CN213114514U - Water conservancy construction slope protection device - Google Patents
Water conservancy construction slope protection device Download PDFInfo
- Publication number
- CN213114514U CN213114514U CN202020527836.8U CN202020527836U CN213114514U CN 213114514 U CN213114514 U CN 213114514U CN 202020527836 U CN202020527836 U CN 202020527836U CN 213114514 U CN213114514 U CN 213114514U
- Authority
- CN
- China
- Prior art keywords
- protection device
- reinforcing steel
- slope protection
- water conservancy
- conservancy construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The utility model belongs to the technical field of water conservancy construction, in particular to a water conservancy construction slope protection device, which comprises a slope body, wherein a preset brick layer is laid on the inclined plane of the slope body, and a reinforced bar net layer is laid on the surface of the preset brick layer; the reinforcing steel bar net layer comprises a plurality of axial reinforcing steel bars and a plurality of radial reinforcing steel bars which are connected in a bundling manner; respectively pouring axial concrete pouring blocks and radial concrete pouring blocks on the axial reinforcing steel bars and the radial reinforcing steel bars; the positioning pile is vertically inserted into the ground and is positioned at the tail of the slope body; the axial reinforcing steel bars are respectively arranged in parallel at equal intervals, and the radial reinforcing steel bars are respectively arranged in parallel at equal intervals; the utility model discloses a water conservancy construction slope protection device easily lays, relies on preset brick layer, reinforcing bar net layer and guide pile, can guarantee the stability of slope protection device, has improved the durability of slope protection device greatly, prolongs the life of slope protection device, guarantees the protection nature that the slope protection device is good to the slope body.
Description
Technical Field
The utility model belongs to the technical field of the water conservancy construction, concretely relates to water conservancy construction slope protection device.
Background
Water is a valuable resource essential to human production and life, but the naturally existing state of the water does not completely meet the needs of human beings, and only water conservancy projects are built to control water flow and prevent flood disasters and regulate and distribute water quantity so as to meet the needs of human life and production on water resources.
Original bank protection only lays a layer of concrete block on domatic when using, and its life is shorter, and rivers easily erode slope protection structure influences its result of use.
SUMMERY OF THE UTILITY MODEL
For solving the above-mentioned problem that exists among the prior art, the utility model provides a water conservancy construction slope protection device has convenient to use, easily lays and long service life's characteristics.
In order to achieve the above object, the utility model provides a following technical scheme: a water conservancy construction slope protection device comprises a slope body, wherein a preset brick layer is laid on the inclined surface of the slope body, and a reinforced bar net layer is laid on the surface of the preset brick layer; the reinforcing steel bar net layer comprises a plurality of axial reinforcing steel bars and a plurality of radial reinforcing steel bars which are connected in a bundling manner; respectively pouring axial concrete pouring blocks and radial concrete pouring blocks on the axial reinforcing steel bars and the radial reinforcing steel bars; the positioning pile is vertically inserted into the ground, and is positioned at the tail of the slope body.
As the utility model discloses an optimal technical scheme, many the axial reinforcing bar is equidistant parallel arrangement, many respectively the radial reinforcing bar is equidistant parallel arrangement respectively.
As an optimal technical scheme of the utility model, axial concrete placement piece with surround out a plurality of blank of adjacent distribution between the radial concrete placement piece.
As an optimal technical scheme of the utility model, through welded fastening there is the steadying plate on the spud pile.
As an optimal technical scheme of the utility model, the tail end of axial reinforcing bar is through welded fastening has the lantern ring, just the lantern ring can be located on the spud pile.
As a preferred technical scheme of the utility model, install the buffer board on the spud the buffer board with be equipped with the buffer structure of two sets of symmetric distributions between the spud, just buffer structure includes connecting block and buffer spring the spread groove has been seted up on the spud surface, the one end of connecting block with buffer board welded fastening, other end activity embedding in the spread groove, buffer spring distributes the built-in end terminal surface of connecting block with between the groove end wall of spread groove.
