过在第一吊钩上设置插销,第二吊钩上设置插销,实现两个吊钩之间的活动连接,从而达到调节两个吊钩之间的夹持距离,进而可以用于夹持不同规格的工字钢。An I-beam hanger (CN108609483A) discloses an I-beam hanger, comprising a first hook and a second hook, the first hook and the second hook are movably connected, and the first hook is movably connected. The side wall is provided with a plug, and the inside of the second hook is provided with a slot matched with the plug. By arranging a latch on the first hook and a latch on the second hook, the active connection between the two hooks is realized, so as to adjust the clamping distance between the two hooks, which can be used for clamping different hooks. Specifications of I-beam.
经分析,上述公开专利与本申请在工字钢吊装施力位置及安全放松脱结构等方面均不相同,因此不影响本申请的新颖性。After analysis, it is found that the above-mentioned published patent is different from the present application in terms of I-beam hoisting force application position and safe release structure, etc., so it does not affect the novelty of the present application.
实用新型内容Utility model content
本实用新型的目的在于克服现有技术的不足之处,提供一种工字钢吊装用组合吊具,该组合吊具配合吊装在工字钢的两端,使吊具不再受工字钢尺寸影响,且有效避免了工字钢向其延伸方向滑动的问题,并且设置安全拉带有效避免了吊具松脱,提高了吊装安全系数,且结构简单,成本低廉,广泛适用于各种型号工字钢的吊装施工。The purpose of this utility model is to overcome the deficiencies of the prior art, and to provide a combined spreader for I-beam hoisting, the combined spreader is hoisted at both ends of the I-beam, so that the spreader is no longer affected by the I-beam. The size is affected, and the problem of the I-beam sliding in its extension direction is effectively avoided, and the safety strap is installed to effectively avoid the loosening of the spreader, which improves the safety factor of hoisting. It has a simple structure and low cost, and is widely used in various models. I-beam hoisting construction.
一种工字钢吊装用组合吊具,包括对向挂接在工字钢两端的阻力挂钩及连接两个阻力挂钩的安全拉带;阻力挂钩包括底板及挂钩板,其中底板中部的一端制有插接在工字钢立板上的插槽,该底板中部的另一端固接有倾斜向上设置的挂钩板;挂钩板的中部制有水平贯通的安全孔,且挂钩板的顶部制有水平贯通的吊装孔。A combined hoisting tool for I-beam hoisting comprises resistance hooks oppositely hung on both ends of the I-beam and a safety pull belt connecting the two resistance hooks; the resistance hook comprises a bottom plate and a hook plate, wherein one end in the middle of the bottom plate is made The slot is inserted into the I-beam vertical plate, and the other end of the middle part of the bottom plate is fixed with a hook plate arranged obliquely upward; the middle part of the hook plate is made with a safety hole that passes through horizontally, and the top of the hook plate is made with a horizontal through hole. hoisting holes.
而且,安全拉带的两端分别穿透并缠绕在安全孔内。Moreover, both ends of the safety belt are respectively penetrated and wound in the safety hole.
而且,插槽两侧的底板顶面上复合粘接有橡胶垫。Moreover, rubber pads are compositely bonded on the top surfaces of the bottom plates on both sides of the slot.
本实用新型的优点和技术效果是:The advantages and technical effects of the present utility model are:
本实用新型的一种工字钢吊装用组合吊具,通过对象夹装在工字钢两端的阻力挂钩配合吊装工字钢,该设计使得工字钢吊装施工不再受工字钢自身的长度及宽度影响,不会受到吊具尺寸限制,广泛适用于各种型号工字钢的吊装施工;通过安全拉带缠绕并对拉固定两个阻力挂钩,避免因高空风阻等因素导致工字钢震动,进而导致两个阻力挂钩背向滑动致使工字钢松脱;通过橡胶垫增加阻力挂钩底板顶面与工字钢顶部横板底面的摩擦阻力,提高吊装安全系数,并且底板通过插槽活动插接在工字钢两端面的立板上,有效避免吊装过程中挂钩与工字钢端面的扭转滑动,提高吊装稳定性,最后通过吊装孔连接吊机吊钩,以倾斜对拉的方式对称吊装在工字钢两端,可保证工字钢水平吊装,有效避免了工字钢与吊钩发生相对滑动的问题。The utility model is a combination hoisting tool for hoisting I-beams. The I-beams are hoisted through the resistance hooks that are clamped at both ends of the I-beams. The design makes the hoisting construction of the I-beams no longer affected by the length of the I-beams themselves. It is not limited by the size of the spreader, and is widely used in the hoisting construction of various types of I-beams; the two resistance hooks are wound and fixed by the safety pull belt to avoid the vibration of the I-beam due to factors such as high-altitude wind resistance. , and then cause the two resistance hooks to slide back and cause the I-beam to loosen; increase the frictional resistance between the top surface of the resistance hook bottom plate and the bottom surface of the I-beam top horizontal plate through the rubber pad, improve the safety factor of hoisting, and the bottom plate can be inserted through the slot. Connected to the vertical plates on the two ends of the I-beam, it can effectively avoid the torsional sliding of the hook and the end surface of the I-beam during the hoisting process, and improve the hoisting stability. Finally, the hoist hook is connected through the hoisting hole, and the hoisting is symmetrically hoisted in a tilt-to-pull manner. At both ends of the I-beam, the horizontal hoisting of the I-beam can be ensured, which effectively avoids the problem of relative sliding between the I-beam and the hook.
