CN213115426U - Building external climbing type building construction operation platform - Google Patents

Building external climbing type building construction operation platform Download PDF

Info

Publication number
CN213115426U
CN213115426U CN202020527275.1U CN202020527275U CN213115426U CN 213115426 U CN213115426 U CN 213115426U CN 202020527275 U CN202020527275 U CN 202020527275U CN 213115426 U CN213115426 U CN 213115426U
Authority
CN
China
Prior art keywords
motor
operation platform
bottom plate
construction operation
roller bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020527275.1U
Other languages
Chinese (zh)
Inventor
姜腾腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020527275.1U priority Critical patent/CN213115426U/en
Application granted granted Critical
Publication of CN213115426U publication Critical patent/CN213115426U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field of construction equipment, in particular to a building external climbing type construction operation platform, which comprises an operation box, wherein a plurality of lifting frames are arranged at the top of the operation box, a bottom plate is arranged at the top of the lifting frames, a hydraulic cylinder is arranged at the middle position of the top of the operation box, the output end of the hydraulic cylinder is connected with the lifting frames, a support plate is arranged at the top of the bottom plate, a motor-driven box is arranged below the inner part of the bottom plate, and a motor is arranged inside the motor-driven box; when the construction equipment at bottom plate top needs to remove, the power of the inside motor of switch-on motor case drives right roller bearing work through the motor under the cooperation of belt, makes the conveyer belt remove under the cooperation of right roller bearing and left roller bearing, and then drives the construction equipment at conveyer belt top and remove, through can avoid the staff to carry the step of drawing construction equipment with the hand like this, has increased operation platform's functionality.

