CN216242652U - Pipeline fixing device for water conservancy construction - Google Patents
Pipeline fixing device for water conservancy construction Download PDFInfo
- Publication number
- CN216242652U CN216242652U CN202121936994.XU CN202121936994U CN216242652U CN 216242652 U CN216242652 U CN 216242652U CN 202121936994 U CN202121936994 U CN 202121936994U CN 216242652 U CN216242652 U CN 216242652U
- Authority
- CN
- China
- Prior art keywords
- fixing plate
- spring
- pipeline
- plate
- water conservancy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 18
- 238000010276 construction Methods 0.000 title claims abstract description 16
- 239000000463 material Substances 0.000 claims description 3
- 229910001220 stainless steel Inorganic materials 0.000 claims description 3
- 239000010935 stainless steel Substances 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 abstract 1
- 230000008901 benefit Effects 0.000 description 2
- 239000003673 groundwater Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000002352 surface water Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Images
Landscapes
- Clamps And Clips (AREA)
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a pipeline fixing device for water conservancy construction, and relates to the technical field of water conservancy construction. According to the utility model, by arranging the clamping block, the clamping groove, the second spring and the limiting rod, a worker can rotate the second fixing plate through the hinge, so that the clamping block is clamped into the clamping groove in the process that the second fixing plate is closed towards the first fixing plate, the limiting rod is contacted with the second fixing plate, meanwhile, the limiting rod stretches the second spring, after the clamping block is completely attached to the clamping groove, the second spring restores elasticity and pulls the limiting rod after being stretched, so that the limiting rod is inserted into the first fixing plate, and the first fixing plate and the second fixing plate are limited and fixed through the limiting rod, so that the looseness generated in the installation of a pipeline is avoided.
Description
Technical Field
The utility model relates to the technical field of water conservancy construction, in particular to a pipeline fixing device for water conservancy construction.
Background
Hydraulic engineering is the surface water and the groundwater that are used for controlling and allotment nature, reach the earth's surface water and the groundwater of harmfully having the benefit purpose and the engineering of building, and water is the essential valuable resource of mankind production and life, but its state that exists naturally does not accord with the human needs completely, only builds hydraulic engineering, just can control rivers, prevents flood disasters to adjust and distribute the water yield, in order to satisfy people's life and production to the needs of water resource, when hydraulic engineering construction, often need lay the pipeline.
Chinese patent according to publication number CN211875292U discloses a pipeline fixing device for water conservancy construction, including backup pad, card pipe horizontal pole, shock attenuation box and base, the left and right sides of backup pad all is provided with the handle, and the outside of handle all is provided with the handle protection and fills up, the inboard of backup pad is provided with the cushion, and is provided with the rotary rod above the backup pad, the top of rotary rod is provided with first card pipe pole, and the outside setting of first card pipe pole all is provided with card pipe pole protection and fills up.
The utility model has the advantages that by arranging the soft cushion, the device plays a role in protecting the pipeline and avoids the pipeline from being abraded and scratched, thereby prolonging the service life of the pipeline, and by arranging the handle, the device is convenient for workers to move and improves the working efficiency; when the pipeline is installed and fixed, the pipeline is closed and fixed only by inserting the convex clamping groove into the concave clamping groove, and when materials are transported in the pipeline, the pipeline is easy to generate certain vibration, so that the convex clamping groove is easy to be separated from the concave clamping groove, and the stability is poor; simultaneously, when the pipeline is installed in the device, because the specification size of pipeline is different, and when the device is carrying out the telescopic adjustment to the card pipe horizontal pole, only adjust the elasticity of pipeline, the card pipe horizontal pole lacks fixedly after finishing adjusting moreover, and stability is relatively poor for it is fixed to be difficult to install the pipeline of different specifications in the device.
SUMMERY OF THE UTILITY MODEL
The utility model aims to: in order to solve the problem that the stability of the installation and the fixation of the pipeline is poor and the pipeline with different specifications is difficult to install and fix, the pipeline fixing device for water conservancy construction is provided.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a pipeline fixing device for water conservancy construction, includes bottom plate and clamp splice, the top both sides of bottom plate all are provided with the bolt, the top intermediate position department of bottom plate is fixed with first fixed plate, there is the second fixed plate top one side of first fixed plate through the hinge mounting, telescopic link and first spring are all installed to the inside of first fixed plate and second fixed plate, the draw-in groove has been seted up to one side of first fixed plate, the fixture block is installed to the bottom of second fixed plate, one side of fixture block is seted up flutedly, the internally mounted of recess has the second spring, the gag lever post that runs through to first fixed plate inside is installed to the one end of second spring.
Preferably, the second fixed plate is rotatably connected with the first fixed plate through a hinge, and the first fixed plate and the second fixed plate are both made of stainless steel materials.
Preferably, the clamping blocks are four in number, the four clamping blocks are all arc-shaped, and rubber pads are fixed on one sides of the four clamping blocks.
Preferably, the telescopic rod is located inside the first spring.