本实用新型的一种工字钢吊装用组合吊具,其结构简单,使用方便,安全拉带便于拆装调节,阻力挂钩便于插拔安装,在解决挂钩尺寸问题的基础上解决了工字钢与挂钩的相对滑动问题,是一种具有较高创造性的工字钢吊装用组合吊具。The utility model is a combined hanger for hoisting I-beams, which has the advantages of simple structure, convenient use, easy disassembly and adjustment of safety pull belts, and easy insertion and removal of resistance hooks. The problem of relative sliding with the hook is a highly creative combination spreader for I-beam hoisting.
附图说明Description of drawings
图1为本实用新型的主视图(吊装连接示意图);Fig. 1 is the front view of the utility model (hoisting connection schematic diagram);
图2为本实用新型的俯视图(局部剖视);Fig. 2 is the top view (partial section) of the utility model;
图3为本实用新型阻力挂钩的立体图;Fig. 3 is the perspective view of the resistance hook of the utility model;
图中:1-吊钩;2-安全拉带;3-吊装孔;4-安全孔;5-挂钩板;6-底板;7-橡胶垫;8-工字钢;9-插槽。In the picture: 1-hook; 2-safety strap; 3-hoisting hole; 4-safety hole; 5-hook plate; 6-base plate; 7-rubber pad; 8-I-beam; 9-slot.
具体实施方式Detailed ways
为能进一步了解本实用新型的内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下。需要说明的是,本实施例是描述性的,不是限定性的,不能由此限定本实用新型的保护范围。In order to further understand the content, features and effects of the present utility model, the following embodiments are exemplified and described in detail with the accompanying drawings as follows. It should be noted that this embodiment is descriptive, not restrictive, and cannot thereby limit the protection scope of the present invention.
一种工字钢吊装用组合吊具,包括对向挂接在工字钢8两端的阻力挂钩及连接两个阻力挂钩的安全拉带2;阻力挂钩包括底板6及挂钩板5,其中底板中部的一端制有插接在工字钢立板上的插槽9,该底板中部的另一端固接有倾斜向上设置的挂钩板;挂钩板的中部制有水平贯通的安全孔4,且挂钩板的顶部制有水平贯通的吊装孔3。A combined hoisting tool for I-beam hoisting includes resistance hooks oppositely hung on both ends of the I-
而且,安全拉带的两端分别穿透并缠绕在安全孔内。Moreover, both ends of the safety belt are respectively penetrated and wound in the safety hole.
而且,插槽两侧的底板顶面上复合粘接有橡胶垫7。Moreover,
另外,本实用新型优选的,安全拉带采用现有技术中的成熟产品。In addition, in the preferred embodiment of the present invention, the safety pull belt adopts mature products in the prior art.
另外,本实用新型优选的,吊机的吊钩1挂接在吊装孔内部。In addition, the present invention preferably, the
为了更清楚地说明本实用新型的具体实施方式,下面提供一种实施例:In order to illustrate the specific embodiments of the present utility model more clearly, an embodiment is provided below:
本实用新型的一种工字钢吊装用组合吊具,在吊装工字钢时需由人工将两个阻力挂钩分别插接固定在工字钢的两端,即将阻力挂钩底板上的插槽插接在工字钢的立板上,而后用安全拉带分别连接在工字钢两端阻力挂钩的安全孔内,实现组合吊具的底面组装,最后仅需将吊机的吊钩分别挂接在工字钢两端阻力挂钩的吊装孔内即可进行吊装作业,需要注意的是,吊机的两个吊钩钢缆应保证同一长度,用以保证工字钢吊装过程中的水平状态,避免单一一端的阻力挂钩受力过大,进而降低使用寿命。The utility model relates to a combined hanger for hoisting I-beams. When hoisting the I-beams, two resistance hooks need to be manually inserted and fixed on both ends of the I-beams, namely, the slots on the bottom plate of the resistance hooks are inserted into the slots of the I-beams. It is connected to the vertical plate of the I-beam, and then connected to the safety holes of the resistance hooks at both ends of the I-beam with safety straps to realize the assembly of the bottom surface of the combined spreader. Finally, only the hooks of the crane need to be attached separately The hoisting operation can be carried out in the hoisting holes of the resistance hooks at both ends of the I-beam. It should be noted that the two hook cables of the crane should ensure the same length to ensure the horizontal state during the hoisting process of the I-beam. Avoid excessive force on the resistance hook at one end, thereby reducing the service life.