Description

Building external climbing type building construction operation platform
Technical Field
The utility model belongs to the technical field of the architectural equipment, concretely relates to building outside formula construction operation platform that climbs.
Background
The construction operation platform is an engineering entity formed by the construction of various house buildings and auxiliary facilities thereof and the installation activities of lines, pipelines and equipment matched with the house buildings, the operation platform is a temporary operation platform and an operation frame which are usually erected on a construction site and is generally used for material turnover, the unloading platform is divided into a movable unloading platform, a floor type unloading platform and a cantilever type unloading platform, the original operation platform is not provided with movable parts, when the objects on the supporting plate need to be moved, the operation platform needs to be manually lifted by workers, the functionality of the operation platform is reduced, and the operation convenience cannot be provided for the workers.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a formula of climbing building construction operation platform outside building has article automatic movement that can make in the backup pad, increases the functional characteristics of operation platform.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building external climbing formula construction operation platform, includes the control box, a plurality of crane is installed at the top of control box, the bottom plate is installed at the top of crane, the top intermediate position department of control box installs the pneumatic cylinder, the output of pneumatic cylinder with the crane is connected, the backup pad is installed at the top of bottom plate, motor-driven case is installed to the inside below of bottom plate, motor-driven case's internally mounted has the motor, the belt is installed to the output of motor, the belt is kept away from right roller bearing is installed to the one end of motor, the conveyer belt is installed to the lateral wall of right roller bearing, the conveyer belt is kept away from left roller bearing is installed to the one end of right roller bearing, motor and external power source electric connection.
As the utility model discloses a preferred technical scheme of building outside formula of climbing construction operation platform, the folded sheet is installed at the bottom both ends of bottom plate.
As the utility model discloses a preferred technical scheme of building outside formula of climbing construction operation platform, the locating lever is installed to the bottom of folded sheet.
As the utility model discloses a preferred technical scheme of building outside formula of climbing construction operation platform, the folded sheet with the pivot is installed to the junction of bottom plate.
As the utility model discloses a preferred technical scheme of formula building construction operation platform climbs outside building, the connecting rod is installed at the both ends of control box, the connecting rod is kept away from electric putter is installed to one side of control box.
As the utility model discloses a preferred technical scheme of building outside formula of climbing construction operation platform, electric putter's quantity is four.
As the utility model discloses a preferred technical scheme of building outside formula of climbing construction operation platform, the universal wheel is installed to the bottom of control box.
Compared with the prior art, the beneficial effects of the utility model are that: when the construction equipment at bottom plate top needs to remove, the power of the inside motor of switch-on motor case drives right roller bearing work through the motor under the cooperation of belt, makes the conveyer belt remove under the cooperation of right roller bearing and left roller bearing, and then drives the construction equipment at conveyer belt top and remove, through can avoid the staff to carry the step of drawing construction equipment with the hand like this, has increased operation platform's functionality.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the internal structure of the base plate of FIG. 1 according to the present invention;
FIG. 3 is a bottom view of the bottom of FIG. 1 according to the present invention;
in the figure: 1. an operation box; 2. a lifting frame; 3. a support plate; 4. a base plate; 5. a hydraulic cylinder; 6. a connecting rod; 7. an electric push rod; 8. a universal wheel; 9. positioning a rod; 10. a motorized case; 11. a conveyor belt; 12. an electric motor; 13. a belt; 14. a right roller; 15. a left roller; 16. folding the board; 17. a rotating shaft.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides an outside formula construction operation platform that climbs of building, including control box 1, a plurality of crane 2 is installed through the slide-shaft in the top of control box 1, bottom plate 4 is installed through the slide-shaft in the top of crane 2, pneumatic cylinder 5 is installed through the bolt in the top intermediate position department of control box 1, the output of pneumatic cylinder 5 passes through bolted connection with crane 2, backup pad 3 is installed through the bolt in the top of bottom plate 4, motor-driven case 10 is installed through the bolt in the inside below of bottom plate 4, motor 12 is installed through the bolt in the inside of motor-driven case 10, motor 12's output can be dismantled and be connected with belt 13, the one end that motor 12 was kept away from to belt 13 is connected with right roller 14, conveyer belt 11 is installed to right roller 14's lateral wall, left roller 15 is installed to the one end that right roller.
In the embodiment, the model of the operating platform is jd0.6-03, when the operating platform needs to be used, the operating platform is moved to the outside of a building, building equipment is placed at the bottom plate 4 at the bottom of the supporting plate 3, the operating box 1 works on the hydraulic cylinder 5, the lifting frame 2 at the top is stretched, the hydraulic cylinder 5 stops working when the lifting frame 2 rises to a certain position, then a worker can work through the operating platform, the model of the motor 12 is YD-112M-4, and the model of the electric push rod 7 is XC 800-A.
In this embodiment, when the construction equipment at the top of the bottom plate 4 needs to be moved, the power supply of the motor 12 inside the motor box 10 is switched on, the motor 12 drives the right roller 14 to work under the cooperation of the belt 13, so that the conveyer belt 11 moves under the cooperation of the right roller 14 and the left roller 15, and further drives the construction equipment at the top of the conveyer belt 11 to move, and thus the step of pulling the construction equipment by a worker can be avoided.
Specifically, the bottom of the bottom plate 4 is connected to folding plates 16 at two ends.
In this embodiment, when the crane 2 is retracted without using an operation platform, the folding plate 16 is extended downward.
Specifically, the positioning rod 9 is mounted on the bottom of the folding plate 16 through a bolt.
In this embodiment, folding plate 16 is tensile back, makes locating lever 9 pass through the bolt fastening in control box 1 one end, through the damage that can avoid crane 2 like this, has increased operation platform's functionality.
Specifically, a rotating shaft 17 is installed at the joint of the folding plate 16 and the bottom plate 4, and the folding plate 16 and the bottom plate 4 are rotatably connected through the rotating shaft 17.
In this embodiment, the folding plate 16 can rotate in cooperation with the rotating shaft 17, so that the working area of the folding plate 16 can be increased.
Specifically, connecting rods 6 are mounted at two ends of the operating box 1 through bolts, and electric push rods 7 are mounted on one sides, far away from the operating box 1, of the connecting rods 6 through bolts.
In this embodiment, make electric putter 7 work, make the bottom of control box 1 break away from ground through electric putter 7, avoid control box 1 to appear the phenomenon of rocking.
Specifically, the number of the electric push rods 7 is four.
In this embodiment, the number of the electric push rods 7 is four, and the four electric push rods 7 can have stability, so that the operation platform is prevented from side turning over.
Specifically, the bottom of the operation box 1 is provided with universal wheels 8 through bolts.
In this embodiment, when the operation platform needs to be used, the operation platform is moved to the outside of the building through the universal wheels 8, so that the convenience of using the operation platform is improved.
The utility model discloses a theory of operation and use flow: after the utility model is installed, when the operation platform is needed, the operation platform is firstly moved to the outside of a building through the universal wheels 8, the construction equipment is placed at the bottom plate 4 at the bottom of the supporting plate 3, the operation box 1 is enabled to work on the hydraulic cylinder 5, and then the crane 2 at the top is stretched, when the crane 2 rises to a certain position, the work of the hydraulic cylinder 5 is stopped, then the worker can work through the operation platform, when the construction equipment at the top of the bottom plate 4 needs to be moved, the power supply of the motor 12 inside the motor box 10 is switched on, the motor 12 is used for driving the right roller 14 to work under the coordination of the belt 13, the conveyer belt 11 is enabled to move under the coordination of the right roller 14 and the left roller 15, and then the construction equipment at the top of the conveyer belt 11 is driven to move, thereby the step that the worker can avoid lifting the construction equipment by, increased operation platform's functionality, when need not use operation platform, make crane 2 contract the back, stretch folded sheet 16 down, then make locating lever 9 pass through the bolt fastening in 1 one end of control box, through the damage that can avoid crane 2 like this, increased operation platform's functionality, and folded sheet 16 can rotate under the cooperation of pivot 17, through the working area that can increase folded sheet 16 like this.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a formula construction operation platform climbs outside building, includes control box (1), a plurality of crane (2) are installed at the top of control box (1), bottom plate (4) are installed at the top of crane (2), pneumatic cylinder (5) are installed to the top intermediate position department of control box (1), the output of pneumatic cylinder (5) with crane (2) are connected, backup pad (3), its characterized in that are installed at the top of bottom plate (4): motor-driven case (10) is installed to the inside below of bottom plate (4), the internally mounted of motor-driven case (10) has motor (12), belt (13) are installed to the output of motor (12), belt (13) are kept away from right roller bearing (14) are installed to the one end of motor (12), conveyer belt (11) are installed to the lateral wall of right roller bearing (14), conveyer belt (11) are kept away from left roller bearing (15) are installed to the one end of right roller bearing (14), motor (12) and external power source electric connection.
2. The external climbing building construction operation platform according to claim 1, wherein: folding plates (16) are arranged at two ends of the bottom plate (4).
3. The external climbing building construction operation platform of claim 2, wherein: and a positioning rod (9) is arranged at the bottom of the folding plate (16).
4. The external climbing building construction operation platform of claim 2, wherein: and a rotating shaft (17) is arranged at the joint of the folding plate (16) and the bottom plate (4).
5. The external climbing building construction operation platform according to claim 1, wherein: connecting rods (6) are installed at two ends of the operating box (1), and electric push rods (7) are installed on one side of the operating box (1) and are far away from the connecting rods (6).
6. The building external climbing building construction operation platform according to claim 5, wherein: the number of the electric push rods (7) is four.
7. The external climbing building construction operation platform according to claim 1, wherein: the bottom of the operation box (1) is provided with universal wheels (8).
CN202020527275.1U 2020-04-13 2020-04-13 Building external climbing type building construction operation platform Expired - Fee Related CN213115426U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020527275.1U CN213115426U (en) 2020-04-13 2020-04-13 Building external climbing type building construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020527275.1U CN213115426U (en) 2020-04-13 2020-04-13 Building external climbing type building construction operation platform

