CN213126231U - Real-time monitoring equipment for electric power construction site - Google Patents

Real-time monitoring equipment for electric power construction site Download PDF

Info

Publication number
CN213126231U
CN213126231U CN202020894095.7U CN202020894095U CN213126231U CN 213126231 U CN213126231 U CN 213126231U CN 202020894095 U CN202020894095 U CN 202020894095U CN 213126231 U CN213126231 U CN 213126231U
Authority
CN
China
Prior art keywords
processing unit
central processing
real
construction site
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020894095.7U
Other languages
Chinese (zh)
Inventor
郑广军
王硕
徐信阳
李志勇
靳晓森
付少华
暴虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xinhe Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Xinhe Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xinhe Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202020894095.7U priority Critical patent/CN213126231U/en
Application granted granted Critical
Publication of CN213126231U publication Critical patent/CN213126231U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model discloses an electric power job site real-time monitoring equipment, including the monitoring device case, the monitoring device case comprises front cabinet and back box to it is articulated through the articulated elements between front cabinet and the back box, front cabinet internal surface top fixed mounting has the surveillance camera head, and the surveillance camera head below is equipped with central processing unit, and the surveillance camera head links to each other with the central processing unit electrical property, central processing unit left and right sides fixed surface is connected with the mounting to be fixed in the front cabinet surface through the mounting, the central processing unit below is through mount fixedly connected with contact. The utility model discloses a central processing unit carries out data monitoring to and carry out image monitoring through the surveillance camera head, in case the electric power job site emergence accident, carry out analysis and processing to data through the module, and send central processing unit, and send monitoring personnel department by central processing unit, make monitoring personnel can learn the emergence of accident the very first time, and make corresponding processing, realize real time monitoring.

