CN213111919U - Water conservancy construction pipe laying pay-off convenient to construction - Google Patents

Water conservancy construction pipe laying pay-off convenient to construction Download PDF

Info

Publication number
CN213111919U
CN213111919U CN202022054146.8U CN202022054146U CN213111919U CN 213111919 U CN213111919 U CN 213111919U CN 202022054146 U CN202022054146 U CN 202022054146U CN 213111919 U CN213111919 U CN 213111919U
Authority
CN
China
Prior art keywords
fixed
construction
water conservancy
pipe laying
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022054146.8U
Other languages
Chinese (zh)
Inventor
刘兵
李慧源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022054146.8U priority Critical patent/CN213111919U/en
Application granted granted Critical
Publication of CN213111919U publication Critical patent/CN213111919U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a water conservancy construction pipe laying pay-off convenient to construction, including the mounting bracket, the outside of mounting bracket is fixed with the locating piece, the outside of locating piece is connected with stabilizing mean, stabilizing mean's top is fixed with the unwrapping wire pole, the outside of mounting bracket has the fifth wheel through link swing joint, the outside of mounting bracket is provided with fixed establishment; the utility model can provide elasticity through the extrusion spring in the groove block after the wire-releasing rod is placed, the extrusion spring can push the mounting plate on one side to move and make the locking block at the other end of the mounting plate clamped in the mounting frame, thereby ensuring the stable structure of the wire-releasing rod after being mounted; the utility model discloses can provide elasticity through the supporting spring in the protective housing through fixed establishment's setting, can vertical direction promote limiting plate and supporting shoe to make the supporting shoe support ground, ensure the fixed of this device placement position.