应当理解的是,对本领域普通技术人员来说,可以根据上述说明加以改进或变换,而所有这些改进和变换都应属于本实用新型所附权利要求的保护范围。It should be understood that, for those skilled in the art, improvements or transformations can be made according to the above description, and all these improvements and transformations should belong to the protection scope of the appended claims of the present invention.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922419229.XU CN211419349U (en) | 2019-12-30 | 2019-12-30 | Combined lifting appliance for lifting I-steel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922419229.XU CN211419349U (en) | 2019-12-30 | 2019-12-30 | Combined lifting appliance for lifting I-steel |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211419349U true CN211419349U (en) | 2020-09-04 |
Family
ID=72275957
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922419229.XU Expired - Fee Related CN211419349U (en) | 2019-12-30 | 2019-12-30 | Combined lifting appliance for lifting I-steel |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211419349U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114674655A (en) * | 2022-05-27 | 2022-06-28 | 中铁十八局集团第四工程有限公司 | Steel bar gauge length device and using method |
| CN118145484A (en) * | 2024-02-02 | 2024-06-07 | 河北或固建筑工程有限公司 | A kind of building construction assembled I-beam lifting equipment and use method thereof |
-
2019
- 2019-12-30 CN CN201922419229.XU patent/CN211419349U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114674655A (en) * | 2022-05-27 | 2022-06-28 | 中铁十八局集团第四工程有限公司 | Steel bar gauge length device and using method |
| CN114674655B (en) * | 2022-05-27 | 2022-08-12 | 中铁十八局集团第四工程有限公司 | Steel bar gauge length device and using method |
| CN118145484A (en) * | 2024-02-02 | 2024-06-07 | 河北或固建筑工程有限公司 | A kind of building construction assembled I-beam lifting equipment and use method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105858435A (en) | Technology for hoisting strip-shaped inclined steel structures in place through single crane | |
| CN204917648U (en) | Turbine rotor lifts by crane instrument | |
| CN211419349U (en) | Combined lifting appliance for lifting I-steel | |
| CN208071138U (en) | Pipe installing component | |
| CN205316527U (en) | Novel suspension type air conditioner outer quick -witted fixed knot construct | |
| CN205316526U (en) | Outer quick -witted support frame of fixed air conditioner suspends in midair | |
| CN222714917U (en) | Lifting appliance for lifting and installing H-shaped steel upright post | |
| CN210041237U (en) | Bus duct gallows convenient to installation | |
| CN102718124A (en) | Anti-slipping lifting appliance | |
| CN206302092U (en) | Overhead transmission line cable drafting tool | |
| CN216072701U (en) | Balanced hoisting accessory | |
| CN110697585A (en) | A mechanism for self-detaching attachment device | |
| CN206156568U (en) | A specialized tool for hoisting hydro -generator rotor magnetic pole | |
| CN210041236U (en) | Adjustable bus duct mounting hanger | |
| CN210041240U (en) | Combined bus duct hanger | |
| CN205616430U (en) | Railway T beam mold board dismouting hoist and hang and move device | |
| CN220827134U (en) | Hoisting device and hoisting system | |
| CN209194362U (en) | Rod piece connects levelling device between a kind of suspension bridge steel truss beam section | |
| CN201372158Y (en) | Horizontal H-shaped steel lifting appliance | |
| CN201367303Y (en) | Side bearing sling | |
| CN206599375U (en) | A kind of door type steel structure hoisting instrument | |
| CN206735624U (en) | A kind of curtain wall plate lifting fixing device and Lift-on/Lift-off System | |
| CN219546493U (en) | Construction steel bar hoisting clamp | |
| CN116928548B (en) | Lifting lug, equipment lifting structure and lifting method | |
| CN207158591U (en) | A kind of ultralong overweight wire insulation substring hangs auxiliary lifting appliance |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200904 |