Description

Real-time monitoring equipment for electric power construction site
Technical Field
The utility model particularly relates to an electric power construction field specifically is an electric power construction site real time monitoring equipment.
Background
Electric power is an energy source using electric power as motive power. In the 70 s of the 19 th century, the invention and application of electric power opened up the second industrialized climax. The technology becomes one of three technological revolution which occur in the world since 18 th century of human history, and the technology changes the lives of people. The invention is the demand of people for continuously increasing electric power in the current internet era, and more products using electric power such as computers, household appliances and the like are invented. It is undeniable that the continuous emergence of new technologies makes electric power a necessity for people.
The use of electric power has penetrated all fields of national economy and people's life, becomes the main power form of industry, agriculture, transportation and national defense and the indispensable energy in people's family life, and has been widely applied in the aspects of dragging, lighting, electric heating, electrochemistry, communication and the like. Electricity is a product that differs from other types of products in that it cannot be stored. Therefore, the electric power generated and transmitted by the electric power system composed of the power plant, the transmission line, the substation and the distribution network must be consistent with the consumption of the electric power of the user. This makes power production closely related to national economy and people's life. Even if the power failure occurs in a short time, great harm is brought, and large-area power failure causes great loss to national economy and inconvenience to people's lives. Therefore, in the planning, design, construction and operation of electric power engineering, attention must be paid to ensure a high degree of reliability of the power supply.
The existing electric power construction site does not have a real-time monitoring function, once an accident happens to the electric power construction site, the accident is difficult to find at the first time, so that greater loss is caused, and therefore a real-time monitoring device for the electric power construction site is urgently needed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric power job site real time monitoring equipment to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides an electric power job site real-time monitoring equipment, includes the monitoring device case, and the monitoring device case comprises front cabinet and back case to it is articulated through the articulated elements between front cabinet and the back case, front cabinet internal surface top fixed mounting has the surveillance camera head, and the surveillance camera head below is equipped with central processing unit, and the surveillance camera head links to each other with the central processing unit electrical property, central processing unit top electric connection has the alarm, back case internal surface top is through mount fixedly connected with module, through wire electric connection between module and the contact.
As a further aspect of the present invention: the display screen is fixedly arranged on the front surface of the central processing unit, and the central processing unit is electrically connected with the display screen.
As a further aspect of the present invention: the monitoring device box is characterized in that a box lock is fixedly arranged on the right side outside the monitoring device box, and the box lock is respectively positioned on two sides of the front box and the rear box.
As a further aspect of the present invention: and a heat dissipation window is fixedly arranged above the outer part of the rear box, and a heat dissipation grid is arranged below the heat dissipation window.
As a further aspect of the present invention: the radiator fan is fixedly arranged above the inner part of the rear box through a fixing rod and is right opposite to the surface of the radiating window, and the radiator fan is electrically connected with a storage battery through a lead.
As a further aspect of the present invention: the storage battery is electrically connected with a power line, and the contact is electrically connected with a monitoring connecting line through a wire.
As a further aspect of the present invention: the surface of the left side and the surface of the right side of the central processing unit are fixedly connected with fixing pieces and are fixed on the surface of the front box through the fixing pieces.
As a further aspect of the present invention: the lower part of the central processor is fixedly connected with a contact through a fixing frame, and the central processor is electrically connected with the contact.
As a further aspect of the present invention: the module below has the circuit breaker through wire electric connection, and the circuit breaker below has the battery through wire electric connection.
As a further aspect of the present invention: the storage battery is electrically connected with the contact through a lead.
Compared with the prior art, the beneficial effects of the utility model are that:
1. carry out data monitoring through central processing unit to and carry out image monitoring through the surveillance camera head, in case the electric power job site emergence accident, carry out analysis and processing to data through the module, and send central processing unit to by central processing unit send monitoring personnel department, make monitoring personnel can learn the emergence of accident the very first time, and make corresponding processing, realize real time monitoring.
2. And once what is abnormal happens on the electric power construction site, the intelligent monitoring is carried out through the central processing unit, abnormal data are sent to the module, and audible and visual alarm is given through the alarm, so that the problem that monitoring personnel cannot find the abnormality in time and the processing efficiency is influenced is avoided.
Drawings
Fig. 1 is a schematic structural diagram of a real-time monitoring device in an electric power construction site.
Fig. 2 is a schematic diagram of an internal structure of the real-time monitoring device in the power construction site.
Fig. 3 is an external structural diagram of a rear box in the real-time monitoring equipment of the power construction site.
Fig. 4 is a schematic diagram of an internal structure of a back box in the real-time monitoring equipment of the power construction site.
In the figure: 1-monitoring device box, 2-monitoring connecting wire, 3-power wire, 4-box lock, 5-monitoring camera, 6-central processor, 7-display screen, 8-alarm, 9-fixing frame, 10-fixing piece, 11-contact, 12-wire, 13-hinge piece, 14-module, 15-circuit breaker, 16-storage battery, 17-heat dissipation window, 18-heat dissipation grid, 19-fixing rod, 20-heat dissipation fan, 21-front box and 22-rear box.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example one
Referring to fig. 1-2, an electric power construction site real-time monitoring device includes a monitoring device box 1, the monitoring device box 1 is composed of a front box 21 and a rear box 22, the front box 21 and the rear box 22 are hinged through a hinge 13, a box lock 4 is fixedly installed on the right side of the outside of the monitoring device box 1, the box lock 4 is respectively located on two sides of the front box 21 and the rear box 22, a monitoring camera 5 is fixedly installed above the inner surface of the front box 21, a central processor 6 is installed below the monitoring camera 5, the monitoring camera 5 is electrically connected with the central processor 6, fixing pieces 10 are fixedly connected to the surfaces of the left side and the right side of the central processor 6 and fixed on the surface of the front box 21 through the fixing pieces 10, a contact 11 is fixedly connected to the lower side of the central processor 6 through a fixing frame 9, and the central processor 6 is electrically connected with the contact 11.
And, 6 top electric connection of central processing unit has alarm 8, the internal surface top of rear box 22 is through mount 9 fixedly connected with module 14, through 12 electric connection of wire between module 14 and the contact 11 to 14 below has circuit breaker 15 through 12 electric connection of wire, and there is battery 16 circuit breaker 15 below through 12 electric connection of wire, through 12 electric connection of wire between battery 16 and the contact 11, 16 electric connection of battery has power cord 3, is used for charging for battery 16, and contact 11 has control connecting wire 2 through 12 electric connection of wire, connects the equipment of electric power job site through control connecting wire 2, realizes the real time monitoring to equipment.
Secondly, referring to fig. 2, a display screen 7 is fixedly installed on the front surface of the central processing unit 6, the central processing unit 6 is electrically connected with the display screen 7, and the display screen 7 is used for displaying the abnormality of the electric power construction site, so that monitoring personnel can obviously know the problems of the electric power construction site, and the problems can be solved more quickly.
Example two
Referring to fig. 1-2, an electric power construction site real-time monitoring device includes a monitoring device box 1, the monitoring device box 1 is composed of a front box 21 and a rear box 22, the front box 21 and the rear box 22 are hinged through a hinge 13, a box lock 4 is fixedly installed on the right side of the outside of the monitoring device box 1, the box lock 4 is respectively located on two sides of the front box 21 and the rear box 22, a monitoring camera 5 is fixedly installed above the inner surface of the front box 21, a central processor 6 is installed below the monitoring camera 5, the monitoring camera 5 is electrically connected with the central processor 6, fixing pieces 10 are fixedly connected to the surfaces of the left side and the right side of the central processor 6 and fixed on the surface of the front box 21 through the fixing pieces 10, a contact 11 is fixedly connected to the lower side of the central processor 6 through a fixing frame 9, and the central processor 6 is electrically connected with the contact 11.
And, 6 top electric connection of central processing unit has alarm 8, the internal surface top of rear box 22 is through mount 9 fixedly connected with module 14, through 12 electric connection of wire between module 14 and the contact 11 to 14 below has circuit breaker 15 through 12 electric connection of wire, and there is battery 16 circuit breaker 15 below through 12 electric connection of wire, through 12 electric connection of wire between battery 16 and the contact 11, 16 electric connection of battery has power cord 3, is used for charging for battery 16, and contact 11 has control connecting wire 2 through 12 electric connection of wire, connects the equipment of electric power job site through control connecting wire 2, realizes the real time monitoring to equipment.
Secondly, referring to fig. 2, a display screen 7 is fixedly installed on the front surface of the central processing unit 6, the central processing unit 6 is electrically connected with the display screen 7, and the display screen 7 is used for displaying the abnormality of the electric power construction site, so that monitoring personnel can obviously know the problems of the electric power construction site, and the problems can be solved more quickly.
Referring to fig. 3-4, a difference between the second embodiment and the first embodiment is that a heat dissipation window 17 is fixedly installed above the outside of the rear box 22, a heat dissipation grid 18 is installed below the heat dissipation window 17, a heat dissipation fan 20 is fixedly installed above the inside of the rear box 22 through a fixing rod 19, the heat dissipation fan 20 faces the surface of the heat dissipation window 17, and the heat dissipation fan 20 is electrically connected to the storage battery 16 through the wire 12.
The utility model discloses a theory of operation is: the utility model discloses a central processing unit 6 carries out data monitoring, and carry out image monitoring through surveillance camera head 5, in case the electric power job site accident, carry out analysis and processing to data through module 14, and send central processing unit 6, and send monitoring personnel department by central processing unit 6, make monitoring personnel can learn the emergence of accident the very first time, and make corresponding processing, realize real time monitoring, and in case what is unusual takes place at the electric power job site, carry out intelligent monitoring through central processing unit 6, and send module 14 with unusual data, and send audible-visual alarm through alarm 8, avoid monitoring personnel discovery that can not be timely unusual, influence the efficiency of handling.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (10)