Description

Water conservancy construction pipe laying pay-off convenient to construction
Technical Field
The utility model belongs to the technical field of construction equipment, concretely relates to water conservancy construction pipe laying pay-off convenient to construction.
Background
Hydraulic construction is one of engineering construction, and has many similarities with the construction of general civil engineering such as roads, railways, bridges, house buildings, and the like, for example: the main construction objects are mainly earthwork, stone, concrete, metal structures, electromechanical equipment installation and other projects; some construction methods are the same; some construction machines may be universal; the organization management work of some constructions also can be for reference each other, and in the water conservancy work progress, often need lay the pipeline in the pipeline, generally need use pipe laying pay-off to go on, and current pipe laying pay-off is in the use, and the height of pay-off pole generally can be adjusted according to actual need, has the problem of rocking easily when placing after the adjustment, for this reason we provide a water conservancy construction pipe laying pay-off convenient to construction.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water conservancy construction pipe laying pay-off convenient to construction to current pipe laying pay-off that proposes in solving above-mentioned background art in the use, the height of putting the line pole generally can adjust according to actual need, has the problem of rocking easily when placing after the adjustment.
In order to achieve the above object, the utility model provides a following technical scheme: a water conservancy construction pipe laying pay-off device convenient for construction comprises a mounting frame, wherein a positioning block is fixed on the outer side of the mounting frame, a stabilizing mechanism is connected on the outer side of the positioning block, a wire laying rod is fixed at the top of the stabilizing mechanism, a connecting wheel is movably connected on the outer side of the mounting frame through a connecting frame, and a fixing mechanism is arranged on the outer side of the mounting frame;
the stabilizing mechanism comprises an arc-shaped sleeve, groove blocks are fixed on two sides of the arc-shaped sleeve, a connecting rod is arranged inside each groove block, a limiting pad is installed at one end of the connecting rod, a mounting plate is installed at the other end of the connecting rod, a locking block is connected to the other side of the mounting plate, and an extrusion spring is movably connected to the outer side of the connecting rod.
Preferably, the fixed establishment includes the fixed block, one side of fixed block is fixed with the installation piece, the bottom of fixed block is fixed with the protective housing, the interior roof of protective housing is connected with supporting spring, supporting spring's bottom is provided with the limiting plate, the bottom of limiting plate is fixed with the supporting shoe.
Preferably, the two sides of the limiting plate are provided with sliding blocks, and the protective shell is internally provided with a sliding groove.
Preferably, one end of the extrusion spring is fixedly connected with the mounting plate, and the other end of the extrusion spring is fixedly connected with the groove block.
Preferably, a through hole is formed in the groove block, and the size of the through hole is matched with that of the connecting rod.
Preferably, the mounting frame is internally provided with a positioning groove, and the size of the positioning groove is matched with that of the locking block.
Preferably, the arc-shaped sleeve is fixedly connected with the pay-off rod through welding.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the utility model discloses can be through the setting of firm mechanism, after placing the completion, extrusion spring in the accessible recess piece provides elasticity, and extrusion spring can promote the mounting panel of one side and remove to in the latch segment card that makes the mounting panel other end goes into the mounting bracket, thereby ensure that the structure after the installation of unwrapping wire pole is firm.
(2) The utility model discloses can provide elasticity through the supporting spring in the protective housing through fixed establishment's setting, can vertical direction promote limiting plate and supporting shoe to make the supporting shoe support ground, ensure the fixed of this device placement position.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the overall structure of the securing mechanism of the present invention;
FIG. 3 is a schematic view of a part of the structure of the fixing mechanism of the present invention;
fig. 4 is a schematic structural view of the fixing mechanism of the present invention;
in the figure: 1. a mounting frame; 2. positioning blocks; 3. a stabilizing mechanism; 31. an arc-shaped sleeve; 32. a groove block; 33. a connecting rod; 34. a limiting pad; 35. mounting a plate; 36. a locking block; 37. a compression spring; 4. a wire releasing rod; 5. a connecting wheel; 6. a fixing mechanism; 61. a fixed block; 62. mounting blocks; 63. a protective shell; 64. a support spring; 65. a limiting plate; 66. and (7) a supporting block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a water conservancy construction pipe laying pay-off device convenient for construction comprises a mounting frame 1, wherein a positioning block 2 is fixed on the outer side of the mounting frame 1, a stabilizing mechanism 3 is connected on the outer side of the positioning block 2, a pay-off rod 4 is fixed on the top of the stabilizing mechanism 3, a connecting wheel 5 is movably connected on the outer side of the mounting frame 1 through a connecting frame, and a fixing mechanism 6 is arranged on the outer side of the mounting frame 1;
stabilizing mean 3 includes arc cover 31, the both sides of arc cover 31 all are fixed with groove block 32, the inside of groove block 32 is provided with connecting rod 33, spacing pad 34 is installed to the one end of connecting rod 33, mounting panel 35 is installed to the other end of connecting rod 33, the opposite side of mounting panel 35 is connected with latch segment 36, the outside swing joint of connecting rod 33 has extrusion spring 37, setting through stabilizing mean 3, arc cover 31 is through welding and 4 fixed connection of unwrapping wire pole, and after placing the completion, extrusion spring 37 in the accessible groove block 32 provides elasticity, extrusion spring 37 can promote the mounting panel 35 of one side and remove, and make the latch segment 36 card of the mounting panel 35 other end go into in the mounting bracket 1, thereby ensure that the structure after the installation of unwrapping wire pole 4 is firm.
In this embodiment, it is preferred, fixed establishment 6 includes fixed block 61, one side of fixed block 61 is fixed with installation piece 62, the bottom of fixed block 61 is fixed with protective housing 63, the interior roof of protective housing 63 is connected with supporting spring 64, supporting spring 64's bottom is provided with limiting plate 65, limiting plate 65's bottom is fixed with supporting shoe 66, setting through fixed establishment 6, the user only needs to insert installation piece 62 in the mounting bracket 1, and accomplish the fixed between installation piece 62 and the mounting bracket 1 through the bolt, supporting spring 64 through in the protective housing 63 provides elasticity this moment, can vertical direction promote limiting plate 65 and supporting shoe 66, and make supporting shoe 66 support ground, ensure that this device places the fixed of position.
In this embodiment, preferably, the two sides of the limiting plate 65 are both provided with sliders, and the inside of the protective shell 63 is provided with a sliding groove.
In this embodiment, preferably, one end of the pressing spring 37 is fixedly connected to the mounting plate 35, and the other end of the pressing spring 37 is fixedly connected to the groove block 32.
In this embodiment, preferably, a through hole is formed inside the groove block 32, and the size of the through hole is matched with the size of the connecting rod 33.
In this embodiment, preferably, a positioning groove is formed in the mounting frame 1, and the size of the positioning groove is matched with the size of the locking block 36.
In this embodiment, the arc-shaped sleeve 31 is preferably fixedly connected to the wire-releasing rod 4 by welding.
The utility model discloses a theory of operation and use flow: when the device is used, the arc-shaped sleeve 31 is fixedly connected with the pay-off rod 4 through welding by the aid of the stabilizing mechanism 3, after the device is placed, elastic force can be provided through the extrusion spring 37 in the groove block 32, the extrusion spring 37 can push the mounting plate 35 on one side to move, the locking block 36 on the other end of the mounting plate 35 is clamped in the mounting frame 1, and accordingly the structure of the pay-off rod 4 after being mounted is stable; can be through the setting of fixed establishment 6, the user only needs to install in piece 62 inserts mounting bracket 1 to can accomplish through the bolt and install the fixed between piece 62 and the mounting bracket 1, provide elasticity through supporting spring 64 in the protective housing 63 this moment, can vertical direction promote limiting plate 65 and supporting shoe 66, and make supporting shoe 66 support ground, ensure that this device places the fixed of position.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a water conservancy construction pipe laying pay-off convenient to construction, includes mounting bracket (1), the outside of mounting bracket (1) is fixed with locating piece (2), its characterized in that: the outer side of the positioning block (2) is connected with a stabilizing mechanism (3), the top of the stabilizing mechanism (3) is fixedly provided with a wire laying rod (4), the outer side of the mounting rack (1) is movably connected with a connecting wheel (5) through a connecting rack, and the outer side of the mounting rack (1) is provided with a fixing mechanism (6);
firm mechanism (3) are including arc cover (31), the both sides of arc cover (31) all are fixed with groove block (32), the inside of groove block (32) is provided with connecting rod (33), spacing pad (34) are installed to the one end of connecting rod (33), mounting panel (35) are installed to the other end of connecting rod (33), the opposite side of mounting panel (35) is connected with latch segment (36), the outside swing joint of connecting rod (33) has extrusion spring (37).
2. The water conservancy construction pipe laying pay-off device convenient to construction of claim 1, characterized in that: fixed establishment (6) are including fixed block (61), one side of fixed block (61) is fixed with installation piece (62), the bottom of fixed block (61) is fixed with protective housing (63), the interior roof of protective housing (63) is connected with supporting spring (64), the bottom of supporting spring (64) is provided with limiting plate (65), the bottom of limiting plate (65) is fixed with supporting shoe (66).
3. The water conservancy construction pipe laying pay-off device convenient to construction of claim 2, characterized in that: the two sides of the limiting plate (65) are provided with sliding blocks, and sliding grooves are formed in the protective shell (63).
4. The water conservancy construction pipe laying pay-off device convenient to construction of claim 1, characterized in that: one end of the extrusion spring (37) is fixedly connected with the mounting plate (35), and the other end of the extrusion spring (37) is fixedly connected with the groove block (32).
5. The water conservancy construction pipe laying pay-off device convenient to construction of claim 1, characterized in that: a through hole is formed in the groove block (32), and the size of the through hole is matched with that of the connecting rod (33).
6. The water conservancy construction pipe laying pay-off device convenient to construction of claim 1, characterized in that: the positioning groove is formed in the mounting frame (1), and the size of the positioning groove is matched with that of the locking block (36).
7. The water conservancy construction pipe laying pay-off device convenient to construction of claim 1, characterized in that: the arc-shaped sleeve (31) is fixedly connected with the wire releasing rod (4) through welding.
CN202022054146.8U 2020-09-18 2020-09-18 Water conservancy construction pipe laying pay-off convenient to construction Expired - Fee Related CN213111919U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022054146.8U CN213111919U (en) 2020-09-18 2020-09-18 Water conservancy construction pipe laying pay-off convenient to construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022054146.8U CN213111919U (en) 2020-09-18 2020-09-18 Water conservancy construction pipe laying pay-off convenient to construction