Preferably, the clamping block is matched with the clamping groove, and the limiting rod is located inside the second spring.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, by arranging the clamping block, the clamping groove, the second spring and the limiting rod, when the pipeline is installed and fixed, a worker can rotate the second fixing plate, the second fixing plate drives the hinge to rotate, so that the second fixing plate is closed towards the first fixing plate, the clamping block is clamped into the clamping groove, the limiting rod is contacted with the second fixing plate, the limiting rod stretches the second spring, after the clamping block is completely attached to the clamping groove, the second spring restores elasticity and pulls the limiting rod after being stretched, so that the limiting rod is inserted into the first fixing plate, and the first fixing plate and the second fixing plate are limited and fixed through the limiting rod, so that the pipeline is prevented from being installed and loosened, and the stability of the device is effectively improved;
2. according to the utility model, by arranging the telescopic rod, the first spring and the hinge, when pipelines with different specifications are installed, a worker can firstly turn the second fixing plate through turning the second fixing plate, so that the second fixing plate can rotate under the action of the hinge, the pipeline can be conveniently placed in the first fixing plate, the clamping blocks can support the pipeline, meanwhile, the pipeline extrudes the first spring and the telescopic rod, the second fixing plate is closed after the pipeline is placed, the pipeline is clamped and fixed through the four clamping blocks, and the first spring and the telescopic rod can restore elasticity and apply force to the direction of the pipeline after being extruded, so that the pipelines with different specifications can be stably clamped.
Drawings
FIG. 1 is a schematic front view of a base plate according to the present invention;
FIG. 2 is a schematic front sectional view of the bottom plate of the present invention;
fig. 3 is an enlarged view of the utility model at a in fig. 2.
In the figure: 1. a base plate; 2. a bolt; 3. a first fixing plate; 4. a hinge; 5. a second fixing plate; 6. a telescopic rod; 7. a first spring; 8. a clamping block; 9. a clamping block; 10. a card slot; 11. A groove; 12. a second spring; 13. a limiting rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art. The following describes an embodiment of the present invention based on its overall structure.
Referring to fig. 1-3, a pipeline fixing device for water conservancy construction includes a bottom plate 1, a bolt 2, a first fixing plate 3, a hinge 4, a second fixing plate 5, an expansion link 6, a first spring 7, a clamping block 8, a clamping block 9, a clamping groove 10, a groove 11, a second spring 12 and a limiting rod 13; bolt 2 is all provided with to bottom plate 1's top both sides, bottom plate 1's top intermediate position department is fixed with first fixed plate 3, second fixed plate 5 is installed through hinge 4 in top one side of first fixed plate 3, telescopic link 6 and first spring 7 are all installed to the inside of first fixed plate 3 and second fixed plate 5, draw-in groove 10 has been seted up to one side of first fixed plate 3, fixture block 9 is installed to the bottom of second fixed plate 5, recess 11 has been seted up to one side of fixture block 9, the internally mounted of recess 11 has second spring 12, the gag lever post 13 that runs through to first fixed plate 3 inside is installed to the one end of second spring 12.
Please refer to fig. 1-2, the second fixing plate 5 is rotatably connected to the first fixing plate 3 by a hinge 4, and the first fixing plate 3 and the second fixing plate 5 are both made of stainless steel, so that the second fixing plate 5 is rotated by the hinge 4 and then closed with the first fixing plate 3 to fixedly mount the pipeline; the clamp splice 8 is provided with four, and four clamp splice 8 all are the arc, and one side of four clamp splice 8 all is fixed with the rubber pad, can carry out the centre gripping through four clamp splice 8 to the pipeline of different specifications fixed.
Please refer to fig. 1-3, the retractable rod 6 is located inside the first spring 7, so that the retractable rod 6 can limit the first spring 7 to prevent the first spring 7 from deviating; the fixture block 9 is matched with the clamping groove 10, and the limiting rod 13 is located inside the second spring 12, so that the fixture block 9 can be conveniently inserted into the clamping groove 10 to fix a pipeline, and meanwhile, the first fixing plate 3 and the second fixing plate 5 are fixed through the limiting rod 13.