1. The utility model provides an electric power construction site real-time monitoring equipment, includes monitoring device case (1), monitoring device case (1) comprises front box (21) and back box (22) to it is articulated through articulated elements (13) between front box (21) and back box (22), front box (21) internal surface top fixed mounting has surveillance camera head (5), and surveillance camera head (5) below is equipped with central processing unit (6), and surveillance camera head (5) and central processing unit (6) electric connection, a serial communication port, central processing unit (6) top electric connection has alarm (8), back box (22) internal surface top is through mount (9) fixedly connected with module (14), through wire (12) electric connection between module (14) and contact (11), module (14) are used for carrying out analysis and processing to data.
2. The electric power construction site real-time monitoring device according to claim 1, wherein a display screen (7) is fixedly installed on the front surface of the central processing unit (6), and the central processing unit (6) is electrically connected with the display screen (7).
3. The real-time monitoring equipment for the power construction site as claimed in claim 1, wherein a box lock (4) is fixedly installed on the right side of the outside of the monitoring device box (1), and the box lock (4) is respectively located on two sides of the front box (21) and the rear box (22).
4. The real-time monitoring equipment for the power construction site as claimed in claim 3, wherein a heat dissipation window (17) is fixedly mounted above the outside of the rear box (22), and a heat dissipation grid (18) is arranged below the heat dissipation window (17).
5. The real-time monitoring equipment for the power construction site as claimed in claim 1, wherein a heat dissipation fan (20) is fixedly installed at the upper part inside the rear box (22) through a fixing rod (19), the heat dissipation fan (20) is right opposite to the surface of the heat dissipation window (17), and the heat dissipation fan (20) is electrically connected with the storage battery (16) through a lead (12).
6. The real-time monitoring device for the power construction site according to claim 5, wherein the storage battery (16) is electrically connected with a power line (3), and the contact (11) is electrically connected with a monitoring connecting line (2) through a wire (12).
7. The real-time monitoring equipment for the electric power construction site as claimed in claim 1, wherein fixing pieces (10) are fixedly connected to the left and right side surfaces of the central processing unit (6) and are fixed to the surface of the front box (21) through the fixing pieces (10).
8. The real-time monitoring equipment for the power construction site as claimed in claim 1, wherein a contact (11) is fixedly connected below the central processing unit (6) through a fixing frame (9), and the central processing unit (6) is electrically connected with the contact (11).
9. The real-time monitoring device for the power construction site as claimed in claim 1, wherein a circuit breaker (15) is electrically connected below the module (14) through a wire (12), and a storage battery (16) is electrically connected below the circuit breaker (15) through the wire (12).
10. The real-time monitoring device for the power construction site as claimed in claim 9, wherein the storage battery (16) is electrically connected with the contact (11) through a lead (12).
CN202020894095.7U 2020-05-25 2020-05-25 Real-time monitoring equipment for electric power construction site Expired - Fee Related CN213126231U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020894095.7U CN213126231U (en) 2020-05-25 2020-05-25 Real-time monitoring equipment for electric power construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020894095.7U CN213126231U (en) 2020-05-25 2020-05-25 Real-time monitoring equipment for electric power construction site