Publications (1)

Publication Number Publication Date
CN213111919U true CN213111919U (en) 2021-05-04

Family

ID=75663089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022054146.8U Expired - Fee Related CN213111919U (en) 2020-09-18 2020-09-18 Water conservancy construction pipe laying pay-off convenient to construction

Country Status (1)

Country Link
CN (1) CN213111919U (en)

Similar Documents

Publication Publication Date Title
CN210342860U (en) Reinforcing apparatus of electric power angle steel iron tower
CN213111919U (en) Water conservancy construction pipe laying pay-off convenient to construction
CN218063672U (en) Water supply and drainage pipeline spreads and buries fixed knot and constructs
CN216177995U (en) Steel member welding auxiliary positioning device with adjustable size
CN214305586U (en) Building pipeline reinforcing structure
CN211851241U (en) Building rail is used in municipal administration convenient to dismantle
CN211151465U (en) Line support for municipal road engineering
CN212210329U (en) Cable fixing device for municipal works
CN210067508U (en) Protection frame is used in building engineering construction
CN220301859U (en) Building carrier plate midspan supporting equipment
CN213226128U (en) Steel bar straightening device for construction engineering construction
CN216008540U (en) Large tracts of land supporting device with adjustable for building
CN216242652U (en) Pipeline fixing device for water conservancy construction
CN216382384U (en) Civil engineering is with antidetonation support
CN220342007U (en) Utility tunnel cable support
CN212224192U (en) Steel component for building
CN217232687U (en) Adjustable positioning buckle for upright rod base of overhanging scaffold
CN216530411U (en) Cable fixing support
CN209855230U (en) A anchor for building engineering's concrete column
CN211118236U (en) A interim cable and fire hose fixed bolster for job site
CN211779404U (en) Supporting device for laying irrigation and water conservancy pipelines
CN217557920U (en) Guardrail for construction worker
CN219100302U (en) Stable steel member house frame
CN216344845U (en) Wireless device support for portable installation and connection of underground engineering
CN214153955U (en) Suspension structure of temporary power cable

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210504

Termination date: 20210918