The working principle is as follows: firstly, when a worker installs a pipeline, the worker turns over the second fixing plate 5 to enable the second fixing plate 5 to rotate under the action of the hinge 4, then the pipeline can be placed inside the first fixing plate 3, the clamping blocks 8 support the pipeline, meanwhile, the pipeline extrudes the first spring 7 and the telescopic rod 6, after the pipeline is placed, the second fixing plate 5 is closed, the clamping block 9 is clamped into the clamping groove 10, meanwhile, the limiting rod 13 is contacted with the second fixing plate 5 and stretches the second spring 12 to move to one side, after the clamping block 9 is completely attached to the clamping groove 10, as the second spring 12 is stretched, the elasticity is restored and the limiting rod 13 is pulled, the limiting rod 13 is inserted into the first fixing plate 3, the first fixing plate 3 and the second fixing plate 5 are limited and fixed through the limiting rod 13, and then the pipeline is clamped and fixed through the four clamping blocks 8, because first spring 7 and telescopic link 6 will resume elasticity and to the direction application of force of pipeline after receiving the extrusion to can stabilize the centre gripping to the pipeline of different specifications, the staff alright fix bottom plate 1 through bolt 2 at last, just accomplished the fixed mounting of pipeline.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (5)
1. The utility model provides a pipeline fixing device for water conservancy construction, includes bottom plate (1) and clamp splice (8), its characterized in that: the top both sides of bottom plate (1) all are provided with bolt (2), the top intermediate position department of bottom plate (1) is fixed with first fixed plate (3), second fixed plate (5) are installed through hinge (4) in top one side of first fixed plate (3), telescopic link (6) and first spring (7) are all installed to the inside of first fixed plate (3) and second fixed plate (5), draw-in groove (10) have been seted up to one side of first fixed plate (3), fixture block (9) are installed to the bottom of second fixed plate (5), one side of fixture block (9) is seted up fluted (11), the internally mounted of recess (11) has second spring (12), gag lever post (13) that runs through to first fixed plate (3) inside is installed to the one end of second spring (12).
2. The pipeline fixing device for water conservancy construction according to claim 1, characterized in that: the second fixing plate (5) is rotatably connected with the first fixing plate (3) through a hinge (4), and the first fixing plate (3) and the second fixing plate (5) are both made of stainless steel materials.
3. The pipeline fixing device for water conservancy construction according to claim 1, characterized in that: the clamping blocks (8) are four, the four clamping blocks (8) are all arc-shaped, and rubber pads are fixed on one sides of the four clamping blocks (8).
4. The pipeline fixing device for water conservancy construction according to claim 1, characterized in that: the telescopic rod (6) is positioned inside the first spring (7).
5. The pipeline fixing device for water conservancy construction according to claim 1, characterized in that: the clamping block (9) is matched with the clamping groove (10), and the limiting rod (13) is located inside the second spring (12).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202121936994.XU CN216242652U (en) | 2021-08-18 | 2021-08-18 | Pipeline fixing device for water conservancy construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202121936994.XU CN216242652U (en) | 2021-08-18 | 2021-08-18 | Pipeline fixing device for water conservancy construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN216242652U true CN216242652U (en) | 2022-04-08 |
Family
ID=80981996
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202121936994.XU Withdrawn - After Issue CN216242652U (en) | 2021-08-18 | 2021-08-18 | Pipeline fixing device for water conservancy construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN216242652U (en) |
-
2021
- 2021-08-18 CN CN202121936994.XU patent/CN216242652U/en not_active Withdrawn - After Issue
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN211779399U (en) | Pipeline fixing device for building water supply and drainage | |
| CN111156349A (en) | Protection fixing device of pipeline for hydraulic engineering | |
| CN113417378A (en) | Fabricated steel structure anti-seismic support for building and use method thereof | |
| CN212001805U (en) | Curtain wall mounting and fixing device | |
| CN215445438U (en) | Fixing device for butt joint of gas pipelines | |
| CN215934775U (en) | Photovoltaic board support convenient to installation | |
| CN214754547U (en) | Fixing device of photovoltaic connector | |
| CN212226397U (en) | Water conservancy and hydropower engineering water supply and drainage pipe reinforced structure for building | |
| CN210490385U (en) | Wind power bus elastic support for different specifications | |
| CN210062720U (en) | Adjustable rotating base | |
| CN213243488U (en) | Novel cable suspension bracket | |
| CN213111919U (en) | Water conservancy construction pipe laying pay-off convenient to construction | |
| CN219065821U (en) | Pipeline protection device | |
| CN214889394U (en) | Municipal administration plumbing construction pipeline fixing device | |
| CN218441042U (en) | Hydraulic engineering pipe connection alignment device | |
| CN220102298U (en) | A water conservancy pipeline bearing structure for hydraulic engineering | |
| CN221509016U (en) | Cable support with wind-resistant and shock-resistant performances | |
| CN221328555U (en) | Wall bushing assembly with high-voltage shielding | |
| CN223782253U (en) | A seismic-resistant flexible connection device for building drainage pipes | |
| CN214699746U (en) | Adjustable width is convenient for fixed antidetonation support | |
| CN214999841U (en) | Quick detach type antidetonation leg joint spare | |
| CN215942675U (en) | Stainless steel connector positioning fixture | |
| CN219611296U (en) | Intensive bus duct with installing support | |
| CN220910688U (en) | Wall-hanging device for building water supply pipeline | |
| CN212429984U (en) | Supporting structure of pvc feed pipe |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20220408 Effective date of abandoning: 20220803 |
|
| AV01 | Patent right actively abandoned |
Granted publication date: 20220408 Effective date of abandoning: 20220803 |
|
| AV01 | Patent right actively abandoned | ||
| AV01 | Patent right actively abandoned |