Publications (1)

Publication Number Publication Date
CN213115426U true CN213115426U (en) 2021-05-04

Family

ID=75643530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020527275.1U Expired - Fee Related CN213115426U (en) 2020-04-13 2020-04-13 Building external climbing type building construction operation platform

Country Status (1)

Country Link
CN (1) CN213115426U (en)

Similar Documents

Publication Publication Date Title
CN110155733B (en) Lifting stacker crane
CN206319625U (en) Equipment is installed in a kind of building inner partition plate transhipment
CN213115426U (en) Building external climbing type building construction operation platform
CN221442065U (en) Movable ascending device for engineering construction
CN112681700A (en) Movable frame for construction of building interior wall
CN210064983U (en) High-rise building electromechanical device installation carrying device
CN213171212U (en) A hoisting apparatus for building engineering
CN214942600U (en) Laborsaving advancing device suitable for installation of large-scale round pin axle of steel construction engineering
CN211615676U (en) Mobile robot positioning device
CN2235471Y (en) Detachably mounted lifting platform for outer wall
CN215760355U (en) Foldable runner overhauls framed bent
CN220430248U (en) Transportation equipment for concrete structural members in factory
CN216740605U (en) Safety work protection platform for construction
CN218909747U (en) Building engineering material hoisting device
CN213742183U (en) Lifting workbench
CN220522038U (en) ALC board installation device under structural beam
CN210217249U (en) Stage that can high efficiency build
CN220182636U (en) Portable small-size component hoisting device
CN218323776U (en) Assembling and disassembling platform for jig frame for construction site assembling
CN221165664U (en) Detachable multifunctional movable hoisting trolley
CN220814823U (en) Mobile operation platform
CN221372967U (en) Novel evaporate and press lightweight concrete partition plate installation device
CN221399740U (en) Safety protection net rack for building construction
CN221682397U (en) Assembled building construction platform
CN215166324U (en) Sewage pipeline network device for municipal works convenient to maintenance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210504