Publications (1)

Publication Number Publication Date
CN213126231U true CN213126231U (en) 2021-05-04

Family

ID=75669117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020894095.7U Expired - Fee Related CN213126231U (en) 2020-05-25 2020-05-25 Real-time monitoring equipment for electric power construction site

Country Status (1)

Country Link
CN (1) CN213126231U (en)

Similar Documents

Publication Publication Date Title
CN213126231U (en) Real-time monitoring equipment for electric power construction site
CN209805362U (en) Novel energy-saving wind power type bus duct
CN203588057U (en) Wind power monitoring device
CN207456618U (en) A kind of ring-main unit temperature of cable junction monitoring device
CN217543293U (en) Fault early warning on-line monitoring system applied to 12KV cable intermediate joint
CN206211942U (en) One kind exchange header box
CN106059493A (en) Solar photovoltaic power generation monitoring system with wireless communication function
CN207098738U (en) A kind of UPS stand-by power supplies
CN213071830U (en) Electric automatization switch board based on thing networking
CN215067223U (en) Cloud online transformer core grounding current double-loop remote monitoring device
CN202939439U (en) Intelligent monitor host
CN204243780U (en) The grid-connection control device of micro-capacitance sensor
CN209119624U (en) A kind of photovoltaic array fault diagnosis monitoring box neural network based
CN207516460U (en) A kind of power station equipment monitoring running state device
CN218678813U (en) Wisdom lamp pole concentrates power supply
CN211830341U (en) Intelligent wireless monitoring device for cross-connection grounding
CN215646851U (en) New energy enterprise information network system
CN213186167U (en) Distribution room data acquisition device
CN221886510U (en) Cloud gateway on electromechanical device
CN210322028U (en) Wireless temperature measuring device for power distribution room Internet of things electrical equipment
CN213660969U (en) Communication box with wire harness protection function
CN103762506A (en) Alternating-current low-voltage power distribution cabinet
CN218445954U (en) Online monitoring device for electric meter
CN213092511U (en) Intelligent transformer internet-of-things monitoring terminal
CN214204353U (en) Active power distribution type intelligent device of power grid system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210504