As a preferred technical scheme of the utility model, the transverse section of the connecting block is an inverted T-shaped structure, and a limiting ring is fixed on the inner wall of the port of the connecting groove; the transverse section of the buffer plate is of a circular arc structure.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a water conservancy construction slope protection device easily lays, relies on preset brick layer, reinforcing bar net layer and guide pile, can guarantee the stability of slope protection device, has improved the durability of slope protection device greatly, prolongs the life of slope protection device, guarantees the protection nature that the slope protection device is good to the slope body.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of a partial front structure of the present invention;
fig. 3 is a schematic front sectional structural view of a spud according to the present invention;
fig. 4 is an enlarged schematic view of a portion a of fig. 3 according to the present invention;
fig. 5 is a schematic top view of the buffer board of the present invention;
in the figure: 1. a slope body; 2. presetting a brick layer; 3. axial reinforcing steel bars; 4. radial reinforcing steel bars; 5. positioning the pile; 6. a collar; 7. axial concrete pouring blocks; 8. radial concrete pouring blocks; 9. a blank space; 10. a stabilizing plate; 11. a buffer plate; 12. connecting blocks; 13. a limiting ring; 14. connecting grooves; 15. a buffer spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-5, the present invention provides the following technical solutions: a water conservancy construction slope protection device comprises a slope body 1, wherein a preset brick layer 2 is laid on the inclined surface of the slope body 1, and a reinforced bar net layer is laid on the surface of the preset brick layer 2; the reinforcement mesh layer comprises a plurality of axial reinforcements 3 and a plurality of radial reinforcements 4 which are connected in a bundling manner; respectively pouring axial concrete pouring blocks 7 and radial concrete pouring blocks 8 on the axial reinforcing steel bars 3 and the radial reinforcing steel bars 4; still include spud pile 5, the vertical interlude of spud pile 5 is on ground, and spud pile 5 is located the afterbody of slope body 1, when setting up the slope protection device, at first the afterbody ground interlude spud pile 5 of slope body 1, and, interval between spud pile 5 needs to be selected to the protection, for example, to the loose highway section of soil property, spud pile 5's setting should be denser, then lay one deck on the inclined plane of slope body 1 and predetermine brick layer 2, carry out laying of axial reinforcing bar 3 and radial reinforcing bar 4 again, guarantee that the tail end of axial reinforcing bar 3 corresponds spud pile 5, later, it can to pour into a mould axial concrete placement 7 and radial concrete placement 8 respectively at axial reinforcing bar 3 and radial reinforcing bar 4.
Specifically, as shown in fig. 1, in this embodiment, the axial rebars 3 are respectively arranged in parallel at equal intervals, and the radial rebars 4 are respectively arranged in parallel at equal intervals, so as to facilitate the subsequent pouring of the axial concrete blocks 7 and the radial concrete blocks 8.
Specifically, according to fig. 1 and fig. 2, in the present embodiment, a plurality of spaces 9 are enclosed between the axial concrete placement block 7 and the radial concrete placement block 8, and at a later stage, the spaces 9 may be filled with soil to be used as a green planting area.
Specifically, according to fig. 1 and 3, in this embodiment, a stabilizing plate 10 is fixed to the spud 5 by welding, and after the spud 5 is inserted into the ground, the stabilizing plate 10 is tightly attached to the ground, so as to ensure the stability of the spud 5.
Specifically, as shown in fig. 1, in this embodiment, the sleeve ring 6 is welded and fixed to the tail end of the axial reinforcement bar 3, and the sleeve ring 6 can be sleeved on the positioning pile 5, so as to ensure the stability of laying the axial reinforcement bar 3 and the radial reinforcement bar 4, prolong the durability of the slope protection device, and prevent the axial reinforcement bar 3 and the radial reinforcement bar 4 from sliding and moving downwards.
Specifically, according to fig. 1 and fig. 4, in this embodiment, install buffer plate 11 on the spud 5, be equipped with two sets of symmetric distribution's buffer structure between buffer plate 11 and spud 5, and buffer structure includes connecting block 12 and buffer spring 15, spread groove 14 has been seted up on spud 5 surface, the one end of connecting block 12 and buffer plate 11 welded fastening, other end activity imbed in spread groove 14, buffer spring 15 distributes between the end face of the end of inlaying of connecting block 12 and the groove end wall of spread groove 14, after lantern ring 6 overlaps locates on spud 5, under buffer spring 15's pushing action, 6 inner walls of lantern rings are hugged closely to buffer plate 11, and produce ascending thrust in the slant to lantern ring 6, avoid axial reinforcing bar 3 and radial reinforcing bar 4 to slide and move down.
Specifically, according to fig. 4 and 5, in the present embodiment, the transverse section of the connecting block 12 is an inverted "T" shaped structure, and a limiting ring 13 is fixed on the inner wall of the end opening of the connecting groove 14 to limit the moving range of the connecting block 12, so as to prevent the connecting block 12 from falling off; the transverse section of the buffer plate 11 is of a circular arc structure and is adapted to the inner wall structure of the lantern ring 6.
The utility model discloses a theory of operation and use flow: the utility model discloses when setting up the bank protection device, earlier at the afterbody ground interlude guide pile 5 of slope body 1, and, need select the interval between the guide pile 5 to the protection, if, to the loose highway section of soil property, the setting of guide pile 5 should be intensive, then lay the one deck on the inclined plane of slope body 1 and predetermine brick layer 2, carry out laying of axial reinforcing bar 3 and radial reinforcing bar 4 again, the tail end of guaranteeing axial reinforcing bar 3 corresponds guide pile 5, and the tail end welding lantern ring 6 at axial reinforcing bar 3, and overlap lantern ring 6 on guide pile 5, afterwards, it can to pour into a mould axial concrete placement piece 7 and radial concrete placement piece 8 respectively at axial reinforcing bar 3 and radial reinforcing bar 4.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (7)
1. The utility model provides a water conservancy construction slope protection device, includes slope body (1), its characterized in that: a preset brick layer (2) is laid on the inclined plane of the slope body (1), and a reinforced bar net layer is laid on the surface of the preset brick layer (2); the reinforcing steel bar net layer comprises a plurality of axial reinforcing steel bars (3) and a plurality of radial reinforcing steel bars (4) which are connected in a bundling way; respectively pouring axial concrete pouring blocks (7) and radial concrete pouring blocks (8) on the axial reinforcing steel bars (3) and the radial reinforcing steel bars (4); the slope body is characterized by further comprising a positioning pile (5), wherein the positioning pile (5) is vertically inserted into the ground, and the positioning pile (5) is located at the tail of the slope body (1).
2. The water conservancy construction slope protection device of claim 1, characterized in that: many axial reinforcing bar (3) are equidistant parallel arrangement respectively, many radial reinforcing bar (4) are equidistant parallel arrangement respectively.
3. The water conservancy construction slope protection device of claim 1, characterized in that: a plurality of spaces (9) which are distributed adjacently are enclosed between the axial concrete pouring blocks (7) and the radial concrete pouring blocks (8).
4. The water conservancy construction slope protection device of claim 1, characterized in that: and a stabilizing plate (10) is fixed on the positioning pile (5) through welding.
5. The water conservancy construction slope protection device of claim 1, characterized in that: the tail end of the axial reinforcing steel bar (3) is fixedly provided with a lantern ring (6) through welding, and the lantern ring (6) can be sleeved on the positioning pile (5).
6. The water conservancy construction slope protection device of claim 1, characterized in that: install buffer board (11) on spud (5) buffer board (11) with be equipped with the buffer structure of two sets of symmetric distributions between spud (5), just buffer structure includes connecting block (12) and buffer spring (15) spread groove (14) have been seted up on spud (5) surface, the one end of connecting block (12) with buffer board (11) welded fastening, other end activity embedding in spread groove (14), buffer spring (15) distribute be in the built-in end terminal surface of connecting block (12) with between the groove end wall of spread groove (14).
7. The water conservancy construction slope protection device of claim 6, characterized in that: the transverse section of the connecting block (12) is of an inverted T-shaped structure, and a limiting ring (13) is fixed on the inner wall of the port of the connecting groove (14); the transverse section of the buffer plate (11) is of a circular arc structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020527836.8U CN213114514U (en) | 2020-04-13 | 2020-04-13 | Water conservancy construction slope protection device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020527836.8U CN213114514U (en) | 2020-04-13 | 2020-04-13 | Water conservancy construction slope protection device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213114514U true CN213114514U (en) | 2021-05-04 |
Family
ID=75643501
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020527836.8U Active CN213114514U (en) | 2020-04-13 | 2020-04-13 | Water conservancy construction slope protection device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213114514U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115182301A (en) * | 2022-07-29 | 2022-10-14 | 长江水利水电工程建设(武汉)有限责任公司 | Construction method for assembled hydraulic engineering slope protection |
-
2020
- 2020-04-13 CN CN202020527836.8U patent/CN213114514U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115182301A (en) * | 2022-07-29 | 2022-10-14 | 长江水利水电工程建设(武汉)有限责任公司 | Construction method for assembled hydraulic engineering slope protection |
CN115182301B (en) * | 2022-07-29 | 2024-03-19 | 长江水利水电工程建设(武汉)有限责任公司 | Assembled hydraulic engineering slope protection construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213114514U (en) | Water conservancy construction slope protection device | |
CN107893425A (en) | A kind of anchor structure and its construction method of steel pipe composite pile and cushion cap | |
CN210459178U (en) | Reinforcing pile structure of soft soil foundation | |
CN210263026U (en) | Anti structure that floats of hole-forming bored concrete pile steel sleeve is protected to mud dado of going out terrace | |
CN213897211U (en) | Assembled debris flow drainage groove retaining wall | |
CN212316830U (en) | Hydraulic engineering is with ecological slope protection brick of concatenation formula | |
CN201635072U (en) | Centrally grouted static-pressured anchor pile former | |
CN213709654U (en) | Foundation cushion block reinforcing structure in building deviation rectifying process | |
CN211816004U (en) | Slope protection device for water conservancy | |
CN210482313U (en) | Foundation pit supporting beam structure | |
CN211057845U (en) | Retaining wall structure for water conservancy project diversion canal | |
CN208995983U (en) | A kind of greening and environmental protection type hydraulic engineering ecological protection slope | |
CN210263341U (en) | Agricultural irrigation reservoir | |
CN218861569U (en) | Ground slope cement reinforced structure | |
CN201526029U (en) | Assembled movable non-disaster dam | |
CN111042057A (en) | Splicing type slope protection building block assembly and slope protection combined by quadrangle and triangle | |
CN213203977U (en) | Ecological precast concrete box dam face structure | |
CN211080117U (en) | Drainage ditch slope protection | |
CN205348098U (en) | A retaining wall structure for river course | |
CN220908420U (en) | Deep foundation pit anchor spraying supporting structure | |
CN213390165U (en) | Deep groove enclosure structure | |
CN212926117U (en) | Mountain region high slope supporting construction | |
CN218147578U (en) | Steady basic unit of water with anti function of splitting is used to road | |
CN221142822U (en) | Roadbed slope protection mechanism | |
CN210507698U (en) | Underdrain for deep burial |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |